Page 1: Turbo-Generator

‘TURBO-GENERATOR’

A presentation by Sandip Ghosh

Electrical Engineering

Page 2: Turbo-Generator

What is a‘Turbo-Generator’?

Page 3: Turbo-Generator

Function of Turbo-Generator

Page 4: Turbo-Generator

Today we will discuss on

Over view of Turbo-Generator (TG) systemSpeed control systemVaccum creation processGear BoxParts of GeneratorAutomatic Voltage Regulator (AVR)Brushless ExcitationSynchronizationInterconnection b/w incomers & outgoings linesLoad distribution of TG

Page 5: Turbo-Generator

Basic overview of Turbo-Generator

Page 6: Turbo-Generator

OVERVIEW

Page 7: Turbo-Generator

Speed Control

Page 8: Turbo-Generator

Closed loop speed feedback control

Page 9: Turbo-Generator

Vaccum creation process

Page 10: Turbo-Generator

Vaccum creation

Page 11: Turbo-Generator

Gear Box

Page 12: Turbo-Generator

Gear setup arrangement

Page 13: Turbo-Generator

PARTS OF GENERATOR

EXCITER STATOREXCITER ROTORALTERNATOR ROTORALTERNATOR STATOR

Page 14: Turbo-Generator

Automatic Voltage Regulator (AVR)

To supply dc excitation voltage after initial start up by converting alternator‘s output ac voltage to dc excitation voltage .

To maintain the alternator‘s output voltage at 415V ac.

Adjust excitation voltage in order to adjust alternator‘s output voltage with either grid voltage during synchronization process.

Page 15: Turbo-Generator

BRUSHLESS EXCITATION

Page 16: Turbo-Generator

SYNCHRONIZATION

Same voltage. Same frequency. Same phase sequence. Same phase angle.

Necessary conditions :-

Page 17: Turbo-Generator

Interconnection b/w incomers & outgoings lines of TG

Page 18: Turbo-Generator

LOAD DISTRIBUTION OF TG

SAP II.NEW MCC OF SAP I.ZEOLITE BUILDING.TANK FARM AREA.RO PLANT (REVERSE OSMOSIS).UTILITY PCC.PACKAGE BOILER OF DM PLANT.

Page 19: Turbo-Generator

SUGGESTIONSOld relays should be replaced with

microcontroller and microprocessor based relay. PLC based Control System should be

implemented.New filter less CPC should be installed as filters

can only be cleaned during shutdown process.Ammeters should be installed in order to check

individual loads.