PUBLIC NOTICE ADVERTISEMENT FOR BIDS JUDICIAL DITCH NO. 13 REPAIR LYON AND LINCOLN COUNTY, MN RECEIPT AND OPENING OF PRO- POSALS: Sealed proposals for the work described below will be received at the Office of the County Auditor-Treasur- er, Lincoln County, 319 No. Rebecca, P.O. Box 29, Ivanhoe, MN 56142 until 10:00 a.m. on February 10, 2015 at which time the bids will be opened and publicly read. DESCRIPTION OF WORK: The work includes the construction of approxi- mately: 13,400 L.F. Open Ditch Cleaning 3,300 L.F. 8” to 24” Surface Water Pipe 13,400 L.F. Ditch Seeding 34 EA 8” to 24” Surface Water In- takes 1,055 L.F. 8” to 60” CS Pipe Installa- tion together with numerous related items of work, all in accordance with Plans and Specifications. PLANHOLDERS LIST, ADDEN- DUMS AND BID TABULATION: The planholders list, addendums and bid tabulations will be available for down- load on-line at www.bolton-menk.com or www.questcdn.com. Any adden- dums may also be distributed by mail, fax or email. TO OBTAIN BID DOCUMENTS: Complete digital project bidding docu- ments are available at www.bolton- menk.com or www.questcdn.com. You may view the digital plan docu- ments for free by entering Quest proj- ect #3639533 on the website’s Proj- ect Search page. Documents may be downloaded for $20.00. Please contact QuestCDN.com at 952-233-1632 or [email protected] for assistance in free membership registration, viewing, downloading, and working with this digital project information. An optional paper set of project documents is also available for a nonrefundable price of $50.00 per set, which includes appli- cable sales tax and shipping. Please make your check payable to Bolton & Menk, Inc. and send it to 140 First Av- enue North, P.O. Box 434, Sleepy Eye, MN 56085, (507) 794-5541, fax (507) 794-5542. RESPONSIBLE BIDDER REQUIRE- MENTS: A contractor responding to this solicitation document shall sub- mit to the County a signed statement under oath by an owner or officer veri- fying compliance with each of the min- imum criteria in Minnesota Statutes, Section 16C.285, Subdivision 3. BID SECURITY: A certified check or proposal bond in the amount of not less than 5 percent of the total amount bid, drawn in favor of Lyon and Lin- coln County, MN shall accompany each bid. OWNER’S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids and to waive any irregulari- ties and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby. Dated: January 5, 2015. /s/ Kathy Schreurs County Auditor (Printed 3x, January 14, 21 and 28, 2015 in the Tyler Tribute, Hendricks Pioneer and the Lake Benton Valley Journal)
1
Embed
TyLER LuMBER COMpANy tyler City utilities tyler PubliC ...clarkprinting.dreamhosters.com/tyler/wp-content/uploads/2013/10/2… · 14/01/2015 · 40 Kaleb Larsen C 6'3 11 42 Westin
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Call Tony 507-530-6482
ALSO:Excavation Demolition Dozer Work Tree MovingSite Work Gravel
SPECIALIZING IN DIRECTIONAL DRILLING
OF ALL TYPES:Farm Drainage | Electrical Sewer | Culverts | Water
*Other Internet speeds available. Contact us for details.
MEANS MORE ENJOYMENT FORMORE USERS ON MORE DEVICES
MORE INTERNET SPEED
How many family members are typically online at your house and what are they doing? Many households now need more Internet speed to handle more streaming, more gaming, more downloading, and more socializing. Fortunately, you can get a lot more Mbps for just a little more money:
UP TO 50 MBPS DOWNLOAD SPEED AVAILABLE.PACKAGES STARTING AT $39.95 507-658-3830 • www.woodstocktel.net
Monday garbage pickup will be on Tuesday, January 20
the tyler City offiCetyler PubliC librarytyler City utilities
in observance of martin lutheran King Jr. Day
wILL BE CLOsED ON MONDAy, JANuARy 19
RTR Knights Boys Basketball vs. Central MN Christian • Friday, January 16, 7:30 p.m.
Central mn Christian varsity team# Player Name Position Height Grade 2 Matthew Van Eps G 5'9 103 Luke Vander Beek F 5'10 114 Noah Wubben G 5'10 115 Lucas Schwitters G 5'10 1110 Ethan Brouwer F 6'1 1011 Tanner Stoel F 6'1 1013 Kishaun Henry F 6'4 1120 Taylor Slagter G 6'3 1122 Joey Johnson F 5'11 1224 Lucas Van Eps G 5'10 1231 Austin Bulthuis F 6'3 1232 Levi Post F 6'2 1135 Ryan Greenwaldt G 6'0 11
Head Coach: Ted TaatjesAssistant Coaches: Brian Nelson , Derrick Bulthuis, Don Grussing
Head Coach: Ted KernAssistant Coach: Daren Gravley
b-squad team b-squad teamC-squad team# Player Name Grade 12 Alex Wojahn 1120 Jayden Strand 1022 Tate Thooft 1032 Joe Jackman 1042 Josh Reese 1050 Sam Schardin 10
# Player Name Grade 3 Tedd Ahrenholz 104 Aaron Zwart 1024 Jaxon Schwitters 1030 Austin Marcus 1033 Micah Groen 1134 Taylor Swart 11
# Player Name Grade 5 Carter Hansen 810 Cooper Hansen 814 Chris Muecke 834 Damian Beaulieu 940 Jared Baartman 9
# Player Name Position Height Grade 4 Dain LaRock G 5'7 115 Brett Knudsen G 6'1 1210 Jonah Johnson G 5'9 912 Carter Johnson G 5'8 1114 Jacob Peterson G 5'7 1024 Garrett Kern F 6'0 930 Isaiah DeRuyter F 6'1 1232 Jerry Wichern F 6'1 1234 Ryan Fischer G 5'8 1140 Kaleb Larsen C 6'3 1142 Westin Kirk C 5'10 944 Wyatt Kirk F 6'0 11
rtr varsity team
wOODsTOCKTELEpHONE CO.
Ph. 658-3830Ruthton, MN
THOMSEN HARDWARE, LLCDowntown Tyler • 247-5553Clair and Cade Drake
Box 67 | Tyler, MN 56178Phone 507-247-5493
Drake Chimney Service and Concrete
Construction
Bruender’s corner Mart
103 S. Tyler Street, Tyler MN507-247-5587 or 507-476-0759 (cell)
Personalized ServiceProfitable Solutions
www.buffaloridgeconcrete.com 1.800.257.5576
8 locations in SW Minnesota
Denny’s RepairD&J Auto Parts
Ruthton507-658-3624
GyllinG Seed
507-247-5496
209 N. Tyler St., Tyler507-247-5878
Apollo WAter SyStemS, Inc.
Kelly Knudsen, Agent120 W Bradley St., Tyler
507-247-5562
507-530-6482For all your directional
boring needs - electric, sewer, water and farm draining
293 N. Tyler Street, Tyler(507) 247-5819
tyler eleCtriC
183 north tyler street, tyler, Mn507-247-5504 or 877-477-0830
Member FDIC
www.csbtylermn.com
Phone 247-5531Tyler, MN
SW MN DAiRY ASSociAtioN
Russell, MN
Phone:823-4311
205 W. Highway 14 • Tyler, MN 56178507-247-5505 • 1-800-927-6276
www.llec.coop115 West Lincoln St., Tyler, MN
(507) 247-5578
JOHNSON TRENCHINg CO.507-823-4253 Russell
507-530-2282
Tyler Lumber Co.
Phone 247-5546
Tyler Body Shop
507-247-5513Jason Brust
Your rTr Land ChevY and BuiCk STore!
www.deboer-motors.com
Buffalo Ridge lockeR
Buffalo Ridge expRess
RuTHTON, MN
EnEmark SEEdS
507-828-3695
Wensman, NorthStar Genetics, NK Soybeans and
Golden Harvest Corn
507-247-3430photos.buffaloridgenews.com
Find all of our sports photos online:
Public NoticeADVERTISEMENT
FOR BIDSJuDIcIAl DITch NO. 13 REpAIR
lyON AND lINcOlN cOuNTy, MN
RECEIPT AND OPENING OF PRO-POSALS: Sealed proposals for the work described below will be received at the Office of the County Auditor-Treasur-er, Lincoln County, 319 No. Rebecca, P.O. Box 29, Ivanhoe, MN 56142 until 10:00 a.m. on February 10, 2015 at which time the bids will be opened and publicly read.
DESCRIPTION OF WORK: The work includes the construction of approxi-mately:
13,400 L.F. Open Ditch Cleaning3,300 L.F. 8” to 24” Surface Water
Pipe13,400 L.F. Ditch Seeding34 EA 8” to 24” Surface Water In-
takes1,055 L.F. 8” to 60” CS Pipe Installa-
tiontogether with numerous related
items of work, all in accordance with Plans and Specifications.
plANhOlDERS lIST, ADDEN-DuMS AND BID TABulATION: The planholders list, addendums and bid tabulations will be available for down-load on-line at www.bolton-menk.com or www.questcdn.com. Any adden-dums may also be distributed by mail, fax or email.
TO OBTAIN BID DOcuMENTS: Complete digital project bidding docu-ments are available at www.bolton-menk.com or www.questcdn.com. You may view the digital plan docu-ments for free by entering Quest proj-ect #3639533 on the website’s Proj-
ect Search page. Documents may be downloaded for $20.00. Please contact QuestCDN.com at 952-233-1632 or [email protected] for assistance in free membership registration, viewing, downloading, and working with this digital project information. An optional paper set of project documents is also available for a nonrefundable price of $50.00 per set, which includes appli-cable sales tax and shipping. Please make your check payable to Bolton & Menk, Inc. and send it to 140 First Av-enue North, P.O. Box 434, Sleepy Eye, MN 56085, (507) 794-5541, fax (507) 794-5542.
RESpONSIBlE BIDDER REQuIRE-MENTS: A contractor responding to this solicitation document shall sub-mit to the County a signed statement under oath by an owner or officer veri-fying compliance with each of the min-imum criteria in Minnesota Statutes, Section 16C.285, Subdivision 3.
BID SEcuRITy: A certified check or proposal bond in the amount of not less than 5 percent of the total amount bid, drawn in favor of Lyon and Lin-coln County, MN shall accompany each bid.
OWNER’S RIGhTS RESERVED: The Owner reserves the right to reject any or all bids and to waive any irregulari-ties and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby.
Dated: January 5, 2015. /s/ Kathy Schreurs
County Auditor
(Printed 3x, January 14, 21 and 28, 2015 in the Tyler Tribute,
Hendricks Pioneer and the Lake Benton Valley Journal)