  • Confidential

    Toray Hollow FiberMembrane ModulesToray Hollow FiberToray Hollow FiberMembrane ModulesMembrane Modules

    August 2009

  • 2Confidential

    Company

    Moduleconfiguration

    Norit

    Membranematerial

    Membranearea (m2)

    Module flux(m3/h,50kPa)

    72

    20(12)

    5035

    Filtrationmode

    GE/Zenon Pall/Asahi Toray

    Inside-outPressure PressurePressure

    Outside-in Outside-in

    PVDFPVDFPES-PVP

    Membranepore size 200kDa

    -

    Hollow-fiberOD/ID (mm) 1.2 / 0.8 1.3 / 0.7 1.5 / 0.9

    0.1 m 0.02 m

    Model XIGA UNA-620A HFS-2020

    -

    Zeeweed1000

    PVDF

    0.02 m

    0.6 / 0.35SubmergedOutside-in

    46.5

    HFU-2020

    PVDF

    0.01 m(150 kDa)

    1.5 / 0.9

    PressureOutside-in

    72

    12

    Hollow Fiber Membrane ManufacturersHollow Fiber Membrane Manufacturers

    HFM-2020

    0.1 m

  • 3Confidential

    CasingPVC

    HF Membrane(PVDF)

    Filtrate

    FeedWater Air

    Drain

    DrainVent

    Back Wash

    216mm2,160mm

    Toray PVDF Large Size ModuleToray PVDF Large Size ModuleType : HFS/HFUType : HFS/HFU--20202020

    FeaturesFeatures- Module Type : Pressured Type- Filtration Method : Outside to Inside- Membrane Area : 72 m2- Dimension : 216D x 2,160L [mm]AdvantagesAdvantages- Stable Continuous Filtration- High Filtration Flow : 110 260 m3/d- High Chemical Resistance- High Physical Strength and High Integrity

  • 4Confidential -- ApplicationApplication --

    1. Drinking Water Production(Municipal & Private)

    4. Industrial Water Treatment(ex. Boiler Water, Beverage)

    2. Waste Water Reuse(Tertiary Treatment )

    3. Seawater Desalination(Ro Pretreatment)

  • 5Confidential

    Toray Hollow Fiber Membrane Technology

  • 6Confidential

    Non-solventInduced PhaseSeparation(NIPS)

    ExtractionHigh StrengthHigh Cost

    Melt spinning with poreformation agent andExtraction (PVDF, etc.)

    Drawing

    Spinning

    Polymer solution iscoagulated by non-solvent(PS, PES, PAN, CA, PVDF,etc.)

    Melt spinning and drawing(PE, etc.)

    Feature

    Low StrengthUF and MFLow Cost

    High StrengthHigh Pore DensityHigh PermeabilityLow Cost

    High StrengthDifficulty for

    pore size controlling

    MeltSpinning

    SolutionSpinning Thermally

    Induced PhaseSeparation(TIPS)

    Pore Formation

    Polymer solution is cooleddown for phase separation(TORAY PVDF)

    Spinning Method of Hollow Fiber MembraneSpinning Method of Hollow Fiber MembraneSpinning Method of Hollow Fiber Membrane

  • 7Confidential

    Membrane Fiber Physical StrengthMembrane Fiber Physical Strength-- by Material & by Spinning Methodby Material & by Spinning Method --

    PVDF

    PAN

    CA

    PS

    Strength (MPa)

    Test ConditionsTensile Tester, Test Sample Length: 50mm, Pulling Speed : 50mm/min, Temp.:25 C

    0 5 10 15

    Strength (g/fiber)

    NIPS(non-solvent inducedPhase Separation)

    TIPSL-L Phase Separation

    0 500 1,000 1,500

    TIPSNewly developed

    S-L Phase Separation

    TIPSS-L Phase Separation

    by Spinning Methodby Material

  • 8Confidential

    1

    10

    100

    1000

    10000

    Membrane Fiber Folding Test Results

    TorayPVDF

    The

    fold

    ednu

    mbe

    rfo

    rbre

    akin

    g

    Test Conditions : ASTM D2176 (JIS P8115),500 g of loads,135 degrees of Angle

    PVDFPES

    8

    Test Equipment Test Results

  • 9Confidential

    0

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    0 100 200 3000

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    0 400 800 1200

    Sodium Hypochlorite(1,000 ppm, pH=10)

    PVDF

    PAN

    PE

    CA

    PS

    Stre

    ngth

    afte

    rsoa

    king

    /Ini

    tialS

    tren

    gth

    (-)

    Soaking period (hr)

    Fenton Reagent5,000ppm H2O2+300ppm Fe2+

    PVDF

    PAN

    PE

    CA

    PS

    Soaking period (hr)

    Stre

    ngth

    afte

    rsoa

    king

    /Ini

    tialS

    tren

    gth

    (-)

    Membrane Fiber Chemical StrengthMembrane Fiber Chemical Strength-- by Materialby Material --

  • 10

    Confidential

    Cross section Low foulinglayer

    Supportlayer(high flux &high Strength)

    Composite membrane

    Toray PVDF Hollow Fiber Membrane Line-upToray PVDF Hollow Fiber Membrane LineToray PVDF Hollow Fiber Membrane Line--upup

    HFSPore sizeor MWCO 0.1 m

    HFM HFU150kDa0.02 m

    Pretreatment None Case by caseCoagulationApplicable ave.Feed turbidity < 0.05 NTU < 30 NTU < 30 NTU

    ApplicableFlux

    < 5.0 m/d(208 lmh)

    < 3.0 m/d(125 lmh)

    < 3.0 m/d(125 lmh)

    Water source Ground water Surface water Surface water

    RecommendedApplication DW DW, IW

    DW, IW, TT,SWRO

  • 11

    Confidential

    Pilot Study

  • 12

    Confidential Pilot Test Competition in KoreaPilot Test Competition in Korea(Drinking Water Production, Mar.(Drinking Water Production, Mar. Aug. 2005)Aug. 2005)

    Competition for Full Scale ProjectTest Term : Mar Aug 2005Participants: Toray, Company A, B

    Toray Asahi Zenon

    50

    A

    PVDF

    0.1

    Supplier

    Module

    MembraneMaterial

    Membrane area (m2) 31.672

    Filtrationsystem

    BToray

    PVDFPVDF

    0.040.02Nominal Pore size(Micro-meter)

    Pressurize/ Dead-end

    Pressurize/ Cross-flow

    Submerged/ Suction

    50

    60

    70

    80

    90

    100

    Wat

    erre

    cove

    ryra

    tio(%

    )

    0

    0.1

    0.2

    0.3

    0.4

    0.5Recovery Power consumption rate

    Elec

    tric

    pow

    erco

    nsum

    ptio

    nra

    te(k

    Wh/

    m3 )

    Toray is selectedas the most preferable supplier

    Most Stable OperationLeast Electricity ConsumptionHighest Water Recovery

    - -

    Zenon CIPZenon CIP

    0

    50

    100

    150

    200

    3/1 3/31 4/30 5/30 6/29 7/29 8/28

    Time (day)

    TMP

    kPa

    Asahikasei Zenon Toray

    AsahiAsahiChemicalChemical

    CIPCIP

    A B

    B

    A

    A B

  • 13

    Confidential SWRO Pilot Test in Qatar(Application : SWRO, Sep. 2008 - )

    - Joint Study of Japans WRPC (Water Re-use PromotionCenter) and QEWC (Qatar Electricity & Water Corporation)

    - Objective : High Salt Concentration SW Desalination- Toray supply both UF and RO for this study.

    BackgroundBackground

    UF Membrane Module Skid RO Membrane Skid

    Pilot Plant SpecificationsPilot Plant Specifications- UF Membrane : HFU-2020 x 8 pieces (Pretreatment with Sand Filter )

    Operating Conditions : Flux 1.46 m/d, Water Recovery 96%, SDI=1.7- RO Membrane : TM820H-400 x 24 pieces (6 pcs/vessel x 4 vessel )

  • 14

    Confidential

    Certificate for Drinking Water Production

  • 15

    Confidential

    NSF61 Certification for Drinking Water ApplicationNSF61 Certification for Drinking Water ApplicationModels : HFS-2020, HFS-1020Certified through UL (Underwriters Laboratories Inc.)

    Drinking Water System ComponentsANSI/NSF STANDARD 61

    FDNP.MH45428

  • 16

    Confidential

    CDHS Conditional Approval for DW ApplicationCDHS Conditional Approval for DW Application- Pilot Test finished with HFS-2020 module in Upland,CA.- Official Approval Letter was issued September 2007.- Very high maximum flux was accepted. (120 gfd / 4.9 m/d)

    TORAYZenonKochHydra-nautics

    Aqua-source

    PallUS FilterCompany

    2001

    11.8

    49.8

    2-log

    4-log

    4-log

    PVDF

    ZeeWeed500

    2001

    10

    30

    3.5-log

    4-log

    4-log

    PVDF

    ZeeWeed1000

    2001

    18

    69.3(ID)

    4-log

    4-log

    4-log

    PES

    HYDRA-cap

    2001

    35

    102(ID)

    4-log

    4-log

    4-log

    PS

    PMPW

    2001

    29

    50

    0.5-log

    4-log

    4-log

    PVDF

    4-log4-log4-log4-log4-logGiardia

    1.5-log4-log0.5-log0-log0.5-logVirus

    Max. TMP(psi)

    Max. Flux(gfd)

    Crypto-sporidium

    (2007)2001200120012001Certificated Year

    2929361715

    12080

    (ID)5293.666.9

    OperationCriteria

    4-log4-log4-log4-log4-logRemoval

    Credit

    PVDFCAPVDFPPPPMembrane

    Material

    HFS-2020

    USV-5203

    Model

  • 17

    Confidential

    Track Record

  • 18

    Confidential

    Cumulative Plants Capacity:339,330 m3/d (as of Dec. 2008)Cumulative Plants Capacity:

    339,330 m3/d (as of Dec. 2008)

    2,700m3/dPretreatmentfor seawaterdesalination9/2003 start

    5,000m3/d7/2002 start

    88,000m3/dDrinking water;3/2007 start

    Largest plant in Japan

    8,000m3/dDrinking water;10/2005 start

    19,000m3/dDrinking water;1/2009 start

    3,300m3/d2/2004 start

    30,000m3/dDrinking water

    in Korea6/2009 start

    Korea s Largest

    8,640m3/dDrinking waterin Indonesia

    12/2007 start

    Boiler WaterProduction Plantin USATotal: 6,500 m3/d

    3,200m3/d6/2004 start

    Drinking WaterCryptosporidiumRemovalTotal: 13,000 m3/d

    8,000m3/d8/2003 start

    3,500m3/dDrinking water;CryptosporidiumRemoval5/2003 start

    18

    Track Record Toray PVDF Hollow Fiber Membrane ModulesTrack Record Toray PVDF Hollow Fiber Membrane Modules

  • 19

    ConfidentialToray PVDF Membrane for Waste Water Treatment

    500 m3/dActual PlantWastewater reusein Korea6/2006 start

    2,500 m3/dActual PlantWaste watertreatment fromchemical factoryin Taiwan3/2007 start

    Pilot TestSewage ReuseUF+ 16 inch ROin Changi Singapore2/2009 start

    2,160 m3/dActual PlantWastewater reusein Beijing China9/2005 start

    1,200 m3/dActual PlantWastewater reusein Beijing China9/2007 start

    Pilot TestSewage ReuseUF+ROin Shiga Japan2005

    Pilot TestSewage TTUFUl Pandan, Singapore20032004

    2,160 m3/dActual PlantWastewater reusein Pilippines6/2006 start

    1,440 m3/dActual PlantWastewater reusein Gifu Japan11/2006 start

    3,600 m3/dActual PlantSewage TTin Chengdu China10/2008 start

  • 20

    Confidential

    References

  • Confidential DW Production Plants (Japan)DW Production Plants (Japan)-- Cryptosporidium RemovalCryptosporidium Removal --

    First Phase- Capacity : 5,000 m3/d- Module :

    HFM-2020 x 20 pieces- Operation Started

    in July 2002- Water Recovery : 98%

    Plant OverviewMembrane Rack

    Second Phase- Capacity : 8,000 m3/d- Module :

    HFM-2020 x 28 pieces- Operation Started

    in Aug. 2003- Water Recovery : 98%

    Plant Overview Membrane Rack

  • 22

    ConfidentialThe Largest Membrane Treatment Plant for DW in JapanThe Largest Membrane Treatment Plant for DW in JapanOperation started in March 2007Operation started in March 2007

    Process Flow MainMembrane

    System

    22 pcs.

    Sub Membrane System

    5 pcs.

    PAC TankPump

    Agitator

    Feed MainFeedPump

    Main Raw Water Tank Sub Raw Water Tank Drainage Tank

    Com-pressor

    AirTank

    Washing TankBackwash Pump

    Public Sewage System

    PermeateWater

    NaClO TankPump

    March 2007Operation Start

    HFM-2320 (75m2)Module Type

    River-Bed WaterRaw Water99.9%Water Recovery Ratio

    1st stage: 264 pcs.2nd stage: 20 pcs.

    No. of Modules

    88,000m3/d(44,000m3/d x 2 trains)

    Capacity

    KinutaKinuta Water Works in Tokyo (88,000 mWater Works in Tokyo (88,000 m33/d)/d)

  • 23

    ConfidentialThe Largest Membrane Treatment Plant for DW in KoreaThe Largest Membrane Treatment Plant for DW in KoreaOperation started in June 2009Operation started in June 2009

    June 2009Operation Start

    HFS-2020 (72m2)Module Type

    River WaterRaw Water480 pcsNo. of Modules

    30,000 m3/d (7,500m3/d x 4 trains)Capacity

    GongjuGongju DW Plant in Korea (30,000 mDW Plant in Korea (30,000 m33/d)/d)

  • 24

    Confidential

    P

    HFMHFM--2020202040 pcs.40 pcs.

    PP

    MFMF

    P

    P

    1

    Sea Water

    3,000 m3/

    P PP

    P

    P

    1

    1,100m3/

    1,600m3/

    2,700m3/

    Brine Conversion2-stages SeawaterDesalination System

    RO Pretreatment for Seawater Desalination (Japan)RO Pretreatment for Seawater Desalination (Japan)Operation Started in Sep. 2003Operation Started in Sep. 2003

    Pretreatment Capacity : 3,000 m3/d

  • 25

    ConfidentialOperating Results of MF for RO PretreatmentOperating Results of MF for RO Pretreatmentin SW Desalinationin SW Desalination

    0

    50

    100

    150

    200

    250

    300

    350

    1/1 1/31 3/1 3/31 4/30 5/30 6/29 7/29 8/28 9/27 10/27

    TMP

    (KPa)

    0

    5

    10

    15

    20

    25

    30

    35

    Tem

    p(

    )

    M F-AM F-BTEM P

    MF: Stable Operation with 1.1m/d of Flux for more than 10 months.RO: Stable Operation

    CIPCIP CIPCIP

    Flux:1.1m/d ,Filtration time:30min, w/o coagulantFlux:1.1m/d ,Filtration time:30min, w/o coagulantFeed turbidity:1Feed turbidity:1 10 NTU10 NTUFiltrate turbidity:0.01NTUFiltrate turbidity:0.01NTUFiltrate SDI : < 3.0Filtrate SDI : < 3.0

  • 26

    ConfidentialScope of Supply for UF Membrane BusinessScope of Supply for UF Membrane BusinessScope of Supply for UF Membrane Business

    Field SupportSystem Design Support

    - Module Installation- Plant Commissioning- Chemical Cleaning- Trouble-shooting

    - Filtration Process Proposal (free)Design Flux Recommendation,Module Projection,Lab. Filtration Test with Water Sample(when difficult raw water)

    - Basic Design RecommendationPFD, Layout, Equipment List,Rack Drawing

    MembraneModuleswith Manual,

    Rackif requested

    Project

    - Module Installation- Plant Commissioning- Chemical Cleaning- Trouble-shooting

    MembraneModuleswith Manual

    BaseProducts

    - Filtration Process Proposal (free)Design Flux Recommendation,Module Projection

    - Detailed Design SamplesP&ID, Layout, Equipment List,Rack Drawing

    PackagePlant

    Technical SupportBusinessCategory

  • 27