One of the largest highway projects in Utah history, the I-15 transportation corridor reconstruction involves restoring and rebuilding 26 miles of highway, more than 60 bridges, 10 interchanges, and 130 mechanically stabilized earth retention walls — all to be completed in an ambitious three-year construction schedule under Utah Department of Transportation (UDOT) guidelines. CHALLENGING LOCATION WITH UNSTABLE TERRAIN The project’s accelerated construction schedule and location within the alluvial deposits of Utah’s Wasatch Valley posed several technical and management challenges. Kleinfelder quickly mobilized field crews to complete site characterization and laboratory testing so engineers could perform analyses and provide recommendations. Subsurface conditions, including an active fault and unstable lake bed deposits, created geotechnical concerns for addressing embankment settlement, slope stability, liquefaction potential, lateral spreading mitigation, and bridge, sign, and high-mast foundations. COST-SAVING RECOMMENDATIONS From engineering technical centers across the firm, Kleinfelder provided numerous time- and cost-saving recommendations for construction, including: Reducing the amount of PV drains and surcharge duration needed to meet settlement requirements; Using lightweight aggregates to reduce the amount of PV drains and surcharge; Reducing the replacement ratio and number of stone columns required to mitigate for liquefaction and lateral spread; and Minimizing pile length only to what was required for settlement and/or axial capacity. An Employee-Owned Company | © 2013 Kleinfelder. All rights reserved. PROJECT RESULTS Kleinfelder’s alternative technical solutions substantially reduced bid estimates for prefabricated vertical (PV) drains, surcharge, stone columns, and pile length – saving millions of dollars in construction costs and significantly reducing the construction schedule. Kleinfelder continues to meet the client’s project budget and scheduling issues while providing engineering services, instrumentation installation, and monitoring services. Location: Utah County, Utah Owner: Utah Department of Transportation (UDOT) UDOT I-15 CORE Technical Solutions
1

UDOT I-15 CORE Technical Solutions - Kleinfelder...One of the largest highway projects in Utah history, the I-15 transportation corridor reconstruction involves restoring and rebuilding

Jul 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: UDOT I-15 CORE Technical Solutions - Kleinfelder...One of the largest highway projects in Utah history, the I-15 transportation corridor reconstruction involves restoring and rebuilding

One of the largest highway projects in Utah history, the I-15 transportation corridor reconstruction involves restoring and rebuilding 26 miles of highway, more than 60 bridges, 10 interchanges, and 130 mechanically stabilized earth retention walls — all to be completed in an ambitious three-year construction schedule under Utah Department of Transportation (UDOT) guidelines.

Challenging loCation with Unstable terrainThe project’s accelerated construction schedule and location within the alluvial deposits of Utah’s Wasatch Valley posed several technical and management challenges. Kleinfelder quickly mobilized field crews to complete site characterization and laboratory testing so engineers could perform analyses and provide recommendations. Subsurface conditions, including an active fault and unstable lake bed deposits, created geotechnical concerns for addressing embankment settlement, slope stability, liquefaction potential, lateral spreading mitigation, and bridge, sign, and high-mast foundations.

Cost-saving reCommendationsFrom engineering technical centers across the firm, Kleinfelder provided numerous time- and cost-saving recommendations for construction, including:• Reducing the amount of PV drains and surcharge duration needed to meet

settlement requirements;• Using lightweight aggregates to reduce the amount of PV drains and surcharge;• Reducing the replacement ratio and number of stone columns required to

mitigate for liquefaction and lateral spread; and• Minimizing pile length only to what was required for settlement and/or

axial capacity.

An Employee-Owned Company | © 2013 Kleinfelder. All rights reserved.

ProJeCt resUlts

Kleinfelder’s alternative

technical solutions

substantially reduced bid

estimates for prefabricated

vertical (PV) drains, surcharge,

stone columns, and pile

length – saving millions of

dollars in construction costs

and significantly reducing

the construction schedule.

Kleinfelder continues to meet

the client’s project budget

and scheduling issues while

providing engineering services,

instrumentation installation,

and monitoring services.