RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services Tunnelen under Fehmernbælt Netværksmøde for beredskabsplanlæggere 2014-10-09 Finn Ennemark og Lars Frisk
17

Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

Jul 13, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

Tunnelen under Fehmernbælt

Netværksmøde for beredskabsplanlæggere

2014-10-09

Finn Ennemark og Lars Frisk

Page 2: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

AGENDA

• Introduktion til Femerntunnel

• Historie for

beredskabsplanlægning

• Organisation

• Trin i processen

• Dokumentation

• Lovgrundlag

• Opbakning fra ledelse?

2

Page 3: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

INTRODUKTION

3

Page 4: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

FEHMARNBELT FIXED LINK

Treaty between Denmark and Sweden 1991 Trans European Network priority Treaty between Denmark and Germany 2008 Multiple solutions investigated, including:

Immersed tunnel Bored tunnel Cable stayed bridge Suspension bridge

Immersed tunnel solution adopted 2011

Page 5: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

OVERALL PROGRAMME

February 2011: Minister of Transport selects IMT as preferred solution

for the German Plan Approval procedure

2013: Publication of the environmental impact statement and EIS-

hearing in Denmark.

2013: Application for the plan approval procedure in Germany.

Expected to start in September

End 2012: Prequalification of contractors

Mid 2013: Start of Tender process

End 2014: Anticipated presentation of the Danish construction law

2015 – 2021: Construction phase for the coast-to-coast segment

End 2021: Prospective opening of the Fehmarnbelt Fixed Link

Page 6: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

ALIGNMENT AND SECTION

Page 7: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

IMMERSED TUNNEL

Page 8: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

Tunnel Length and Depth

0 5 10 15 20

Marmaray Crossing

Tama River Tunnel

Cross Harbour Tunnel

Hampton Roads Tunnel

Busan-Geoje Fixed Link

Øresund Tunnel

Trans Bay Tube BART Tunnel

Fehmarnbelt Fixed LinkTunnel Length 18.1 km

Immersed Tunnel Length

17.6 km

Tunnel Depth 40 m

WORLD IMT RECORD !

Page 9: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

DRIVING THROUGH THE TUNNEL

Page 10: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

HISTORIE FOR BEREDSKABSKABS-

PLANLÆGNING

10

Page 11: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

HISTORIE

• SURR gruppe – Sikkerhed,

Uheld, Redning og Rydning

• Kendt i DK fra

Storebæltsforbindelsen,

Øresundsforbindelsen, Metro,

Nordhavnsvejtunnel mm.

• Samarbejde mellem politi,

brandvæsen, sundheds-

beredskab, Beredskabsstyrelsen

og Bygherre

• Benyttes i projekter hvor

“normal praksis” ikke dækker

Page 12: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

F-SURR ORGANISATION

• F-SURR styregruppe med DK

politi som formand

• Beredskaber fra DK og D

• Arbejdsgrupper:

• Øvelser

• Digital kommunikation (SINE mm)

• Bedriftsbrandværn (Gutachter)

• Procesplanlægning

• Øvelsestunnel

• Materiel (fra ca. 2015)

• Beredskabsplan (fra ca. 2015)

• Uddannelse (fra ca. 2015)

Page 13: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

TRIN I F-SURR PROCES

• Introduktion til grundlæggende design

samt Sikkerheds og Rednings Koncept.

• Planspil for designaccept (2012)

• Scenarieworkshop (2014)

• Workshop om dimensionering af materiel,

mandskab mm.

• Beredskabsplan for driftsfasen

• Workshop om kortlægning af

kommunikationsbehov ved ulykker.

• Uddannelse niveau 1

• Planspil (ca. 4)

• Uddannelse niveau 2

• Praktiske øvelser for hver myndighed

• Fuldskalaøvelser på færdigt anlæg inden

idriftsættelse

Page 14: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

DOKUMENTATION

• Sikkerhedskoncept (teknik)

• Beredskabskoncept (involverede)

• Beredskabsplan

• Indsatsplaner

• Action cards

BEREDSKABSPLAN

Dim.Scenarie

Politi Brand Sundhed ……osv.

1

2

3

4

…..osv

Beredskabsplan fælles for alle involverede

Indsatsplan for hvert dimensionsgivende scenarium

Actions cards for hver myndighed og for hvert dimensionsgivende

scenarium (inkluderes ikke i Beredskabsplan)

Page 15: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

LOVGRUNDLAG

• Beredskabslov (LBK 660)

• Risikobaseret kommunalt redningsberedskab (BEK 765)

• Sundhedsberedskab (BEK 1150)

• EU Direktiv 2004/54

• Tunnel Manager

• Safety Officer

• Dansk-Tysk aftale

• Anlægslov

Page 16: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

OPBAKNING FRA LEDELSEN ?

• Succeskriterier

• Organisation

• Ansvar, ressourcer og mandat

• Arbejdsmiljø, entreprenører, QA ?????

• Lufthavn i Berlin (ibrugtagningstilladelse)

Page 17: Tunnelen under Fehmernbælt...Busan-Geoje Fixed Link Øresund Tunnel Trans Bay Tube BART Tunnel Tunnel Length 18.1 km Fehmarnbelt Fixed Link Immersed Tunnel Length 17.6 km Tunnel Depth

RAMBØLL ARUP TEC Fehmarnbelt Fixed Link – Tunnel Design Services

17

Thank you for the attention! Vielen Dank für Ihre Aufmerksamkeit! Tak for opmærksomheden!