RECEIVED UL 2o 2sj Form 3160-5 UNITED STATES (February 2005) DEPARTMENT OF THE INTERIOR c. Farmincston Field '-Ji BUREAU OF LAND MANAGEMENT ^ Mtina, SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill or to re-enter an abandoned well. Use Form 3160-3 (APD) for such proposals. FORM APPROVED OMB No. 1004-0137 Expires. March 31,2007 5. Lease Serial No. NMSF 078894 6. If Indian, Allottee or Tribe Name SUBMIT IN TRIPLICATE - Other instructions on page 2. 7. If Unit of CA/Agreement, Name and/or No. NMNM78407X 1. Type of Well 3 Oil Well Gas Well Other 8. Well Name and No. Rosa Unit 602 2. Name of Operator WPX Energy Production, LLC 9. API Well No. 30-039-30914 3a. Address PO Box 640 Aztec. NM 87410 3b. Phone No. (include area code) 505-333-1808 10. Field and Pool or Exploratory Area Basin Dakota/ Basin Mancos 4. Location of Well (Footage, Sec., T..R..M., or Survey Description) SHL: 1200FNL & 1715FWL, Sec 27, T31N, R4W BHL: 1346FNL & 1801FWL, Sec 27 T31N, R4W 11. Country or Parish, State Rio Arriba, NM 12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA TYPE OF SUBMISSION TYPE OF ACTION [3 Notice of Intent 1 1 Subsequent Report ^ Final Abandonment Notice 1 1 Acidize 1 1 Alter Casing 1 1 Casing Repair 1 1 Change Plans ^ Convert to Injection 1 1 Deepen 1 I Fracture Treat 1 1 New Construction EX] Plug and Abandon H Plug Back 1 1 Production (Start/Resume) 1 1 Reclamation 1 1 Recomplete 1 1 Temporarily Abandon Water Disposal Water Shut-Off 1 1 Well Integrity 13 other Dakota Plueback 13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones. Attach the Bond under which the work will be performed or provide the Bond No on file with BLM/BIA. Required subsequent reports must be filed within 30 days following completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 must be filed once testing has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed and the operator has determined that the site is ready for final inspection.) WPX Energy request to plug back the Basin Dakota per attached procedure and wellbore diagram. This well will produce as a standalone Basin Mancos; upon completion a subsequent submittal will identify the Basin Mancos with a new version of a C102 Plat. OIL CONS. DIVDIST. . Notify NMOCD 24 hrs j prior to beginning operations AUG 012016 3 14.1 hereby certify that the foregoing is true and correct. Name (.Trinted/Typed) \ Marie E. Jaramillo A \ *11 Title Permit Tech III Signature lAA, l \ KXUika1 j D____________________ Date 7/25/16 ' 'V\v \ THIS SP>^QlE-FOR FEDERAL OR STATE OFFICE USE Approved by Conditions ofSpproval, if £re attached. Approval of this notice does not warrant or certify that the applicant holds legal or equitable title to those rights in the subject lease which would entitle the applicant to conduct operations thereon Title Date Office Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction (Instructions on page 2) NMOCDfy Copyright 2006 Forms in Word (www. formsinword. com). For individual or single-branch use only.
6

UL 2o 2sj - New Mexico Department of Energy, Minerals, and ...ocdimage.emnrd.state.nm.us/Imaging/FileStore/aztec/wf/304425/... · UL 2o 2sj Form 3160-5 UNITED STATES (February 2005)

May 01, 2019

Download

Documents

ngotu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: UL 2o 2sj - New Mexico Department of Energy, Minerals, and ...ocdimage.emnrd.state.nm.us/Imaging/FileStore/aztec/wf/304425/... · UL 2o 2sj Form 3160-5 UNITED STATES (February 2005)

RECEIVED

UL 2o 2sjForm 3160-5 UNITED STATES(February 2005) DEPARTMENT OF THE INTERIOR c.

Farmincston Field '-JiBUREAU OF LAND MANAGEMENT ^ Mtina,

SUNDRY NOTICES AND REPORTS ON WELLS

Do not use this form for proposals to drill or to re-enter an abandoned well. Use Form 3160-3 (APD) for such proposals.

FORM APPROVEDOMB No. 1004-0137

Expires. March 31,2007

5. Lease Serial No.

NMSF 078894

6. If Indian, Allottee or Tribe Name

SUBMIT IN TRIPLICATE - Other instructions on page 2. 7. If Unit of CA/Agreement, Name and/orNo.

NMNM78407X1. Type of Well

3 Oil Well □ Gas Well □ Other8. Well Name and No.

Rosa Unit 602

2. Name of Operator

WPX Energy Production, LLC9. API Well No.

30-039-30914

3a. Address

PO Box 640 Aztec. NM 874103b. Phone No. (include area code) 505-333-1808

10. Field and Pool or Exploratory Area

Basin Dakota/ Basin Mancos

4. Location of Well (Footage, Sec., T..R..M., or Survey Description)SHL: 1200’ FNL & 1715’ FWL, Sec 27, T31N, R4WBHL: 1346’FNL & 1801’ FWL, Sec 27 T31N, R4W

11. Country or Parish, StateRio Arriba, NM

12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

[3 Notice of Intent

1 1 Subsequent Report ^

Final Abandonment Notice

1 1 Acidize

1 1 Alter Casing

1 1 Casing Repair

1 1 Change Plans

^ Convert to Injection

1 1 Deepen

1 I Fracture Treat

1 1 New Construction

EX] Plug and Abandon

H Plug Back

1 1 Production

(Start/Resume)1 1 Reclamation

1 1 Recomplete

1 1 Temporarily

Abandon

Water Disposal

□ Water Shut-Off

1 1 Well Integrity

13 other Dakota Plueback

13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones. Attach the Bond under which the work will be performed or provide the Bond No on file with BLM/BIA. Required subsequent reports must be filed within 30 days following completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 must be filed once testing has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed and the operator has determined that the site is ready for final inspection.)

WPX Energy request to plug back the Basin Dakota per attached procedure and wellbore diagram. This well will produce as a standalone Basin Mancos; upon completion a subsequent submittal will identify the Basin Mancos with a new version of a C102Plat.

OIL CONS. DIVDIST.. Notify NMOCD 24 hrs j prior to beginning

operationsAUG 012016

3

14.1 hereby certify that the foregoing is true and correct. Name (.Trinted/Typed) \Marie E. Jaramillo A \ *11 Title Permit Tech III

Signature lAA, l \KXUika1

jD____________________

Date 7/25/16' 'V\v \ THIS SP>^QlE-FOR FEDERAL OR STATE OFFICE USE

Approved by

Conditions of Spproval, if £re attached. Approval of this notice does not warrant or certify that the applicant holds legal or equitable title to those rights in the subject lease which would entitle the applicant to conduct operations thereon

Title Date

Office

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction

(Instructions on page 2)

NMOCDfy

Copyright 2006 Forms in Word (www. formsinword. com). For individual or single-branch use only.

Page 2: UL 2o 2sj - New Mexico Department of Energy, Minerals, and ...ocdimage.emnrd.state.nm.us/Imaging/FileStore/aztec/wf/304425/... · UL 2o 2sj Form 3160-5 UNITED STATES (February 2005)

WPXENERGY.

Rosa UT#602

San Juan Basin, New Mexico

15th July, 2016

***Ensure fuel used during job & estimate of vented gas is reported in daily reports*** ***Continuous personal H2S monitoring is required. Any H2S alarms or other indications

above lOppm will require work to stop and the situation to be evaluated.***

Objective:

1) Spot cement on top CIBP plugging back Dakota formation.

2) Return well to production.

Prior To Primary Job

1) Verify location is OK for operations.2) Ensure JSA, ECP’s and lockout procedures are in place for the flowline and other energized

piping or equipment.

SAFETY NOTICE

PERSONNEL SAFETY IS THE NUMBER ONE JOB.NO EXCEPTIONS!!!

PLEASE FOLLOW APPROPRIATE WPX CONTRACTOR PROTOCOLSFOR THIS JOB PLAN

Please see your WPX Business Representative if you have any questions; Contrator protocols can be located in the WPXEnergy Contractor Guide_____________________________________________________________ ______________________________________

Page 3: UL 2o 2sj - New Mexico Department of Energy, Minerals, and ...ocdimage.emnrd.state.nm.us/Imaging/FileStore/aztec/wf/304425/... · UL 2o 2sj Form 3160-5 UNITED STATES (February 2005)

Procedure:

Note: A safety meeting shall be held each morning before work and

subsequent “tailgate” safety meetings are to be held during the day when

operation objectives shift in nature and intent (i.e. beginning/ending fishing

operations, squeeze jobs, rigging down, etc.) Please ensure these are

documented per the WPX Energy Contractor Guide

1. Spot equipment, MIRU.

2. Blow down gas on well to production tank, ensuring tank hatch is open. Pump produced

water down tubing and backside to kill well.

Note: Steps 2 is to be performed each day before work begins and as necessary throughout the

workday (with expected departure(s) when tubing is out of the hole).

3. RIH with tubing, softly tag CIBP @ 8430’, TOOH with 2 joints.

4. Spot 50’ cmt above CIBP by pumping cmt down tbg followed by displacement.

5. TOOH with tbg, landing back at original depth of 8323’.

6. RDMO rig equipment.

7. Allow 24-48 hrs for cmt to set up.

8. MIRU slickline.

9. RIH and tag TOC.

10. RDMO slickline.

11. Return well to production.

Page 4: UL 2o 2sj - New Mexico Department of Energy, Minerals, and ...ocdimage.emnrd.state.nm.us/Imaging/FileStore/aztec/wf/304425/... · UL 2o 2sj Form 3160-5 UNITED STATES (February 2005)

ROSA UNIT #602BLANCO MV/BASIN MC/ BASIN DK

Current Wellbore Diagram Spud Date 6/10/10 Completed

1200’ FNL & 1715’ FWL, Sec 27, T31N, R4W BHL:1346’ FNL & 1801’ FWL, Sec 27.T31N.R4W Rio Arriba, NM

Elevation: 7028’GR API #: 30-039-30914

Tops DepthLewis 4248’Cliff House 6073Point Lookout 6289’Man cos 6788Graneros 8395’Dakota 8535’

5th Stage MC: 7105’-7200’ (60, 0.34” holes) Frac with 5,000# 100 mesh followed with 102,100# 40/70 mesh Ottawa

4* Stage MC: 7470’-7650’ (51,0.34” holes) Frac with 7,600# 100 mesh followed with 149,100# 40/70 mesh Ottawa

3rd Stage MC: 7765’-7935’ (45,0.34” holes) Frac with 14,186# 100 mesh followed with 8,082# 30/50 mesh Ottawa followed with 28,228# 30/50 mesh Ottawa followed with 6,672# 30/50 mesh Ottawa followed with 78,719# 20/40 mesh Ottawa

2nd Stage MC: 8055’-8165’ (36,0.34” holes) Frac with 15,026# 100 mesh followed with 45,414#30/50 mesh Ottawa followed with 90,744# 20/40 mesh Ottawa

l 8355’-8390’ (24,0.34” holes) Frac with 4,390# 100 mesh followed with 84,450# 40/70 mesh Ottawa

L 8440’-8490’ (33.0.34” holes)Frac with 3,604# 100 mesh followed with 77,696# 30/50 mesh Ottawa

S’-8609’ (36,0.34” holes)Frac with 3,224# 100 mesh followed with 96,011# 40/70 mesh Ottawa

1: 8724’-8772’ (18,0.34” holes)No Frac

Run 7 Jts,10 3/4", 40.5#, J-55.ST&C - 8rd, CSG SET @ 317’

Run 97 JTS, 7 5/8”, 26.4#, J-55, LT&C 8rd, CSG SET @ 4358’, FC@ 4312’

Run 197 Jts,4-l/2”, 11.6#, P-110, LT&C 8rd Prod Casing. Set @ 8884', FC @ 8862', Marker Jt @ 6264’.

Well landed @ 8323' KB as follows, one 2.375" Exp-chk/ 1/2 MS, one jt 2.375", N-80, 4.7#, EUE 8md tbg, one 1.78" F-nple, 260 jts 2.375", N-80,4.7#, EUE 8md tbg, (261 total jts), F-nple set @ 8290'.

CIBP @ 8430

C1BP @ 8520

CIBP @ 8700

TD @ 8885 PBTD @ 8400’

\ HOLE SIZE CASING i CEMENT CU FT. CMTTOP

12 1/4" 10 3/4",40.5# 290 sxs 522 cu.ft. surface

10 3/4" 7 5/8",26.4# 910 sxs 2297 cu.ft. 500' -Temp

6-3/4" 4 1/2", 1L6# 615 sxs 861 cu.ft. 4450' - CBL |BM 7/27/2011

Page 5: UL 2o 2sj - New Mexico Department of Energy, Minerals, and ...ocdimage.emnrd.state.nm.us/Imaging/FileStore/aztec/wf/304425/... · UL 2o 2sj Form 3160-5 UNITED STATES (February 2005)

ROSA UNIT #602BLANCO MV/BASIN MC/ BASIN DK

Proposed Wellbore Diagram Spud Date 6/10/10 Completed

Surface Location;1200’FNL& 1715’FWL, Sec 27, T3 IN, R4W BHL:1346’ FNL & 1801' FWL, Sec 27. T3IN, R4W Rio Arriba, NM

Elevation: 7028’ GR API #: 30-039-30914

Tops DepthLewis 4248’Cliff House 6073Point Lookout 6289’Mancos 6788Graneros 8395’Dakota 8535’

5th Stage MC: 7105’-7200’ (60,0.34” holes) Frac with 5,000# 100 mesh followed with 102,100# 40/70 mesh Ottawa

4* Stage MC: 7470’-7650’ (51.0.34” holes) Frac with 7,600# 100 mesh followed with 149,100#40/70 mesh Ottawa

3ri Stage MC: 7765’-7935’ (45,0.34” holes) Frac with 14,186# 100 mesh followed with 8,082# 30/50 mesh Ottawa followed with 28,228# 30/50 mesh Ottawa followed with 6,672# 30/50 mesh Ottawa followed with 78,719# 20/40 mesh Ottawa

2nd Stage MC: 8055’-8165’ (36,0.34” holes) Frac with 15,026# 100 mesh followed with 45,414#30/50 mesh Ottawa followed with 90,744# 20/40 mesh Ottawa

1” Stage MC: 8355’-8390’ (24,0.34” holes) Frac with 4,390# 100 mesh followed with 84,450# 40/70 mesh Ottawa

3rd Stage DK: 8440’-8490’ (33,0.34” holes)Frac with 3,604# 100 mesh followed with 77,696# 30/50 mesh Ottawa

2nd Stage DK: 8536’-8609’ (36,0.34” holes)Frac with 3,224# 100 mesh followed with 96,011# 40/70 mesh Ottawa

1CT Stage DK: 8724’-8772’ (18,0.34” holes)No Frac

Run 7 Jts,10 3/4", 40.5#, J-55.ST&C - 8rd, CSG SET i 317’

Run 97 JTS, 7 5/8”, 26.4#, J-55, LT&C 8rd, CSG SET I 4358’, FC@ 4312’

Run 197 Jts.4-1/2”, 11.6#, P-110, LT&C 8rd Prod Casing. Set @ 8884', FC @ 8862', Marker Jt @ 6264’.

Well landed @ 8323' KB as follows, one 2.375" Exp-chk / 1/2 MS, one jt 2.375", N-80, 4.7#, EUE 8md tbg, one 1.78" F-nple, 260 jts 2.375", N-80,4.7#, EUE 8md tbg, (261 total jts), F-nple set @ 8290'.

Spot 50’ emt above CIBP in order to plug Dakota

CIBP <a 8430

crop @ 8520

CIBP @ 8700

TD @ 8885 PBTD @ 8400’

HOLE SIZE CASING CEMENT | CU. FT. CMTTOP. i

n 1/4" 10 3/4", 40.5# 290 sxs 522 cu.ft. surface

10 3/4" 7 5/8",26.4# 910 sxs 2297 cu.ft. 500' -Temp

6-3/4" 4 1/2", 11.6# 615 sxs 861cu.ft. 4450' - CBLDM 7/18/2016

Page 6: UL 2o 2sj - New Mexico Department of Energy, Minerals, and ...ocdimage.emnrd.state.nm.us/Imaging/FileStore/aztec/wf/304425/... · UL 2o 2sj Form 3160-5 UNITED STATES (February 2005)

PLU6BACK CONDITION OF APPROVAL

Operator*. Lease No.: Well Name: Well Location:

WPX Energy Production, LLC NMSF-078894 Rosa Unite 602Sec.27, T31N, R04W; 1200* FNL A 1715* FWL

All cement plugs placed inside casing shall have sufficient volume

to fill 50’ of the casing, plus 100% excess of cement is required.