Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

Mar 16, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

Understanding Well Construction and

Surface Footprint

Page 2: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

2

Well Site Planning & Preparation Drilling Casing & Cement Completion & Stimulation Site Maintenance

Well Construction Timeline

Stage 1: Planning and Preparation• AcquireSurfaceLease

Agreement• Determinationofmulti-wellpad

orsinglewellpadrequirements• Informstakeholdersofthe

proposedwellconstruction• Evaluationofsourgas

probability;thiswillinfluenceequipmentlocation,etc.

• AcquireWelllicense(s)• ObtainOperation(s)permits• SiteExcavationandPreparation• Thepreparationofthelocation

wouldincludethedrillingofinitial“rathole/mousehole”andplacementofconductorstring/pipe

• Identifysafetyprocedures,environmentalandregulatoryrequirements

• Outlinetheemergencyresponseplans/procedures

Stage 2: Drilling• Drillingrigandequipment

mobilization(ifnotusedforSurfaceHoledrilling)

• Drillingfluids/mud–testingandrecycling

• BlowOutPreventer(BOP)installation

• Surface,andintermediate(insomecases)casingcementedintothewellbore

• Drillcuttingsamplestakenandanalyzed(ongoingthroughoutthedrillingprocess)

• Wellboredrilledtototaldepth(vertical,directionalorhorizontal)

• Potentialreservoir(s)identifiedandevaluatedusinggeophysicalloggingtechniques

Most stages of well construction include stakeholder dialogue. Consultation with stakeholders is the responsibility of the individual project proponent.

Page 3: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

3

Well Site Planning & Preparation Drilling Casing & Cement Completion & Stimulation Site Maintenance

Well Construction Tim

eline

Stage 3: Casing and Cement• Productioncasing

loweredintothewellandcementedintoplace

• Diagnostictoolsareutilizedtoensurewellboreintegrity

Stage 4: Completion & Stimulation• Drillingrigismovedoffsiteand

permanentwellheadinstalled• Stimulationequipmentismoved

intoplace• Reservoirhorizonsare

perforatedandthenstimulated• Stimulationequipmentismoved

offsite• Producingzonesaretested• Withthedrillingandcompletion

equipmentdemobilized,thesurfacefootprintisdramaticallyreduced.

Aftercasing,cementingandwellstimulationactivitiesarecompleted,andassumingthewellissuccessful,therewillbeadditionalconstructionactivityonsitetoinstallsurfacefacilitiesifrequired,tiethewellintothepipelineinfrastructure,andcontourandreclaimpartoftheleasesite.

Thisinformationbookletdiscusseswellconstructionpracticesonly.Formoreinformationaboutthecompletionsprocess,includingHydraulicFracturingorotherstimulationtechniques,pleasereferenceUnderstanding Hydraulic FracturingorUnderstanding Water and Unconventional Resourcesatwww.csur.com

Page 4: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

4

Well Site Planning & Preparation

Single vs. Multi-well padAstandardsinglewellleasesiteforconventionaloilorgaswilltypicallyaffectasurfaceareameasuring100metresby100metres.Theleasesitewilltypicallyholdthedrillingrigandadditionalequipmentalongwithsupervisoryaccommodationandmaterialstorage.Ifmultiplewellsfromasinglepadareplanned,thesurfaceareaoftheleasesitewouldbelarger;insomecasesasmuchasdoublethesize.(100metresby200metres.)Whileamulti-wellpadsitewillhavealargersurfacearea,thecumulativesurfaceimpactofthetotalnumberofwellsdrilledintheprojectareawillbesmaller.Padsitesallowmultiplewellstobedrilledfromonesurfacelease,therebyreducingthetotalsurfacearearequiredforoilandgasdevelopment.Oncedrillingiscompletedandthewell(s)is/areconnected/tied-intothepipeline,aportionoftheleaseareacanbereclaimedtominimizesurfacedisturbance.

Surface Lease Site AgreementAsurfaceleasesiteagreementgrantsacompanyaccesstodrillawell(s)onlandthatisheldeitherprivately,bythecrownorbyaFirstNation.Theagreementalsospecifiesanyconditionsrelatingtothecommitmentsandresponsibilitiesofboththecompanyandthelandowner,includingthepaymentofcompensationbythecompanytothelandowner.

License & PermitFederaland/orProvincialandMunicipallicensesandpermitsarerequiredforleasesiteconstruction;projectspecificrequirementswillvarydependingonthelocationofthewell.

Excavation & LevelingToprepareforinitialdrilling,theleasesiteisleveled,ifnecessary,withabulldozerand/orgrader,withcarefulconsiderationgiventoburiedpipelinesandutilities,aswellasproximitytosurfacewaterfeatures.Thescaleanddurationofleasesitepreparationissite-specific.Onsomedrillingsites,acellarmaybeexcavated.Thisiswherethemainboreholeistobedrilled.Areservepitandsettlingpitsmaybeexcavatedandareusedforwaterordrilling fluid(mud)discharges.Oftenthesoillayersareseparatedforbettersoilconservation.Uponcompletionofthedrilling,thesoilscanthenberestoredtotheiroriginallocation.

Excavated lease site

Page 5: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

5

Well Site Planning &

Preparation

Drilling of the “Surface Hole” , etc. Aspartofanyoilorgaswell,aconductorholeandsurfaceholearerequiredaspartoftheentirewellbore.Commonly,aratholeand/oramouseholearedrilledpriortotheactualdrillingofthewelltoreservoirdepth.Aconductorhole,alsoreferredtoasa“starterhole”isalargediameterhole,linedwithpipewhichvariesindepth,andisusedtohousetheBOP(BlowOutPreventer).Aratholeisaholelyingbelowtherigfloor,30to35feetdeep,linedwithcasingintowhichthekellyisplacedwhenhoistingoperationsareinprogress.Amouseholeisashallowboreholeundertherigfloor,usuallylinedwithpipe,intowhichjointsofdrillpipearetemporarilyplacedduringdrillingoperations.Theseareeitherdonebytheportablerigthatdrillstheconductorhole,orcanbedonebytheprimaryrigafterrigging-up.Thesurfaceholeisdrilledandcasedtoisolatepotentialshallowgroundwateraquifersfromthewellbore.

Safety Procedures & Emergency Response PlansAlldrillingsitesaretypicallyclassifiedaccordingtoareasofpotentialand/oractualexposuretoHydrogen Sulfide (H2S).H2Sisanextremelytoxicandpoisonousgas.Employerswilltakespecialprecautionswhenchoosingequipment.WellsiteemployeesaretrainedtorespondaccordinglyshouldtheyencounterH2S.Underthesecircumstances,allemployeesarerequiredtowearspecially

approvedmasksandairsupplyequipment.Therecommendationsandemployeeinstructionwillvarydependingonthetypeofarea,aswilltheemergencyresponseplans(ERPs)thatareinplace

Environmental and Regulatory ConsiderationsProvincialandfederalregulations,whichgoverntheoilandgasindustry,havebeeninplaceformanyyears.Theyhavebeenestablishedtoensurethatboththepublicandtheenvironmentareprotectedthroughoutexploration,developmentandproductionofhydrocarbonresources.Regulationsarealsocontinuallyreviewedandrevised,asrequired,inresponsetoadvancementsinindustrytechnologiesandthetechniquesemployedtoextracttheresource.

Thefundamentalregulatorybasicsofsurfaceandgroundwaterprotection,wellboreintegrity,leaseconstruction,forexample,applytoalltypesofhydrocarbondevelopments;includingunconventionalresources.Similarly,theuseofwaterfordrillingandcompletionactivitiesrequireapprovalsorpermitsfromappropriateauthorities.

Prior to acquisition of the surface lease site, a number of different steps are required. Requirements will vary depending on the location of the proposed development and jurisdictional prerequisites.

Page 6: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

6

Drilling

Equipment Assembly and PlacementAsite,anditsaccessroad,mustaccommodatealargenumberoftemporaryandsemi-permanentstructuresandtanks,allbroughtinbytruck.Atanewly-prepareddrillsite,thestabilityofthewellpadisnecessarytosupportthedrillingrigandauxiliaryequipmentrequiredonsite.Insomelocalitieswherethegroundisunstablerigmatsarecommonlyused.Afterthewellpadisproperlypreparedthedrillingrigisthenunloadedandassembled.

Therearemanyrigdesigns,andthisbookletdoesnotcovereachtypeindividually.Duringassemblyoftherig,someequipmentmaybehandledandsetwithcrane,riguptrucks,orforklift,dependingonthesizeoftherig.

Thesubstructureisassembled,pinnedtogether,leveled,andtiedintootherrigcomponents.Oncethesubstructureissetinplace,installingthepowersystemandraisingthederrickbegins.Mostdrillingrigsarepoweredbyelectricitythatisdeliveredbyonsitedieselpoweredgenerators.

Whileonecrewfinishespreparingtherigfloor,anothercrewmightberiggingupthecirculatingsystem.Themudtanksandmudpumpsaresetintothepredeterminedlocation.

Oncealladditionaldrillingandauxiliaryequipmentaresetintoplaceafinalinspectioncanbedone.Theentireprocessofrigging-upcantakeoneortwodays.Wheremultiplewellsaredrilledfromasinglepad,commonlythedrillingrigwillhavetheabilitytomovetothenextlocationontheleasewithminimaldisassembly/reassembly.

Drilling boreholes deep into the ground and preparing them to produce oil and gas is a highly technical and specialized process. Throughout the operation, custom-designed fluids fulfill many different roles. While drilling, these include: lubricating the drill bit; circulating drilled-up rock out of the hole; containing formation fluids within the hole; and facilitating operation of sophisticated formation evaluation tools. Fluids may be water-based, oil-based, or synthetic.

Source: Shale Exploration

Page 7: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

7

Drilling

Core SamplesInsomecases,acoresampleoftheformationistakenfortesting.Aspecialcorebarrelisloweredtothebottomonthedrill stringandisrotatedtocutacorefromtheformation.Thiscoreisbroughttothesurfaceandexaminedinalaboratory.Somecoreorchipanalysismayoccuratthetemporaryon-sitelabwhileothercoresamplesaresealedandshippedtospecializedlabsforin-depthreservoircharacteristicandcoreanalysis.

Vertical vs. HorizontalAlthoughhistoricallyoilandgaswellshavebeendrilledvertically,newtechnologieshavemadeitpossibleforwellstobedrilledhorizontally.Thepurposeofdrillingahorizontalwellistoincreaseamountofreservoirrockthatisintersectedfromthewellbore.Horizontaldrillingfirstentailsdrillingaverticalwelltoapredetermineddepthabovethereservoir.Thewellisthendrilledatanincreasingangleuntilitintersectsthereservoirintervalinahorizontalplane.Oncehorizontal,thewellisthendrilledtoaselectedlength,whichcouldextendtoasmuchas3500m.Thisportionofthewell,calledthehorizontalleg,allowssignificantlyincreasedcontactofthewellborewiththereservoircomparedtoaverticalwell.Uponcompletionofdrilling,production casingiscommonlyplacedintothewellbore.Aperforating

gunisloweredintothewellboreandplacedinaselectedintervalwithinthehorizontalleg.Itisthenactivatedtocreateaseriesofholesinthecasingtoallowcommunicationbetweenthereservoirandthewellbore

Source: Kocurek Industries

Example of a core sample. Typically 12

inches in length and 8 inches in

diameter. The pitted surface

represents visible pore space.

Step 1Drillverticallyuntilthewellbore

reachesapointabovethetargetedreservoir.

Step 2“Kickoff”andbegintodrillatan

increasingangleuntilthewellborerunshorizontallythroughthe

targetedreservoir.

Step 3Drillhorizontallytodesiredlength.

Source: Kocurek Industries

Page 8: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

8

Casing and Cement

Wellconstructionactivitiesareengineeredtoensurethatgroundwaterbearinghorizonsareisolatedfromthewellbore.Thisprocesseliminatesthepotentialforcommunicationsandpossiblecontaminationduringsubsequentdrilling,completionandfinalproductionoperations.Toprovidetheprotectionnecessary,usuallyanumberofstepsarecompletedtoisolatethewellborefromthesurroundingrockintervalsthathavebeenpenetratedduringthedrillingprocess.

Step 1 Oncetheconductorpipehasbeenputinplacethesurfaceholeisdrilledtothebaseofgroundwaterprotection,asdefinedbytheregulatorybody.Surfacecasingisloweredintotheholeandcementedinplace.Atthisstage,abarrierofsteelANDcementiscreatedtopreventthecontaminationofpotentialshallowgroundwateraquifersaswellprovidewellborestabilityfortheremainingdrillhole.

Step 2 Thecementisallowedtosetpriortocontinuationofdrillingandinsomejurisdictions,a“cementbond”geophysical logisruntodeterminetheintegrityofthecementthatsurroundsthesurfacecasing.

Step 3 Thewellboreisthendrilledtoitstotaldepth.Insomecases,dependingonthetotaldepthofthewellortheorientation(horizontalor

vertical)anintermediatesetofcasingmaybeinsertedintothewellboreandcementedinplace.Theprocessofinstallationandcementingofintermediateandproductioncasingissimilartosurfacecasing.Thedecisiontoinstalladditionalcasingisbaseduponexpectedreservoirconditionsaswellascompletionandstimulationtechniquesthataretobeused.Thissecond(orthird)setofsteelcasingprovidesadditionalisolationofthehydrocarbonzonefrompotentialshallowaquifers.

Itisimportanttorecognizethattheoilandgasindustryusestechnologicallyadvancedcementtoconstructthewellbore.Concreteusedforsidewalksisverydifferentthanthecementusedtosecuresurface,intermediateandproductioncasinginplace.Cementsaretailoredtoformation,temperature,depth,completiontechniqueandotherfactors.

CSUR Casing Model

Page 9: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

9

Casing and Cement

Itisimportanttoensurethatgroundwaterisprotected,notonlyinthefirstfewstagesofwellboreconstruction,butalsoduringthefulllifecycleofthewell.Thisisaregulatedprocesswherebytheownerofthewellisrequiredtoensurethatconditionsdownholedonotdegradethewellboreintegrityovertime.Possiblewellintegrityconcernscouldariseasaresultofpoorcementbond,casingshift,corrosionofcasingovertime,etc.Thereareseveraldiagnostictoolsutilizedinindustrytohelppromotewellboreintegritysuchascathodic protection,chemicaltreatmentandproductionpackers.Therearealsoseveraltoolstoidentifywellboreintegrityissuesafterthey’veoccurred,forexample,corrosionlogs,cementbondlogs,productionlogsandcasingpatches.

Gas-rich shale

SandstoneSandstone

LimestoneLimestone

HYDRAULIC FRACTURING

Shallow groundwater aquiferDeep groundwater aquifer

Protective steel casing:Steel casing and

cement provide wellcontrol and isolate

groundwater zones

Municipal water wellPrivatewell

Surface gas-well lease

Horizontal bore

Induced shale fractures

Note: Buildings andwell depth not to scale

1,000m

Surface

2,000m

2,300m

1,500m

Source: Canadian Natural Gas

Page 10: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

10

Completions and Stimulation

Oncethewellhasbeendrilledandcaseditisnowreadytobestimulated.Thereareavarietyofstimulationprocesses,themostcommonofwhichbeinghydraulicfracturing.Followingthestimulationofthepotentialzone(s)thewellisreadytobeequippedforproduction.

Whenthewellisready,hydrocarbonscanbeproducedeitherthroughtheproductioncasingorthroughtubinginserteddowntheproductioncasing.Thetypeofhydrocarbonsproduced(oilorgas)willdeterminethetypeofproductionstringused.

Iftubingistobeused,thejointsarelinkedtogetherwithcouplingstomakeupatubingstring.Tubingisrunintothewellmuchthesameascasing,buttubingissmallerindiameterandisremovable.Coiledtubingcanalsobeusedthuseliminatingtheneedfortongs,slips,orelevators,whichmakesiteasiertoinstall.Priortoproductionflow,downholeisolationequipmentsuchaspackersorplugsareremovedanddrillingfluidisflushedfromthewellbore.Hydrocarbonscannowflowfreelytothewellhead.

Ifthewelldoesnotflowonitsown,artificialliftsystemsmayneedtobeconsidered,suchasabeam pumping unit.

Beam Pumping Units. Source: United States Department of Labour

Coil Tubing UnitSource: Schlumberger

Page 11: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

11

Key Personnel

Completions and Stim

ulation

Thedrillingofanoilorgaswellrequiresanumberofhighlytrainedprofessionals,bothintheofficeaswellasinthefield.Keypersonnelmayincludebutarenotlimitedto:

Drilling Engineersdesignandimplementprocedurestodrillwellsassafelyandeconomicallyaspossible,whileatthesametimeprotectingthehealthandsafetyofworkersandotherpersonnelinaccordancewithestablishedregulations.

Surface Land Menensurethetimelyandaccurateacquisitionofsurfacerights;coordinatingtheeffortsofSurveyorsandBrokers.TheyrepresentthedrillingcompanyandinteractextensivelywithinternalBusinessUnits,publicandregulatorystakeholders.TheyalsomakesuresurfaceacquisitionandconsultationcompliancemeetRegulatoryrequirements.

Surveyorsdeterminethepreciselocationoftheplannedwellthesurroundingleasesite.Heorsheislicensedbytheprovinceandworkonbehalfoftheoilandgascompany

AConstruction Engineerperformsengineeringworkinthefieldtosupportwellconstructionandhelpsintheplanningandexecutionofconstructionworkinthefield.

ContractorsorSub-Contractorsareemployedbytheoilandgascompanytoperformworkonsitethroughoutvariousstagesduringwellconstruction.Thedrillingcrew,cementers,welltesters,waterhaulersandweldersareallexamplesofcontractorsthatworkontheconstructionsite.

Well site geologistsmonitortheprogressofthewellasitisdrilledtoidentifythepresenceofoilandgasinthesubsurface.Theyalsoinformtherestofthedrillteamwhenthewellhasreachedthereservoirtarget.

Page 12: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

12

Site Maintenance

FootprintCommercialproductionofunconventionalresourcesoftenrequiresnumerouswellstointersecttheoilandgasbearingformation(s)inordertobeeconomic.Thetechnologiesofhorizontaldrillingandmulti-stagefracturestimulationcoupledwithmultiplewellsfromasinglepadhaveenabledthecumulativesurfacefootprinttobeminimized.

Companiescandrillmultiplewellsfromasingle-padlocationandextractthehydrocarbonsfromasmuchas10sqkm.Whilethesizeofamulti-wellpadisslightlylargerthanaregularoilandgasleasethecumulativefootprintforadevelopmentismuchsmallerthanitwouldbewithconventionaldevelopmentusingverticalwells.Feweraccessroadsandtheconcentrationoffacilitiesandpipelineswithinthepadfootprintminimizethesurfacedisturbanceofadevelopment.

Duringtheactualdrillingandhydraulicstimulationproceduresforunconventionalresourcedevelopment,thereisaconcentrationofheavyequipmentonsite.Waterrequirementsforbothdrillingandfracturingcanbelargeandcommonlyalinedreservoirpitortanksareusedforstorage.Insomecases,ifthewatersourceisnearby,temporarypipelinesareconstructedtotransportthewaterratherthanusingtankertrucks.Uponcompletionofthedrillingactivities,alloftheheavyequipmentisremovedandpermanentsurfacefacilitiesareconstructed.Inmostcases,thefootprintofthewellsandsurfacefacilitiesismuchsmallerthantheoriginaldrillingfootprint

Construction vs. ProductionOncethewelliscompletedandfullymovedthroughtoproduction,thefootprintoftheleasesiteisgreatlyreduced.

Multi-well pad during construction and completions activity

Horizontal multi-well pad in productionSource: Trident Exploration

Page 13: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

13

Site Maintenance

Well ControlProperlytrainedpersonnelareessentialforwellcontrolactivities.Wellcontrolconsistsoftwobasiccomponents:anactivecomponentconsistingofspecializeddrillingfluidsandpressurecontroltominimizethepotentialinflowofhydrocarbonsorgroundwaterfluidsandapassivecomponentthatconsistsofmonitoringequipmentthatrespondsifainfloworpressurekickoccurs.TheBlowoutPreventer(BOP)isanintegralpartofthemonitoringandwellcontrolequipment.

Thefirstlineofdefenseinwellcontrolistohavesufficientdrillingfluidpressureinthewellbore.Inthesubsurface,undergroundfluidssuchasgas,wateroroilareunderpressure(formation pressure).Thecolumnofdrillingfluidinthewellcreatesapressure(mud pressure)thatcounteractstheformationpressure.Iftheformationpressureisgreaterthanthemudpressure,thereisthepossibilityofablowout.

Theblowout preventer (BOP),accumulator andchoke manifold areinstalledbytherigcrewafterthesurfacecasingissetandcemented.Thechokelinevalveisusedtoredirectthemudfromthewellboretothechokemanifoldshouldapressureeventoccur.Ifaneventdoesoccur,theBOPisactivated,containingthepressureandavoidingablowout.

TheBOPs,accumulators,andchokemanifoldneedtobeproperlymaintainedandaretestedonaregularbasis

Blowout Preventer (BOP)

Choke Manifold

Page 14: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

14

Glossary and Terminology

Accumulator:Adeviceusedinahydraulicsystemtostoreenergyor,insomeapplications,dampenpressurefluctuations.Wellpressure-controlsystemstypicallyincorporatesufficientaccumulatorcapacitytoenabletheblowoutpreventertobeoperatedwithallotherpowershutdown.

Aquifers:Anywater-bearingformationencounteredwhiledrilling.Drillersoftenareconcernedaboutaquifersandarerequiredtotakespecialprecautionsinthedesignandexecutionofthewellplantoprotectfreshwateraquifersfromcontaminationbywellborefluids.

Beam Pumping Unit:Anartificial-liftpumpingsystemusingasurfacepowersourcetodriveadownholepumpassembly.

BOP (Blow Out Preventer):Alargevalveatthetopofawellthatmaybeclosedifthedrillingcrewlosescontrolofformationfluids.Byclosingthisvalve(usuallyoperatedremotelyviahydraulicactuators),thedrillingcrewcanregaincontrolofthereservoir.

Casing:Large-diameterpipeloweredintoanopenholeandcementedinplace.Thewelldesignermustdesigncasingtowithstandavarietyofforces,suchascollapse,burst,andtensilefailure,aswellaschemicallyaggressivebrines.

Cathodic Protection:Atechniqueusedtominimizetherateofcorrosionofastructure.Itdoesnoteliminatecorrosion,ittransferscorrosionfromthestructureunderprotectiontoaknownlocationwhereartificialanodes(platesormetalbars)areplacedandcouldbereplacedeasily.

Cellar:Adug-outarea,possiblylinedwithwood,cementorverylargediameterpipe,locatedbelowtherig.Thecellarservesasacavityinwhichthecasingspoolandcasingheadreside.Onsmallerrigs,thecellaralsoservesastheplacewherethelowerpartoftheBOPstackresides.

Cement Bond Logs:Arepresentationoftheintegrityofthecement,usedincasingofthewell.

Choke Manifold:Asetofhigh-pressurevalvesandassociatedpipingthatusuallyincludesatleasttwoadjustablechokes,arrangedsuchthatoneadjustablechokemaybeisolatedandtakenoutofserviceforrepairandrefurbishmentwhilewellflowisdirectedthroughtheotherone.

Drill Bit:Thetoolusedtocrushorcutrock.Everythingonadrillingrigdirectlyorindirectlyassiststhebitincrushingorcuttingtherock.

Drilling Fluid:Anyofanumberofliquidandgaseousfluidsandmixturesoffluidsandsolids(assolidsuspensions,mixturesandemulsionsofliquids,gasesandsolids)usedinoperationstodrillboreholesintotheearth.

Drill String:Apipemadeoflengthsofsteeltubingthatisattachedtothedrillingtoolandrotatesduringdrilling.Thedrillingfluidpassesthroughthecentreofthedrillstringthroughthebitwhichisattachedattheend.

Page 15: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically

15

Glossary and Term

inology

Formation Evaluation Tools:Thetoolsusedforthemeasurementandanalysisofformationandfluidproperties.Formationevaluationisperformedtoassessthequantityandproducibilityoffluidsfromareservoir.Formationevaluationguideswellsitedecisions,suchasplacementofperforationsandhydraulicfracturestages,andreservoirdevelopmentandproductionplanning.

Formation Fluids:Anyfluidthatoccursintheporesofarock.Stratacontainingdifferentfluids,suchasvarioussaturationsofoil,gasandwater,maybeencounteredintheprocessofdrillinganoilorgaswell.Fluidsfoundinthetargetreservoirformationarereferredtoasreservoirfluids.

Formation Pressure:Thepressureoffluidswithintheporesofareservoir,normallyhydrostaticpressure,orthepressureexertedbyacolumnofwaterfromtheformation’sdepthtosealevel.

Geophysical Logs:Alogofelementalconcentrationsfromwhichthegeochemistryoftheformationmaybederived.

Hydrogen Sulfide (H2S):AnextraordinarilypoisonousgaswithamolecularformulaofH2S.Atlowconcentrations,H2Shastheodorofrotteneggs,butathigher,lethalconcentrations,itisodorless.H2Sishazardoustoworkersandafewsecondsofexposureatrelativelylowconcentrationscanbelethal,butexposuretolowerconcentrationscanalsobeharmful.TheeffectofH2Sdependsonduration,frequencyandintensityofexposureaswellasthesusceptibilityoftheindividual.

Kelly:Alongsquareorhexagonalsteelbarwithaholedrilledthroughthemiddleforafluidpath.Thekellyisusedtotransmitrotarymotionfromtherotarytableorkellybushingtothedrillstring,whileallowingthedrillstringtobeloweredorraisedduringrotation.

Mud Pressure:Thepressureofthecolumnofdrillingfluidinthewellbore.

Packer:Adevicethatcanberunintoawellborewithasmallerinitialoutsidediameterthatthenexpandsexternallytosealthewellbore.

Perforating Gun:Adeviceusedtoperforateoilandgaswellsinpreparationforproduction.

Rigging-up:Tomakereadyforuse.Equipmentmusttypicallybemovedontotherigfloor,assembledandconnectedtopowersourcesorpressurizedpipingsystems.

Rig Mat:Aportableplatformusedtosupportequipmentforconstructionandresource-basedactivitiesincludingdrillingrigs,camps,tanks,helipads,etc.Italsoincludesastructuralroadwaytoprovidepassageoverunstableground,pipelinesandmore.

Page 16: Understanding Well Construction and Surface …...4 Well Site Planning & Preparation Single vs. Multi-well pad A standard single well lease site for conventional oil or gas will typically