Cost Efficient Operations at Fira Barcelona How to focus on what really counts
23

UFI Operations Award 2010 - Fira Barcelona

Jan 13, 2015

Download

Business

UFI Operations Award 2010 presentation for Fira Barcelona, Barcelona, Spain
By: Jordi Estruga, Production & Logistics Manager
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: UFI Operations Award 2010 - Fira Barcelona

Cost Efficient Operations at Fira BarcelonaCost Efficient Operations at Fira Barcelona

How to focus on what really countsHow to focus on what really counts

Page 2: UFI Operations Award 2010 - Fira Barcelona

Halls 5 & 7

• 2 venues: Montjuïc and Gran Via

• under expansion with 2 new halls in Gran Via.

• publicly owned company with private management: funded with its own profit.

Introduction

Page 3: UFI Operations Award 2010 - Fira Barcelona

Objective

Challenges to complete the expansion:

1. Reduce current costs and free up resources

2. Reinvest these resources in the growth

3. Increase the value (better quality & service, less cost).

Page 4: UFI Operations Award 2010 - Fira Barcelona

Analysis and Diagnosis current processes, organization and costs were analyzed and barriers identified

• Lack of information and appropiate indicators • Vertical organization, not horizontal

• Responsibilities unclear and little teamwork

• Mindset reluctant to change

• Limited Scope in operating Strategy

Analysis & Diagnosis

Step 1

Page 5: UFI Operations Award 2010 - Fira Barcelona

Analysis & Diagnosis

Barriers and Action PlanAreas to tackle to overcome the barriers identified

Step 4

Projects on Value

Step 3

Changes in organization

Step 2

Select indicators

Information and indicators

Organization

Value creation

Step 1

Page 6: UFI Operations Award 2010 - Fira Barcelona

Establish indicators & new cost information system to measure the effectiveness of the actions and track their results.

Indicators

Step 2

Implement & exploit Business Intelligence Module (SAP BW)

Specific Key Performance Indicators (KPI’s) to track results were developed.

€/m2 (net) for all cost components Comparison: Actual vs previous edition, actual vs plan and vs. Estimated (SAP)

Specific and measurable Cost objectives were set, and become visible in every department.

Weekly, monthly, quarter and anual review with all teams

Cost Deployment. These objectives were linked to variable compensation (bonus) of all involved.

up to 10-20% of bonus contribution

Page 7: UFI Operations Award 2010 - Fira Barcelona

Make organizational changes

required to implement the improvement projects.

One Operations controller* was assigned to the area of operations.

An Operations cost control Committee was established.

One new Operations planning position was created within the planning team.

One new Operations purchasing position is approved and recruited.

Changes in organization

Step 3

Page 8: UFI Operations Award 2010 - Fira Barcelona

Enhance VAA

Step 4.2

Analysis of value

understand what value means and execute the projects to increase value proposition.

• Identify Value added and non value added activities

• Select projects to:

• minimize non-value added activities (NVAA)

• enhance value-added activities (VAA)

Projects on Value

Step 4

Minimize NVAA

Step 4.1

Analysis of Value

Step 4.0

Page 9: UFI Operations Award 2010 - Fira Barcelona

Select value areas to work

Identify main contributors to NVAA

Cost

0% 2% 4% 6% 8% 10% 12% 14%

waste management

registration

air conditioned

signage

customer services

cleaning

carpet

security

access control

set up costs

Minimize NVAA

Step 4.1

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Position 1 Position 2

waiting time

walking

health & safety

complaintmanagement

customer service

activitiescoordination

Waste management

Customer services

Set up costs

Maintenance

OtherEnergy

CleaningSecurity Process optimization

Human effort

* *

* **

Projects to develop:

Page 10: UFI Operations Award 2010 - Fira Barcelona

Security cost reductionReduction of security (including access and registration)

Increase productivity through automation

Minimize NVAA

Step 4.1

New additional supplier

Adjustment of security and access schedules.

Security cost evolution (Reduction index 2009 vs 2007)

0 500 1.000 1.500 2.000 2.500

Operating -exhibitions

Structural -venue

Cost (m€)

2007

2008

2009

2010

-38%

-17%

Page 11: UFI Operations Award 2010 - Fira Barcelona

Security cost reductionReduction of security (including access and registration)

Minimize NVAA

Step 4.1

Self-service laptops

Registration confirmation (bar code)

Development of optimized registration services based on pre-registration plus onsite fast track system:

Pre-Registration

Auto Check-in Kiosks

Page 12: UFI Operations Award 2010 - Fira Barcelona

Energy cost reduction

Adjusting setpoints to 22ºC (winter) and 24ºC (summer)

District heating & cooling system

Energy management system

Installation of water-free toilettes

Light WaterAir

conditioned Power

Ejemplo: pantalla de gestión de una planta climatización

Redefining the lightning schedules (“venue shutdown”)

Replacing incandescent illumination by LEDs

Re-negotiating contracts

Solar cell panels installed (135.000m2 up to 5 Gwh/year)

Minimize NVAA

Step 4.1

Page 13: UFI Operations Award 2010 - Fira Barcelona

Waste cost reduction: strategy

ExhibitionDisposal

WasteEco-designControl

Patrols

New recyclable materials in

sales portfolio

RecyclingBuild up

dismantling

1. Reduce generation

2. Control of abandoned waste

• eco-design

• add recycled product in sales portfolio

• no free containers

• credit card guarantee

• patrols & penalties

3. Increase recycling • new cleaning process – by material

• new cleaning supplier

Materials New procedure and supplier

Minimize NVAA

Step 4.1

Page 14: UFI Operations Award 2010 - Fira Barcelona

29

28

17

6

5

86

wood

paper/carton

textile

plastic (film)

bottles/cans

Organic

Other

a) Waste composition study (%)

Waste cost reduction: actions

1. Reduce generation

3. Increase recycling

a) Eco-design guide

c) Joint initiatives with organizers

b) New green products in portfolio

b) Selective waste collection points

c) Specific treatment per material

d) Specific recycling projects (p.eg. Carpet)

a) No free containers in the halls (contracted and under control)

b) Patrolling+pictures (credit card guarantee)

2. Control of abandoned waste

Minimize NVAA

Step 4.1

Page 15: UFI Operations Award 2010 - Fira Barcelona

Waste cost reduction: results

Results Cost evolution

0 5 10 15 20

ESTUDIA

EXPOHOGAR Tard

EXPOHOGAR Prim

MAQUITEC

INFANCIA

ANTIQUARIS

ECOCITY

BCN RAIL

PISCINA

SONIMAGFOTO

SITC

Exhib

itio

n

cost (m€)

previousedition

2009

0 50 100 150 200 250 300

NÀUTIC

AUTOMÒBIL

CONSTRUMAT

Exhib

itio

n

cost (m€)

previousedition

2009

Exhibition Disposal

Waste

RecyclingMaterials

-86%

-78%

-51%

-36%

Minimize NVAA

Step 4.1

Page 16: UFI Operations Award 2010 - Fira Barcelona

Waste management

Customer services

Set up costs

Maintenance

Other

Summary of projects on cost reductionMinimize

NVAA

Step 4.1

eco-design Patrols recycling

optimization of positions

standard signage less carpet

frequency optimization contract re-negotation

overheads, ITC, transport, supplies...

automated office accesses access scheduled reviewed

energy project

new process change of supplier

frequency optimization change of supplier

Exhibitions Operational Cost Venue Structural Cost

Energy

optimization of positions new supplier

Security

Cleaning

-38%

-47%

-17%

-16%

-16%

-34%

-73%

-24%

-33%

-23%

Results (Reduction index 2009 vs 2007)

energy project

Page 17: UFI Operations Award 2010 - Fira Barcelona

• Optimization of planning process: from coordination of roles, to small team.

• ICT Projects to replace processes based on telephone, fax and photocopies, to web interfaces (faster, less effort and less prone to mistake).

• Externalizing non core processes: p.eg. Warehouse, customs

Human Effort reductionby using ECRS (Eliminate, Combine, Reduce and Simplify)

E-commerce Supplier portalFootprints

(complaints management)

Exhibitor online

Minimize NVAA

Step 4.1

Page 18: UFI Operations Award 2010 - Fira Barcelona

Develop projects to increase value. Enhance

VAA

Step 4.2

Leverage Items Strategic Items

Non-critical Items Bottleneck ItemsPro

fit

Imp

act

Exploitation of purchasing power

Diversify, balance or exploit

Volume AssuranceEfficient progressingLow

High

Kraljic Model Purchasing Portfolio management

Supply Risk HighLow

Stand building, logistics

Power, rigging

Cleaning & waste

security

Air-conditioning rental

Vertical Integration. Firesa and Servifira Project.

Exploiting sinergies in the supply chain

Kraljic Matrix: to guide the purchasing negotiation efforts. All contracts were re-newed (cleaning, rigging, electrics, carpet, hostesses, security, etc.).

Developing new business models, creating 2 joint ventures

Page 19: UFI Operations Award 2010 - Fira Barcelona

Exhibitions Operational Cost Venue Structural Cost

1. Operating costs and Venue Structural costs have reduced in 42% and 21% respectively

Overall results

0% 20% 40% 60% 80% 100%

Total

Set upcosts

LogisticsServices

Customerservices

Energy 2007

2008

2009

2010 (budget)

0% 20% 40% 60% 80% 100%

Total

Security

Energy

Cleaning 2007

2008

2009

2010 (budget)

Since the start of this program :

Page 20: UFI Operations Award 2010 - Fira Barcelona

2. Reinvestment of savings has generated 29% additional revenues in new products and services (whilst operating cost has reduced 22%)

Overall resultsSince the start of this program :

0%

20%

40%

60%

80%

100%

2007 2008 2009 2010(budget)

Operational Cost contribution

Contribution for new services

0%

25%

50%

75%

100%

125%

150%

2007 2008 2009 2010(budget)

-22%+ 29%

Page 21: UFI Operations Award 2010 - Fira Barcelona

0

0,1

0,2

0,3

0,4

0,5

2007 2008 2009 Year todate2010

Complaintsper exhibitor(average)

exhibitors (%)withcomplaints

3. The number of complaints in services to exhibitors has dropped above 80%

Overall results

-83%

Reduction index 2010 vs

2007

-77%

Since the start of this program :

Evolution of complaints in exhibitor services

Page 22: UFI Operations Award 2010 - Fira Barcelona

Objective

Challenges to complete the expansion:

1. Reduce current costs and free up resources

2. Reinvest these resources in the growth

3. Increase the value (better quality & service, less cost).

Success!!

- 42% operating cost + 22% released resources- 21% structural cost

+ 29% additional business (new services)

- 80% complaints in exhibitor services

Page 23: UFI Operations Award 2010 - Fira Barcelona

Cost Efficient Operations at Fira BarcelonaCost Efficient Operations at Fira Barcelona

How to focus on what really countsHow to focus on what really counts