Top Banner
UMAC data call page 1 of 16 Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling Center NOAA / NWS / NCEP [email protected]
16

UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

Dec 24, 2015

Download

Documents

Harvey Morrison
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 1 of 16Global Ensemble Forecast System - GEFS

Global Ensemble Forecast System

Yuejian ZhuEnsemble Team Leader, Environmental Modeling CenterNOAA / NWS / NCEP

[email protected]

Page 2: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 2 of 16Global Ensemble Forecast System - GEFS

Wh

ole

A

tmo

sph

ere

M

od

el

Unified Global Model

Application=

Ensemble+

Reanalysis+

Reforecast

NGGPSUnified Global Coupled Model

“GFS” “GEFS” “CFS”

Actionable weather

Week 1 through 4-6

Seasonal & annual

1 y 2 y 4 y Update cycle

3 y 20-25 y 1979 - present Reanalysis

6h 6-24h ??? cycling

WCOSS WCOSS WCOSS ? where

Page 3: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 3 of 16Global Ensemble Forecast System - GEFS

Current Status of GEFS

• Initial analysis/perturbations– GFS/GSI analysis– BV-ETR (Breeding Vector – Ensemble Transform with Rescaling)

• Toth, Z., and E. Kalnay, 1997: Ensemble forecasting at NCEP and the breeding method. Mon. Wea. Rev., 125, 3297–3319.

• Wei, M., Z. Toth, R. Wobus, and Y. Zhu, 2008: "Initial Perturbations Based on the Ensemble Transform (ET) Technique in the NCEP Global Operational Forecast System" Tellus 59A, 62-79

• Model– GFS model (see GFS reforences)

• Relocation– TS relocation since 2005

• Liu, Q., S. J. Lord, N. Surgi, Y. Zhu, R. Wobus, Z. Toth and T. Marchok, 2006: Hurricane Relocation in Global Ensemble Forecast System, Preprints, 27th Conf. on Hurricanes and Tropical Meteorology, Monterey, CA, Amer. Meteor. Soc., P5.13.

• Stochastic physics– STTP (stochastic total tendency perturbation) since 2010

• Hou, D., Z. Toth, Y. Zhu, W. Yang and R. Wobus, 2012: A Stochastic Total Tendency Perturbation Scheme Representing Model- Related Uncertainties in the NCEP Global Ensemble Forecast System, Submitted to Tellus-A (Dec. 2010)

• Configuration– 20+1 members, four times per day, out to 16 days.

Page 4: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 4 of 16Global Ensemble Forecast System - GEFS

GEFS Upgrade (Q4FY15)

V10.0.0 (OPR) V11.0.0 (PARA)

GFS Model Euler, 2012 Semi-Lagrangian, 2015

Resolution 0-192 h T254 (52km) L42 (hybrid) TL574 (34km) L64 (hybrid)

Resolution 192-384 h T190 (70km) L42 (hybrid) TL382 (52km) L64 (hybrid)

Computational Cost105 nodes (Integration + post-process)

310 nodes 1st segment250 nodes 2nd segment

Execution time 55 min35 min 1st segment30 min 2nd segment

Output resolution 1O x 1O 0.5O x 0.5O for 0-8 days 1O x 1O the rest

Output frequency 6h 3h the first 8 days; 6h the rest

Page 5: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 5 of 16Global Ensemble Forecast System - GEFS

GEFS Upgrade (Q4FY15)

• Moving from BV-ETR approach to EnKF– A major scientific shift

• Unification DA and Ensemble Generation– Direct link to the hybrid 3D-Var EnKF DA system

• Perturbations are 6h forecasts EnKF with adjustments:– Tropical Storm Relocation– Centering of the perturbations on the ensemble control analysis

• Stochastic perturbation (STTP) upgrade– Fine-tune amplitude for changes in model and perturbation

method– Turn off surface pressure perturbations for tropical

• to reduce the spread growing of geopotential height

Page 6: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 6 of 16Global Ensemble Forecast System - GEFS

GEFS Upgrade (Q4FY15)

6

685 cases

Northern Hemisphere 500hPa Geopotential

Height

77%

9.52d

9.20d

75%

Summary from nearly 2 years retrospective runs:

1. GEFSv11 improves forecast skill (60%) about 8 hours

2. GEFSv11 enhances AC score from 75% to 77% for day-7 forecast

T2m for Northern American

With bias correction, GEFSv11 reduces

RMS error for all leads

Summer precipitation for CONUS

Improve reliability

Page 7: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 7 of 16Global Ensemble Forecast System - GEFS

00UTC

Opr: T254L42(55km)

Para: T574L64(33km)

06UTC

Thick blue: ensemble

mean

Bimodality?

Sandy

Ini: 20121022; Fcst: 8-day

Page 8: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 8 of 16Global Ensemble Forecast System - GEFS

GEFS Short-term Plan

• Initial perturbations– Use EnKF analysis directly, not 6-hour forecasts

• Model– GFS model with tuning parameters for lower resolution

• Relocation– TS relocation with tuning TS amplitude of perturbations

• Stochastic physics– Introduce well-established stochastic tendency perturbations

• SKEB, SPPT and SHUM

• Configurations– 20+1 members, four times per day, out to 16 days.– Continue to investigate the benefits from different ensemble

membership (size)

Page 9: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 9 of 16Global Ensemble Forecast System - GEFS

GEFS Long-term Plan

• Toward unified global system– Full coupled system

• Uniform resolution– Consider uniform resolution after introduce high resolution global

ensemble for weather (out to 7-10 days)

• Ensemble size (or membership)– Continue to investigate the benefits of different ensemble membership

• Cover week-1, week-2, week 3&4 and monthly forecast– See slides (#10-15) for GEFS extend forecast– Introduce land surface uncertainties (perturbations)– Introduce ocean uncertainties (perturbations)

• Upgrade every 2 years• 20-25 years reanalysis and GEFS reforecasts for every

upgrade.

Page 10: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 10 of 16Global Ensemble Forecast System - GEFS

Global Ensemble Forecast System

Extend to 35 days (experiments)

Yuejian ZhuEnsemble Team Leader, Environmental Modeling CenterNOAA / NWS / NCEP

[email protected]

Page 11: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 11 of 16Global Ensemble Forecast System - GEFS

GEFS Extend Forecast• Short term plan (1-2 years)

– Atmospheric model only– Introduce SST forcing to assimilate MJO and others– Ocean and land surface perturbations

• In testing – may not include in short-term implementation plan– Stochastic physics

• Will use the same stochastic physic scheme as GEFS 0-16 day forecast.– Configurations

• 20+1 members, twice per week, from 16 days to 35 days.

• Long term plan (3-5 years)– Unified global forecast system– Fully coupled system

• Atmosphere-Ocean-Land-Ice-Wave-Aerosol – Initial perturbations

• EnKF DA for atmosphere and ocean– Model uncertainties

• Stochastic physics– Configurations

• 20+1 members (?), uniform resolutions, once per day, out to 45 days

Page 12: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 12 of 16Global Ensemble Forecast System - GEFS

GEFS Extend Forecast

• Experiments– Period: Sept. 1st 2013 – Feb. 28th 2014 (6 months)

• Weak MJO period– GEFS v11 (2015)

• 20+1 members, 33km for day 0-8, 50km for day 8-16, 70km for day 16-35– Three different configurations have been tested

• CTL – default GFS/GEFS setting – start with RTG SST analysis, relaxed to climatology (90 days e-folding)

• RTG – using RTG analysis forcing GEFS every 24 hours (AMIP)• CFS – using CFSv2 predictive SST forcing GEFS every 24 hours)

– Two additional configurations are on going• CFS* - using CFSv2 predictive SST (bias corrected) anomaly forcing GEFS

every 24 hours• Full coupling with MOM4 (or MOM6)

– Evaluations• Tropical – MJO, precipitation• Extratropical – 500hPa height, surface temperature and precipitation• Extreme weather patterns – Blocking, polar vortex

Page 13: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 13 of 16Global Ensemble Forecast System - GEFS

1. RTG-SST (AMIP) run has good MJO forecast skills2. CTL-SST runs has less MJO forecast skills for first 2 weeks

WH-MJO fcst skills for GEFS(6 months average)

Page 14: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 14 of 16Global Ensemble Forecast System - GEFS

Evolution of error difference (500hPa height)5-day running mean (09/01/2013 – 2/28/2014)

Page 15: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 15 of 16Global Ensemble Forecast System - GEFS

Lea

d d

ay =

19

Lea

d d

ay =

23

RMSE SPREAD

RMS error and spread distributions for 500hPa height of CTL-SST20130901 – 20140228 (6 months) 5-day running mean

For different lead times

Uncertainty is Well represented

Over dispersion ?

Page 16: UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.

UMAC data call page 16 of 16Global Ensemble Forecast System - GEFS

GEFS Reforecast

• Consider latest 20-25 years– Goes with every model upgrade– Goes with new re-analysis– Better to start from 1998 (AMUSU data started)

• Configurations– Option 1: use “white paper” recommendation– Option 2: consider NWC’s request (current impossible)

• Real-time or retrospective– Resource dependence

• Benefits– National centers: WPC, CPC, OPC, NWC– Regions: WFO