Utah Department of Transportation Report to Executive Appropriations Committee Shane Marshall, P.E., Deputy Director June 16, 2015
Aug 04, 2015
UtahDepartmentofTransportationReporttoExecutiveAppropriationsCommittee
ShaneMarshall,P.E.,DeputyDirectorJune16,2015
AnnualPavementandBridgeNeeds
BridgesLevel 2
$50
$38
$25
$13
$0
Millions of D
ollars
Anticipated NeedsAvailable
$40 Million $27 Million
$10 Million
$21 Million
Unfunded Needs
ProgrammingRevenuetoMeetPavementandBridgeNeeds
BridgesLevel 2
$50
$38
$25
$13
$0
Millions of D
ollars
Unfunded NeedsAvailable
$40 Million $27 Million
$10 Million
$21 Million
HB 362
$10 Million
$40 Million$15 Million
UDOT Asset Management
$2 Million
ProjectedPavementConditionswithH.B.362
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Level 2 ConditionForecast with $10 million/yr
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Level 2 ConditionForecast with $50 million/yr
ProgrammedCapacityProjects
Project Description Project Value Project Description Project Value
I-15; SR-73 to 12300 South Widening $252,000,000.00 SR-18; Interchange at Bluff and Sunset Streets $20,000,000.00
Mountain View Corridor - 5400 South to 4100 South $180,000,000.00 I-80; Parley's Summit to Jeremy Ranch WB Truck Ln $17,000,000.00
I-15; South Davis Operational Upgrades $133,000,000.00 SR-108; SR-37 to SR-79 $17,000,000.00
I-15, 2700 N (Farr West) to 1100 S (Brigham City) $68,000,000.00 US-40; Myton Bench Widening $15,000,000.00
SR-265; Univ. Pkwy.,800 E Orem to Univ. Ave. Provo $52,000,000.00 I-15; Beaver Ridge Climbing Lanes Project $15,000,000.00
I-15; Interchange Modifications (Layton Area) $52,000,000.00 US-89 (300 S); 100 E to 700 E Provo $12,000,000.00
SR-108; SR-127 to SR-107 $50,000,000.00 US-6; Passing Lanes MP 262.5 to MP 297 $9,000,000.00
Bangerter Hwy. & 600 W $49,000,000.00 SR-10; SOUTH PRICE TO RIDGE ROAD $8,000,000.00
SR-154 & 90th South Interchange $49,000,000.00 US-6; Passing Lanes MP 273 to MP 290 $6,000,000.00
SR-18; St. George Blvd to Sunset Blvd. $38,000,000.00 US-191; Passing Lanes MP 80 to MP 96 $6,000,000.00
SR-68; Saratoga Springs to Stillwater Parkway $31,000,000.00 SR-30; Passing Lanes (Box Elder/Cache Counties) $5,000,000.00
I-15; Pine Creek Climbing Lanes & ITS/ATMS $29,000,000.00 I-15; MP 10 Thru Turns at Green Springs $3,000,000.00
I-15; MP 22 to MP 28 - Passing Lane, North Bound $25,000,000.00 SR-92 Center Street Access $2,000,000.00
I-15; Brigham Road to Dixie Drive South Bound $25,000,000.00 I-15 Mobility Study $2,000,000.00
SR-37; 5100 West to SR-108 $22,000,000.00 I-15; MP 8-10 Aux Lanes to Allow for Underpass $1,000,000.00
TransportationInvestmentFundEstimatedRevenuewith$100MreductionandBondPayments
$10MinFY2017,$20MinFY2018,$30MinFY2019,etc.
$325,565 $349,205 $326,332 $276,152 $269,368 $270,055 $283,595 $276,637
$262,698 $290,264 $338,232 $413,344 $428,779 $437,348 $434,228 $451,171
588,263
639,469 664,564
689,496 698,147 707,403 717,823 727,808
$‐
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022
Bonds Payments Cash Available for Projects TIF Revenue