The Project Managemet Triangle (Triple Constraint) Creating a Project Priority Matrix J Scott Christianso
Jan 25, 2017
The Project Managemet Triangle (Triple Constraint)
Creating a Project Priority Matrix
J Scott Christianson
The PM TriangleTime Cost
Scope
The PM TriangleTime Cost
Scope
Project Priority Matrix
Accept Constrain Enhance
Time
Cost
Scope
Enhance = BetterBetter = More Features,
Better Specs
Project Priority Matrix
Accept Constrain Enhance
Time
Cost
Scope
Project Priority Matrix
Accept Constrain Enhance
Time
Cost
Scope
Enhance = Better
Better = Lower Costs
Project Priority Matrix
Accept Constrain Enhance
Time
Cost
Scope
Enhance = Better
Better = Less Time
The PM TriangleTime Cost
Scope