Top Banner
4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006
25

TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

May 13, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

4

TXU PowerComanche Peak Site

NRC Onsite ReviewSite Geotechnical Investigation Activities12-13 December 2006

Page 2: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Agenda and Introduction

• Project Introduction- Introductions

- Project Background and Status

• Project Organization and QA

* Site Investigations Overview

• Site Orientation- Site safety briefing- Logistics

- Site tour

Page 3: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Comanche Peak Site Background

" Multiple reactor technologies considered

• Plant placement designs were developed that enveloped potentialreactor technologies

• Multiple placements on the Comanche Peak site were consideredbefore current placement selected

* Geotechnical investigation commenced on borings common to allpotential reactor technologies (Phase 1)

* Geotechnical investigations will finalize site characterization afterthe reactor technology is selected (Phase 2)

* Hydrogeological investigation - including well developmentperformed to investigate groundwater conditions

Page 4: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Project OrganizationSite Geotechnical Investigations

TXU Power

Enercon ServicesCOLA Development

WLA FugroSeismic, Geologic & Site

Geotechnical GeotechnicalCharacterization Investigations

TSupport

SubcontractorsSupport

Subcontractors

Page 5: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Project Organization ResponsibilitiesSite Geotechnical Investigations

• TXU Power- Site owner

* Enercon Services, Inc.- COLA contractor for TXU Power- Providing QA oversight for geotechnical investigation activities

as well as managing interface with site owner• Enercon Subcontractors

- William Lettis & Associates, Inc. (WLA) - Provides OverallTechnical Direction for Geological, Geotechnical andSeismological Studies

- Fugro - Implementation of Site Characterization Activities; i.e.,Drilling, Well Installation, Laboratory Testing, GeotechnicalEngineering Services

Page 6: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Site Investigation/Data CollectionQuality Assurance

I TXU Power I

IEnercon QA Program IContracted to perform work under

LEnercon QA program ]I,

I Enercon QA ProjectPlan Document

[ Enercon ProjectInstruction (P1-02)

I-

4-

Includes drilling, well installation, surface anddownhole geophysical testing, geologic mapping,and laboratory testing.

*Data Collection Plan*Work Plan (DCP)* lnstructions-Preparation of DCP* lnstructions-Preparation of Work Plan* Instructions-Preparation of Work Instructions*Document Control Register

JI

Page 7: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Quality Assurance

* TXU contracted Enercon Services to perform COLAdevelopment under the Enercon Services' QA Program

• Geotechnical field investigation, laboratory testing, andengineering analysis performed by William Lettis &Associates and Fugro is performed under the EnerconServices' Quality Assurance Project Plan

Page 8: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Geologic and Geotechnical SiteCharacterization

* Characterize subsurface with existing (FSAR) and new data

• Sufficient new exploration to confirm and refine site stratigraphy

• Evaluate site subsurface variability* Develop site profile for ground motion response

" Identify possible geologic hazards

• Verify Vendor plant design parameters

" Prepare Conceptual Foundation/Geotechnical Design

• Characterize groundwater conditions (water table, confinedaquifers, dewatering requirements)

• Evaluate rock excavatibility and excavation support

Page 9: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Exploration Protocol

" Work will follow formal Enercon QA Program

" Performed by qualified, experiencedgeologists/engineers

" Senior Review (licensed professionals)

" Formal Internal Technical Review (ITR)

" Conformance to NRC RG 1.132, RG-1.138

" Satisfy vendor and SSI data requirements

Page 10: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

u-q

ffxpkwionb of 0004"k~ Uafts

OU* & i- . 04

*- W-

L-w

ammAWmr

wo.ws.

An

P 0 -. ONowom Explamallon

Somm;. G~oIM *ad foul daft derdwd "om "in & Bekmui (1974). * owh PI*S

01o50 SOf UAI ~oCffiPau"

0 100 200 kfn ED mm

Page 11: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

!xpbusU.n - GsoIm~m UftajGs~Ie Mm of Tmas~

- a

r. Wa,

~fl, ~

~ - Lfl0S l a, -

- .#4'4 lIt - -~ - a,~t a

NlIt

W~. a that atta, *~~~4t tatI,a,- ,~ it- fl - tatin.c.. -

Ir*t-.a tat 345 aaatha Itrtl

'atal laW 0 Cfl~flU bIll

- c,.~ taaaal Ittw.at '4 *

U~ - - - ~taam

Ia; ra flaIl atlC.l'tllat tlttttlItlalt,, tal11ata ,a taltlal IfI t

fllltall .la nl.at' bw, 11th In..,

'AOSW't alIt. ,,'4 qnbt 'tatIt twIlIt

wIle a tIn., I alt.4 hAtS 'tama

wet laIttOl .t*i lwtaa, 1111 ,tt.sbttl wInScIwttt't a.

U(3w ha. tlSllS,11SS

II -latt.*lawlwlI alItI,, qua1.51 III SI 'tIll atOllS atwIttIt M' -la, gIty flhll'Ih lIlt Ia lOll 51

NVa.tlt.SltaShl 6111 lOll ,,hlt C

*4Il. 1*1 ltt,. WIth lattoataa,, MIlaS IllSIaSl,.W.t

8~irce G*.Iogyiht. dst*ed tom Mw Oedo~e AMa. of Texas ~ Oval

15 fl*WtS J~II~a. tout Mw Texas COKWI~SI~O.t Oat EffVkOOmWt5~ QUSKy (TCEQ).

C

ni I * Coqane PogOf03 M 2ft l~ tilecnIss o rus

Page 12: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Field Exploration Methods

• Standard Penetration Testing(SPT) (Phases 1 and 2)

• Rock Coring (NQ, HQ sizes)(Phases 1 and 2)

• Borehole Pressuremeter Testing(Phase 2)

• Seismic Downhole and P-SSuspension VelocityMeasurements (Phases 1 and 2)

• Borehole Televiewer Profiles(Phases 1 and 2)

• Gamma and Caliper Profiles(Phases 1 and 2)

• Seismic Refraction and Gravity(Phase 2)

• Spectral Analysis of SurfaceWaves (SASW) (Phase 2)

• Borehole Packer Testing (Phase 2)

• Cone Penetration Test (CPT)Soundings (Phase 2 potential)

• Groundwater Monitoring Wells(Phase 1)

• Geologic Mapping (Phase 2)

• Test Pit Excavation and Mapping(Phase 2)

Page 13: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

-!I

V22 --. 1 1;

k

r - -I. - - -

I1

_____ ~~~~2

Page 14: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

MONTHLY PROGRESS REPORT NO. 10PERIOD ENDING AUGUST 31, 1975

2" ~"'.

NUMBER 87AUGUST 8, 1975

TEXAS UTILITIES SERVICES, INC.COMANCHE PEAK STEAM ELECTRIC STATION1980-82 2300 MW INSTALLATION

TURBINE GENERATOR AREA. BOTTOM-PUMPING CONCRETEINTO UNIT 1 CIRCULATING WATER DISCHARGE TUNNEL; TOP-

SCALING SOUTH EXCAVATION WALL. VIEW TO SOUTHWEST

Page 15: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

A W11207 --

1020- UNIT I UNIT 2 H-

920

8 2 0 --- -- -- -, -- -

720 4 9j r ~~15'GenRs V z~m t r

1120

1020

920

820-

720 1

wi¢

I

I'('•11

520 - -3 ' 520

420 .--• 44. ..... 420

320- L 32

P-S500'0 100 200 300 400 500 feet Notes:

1. Structures are schematic2. No vertical exaggeration

Scale

Page 16: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

'v-

( 0¼

I

7

"Iý7

!ýý7- I ~C,

Page 17: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

-l

II I

~ h

Page 18: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

--- F it .Im•

- 3.

/

I r-/ý U

A'

1'~-l t

~- -~

-3-

ýn

AI

*~ ~-1a,.

- 3 3~

2 - "~'-~ #'2.- -~-~-* /

-'.1 S

N

Page 19: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Laboratory Testing Program

GEOTECHNICAL INDEX GEOTECHNICAL INDEXMoisture Content and

Density

Specific Gravity

Petrographic Thin Section

Carbonate Content Consolidation

X-Ray Diffraction/Mineralogy Corrosion

Grain Size Proctor

Atterberg Limits and Indices(soil)

Slaking Durability (core)

Organic Content

California Bearing Ratio (CBR)Test

Page 20: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Laboratory Testing Program

GEOTECHNICAL STRENGTH

Unconfined Compression (core)

Unconfined Compression withModulus (core)

Unit Weight and Density (core)

Triaxial CU (3-point)

Direct Shear (3-point)

DYNAMIC TESTING

X-ray of UD Samples Prior to Shipping

Resonant Column/Torsional Shear Testing(University of Texas - Austin)

Lab Shear Wave Velocity (modulus)

Page 21: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Project Organization ResponsibilitiesSite Geotechnical Investigations

• WLA provides field project management for geotechnicaland geologic data collection tasks

" WLA Site Coordinator provides supervision of the day-to-day field activities

* Rig Geologist is assigned full-time with a drill rig.Responsibilities include:- Verify drilling or testing operations are conducted in

conformance with specified procedures- Document sample or test depths and test results- Maintain field logs of borings, including classification of materials

recovered and description of geotechnical soil properties- Chain-of-custody document preparation and logging samples

Page 22: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Geotechnical Borehole Procedure

" Work Instructions issued to drilling companies and Rig Geologistsdefining duties

* Boring Assignments for each borehole prepared by WLA SiteCoordinator. Boring assignments specify:- Boring location- Boring type- Boring depth- Required tests- Boring Completion

• Rig Geologist directs Drill Crew to prepare drill site and performdrilling per Boring Assignment

• Rig Geologist monitors drilling, describes samples, maintains fieldlog

• Modifications to Boring Assignment instructions, if needed,reviewed and approved by Site Coordinator

• Samples transported to site storage facility at end of each day

Page 23: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Current Site Activities

* Borings- 22 geotechnical borings completed or in progress

* Testing- Caliper

- Gamma

- Seismic Downhole and P-S Suspension Velocity Measurements- Borehole Televiewer Profiles

* Monitoring Wells- 20 monitoring well clusters installed

Page 24: TXU Power Comanche Peak Site - NRC: Home Page4 TXU Power Comanche Peak Site NRC Onsite Review Site Geotechnical Investigation Activities 12-13 December 2006

Safety

" Personal protective equipment requirements

" Incident reporting (including near misses)

• Inclement weather precautions

* Potential hazardous insects/reptiles

* Plant access requirements