installation guidelines for Next Dimension
installer• Readinstructionscompletelybeforeattemptinginstallation.Failuretofollowtheseguidelineswillforfeit
allwarranties(writtenorimplied),WindsorWindows&Doorswillnotbeheldresponsibleforanyclaimsordamagesresultingfromwindowinstallation.
• Alwaysprovideacopyoftheseinstructionstothehomeowner.• TheseinstructionsareconsistentwithASTM2112“StandardPracticeforInstallationofExteriorWindows,
Doors,andSkylights”intocommonwallconstructions.Contactyourarchitectorconstructionprofessionalforinstallationintootherbuildingdesignsorconstructionmethods.
• Regionalcodesandenvironmentalconditionsmayrequireinstallationthatisdifferentfromtheseguidelines.Itisyourresponsibilitytoensurethatlocalcodesandordinancesarefollowed.
Warning! Work Safe! AlwayswearpropereyeandhearingprotectionwheninstallingoradjustingWindsorproducts.
Use Power Tools Properly! Toavoidpersonalinjury,alwaysfollowmanufacturer’sinstructionsforsafeoperationofpowertools.
Ladder Safety! Workingatelevatedlevelscanbehazardous.Alwaysuseladdersandscaffoldingproperly.Consultmanufacturer’sguidelinesforsafeuseofthesetypesofequipment.
Safety glazing! Windsorproductsdonotcontainsafetyglazingunlessspecificallyorderedthatway.Usecaution–injurycouldresultifglassisbrokenandfragmented.Buildingcodesrequiresafetyglazingforwindowsinstalledincertainareas.Consultyourlocalbuildingcodeofficialforguidelines.
important• Windsorreservestherighttochangetheinformationcontainedintheseguidelineswithoutnotice.• Maintainaminimumof¼"betweenthewindowframeandanytrim,siding,ormasonry.• UseofWindsorproductsinbarrierEIFSsystems(syntheticstucco)isnotrecommended.Todosowill
forfeitallwarranties(writtenorimplied),WindsorWindows&Doorswillnotbeheldresponsibleforanyclaimsordamagesresultingfromwaterinfiltration.
• SteelfastenerswillcorrodewhenusedwithACQPressureTreatedLumber.Usecorrosionresistantfasteners(suchasstainlesssteel)wheninstallingwindowsinoraroundthesetypesofmaterials
• Windownailingflangesanddripcaps(integralorapplied)donottaketheplaceofwindowflashing.Allwindowsanddoorsmustbeproperlyflashedandsealedaroundtheperimeter.
Handling and Storage• Alwayscarrywindowunitsupright.Donotcarryflat!Doingsocouldresultindamagetotheunit.• Donotstoreunitsoutside.
Page 3
Tools Needed
• SafetyGlasses
• UtilityKnife
• Hammer(ornailgun)
• CaulkGun
• Level
• Ladder/Scaffolding
• Square
• TapeMeasure
• Stapler
Materials Needed• BackerRod
–¼"-½"diameterclosedcellfoam
• Insulation–Minimallyexpandinglowpressure
polyurethanewindowanddoorfoam
• Shims–Madeofcedarorsyntheticmaterial
• RoofingNails–2"Galvanized(16D)
• SiliconeSealant–100%Silicone–Neutralcure(modifiedoxime)only
• Flashing–Self-adhesiveflexibleflashingthat
complieswithASTM-D
Fig. 1
Fig. 2
Fig. 3
SEALANT
x-jAMBCLIP
Step 1: inspect UnitBefore installation:A) Removeallshippingpackagingmaterial(blocks,pads,protectors,stretchwrap).B) Donotremovedoublehungsashretainerblocks(redclips)untilafterinstallation.C) Inspectunitforanydamageordefects.D) Verifythatthewindowunitisthecorrectsizeandconfiguration.E) Makesuretheunitoperatesproperly.F) ContactyournearestWindsordistributorifthereareanyproblems.
Step 2: Apply Jamb Extension Clips or Drywall ReturnA) Placea1⁄8"diameterbeadof100%neutralcure
sealantaroundtheinteriorperimeteroftheframeintherecessshown.(Fig.1)
B) Installthe3"jambextensionclipsaroundtheperimeteroftheframe,twooneachcorner,andthenspacedonapproximately18"intervalsalongtheframe.(Fig.2)Note:Fordrywallreturn,installlinealpieces.
C) Positionthejambextensionasshownagainsttheclipsandstapleorscrewthroughtheclipintothebacksideofthejambextension.(Fig.3)
D) Wrapjambextensionapplicationas shown.(Fig.3)
Page 4
Step 3: Prepare Rough OpeningA) Measureandverifythesizeoftheroughopening.Theroughopeningshouldbe½"larger
thantheframeinbothwidthandheight.B) Verifytheroughopeningisplumb,level,andsquare.(Fig.4)C) Takediagonalmeasurementstocheckforsquare.(Fig.4)D) Makesurethebottomsillareaoftheopeningdoesnotslopetowardtheinterior.E) Cuttheweather-resistantbarrier(WRB)ina“ModifiedI”patternshownbelow.(Fig.5)F) FoldbacktheWRBonthesidesandsilltowardtheinteriorandstapleintoplace.(Fig.6)G) Fromtheexterior,cutthetopoftheWRBasshowntoformaflap.(Fig.7)H) Temporarilytapethistopflapup.(Fig.7)
Fig. 4 Fig. 5
Fig. 6 Fig. 7
Page 5
Step 4: Flashing the SillA) iMPORTANT! a.Useflashingthatis6"minimuminwidth. b.FlashingmustmeetASTM-Dperformancerequirements. c.Adhesiveormechanicallyfastenedflashingmaybeused.B) Measurethewidthoftheroughopening.Cutalengthofflashingthatis12"widerthantherough
opening.Thiswillallowyoutoruntheflashing6"upeachside.(Fig.8)C) Cut1½"slitsateachendoftheflashingasshownbelow.(Fig.8)D) Applysillflashingtotheroughopeningasshownbelow.(Fig.9)E) Ifyouareusingnon-adhesiveflashing: a.Stapleflashingintoplace. b.Sealcornernotchesusing100%neutralcuresiliconesealant.F) Flashingtapemustcovertheentiresillplate.Ifneeded,applyanadditionalflashingpieceoverthefirst
one(startfromtheexteriorandworktowardstheinterior).Maintainaminimum1"overlap.(Fig.10)
Fig. 8
Fig. 9 Fig. 10
iNT
ExT
iNT
ExT
1½"
6" ½"
6" minimum
Page 6
Fig. 11 Fig. 12
6”BEAD 1”GAP
Step 5: Window installationA) Removeallpackagingmaterial(blocks,pads,protectors,stretchwrap). iMPORTANT! Onvinyldoublehungwindows,therearetworedsashretainerclipsattachedtothebottom
ofthetopsash,donotremovetheseclipsuntilafterinstallation.B) Inspectandverifythefollowing: a.Thewindowisthecorrectsizeandspecification. b.Theunitisfreefromanydamageordefects.C) ContactyournearestWindsordistributorifthereareanyproblemswithstepBabove.D) Applysealant: a.Applya¼"diameterbeadof100%neutralcuresiliconesealantalongthebacksideofthenailingflange. b. Beadmustruncontinuouslyaroundbothsidesandacrossthehead,inlinewithandcompletely coveringthenailingflangeholes.(Fig.11) c.Useadiscontinuousbeadatthesilltoallowforanydrainage.Alternateusinga6"longbead with1"gapsasshownbelow.(Fig.12)E) Setthewindowintotheroughopening.Centertheunitintheopening,makingsurethereareequal
gapsonbothsidesofthewindow.F) Temporarilytackthewindowintoplaceusing2"galvanizedroofingnailsthroughthepre-punched
holesononetopcornerofthenailingflange.Donotdrivethenailsinfully.
Page 7
Step 5 (continued):G) Shimunderneaththewindowuntilsillislevel.Startwithashimateachcornernomorethan1"from
jambcorner.Addadditionalshimsspacedevenlyfromthecenterofunit,makesureshimsarespacednomorethan16"apart.Failuretoevenlysupportsillcanresultinimproperoperationandperformanceandwillvoidthewarranty.
H) Checktheunitforsquareusingdiagonalmeasurements.Shimwindowtoensuretheunitissquare.Multipleunitsmusthaveshimsundereachmull.Casementunitsover48"inheightmusthaveshimsplacedatthecentertopreventbowingofjambs.
I) FORDOUBLEHUNGUNITS:TOENSUREPROPERWINDOWOPERATIONANDPERFORMANCE,ITISVERYIMPORTANTTOSHIMTHEMIDDLEOFTHEUNITTOOBTAINEQUALFRAMEWIDTHSASSHOWN.
j) Nailallfourcornersinplacethroughthepre-punchedholesinthenailingflange.K) Makesurejambs,head,andsillsarestraight.Additionalshimmingmayberequired.Seebelowfor
minimumshimplacement.L) Finishnailingthewindowintoplacethroughthepre-punchedholesinthenailingflange,placingnails
within4"ofeachcornerandnomorethan8"-10"inbetween.
Page 8
Step 6: Complete FlashingA) Cutandapplysideflashing.Sideflashingshouldrunfromthebottomofthesillflashingto8"above
theroughopening.(Fig.13)B) Ifnon-adhesiveflashingisused,makesureallstapleholesaresealedwithsilicone.C) Cutandapplyheadflashing.Theheadflashingshouldrunslightlypasttheedgeofthesideflashing
asshown.(Fig.14)D) FlipdownthetopflapoftheWRB.E) TapethecutseamsoftheWRB.(Fig.15)
Fig. 13 Fig. 14
Fig. 15
Page 9
Step 7: Seal the ExteriorA) WARNiNg: Youmustmaintainaminimumof1/4”betweenthewindowframeandanytrim,sidingor
masonry.Failuretodosocancausebindingandwillforfeitallwarranties(writtenorimplied),WindsorWindows&Doorswillnotbeheldresponsibleforanyclaimsordamagesresultingfrombinding.
B) Afteryoucompletethesidingorwallexterior,applybackerrodand100%neutralcuresiliconesealant betweenthewindowframeandsidingmaterialonbothsidesandsill. a.Note:ThisstepisnotneededforwindowsthathaveanintegralJ-channel/Brickmouldframewithsiding thattucksbehindtheframe.ForwindowsthatuseaJ-channelasanadditiontotheframe,thebackerrod andsealantmustbeappliedasshownbelowbeforeyouapplytheJ-channeladdition.
Page 10
installation
guidelines
Next D
imensio
n SingleH
ung/SingleHungFixed/D
oubleHung/
SlidingWindow
/FixedWindow
WindsorW
indows&
Doors
WindsorW
indows&
Doors
900S.19thSt.
2210StaffordSt.ExtnW
estDesM
oines,IA50265
Monroe,N
C28110
661522 01/2008
Step 8: Complete the interiorA) Insulatebetweenthewindowframeandtheroughopeningusingminimallyexpandingwindow
anddoorsprayfoaminsulation.B) Operatewindowunittoensureproperoperation.Sashwillnotoperatecorrectlyifwindowis
outofsquare,over-shimmedorover-insulated.C) Removealllabelsorshippingmaterials.D) Paintorstainallinteriorwoodcomponents. •Painting:Applyprimertoun-primedwoodsurfacesthatwillbepainted.Twocoatsofagood
qualityinteriortrimenamellatexoroilbasedshouldbeappliedinaccordancetothepaintmanufacturer’sspecifications.
•Staining:Applystainaccordingtomanufacturer’srecommendations.Twocoatsofagoodqualityclearfinishcoatshouldbeappliedoveranystain.
E) iMPORTANT: Donotstainorpaintanyvinylcomponents.
Care and Use:Aninspectionofyourunitshouldbemadeannually.VisittheWindsorwebsite(www.windsorwindows.com)orcontactyourlocalindependentWindsordistributorforinformationonthecareanduseofyourproduct.Askforthe“CareandUse”guide.Containedinthisguideisinformationonfinishing,cleaning,whattolookforduringyearlyinspections,generalmaintenancetips,sash/paneladjustment,sash/panelremoval,screenremovalandinformationoncondensation.