Frigstad D90 : Ultra Deepwater Semi Submersible
Simen Skaare Eriksen, CEO – Frigstad Offshore Pte Ltd
IBC Conference, London, September 2008
Page 2
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 2/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 2
N O T E
THE MATERIAL CONTAINED WITHIN THIS PRESENTATION, AND THE INFORMATION UPON WHICH IT IS
BASED, IS THE PROPERTY OF FRIGSTAD ENGINEERING INC AND ITS AUTHORISED ASSIGNEES (THE
“COMPANIES”). This document must not be acted on or relied on by persons who are not relevant persons. Any
investment or investment activity to which this communication relates is available only to relevant persons and will be
engaged in only with relevant persons. This document is incomplete without reference to, and should be viewed solely
in conjunction with, the oral briefing provided by the Companies. This document is not intended to form the basis of
any investment decision and should not be considered as a recommendation by the Companies to do so. In preparing
this document the Companies has relied upon and assumed, without independent verification, the accuracy and
completeness of all information available from public sources or which was provided to it or otherwise reviewed by it.
The information contained in this document has been taken from sources deemed to be reliable. The Companies cannot represent that such information is accurate or complete and it should not be relied on as such. Any opinions
expressed herein reflect the Companies’ judgment at this date, all of which are accordingly subject to change. All
technical details and data shall be regarded as preliminary and subject to change, and should not be used for any
other purposes than mentioned in this disclaimer. Accordingly, this information is being supplied to you for information
purposes only and not for any other purpose. This communication and the information contained in it does not
constitute or form any part of an offer of, or invitation or inducement to invest in the products or services of the
Companies or any of its affiliates.
Page 3
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 3/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 3
Contents
Background – Frigstad group of companies
The Frigstad D90 design
• Design Philosophy
• Design Features
Page 4
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 4/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 4
Background
Page 5
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 5/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 5
Background : Frigstad group of companies
Established by Mr Harald Frigstad in Norway in 1980.
Operational headquarters in Singapore since 1989.
Operational experience from 15 different countries.
ISO 9001 certified in 1999.
Currently employing approx 80 staff, presence in Singapore, Norway, China.
Two primary business units:
Page 6
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 6/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 6
Background : Frigstad group of companies
Frigstad Engineering
• Development of Advanced Rig Designs
• Engineering Services to offshore industry
• Inspections
• Project Support to Frigstad Offshore
Frigstad Offshore
• Offshore Drilling Contractor
• Rig & Project Management
• Construction Site Supervision
• Refurbishment, Upgrade and New-Build
• Business Development
Page 7
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 7/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 7
Background : Frigstad group of companies
A unique combination of industrial capabilities
Frigstad Engineering
• Development of Advanced Rig Designs
• Engineering Services to offshore industry
• Project Support to Frigstad Offshore
Frigstad Offshore
• Offshore Drilling Contractor
• Rig & Project Management
• Construction Site Supervision
• Refurbishment, Upgrade and New-Build
• Business Development
Page 8
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 8/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 8
The Frigstad D90 design
Design Philosophy
Design Features
Page 9
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 9/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 9
Foundation
► The core foundation for the development of the Frigstad D90 is founder and chairman, Mr Harald Frigstad’s decision to realize his ambition todesign and build the ultimate drilling rig, making use of the practical,
hands-on experience gained during a 15-year career of workingoffshore.
► The quest for energy drives exploration activities into deeper and
deeper waters, and consequently the challenges faced by drillingcontractors change and become more demanding.
► Rising costs of large scale offshore projects means that efficiency of the drilling units has become ever important.
► Extensive research, testing and implementation of innovative andefficiency enhancing features has resulted in a rig design which istailored to meet these demands of the future.
Page 10
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 10/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 10
Ultra Deepwater : New Trends & Challenges
“The easy oil is gone.”
Future is in the deep waters & remote areas.
Page 11
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 11/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 11
Ultra Deepwater : New Trends & Challenges
► More Marine Riser and TensioningCapacity
► More Liquid Mud Capacity
► More Bulk and Sack Material
► Higher Derrick- and Crane Capacities
► More Pipe Racking Capacity in
Derrick
► More Storage Space for Consumables
► More Beds & High Quality Quarters
► More Efficient Tubular Handling
► Higher Mud Pump Volume & Pressure
► Development Drilling Capabilities
► Sub Sea Completion
► Dual Activity and Drilling Features
► More Deck Space
► Increased Capacity of Power Plant
►Increased Capacity of DP and Mooring
► Increased Space Requirement for
Mooring Equipment
“The easy oil is gone.” Future is in the deep waters & remote areas.
Page 12
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 12/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 12
Frigstad D90 : Responding to future demands
Most drilling rigs in operation and under construction today are
based on generic hull designs which have been made to serve
different purposes.
Production, accommodation, drilling, heavy lift, pipe laying,
intervention, transportation, storage etc etc….
In order to respond to the new market trends and demands, the
Frigstad D90 has been developed from scratch, & with one sole
objective:
To provide an optimal tool for ultra deepwater
drilling and development operations.
Page 13
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 13/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 13
Frigstad D90 : Optimising rig design
So, Frigstad Engineering set out to design the ultimate drilling rig from
scratch, not depending on any existing generic hull designs.
Which gave the team the luxury of starting with a blank sheet of paper.
Certain core parameters were at the top of the priority list, such as
- Drilling performance and efficiency
- High variable load
- Large deck space
- Safe & easy logistics
- Low cost; both to build and operate.- Cover majority of the world’s deepwater areas
Page 14
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 14/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 14
Frigstad D90 : Optimising rig design
- Frigstad Engineering started with what we regard as the most
important component of a drilling rig; the drilling systems.
- We worked together with Aker MH for years to further develop their Dual Ram Rig concept into a customised solution for the Frigstad D90,
focussing on certain core properties of the drilling system:
- High capacities & a user friendly man-machine interface.
Page 15
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 15/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 15
Frigstad D90 : Optimising rig design
The Dual Ram Rig supports our ultimate objectives and helps us achieve i.a: - Efficiency in the drilling operations; dual activity, offline pipe handling.
- Safety; equipment pushed from drill floor by hydraulic cylinders rather
than suspended by wire from top of derrick. No slip and cut.- Lower weight & lower centre of gravity; higher variable deck load.
- Cost efficient maintenance.
Page 16
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 16/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 16
Frigstad D90 : Optimising rig design
In short, the rig has been designed specifically to support the drilling systems
and operations.
The end result of this holistic philosophy is a solution where the various
aspects of the drilling rig can be customised to suit the purpose, thereby
avoiding many compromises and sub-optimal utilisation of resources and
equipment applications.
Page 17
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 17/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 17
Frigstad D90 : Optimising rig design
Page 18
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 18/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 18
Frigstad D90 : Optimising rig design
All anchor winches
below deck. Frees
up large deckspace areas and
Eases equipment
maintenance
Large Open Deck
areas for handlingof many X-mas
trees and BOP.
Unobstructed
access for
assembly and
maintenance by
overhead cranes,
both Port andStarboard
Large 100 ton deck
cranes P/S will
handle heavy liftssuch as X-mas
trees and change
out of thrusters.
200 men modern
living quarters with
only 1 or 2 men
cabins, many offices,
large facilities.
Highest capacity
drilling facilities
worldwide at
present; 2 x 1000
Short TonsLarge open and
accessible pipe
rack deck.Dedicated knuckle
boom crane for
safe pipe handling
8 x 4,3 MW
thrustersReady for pre-set
mooring system
Hull with good motion
characteristics and
high transit speed.
Page 19
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 19/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 19
Large Capacity Drilling System
Dual Ram Rig MkII –developed together withAker MH and tailored forthe Frigstad D90
World’s highest capacitydrilling facilities.2 x 1,000 short tons load
2 hydraulic top drives1,000 tons each
Full dual capacity at bothWell centers > increasedflexibility.
Working on solutionenabling 2 x 1,250 sT.
Page 20
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 20/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 20
Large Vertical Racking Capacity
10,000 ft of vertical riser storage
for clip type risers in 100 ft stands.
Vertical tubular setback with capacity for
50,000ft of drill pipe in 90 ft stands.
The rig can move with full riser and drill string racked in the setback!
Page 21
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 21/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 21
Large open deck area
Very large open & clean deck space - 54,000 sqft total
Facilitates onboard logistics and material handling
Increasingly important as drilling locations are becoming more remote, and advanceddevelopment operations require more equipment.
No mushrooms on deck!
Page 22
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 22/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 22
Large open deck area
Large open area
for X-mas treepreparation and
deployment.
Moon pool access
via
100 mt gantrycrane
Moon pool accessvia
450 mt gantry crane
Large well test
area
Large ROV areas
(Port and STB)
Large open area for
2 complete BOP
stacks and
numerous X-mas
trees.
Page 23
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 23/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 23
It continues beneath the surface…
Large moon pool
opening with direct
access from maindeck from both sides
Thrusters placed in
circular formation toavoid interference
and loss of effect.
Total thruster power
46,000 hp!
Distance between well
centers allows riser
and BOP to be parked
in the middle,
increasing flexibility.
“Trip saver” with
skiddable DAT
system.
Estimated transit
speed 8-10 kts, with
The horizontal
bracings above sea
level
Large distance
between well centers
allows BOP and riser
to be parked in the
middle.
Page 24
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 24/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 24
High Capacity Deck Cranes
The rig is equipped with 2 x 100 tonnes
deck cranes.
Cranes are designed to enable change
out of thrusters.
Draft of a large DP semi submersiblemakes it virtually impossible to get
alongside for repair & maintenance
(without removing thrusters)
Single unit lift – Reduced weatherdependency.
No need for external barge support.Less waiting time & less cost.
Page 25
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 25/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 25
Large Accommodation
High quality quarters, with large office space and accommodation for 200
persons, all in 1 or 2 bed cabins
Page 26
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 26/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 26
Anchor winches below deck
The Frigstad D90 is designed with DP-3 system, and prepared for pre-set
mooring spread. In addition, the rig can be equipped for a conventionalchain/wire mooring system.
All the anchor winches have been placed below deck. This saves deck space,eases maintenance and reduces wear and tear on equipment.
Page 27
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 27/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 27
Easy Handling and Access
Forklift “ring-road” on lower decks Maintenance tunnel inside pontoons.Gives access to manifolds, pumps etc.
Page 28
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 28/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 28
Summary : Key Design Features
► Large deck Space - 3 Full Decks
► Clean Design – Easy to Fabricate
► Equipment Placed Indoor – Low Corrosion► Reduced Need for Water Tight Upper Hull, Big Savings in Outfitting
► Bulk Storage Tanks Located Next to Mud Mixing Area – Short Transport Distance
► Vertical Riser Storage – Easy Handling
► Lay Down Area for Riser Inspection
► Large Area for BOP/LMRP and Christmas Tree Holding
► Tunnel in Pontoons – Exposed and Accessible Manifolds
► Dual Drilling Capable Derrick
► Can Perform Many Dual Operations
► Space for Two BOP stacks on Deck.
Page 29
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 29/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 29
5
2
2
1
1
3
22
24
27
Frigstad D90 : Geographical Coverage
1
1
Location: Units:
USGOM 27
West Africa 22
South America 24
NW Europe 5
India 3
Latin America 1
South East Asia 2
Australia/NZL 2
Mediterranean 1
Caspian Sea 1
Far East 1
Total working: 89
* Designates location of deep water rated units not necessarily working in deep water
The Frigstad D90 isdesigned to cover95% of the world’s
deep water E&P areas.
Page 30
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 30/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 30
Frigstad D90 : Design Verification
► Motion, Acceleration and Air Gap Analysis:
using WADAM and SESAM computer programs
► Global strength and fatigueby Sesam Program, Aker Brevik.
► Stability Analysisusing AutoHydro computer program.
► Design approved by DnV in 2007
Page 31
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 31/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 31
Frigstad D90 : Market Acceptance
► March 2006 - April 2007: Frigstad Discoverer Invest Ltd secured financing for theconstruction of a Frigstad D90, and listed the company on the main board at the Oslo
Stock Exchange.
► The first Frigstad D90 rig is currently under construction at the Yantai Raffles
Shipyard in China.
► October 2007: Frigstad Discoverer Invest Ltd acquired by Saipem S.p.A, at a premium
of more than USD 140 million above the construction cost.
► November 2007: Eni awards a 5 year, USD 860 million drilling contract to the first
Frigstad D90.
Page 32
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 32/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 32
Frigstad D90 : Best in Class
Deeper
12,000 feet water depth
50,000 feet drilling depth
Larger 24,000 bbl liquid mud/brine
4,000,000 lbs combined hook load
3,200,000 lbs total riser tensioning capacity
8,100 mt variable deck load
54,000 sqft deck space
Large, clean deck layout
62,000 BHP power plant
200-bed quarters
More efficient
Dual operations (2 x 1000 s.t.) Significantly more efficient than single derrick operations,
considerably reducing non-productive time
50,000 ft vertical drill pipe set-back
10,000 ft vertical riser set-back
Page 33
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 33/34
Page 34
8/2/2019 Ultra Deepwater Semi Submersible
http://slidepdf.com/reader/full/ultra-deepwater-semi-submersible 34/34
© Frigstad Engineering | Frigstad D90 - Experience meets Innovation | London, September 2008 34
Contacts
Frigstad Offshore Pte LtdFrigstad Engineering Pte Ltd
9 Temasek Boulevard#44-02 Suntec Tower 2
Singapore 038989
Tel: +65 6223 1277
Fax: +65 6223 3906
www.frigstad.com