Page 1: Turbo

Kiril Levkov, CEO

LLC TurboEnergy2015

TurboSphere

INNOVATIVE MACHINE FOR UTILIZATION OF

NATURAL GAS OVERPRESSURE

ENERGY

Page 2: Turbo

Natural gas transmission system

75 b

ar

12 b

ar

3-6 barIndustry Residential

Compressor(spends 4-8% of transported gas)

Well

20,3 bar 0,1 bar

Page 3: Turbo

Electricity15-500 kW

Overpressureenergy

3 - 55 bar>500 m3/h

3

Low grade heat energy20 - 40 C

TurboSphere – 3 in 1:Turbine wheel

Heat exchangerGenerator

Velocity: 3000 rpm;Size: from 600x600x600 mm;Weight: from 300 kg;

Page 4: Turbo

Advantages

Low velocity

Internal multistage heating

The possibility of regulating

Work without fuel consumption

No need for extra equipmentImpermeability

4

The existing turboexpanders from 1000 kW Limited objects

TurboSphere from 15 kW Thousands of objects!

Page 5: Turbo

Manufacture and supply Consumers

TurboSphere(15-500kW)

Natural gas consumersindustry, electric and heat generation

Natural gas distributors Gazprom, Beltopgaz, gazsystem etc.

Outsourcing(partners)

B2g market50% of sales

B2b market50% of sales

5

TurboEnergy

R&D and engineering

Page 6: Turbo

2015 2020 2025 2030 20350

200

400

600

800

1000

Size of the market, bln. RUB

Series5USAEuropeRussia

Belaru

s

Russia

Europ

eUSA

010000200003000040000500006000070000

Quantity of units

low pressurehigh pressure

56%17%

22%

6%

Market by power range

0-30 kW

30-60 kW

60-200 kW

200-450 kW

6

Page 7: Turbo

Costs: overpressure energy – $ 0 waste heat – $ 0 TurboSphere – $1500-2000 per 1kWLCOE during 8 years – 2-4 ¢/kWh payback period – 3-4 year.

…for own needs …for saleElectricity (15-500 kW)

7

Page 8: Turbo

Project teamKirill LEVKOVProject managerEducation: Belarusian National Technical University, profession - Industrial heat power engineering, Master of Science.

Key experience and knowledge: energy carrier production and distribution systems, turbomachinery, business-planning, innovative management.

Achievements: awards from contests, exhibitions and conferences. Training programs and studies abroad (USA, Germany, Syria, Lithuania). More than 30 scientific publications.

Leonid LEVKOVChief project developerEducation: Belarusian Polytechnic Institute, profession - Heat and gassupply and ventilation.

Key experience: 50 years of work in technical equipment design, development and appliance of energy saving technologies, project realization of heat and gas supply, ventilation and air conditioning systems.

Knowledge: gas and thermodynamics, energyefficiency, etc.

Achievements: invention of a new turbine type.

ALEKSANDR PANKOV

Chief mechanic-technologist

ALEKSANDR NOVIKOV

Chief designer

SERGEI SVERCHKOV

Developer

ELENA SHCHEMELEVA

Project manager

MATVEI CHERENKOV

Mechanical engineer

MAKSIM NEKHAICHIK

Electrical engineer

ANDREI TABATCHIKOV

Designer-technologist

VLADIMIR ROMANIUK

Scientific leader

More than 12 professionals

8

Page 9: Turbo

Achievements

9

Patented technology

21 Honor diplomas

Skolkovo minigrant

More than 15 partners: industry, engineering, R&D, sales

- TurboSphere prototype 10kW

Page 10: Turbo

Road map

2004-2014 2015-2016 2017-…

The idea, patent, R&D,model sample, preliminary test

Pilot project, certification, IP

Commercialization

Science and research department

Production and testing laboratory

Production

Invested resources: Required investment: Further fundingfrom

10

14

42

CAPEX, mln RUB OPEX, mln RUB

7

3110 12

Page 11: Turbo

Financial plan

2015 2016 2017 2018 2019 2020

-30.0

-20.0

-10.0

0.0

10.0

20.0

NPV (r=30%)

Mln

. RU

B

11

2015 2016 2017 2018 2019 20200

5

10

15

un

its

Planning manufacture

Page 12: Turbo

Thank you for attention!

Kiril Levkov, CEO

+375-29/[email protected]

www.ts-enegy.info 12

Page 13: Turbo

ParameterMeasu

reTurboSphere DGU-8 TRex 370 MDG-20 MTG 160

Picture -

Country - CIS UkraineCzech

RepublicRussia Germany

Electric power kW15, 30,

(60, 120, 250, 500)8 - 10 11 - 15 20 160

Rotational velocity rpm 3000 3000 3000 40000 45000

Flow rate m3/h 500 - 50000 1800 - 10000 1500 - 2000 17000 3000 - 10000

Input pressure bar 3-55 10-75 15-23 54 40

Stages of expansion  - 3-20 1 1 1 1

Dimensions mm 820х600х820 N/A 400х600 N/A 1.093х955х735

Gas heating type - internalexhaust gases

external - boiler heater

Installation site  - GRS and CGS GRS GRS GRS GRS

Source type -

rejected heat gas gas - gas

Voltage V 380 220/380 400 380 400

Cost$ Per 1 kW

1500 - 2000 N/A 4000 N/A ~7000

Comparison with analogues

Page 14: Turbo

Partners:Key partners:

Principles of cooperation:Joint realizationSelf-financingNo property transfer

Technology development, testtraining and carrying out

Production and testing base,

TurboSphere trial operation

Construction documentation development,

TurboSphere and testbed production

Page 15: Turbo

• Investments• Research• Customers• Mentorship

We are open for collaboration

Join to our team!