e Beaumont Partnership ( Architecture design firm base in Bangkok) RMIT University (Melbourne) Silpakorn University (Bangkok) RMIT University (Melbourne) Wat Ram Poeng (Chiang Mai) Hanasan Scrub Silpakorn University (Bangkok) Branding project for a skincare production Silpakorn University (Bangkok) Kathletic Architecture Internship B. Architectural Design B. Architectural Design English for Academic Purposes Buddhist Monk-hood Billboard Design Volunteers Dec 2014- Jan 2015 2014 - 2016 2011-2012 Jan 2014 2013 Freelance Graphic Designer June 2012 Oct 2012 Communicate with client in order to delivers the design soluon that we both appreciat- ed. The graphic design producon was conducted in work session between adobe suite and manual watercolouring. communicate and iterate the design with client to deliver a Computer generated logo design that we both appreciated. In charge of the graphic design of the board, which it was to celebrate senior gradua- on. the work also include dividing the sensible workload for the team. Logo Design for a small sport apparel production Volunteering for customer service within the University's events by working in a wide range of services in the event for example waing and heavy liſting, 624 High Street, Thornbury, Melbourne, VIC, 3071 T: 0413 730 932 E: [email protected]Facebook: hps://www.facebook.com/tul.nanotec Instagram: Tul1 (Tul Srisompun) Website: hp://cargocollecve.com/TulSrisompun Revit Auto CAD Photoshop Indesign Illustrator 3Ds Max Rhinoceros Grasshopper Maya Architecture Drawing physical model making Sketch Up Photography English (advance) Thai (Nave) Microsoſt office Management skills with calmness +++++ ++++ +++++ +++++ +++++ +++ +++++ ++++ +++ +++++ +++++ ++++ +++ Skills Others About Tul Experiences Educations Mr. Jock Gilbert Mr. Navacha Navasith Mr. Vorabhat Somsantichai Productions Designs Utilities Assisted in the design process by producing a concept model in a supervision of the pro- ject designer, mainly in computer soſtware such as SketchUp and Revit. the projects in- clude a terrace, facade, pavilion and Gate pavilion. Assisted in post-producon processes such as presentaon drawings, renders, and docu- mentaon layouts using Auto CAD, Adobe Suite, and soſtware menoned above. Assisted in the researching process for the design project include surveying a physical condion of the site, and research on precedent projects. - - - - - - - Graduate with 3.50 GPA and consistently achieving high disncon in design studios, which mostly specialized in architecture conceptual design. Have finished the first year in the school in which, heavily focus on the design soluon and applicable architecture knowledge. Succesfully completed the course. Registered Architect, Architect council of Thai land. (Former) Project architect design, at The Beaumont Partnership The Millennia Tower 18th floor, Unit 1804, 62 Langsuan Road, Lumpini, Pathumwan, Bangkok, Thailand 10330 Email: [email protected]Registered Architect, Architect council of Thai land. (Former) Senior Project architect designer, at The Beaumont Partnership 19/F Sathorn City Tower 175 South Sathorn Road, South Sathorn, Sathorn, Bangkok, Thailand 10120 Email: [email protected]Lecturer Registered Landscape Architect, AILA Lower Pool Design Studio Coordinator Landscape Architecture Program School of Architecture + Design RMIT University GPO Box 2467 Melbourne VIC 3001 Australia Locaon: Bldg 8 Level 11 Room 52 Phone: (03) 9925 1856 Fax: (03) 9925 1820 Email: [email protected]Tul Srisompun Professional references for Tul Srisompun the performance of assigned tasks for the maintenance of the monasc instuon. meditate daily as part of the pracce parcipaon in collecve observances like the recitaon of the disciplinary code on new moon and full moon days and the performance of religious services for the lay community. Graduate architecture student from B. Architec- tural design, RMIT University. Skilled in Archi- tectural Representaon drawing and Graphic design from ranges of experience. Experienced operang design soſtware in Architectural pro- fession from student placement in the design firm; The Beaumont partnership. Able to com- municate and Collaborate with client in order to deliver in graphic design from freelance de- signer jobs in the field of branding. Other ex- periences include volunteer works within the university and monk-hood in the monastery.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
The Beaumont Partnership( Architecture design firm base in Bangkok)
RMIT University (Melbourne)
Silpakorn University (Bangkok)
RMIT University (Melbourne)Wat Ram Poeng (Chiang Mai)
Hanasan Scrub
Silpakorn University (Bangkok)
Branding project for a skincare production
Silpakorn University (Bangkok)
Kathletic
Architecture Internship
B. Architectural Design
B. Architectural Design
English for Academic Purposes Buddhist Monk-hood
Billboard Design
Volunteers
Dec 2014- Jan 2015
2014 - 2016
2011-2012
Jan 2014 2013
Freelance Graphic Designer
June 2012
Oct 2012
Communicate with client in order to delivers the design solution that we both appreciat-ed. The graphic design production was conducted in work session between adobe suite and manual watercolouring.
communicate and iterate the design with client to deliver a Computer generated logo design that we both appreciated.
In charge of the graphic design of the board, which it was to celebrate senior gradua-tion. the work also include dividing the sensible workload for the team.
Logo Design for a small sport apparel production
Volunteering for customer service within the University's events by working in a wide range of services in the event for example waiting and heavy lifting,
Rhinoceros GrasshopperMayaArchitecture Drawingphysical model makingSketch UpPhotography
English (advance)Thai (Native)Microsoft officeManagement skills with calmness
+++++++++
+++++++++++++++
+++
+++++++++
+++++++++++++
+++++++
Skills OthersAbout Tul
Experiences
Educations
Mr. Jock Gilbert Mr. Navacha Navasith Mr. Vorabhat Somsantichai
Productions
Designs
Utilities
Assisted in the design process by producing a concept model in a supervision of the pro-ject designer, mainly in computer software such as SketchUp and Revit. the projects in-clude a terrace, facade, pavilion and Gate pavilion.
Assisted in post-production processes such as presentation drawings, renders, and docu-mentation layouts using Auto CAD, Adobe Suite, and software mentioned above.
Assisted in the researching process for the design project include surveying a physical condition of the site, and research on precedent projects.
-
-
-
-
-
-
-
Graduate with 3.50 GPA and consistently achieving high distinction in design studios, which mostly specialized in architecture conceptual design.
Have finished the first year in the school in which, heavily focus on the design solution and applicable architecture knowledge.
Succesfully completed the course.
Registered Architect, Architect council of Thai land.
(Former) Project architect design, at The Beaumont Partnership
The Millennia Tower 18th floor, Unit 1804, 62 Langsuan Road, Lumpini, Pathumwan, Bangkok, Thailand10330
the performance of assigned tasks for the maintenance of the monastic institution.
meditate daily as part of the practice
participation in collective observances like the recitation of the disciplinary code on new moon and full moon days
and the performance of religious services for the lay community.
Graduate architecture student from B. Architec-
tural design, RMIT University. Skilled in Archi-
tectural Representation drawing and Graphic
design from ranges of experience. Experienced
operating design software in Architectural pro-
fession from student placement in the design
firm; The Beaumont partnership. Able to com-
municate and Collaborate with client in order
to deliver in graphic design from freelance de-
signer jobs in the field of branding. Other ex-
periences include volunteer works within the
university and monk-hood in the monastery.
Tul SrisompunArchitectural Port Folio
My interests are reside in between a con-ceptual framework of architecture and the tool for its representation, includes draw-ing style and graphic design. As I believe that architecture is also some form of a cultural practice, it is also a spatial setting that set a circumnavigation of form, it’s generates a cultural imagination and ad-aptable to toward its situation. Therefore, Most of Tul works are heavily focuses on the question; what can architecture do and possibly be in an ever changing envi-ronment?
Additionally, as I aim to explore and ex-plaining this conceptual question, most of Tul architectural works revolve around conceptual related representational graphics and drawings.
Field Junction
Arterial medini
The Living Fence
Delirious Melbourne
Burining Cemetery
Revit Documentation
Statement Content
Field Junction “Field Junction”, is a project that aim ex-pand the landscape of Mutawintji National Park by planting nodal hubs for activities such as learning, teaching work shop, and camping, in the unused landscape.
Mutawintji national park is an indigenous landscape that culturally importance. It has 40000 years old traces of history. From ‘Closing the gap’ and handed back cam-paign, the park now suffers from political and cultural struggles.
Field junction project start from reformu-lates spatial relationship of the landscape as a foundation for the expansion, divided it into 3 spaces. This planning is a method derive from Bernard Tschumi Parc de la vil-lette, the grid is to organized the space into a familiar space in the same time mediated by the terrain, create a space junction.
its reformulates Mutawintji’s landscape paving the foundation for its new object.
Spatial Reformation
the objects within the field junction the object tectonically and materially rep-resent the landscape in order to form a dialogue between narratives imprinted within the landscape and the objects. as Lebbeus Woods’s statement; the tectonic field is experience within our imagination without any relative scale
Camping Infrastructure
Arterial Medini
The project is about the how objects occupying of public infrastructure could seed a negotia-tion of the public and private landscape own-ership between two parties, the project aims to blur the line, decrease the conflict between cultures raise by territorial ownership.
The project operates in 3 different political scales; First, the experiential scale, as people navigate the city, access and rights toward pub-lic space become sources of conflict. Second, the city scale where neighbouring community become an un-wanted growth within the Med-ini. The Last, is regional scale, the political con-flict between Singapore and Malaysia on terri-tories that made by an undefined boundary.
The conflicts within the city are often seen in Asian city is the conflict cause by the use of public space but in private experience, which mean no social interaction. Driving a personal car is a good example for such issue. By replac-ing the city arterial road, with the canal, and turn the adjacent space to a City CBD, that con-tain programs such as commercial, retail, park, and residential, strip off the personal right and access, force people to use a public infrastruc-ture.
However, the CBD will provide a fully accessi-ble route within, the car park will provide them full access to a public facility (boat stop and bike park). The architecture will intregrate and create a direct access toward the commercial building, (public space within), it will parasiti-cally occupied a commercial building and be-come an infrastructure for communal event, it create an access toward the centre of the park.
the second node of exchange is the recreation centre surround the wet market.The recreation program will keep the image of a “good city” while wet market is a real deal of this node. The wet-market within, occupying the canal by open itself to the canal, agriculture goods will be transport from farms and fishery outside of the town though these canal. The occupation by the unwanted images will then strengthen and emerge along the canal.
The last node is made of terminal for transpor-tation, Mall and square will act as a space of transition from Medini to Public Channel, im-migration office, desalination plant that trans-fer fresh water to Singapore. The node then, will act as a node of resources for both Malay-sia and Singapore, act as a buffer for land ex-tension from both sides, destabilised the occu-pation of the channel, which originally a public domain.
The Living Fence“The living fences” is an infrastructur-al project that aims to revitalize a ghost town; that used to be a gold mining town in a gold rush period, Victorian Era, since mining is prohibited; the town is turned into a real estate. by delivered a platform for activities within the town, facilitates activities ranged from artist in residence to major town event such as antique fair.
the living fence come in the form of ribbon is a platform for events such as mobile li-brary, town dinning, outdoor cinema, and artist in residence that weaves the town and landscape together; the ribbon itself.
As aim to effectively activate the land-scape, the ribbon is spatial sensitive to-ward the landscape. By occupying an un-used terrain and object, it become a mixed urban infrastructure, for example urban canopy, garden, movie screen, water tank and water channel.
Ribbon Form
SEASONAL CHANGES
Also, the living fence project is very de-manding for a support for its performance.The system within the fence was articulat-ed to be flexible toward adjustments by using this spacing wall system will allow them performs
Surface Articulation
Delirious Melbourne“Delirious Melbourne” is a hybrid archi-tecture project that formally and function-ally merges; the tower is to be a cultural representation situated within Melbourne CBD.
Delirious Melbourne re-constructs the spatial organization of its building type in the architectural scale. The project seeks to offer a vertical public space by distorted the service core of the building, the core will then authorize structure and programs that build upon it.
Spatial Reformation
The objects as found in Melbourne are oriented and voxelated to the vertical grid system disregard its originality in order to speak the same language as the city, its system, and its adjacency.
Additionally, the projects is in fact an act of superimposition within the process of change; in the same time spatially act as a time lapse of the landscapes history.
Vertical Urbanism
BURNBorder as a Universal Reunification of two Nations
Demilitarized Zone (DMZ); the last remnant of the cold war is the conflicted, tense, and complex border between North and South Korea, according to the change and mutation that mostly caused by human activities such as a bush fire in order to gain a visibility, emerging of agriculture, fence construction, etc. However, regardless of those ac-tivities, the Joint security area in DMZ also has a ‘life’ of its own. JSA or Joint security area is the beginning point of DMZ. As we know, the area should be the joint area as its name states, yet it has changed itself into a barrier. Other than that, JSA keep strengthening itself due to the major events and ‘things’ that still remain in the area today. The evidence is that in the past, JSA was not intensively guarded by duty officer, but it turns out that, today the officer defensively observing each other all the time.
Since, JSA become an undesirable growth to DMZ, we introduce “BURN” (Border as a Universal Reunification of two Nations) as a new growth in JSA. BURN working aspect is similar to the cauterization; the treatment of using burnt metal. For example, the old building will be burnt down and delivering the solution to the origin of the tension by obstructing the soldier visibility in JSA. Furthermore, BURN will pro-vide an intellectual observatory, which generated by an interaction be-tween citizen and the pavilion, causing individual to observe thoughts rather than view. In addition, BURN would remove the infection of this
border, and restore and fertilize JSA to its better life.
Burning Cemetery
Form
“Burning cemetery” project is a platform for observation that seeks to transform the act of observation within the demili-tarized zone of Korean peninsula to an ob-servatory that promotes peace between North and South Korea.
Demilitarized Zone or DMZ for short, used to be a front line, an elongated place for exchanging violence, now has been trans-formed into today’s DMZ; a tourist desti-nation and ironically a no man’s land.
The burning cemetery are formally repre-sents the forest within DMZ as a reflection of the fragility of landscape. The platform houses tangible scale activities such as me-morials and burning ceremony for tourist. This move is to change the landscape by turning the points of interest from territo-rial security and historical objects, to the platform itself.
Platform for observation Proposed Systems
Plat
form
Cem
eter
y
Mechanic
Interactive
The platform is entirely made of bamboo that is easily constructed and replaced, Tourist are invited to overlay and display their personal be-longings and in doing so, they are also aware of the others doing.
As audience, thorough-ly engage with an overall spatial transformation; between quiet and cha-os, active and inactive, intervened space shifting experience of interaction towards the landscape and cultural-scape that in the end, will unfold a specific cultural knowledge left in landscape
UP
UP
DN
UP
41
D C A
21900
B
Electrical Substation
3
Shop
4
Loading Bay
5
1A500
1A502
1A501
--------
1
A301
1
A302
1
A303
5477
392
23
19310
300 5217 2071 712 5588 5422
3443
3987
62631386
21378
40102604
7274
3441
925
15401382
8698021
6872
4996 1110
Room
6
Room
7R
oom
8
Scale
Checked by
Draw
n by
Date
Project number
Consultant
AddressAddressPhoneFaxe-m
ail
81-89 BOU
VERIE ST,
VIC 3053
CO
NSTR
UC
TION
TYPEFIN
ISHES
FIXTUR
ESELEC
TRIC
AL
Polished Concrete
Concrete
Painted PlasterboardPrecast C
oncreteC
upid 500 Above Counter Basin
600mm
x 200 mm
Sands Om
an antislip full body porcelain
Chrom
e Arona Wall Basin M
ixer
Urinal-W
all Hung-C
aroma Torres
Invisi Suite
WC
-Wall Faced-C
aroma Leda C
areInvisi II Suite
WC
-Wall Faced-C
aroma O
pal II EasyH
eight Suite
CO
N- 01
PRC
- 02
PPB- 01
PCL- 01
CO
N-02
20mm
x 70 mm
red and black MT-89
Mosaic tile
Exposed Brickwork
MO
S- 01
BRK
- 01
FLOO
RW
ALL
TMF- 01
Recyled Tim
ber Flooring
BHT 01
Bluestone Honed Paver
TMF- 02
Timber Flooring Polyurethane C
oatingC
UR
- 01
CU
R- 02
Curtainw
all 1Plasterboard
PB- 01
Curtainw
all 2
CO
N- 02
Concrete
CB
WB
UW
WC
01
WC
02
Ultralix petite N
29687
BRK
- 01Brickw
ork
Luxspace BB5480
Deco LED
Emergency
DEC
OLED
MS- BK
Lux Aib 218 LED 2x18W
LedIndustrial Batten Evolution
Electresafe double powerpoint
with 10A and 15A outlets
Electresafe triple powerpoint
with 10 A and 15A outlets
10 A gang standard size switch
10 A dimable standard size
switch
10 A Gang standard size sw
itch
General N
otes- All dim
ension s to be verified on site prior toconstructionand discrepencies to be clarified w
ith architect.- D
o not scale drawings. refer to figured
dimensions only.
- Architectural drawings are to be read in
conjunction with
specification and other consultantsdocum
entation.- G
F is the benchmark level taken from
the floorlevel of theexisting building.- D
imensions are in m
m.
- This drawing is copyright.
1 : 50
Ground Floor
Plan2016.01
JOH
N D
OYLE
06/03/2016
AuthorC
hecker
A102 1 : 50G
round Floor1
2C
afe
PC 01
TMF 01
PC 01
PC 01
PC 01
BHP 01
Street Access to Building
Lift 1
Lift 2
Waste
ElectricalH
ot Water
Cold W
ater
SITE BOU
ND
ARY
LobbyN
o.D
escriptionD
ate
Technical Drawings/ DocumentationBig Scale: Tutor John Doyle
GROUND FLOOR
0
Level 01- MEZZANINE
4300
LEVEL 02
7950
LEVEL 03
11700
LEVEL 04
15450
LEVEL 05
19200
LEVEL 06
22950
LEVEL 07
26700
LEVEL 08
30450
LEVEL 09
34200
LEVEL 10
37950
LEVEL11
41700
LEVEL 12
45450
PARAPET
49200
RL LIFT MACHINE ROOM
52950
BASEMENT
-3400
D C AB
BCL
-400
TOILET
TOILET
TOILET
TOILET
TOILETMOS-01
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILETOFFICE /WORK SPACE
OFFICE /WORK SPACE
OFFICE /WORK SPACE
OFFICE /WORK SPACE
OFFICE /WORK SPACE
OFFICE /WORK SPACE
OFFICE /WORK SPACE
OFFICE /WORK SPACE
OFFICE /WORK SPACE
OFFICE /WORK SPACE
OFFICE /WORK SPACE
SHOP
CON-02
1260
2490
3750
3750
3750
3750
3750
3750
3750
3750
3750
3750
3750
3650
4300
RL LIFT OVER-RUN
51690
----
MOS-01
MOS-01
MOS-01
MOS-01
MOS-01
MOS-01
MOS-01
MOS-01
MOS-01
MOS-01
MOS-01
CON-02
CON-02
CON-02
CON-02
CON-02
CUR-02
CUR-02
CUR-02
CUR-02
CUR-02
CUR-02
LOADING BAY
PB-01
ELECTRICAL ROOM
CON-02
Scale
Checke d
by
Draw
nby
Date
Project number
Consul tant
Addres sAddres sPhoneFaxe-m
ail
81-8 9BO
UVE R
IEST,
VIC3053
CO
NS TR
UC
TION
TYPEFIN
IS HES
FIXTUR
ESELEC
TRIC
AL
Polishe dC
oncreteC
oncre te
PaintedPlasterboard
Precas tConcrete
Cupid
5 00Above
Cou nterBasin
600mm
x200
mm
SandsO
man
antislipf ullbody
porcel ain
Chrom
eArona
WallB asin
Mixer
Urinal-W
allHung-C
aro ma
TorresInvisiS uite
WC
-Wa llFaced-C
aroma
LedaC
areInvisiII Suite
WC
-Wa llFaced-C
aroma
OpalIIEasy
Height Suite
CO
N-01
PRC
-02
PPB-01
PCL-01
CO
N-02
20mm
x70
mm
redan d
blackM
T-89M
osaictile
Expose dBrickw
ork
MO
S-01
BRK-01
FLOO
RW
ALL
TMF-01
Recyled
TimberFloori ng
BHT
01Bluesto ne
Honed
Pav er
TMF-02
Timbe rFlooring
Polyu rethaneC
oatin gC
UR
-01
CU
R-02
Curtain w
all1Plaster board
PB-01
Curtain w
all2
CO
N-02
Concre te
CB
WB
UW
WC
01
WC
02
Ultralix
petiteN
29687
BRK-01
Brickwo rk
Luxspa ceBB5480
Deco
L EDEm
ergencyD
ECO
L EDM
S-BKLux
Aib218
LED2x18 W
LedIndustr ialBatten
Evolu tion
Electre safedouble
po werpoint
with
10 Aand
15Aoutl ets
Electre safetriple
powe rpoint
with
10A
and15A
out lets
10A
ga ngstandard
si zesw
itch
10A
di mable
standardsize
switch
10A
Gang
standards ize
switch
Gene ralN
otes-Alldim
ensions
tobe
verifiedon
sitepriorto
constru ctionand
dis crepenciesto
b eclarified
with
architect.-D
ono tscale
drawing s.referto
figur eddim
ens ionsonly.
-Archit ecturaldrawing s
areto
berea d
inconjunc tion
with
specific ationand
othe rconsultantsdocum
e ntation.-G
Fis
thebenchm
arkleveltaken
fro mthe
floorlevelof theexisting
building.-D
imen sions
arein
mm
.-This
d rawing
iscopy right.
1: 100
Sec tionA -A'
201 6.01
Towerof Joy
JOH
ND
OYLE
06/03/2 016
Au thorC
he cker
A301
1 : 100Section A-A,
1
No.
Descriptio n
Date
Ground Floor0
680
2
Ground Floor0
D
180
100
914
900
345
680
90
Ground Floor0
2000
2
Ground Floor0
D
1524
2000
390
852
435
377
D
A700
2
A700 3
A700
4
A7005
610
3481
3780
990
991
183119
80
2090 1690
1500
490
241
496
348
496
250
235
350
263
762
2
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
81-89 BOUVERIE ST,VIC 3053
CONSTRUCTION TYPE FINISHES FIXTURES ELECTRICAL
Polished ConcreteConcrete
Painted PlasterboardPrecast Concrete
Cupid 500 Above Counter Basin
600mm x 200 mmSands Oman antislip full body porcelain
Chrome Arona Wall Basin Mixer
Urinal-Wall Hung-Caroma TorresInvisi Suite
WC-Wall Faced-Caroma Leda CareInvisi II Suite
WC-Wall Faced-Caroma Opal II EasyHeight Suite
CON- 01
PRC- 02
PPB- 01
PCL- 01
CON-02 20mm x 70 mm red and black MT-89Mosaic tile
Deco LED EmergencyDECOLEDMS- BKLux Aib 218 LED 2x18W LedIndustrial Batten Evolution
Electresafe double powerpointwith 10A and 15A outlets
Electresafe triple powerpointwith 10 A and 15A outlets
10 A gang standard size switch
10 A dimable standard sizeswitch
10 A Gang standard size switch
General Notes- All dimension s to be verified on site prior toconstructionand discrepencies to be clarified with architect.- Do not scale drawings. refer to figureddimensions only.- Architectural drawings are to be read inconjunction withspecification and other consultantsdocumentation.- GF is the benchmark level taken from the floorlevel of theexisting building.- Dimensions are in mm.- This drawing is copyright.
1 : 20
WomensAmenities
2016.01
JOHN DOYLE
06/03/2016
AuthorChecker
A701
1 : 20Elevation A
2 1 : 20Elevation B
3
1 : 20Elevation C
4 1 : 20Elevation D
5
1 : 20Womens Toilets
1
Cupid 500 Above Counter Basin
20mm x 70 mm red and black MT-89Mosaic tile600mm x 200 mmSands Oman antislip full body porcelain
Chrome Arona Wall Basin Mixer
LEGEND
CONSTRUCTION TYPE FINISHES FIXTURES ELETRICAL GENERAL NOTES
No. Description Date
Ground Floor0
457
585
100
180
1009
091
4
120341457634501892
1500
300
Ground Floor0
Ground Floor0
1900
680
Ground Floor0
2000
A700
2
A701
2
A701 3
A701
4
A7015
110496278496120
450
267443170237443200
895 895
1990 1790
1582
3780
2
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
81-89 BOUVERIE ST,VIC 3053
CONSTRUCTION TYPE FINISHES FIXTURES ELECTRICAL
Polished ConcreteConcrete
Painted PlasterboardPrecast Concrete
Cupid 500 Above Counter Basin
600mm x 200 mmSands Oman antislip full body porcelain
Chrome Arona Wall Basin Mixer
Urinal-Wall Hung-Caroma TorresInvisi Suite
WC-Wall Faced-Caroma Leda CareInvisi II Suite
WC-Wall Faced-Caroma Opal II EasyHeight Suite
CON- 01
PRC- 02
PPB- 01
PCL- 01
CON-02 20mm x 70 mm red and black MT-89Mosaic tile
Deco LED EmergencyDECOLEDMS- BKLux Aib 218 LED 2x18W LedIndustrial Batten Evolution
Electresafe double powerpointwith 10A and 15A outlets
Electresafe triple powerpointwith 10 A and 15A outlets
10 A gang standard size switch
10 A dimable standard sizeswitch
10 A Gang standard size switch
General Notes- All dimension s to be verified on site prior toconstructionand discrepencies to be clarified with architect.- Do not scale drawings. refer to figureddimensions only.- Architectural drawings are to be read inconjunction withspecification and other consultantsdocumentation.- GF is the benchmark level taken from the floorlevel of theexisting building.- Dimensions are in mm.- This drawing is copyright.
1 : 20
Mens Amenities
2016.01
JOHN DOYLE
06/03/2016
AuthorChecker
A702
1 : 20Elevation 5 - a
2 1 : 20Elevation 6 - a
3
1 : 20Elevation 7 - a
4 1 : 20Elevation 8 - a
5
1 : 20Mens Toilets
1
No. Description Date
4
Scale
Checke d
by
Draw
nby
Date
Project number
Consul tant
Addres sAddres sPhoneFaxe-m
ail
81-8 9BO
UVE R
IEST,
VIC3053
CO
NS TR
UC
TION
TYPEFIN
IS HES
FIXTUR
ESELEC
TRIC
AL
Polishe dC
oncreteC
oncre te
PaintedPlasterboard
Precas tConcrete
Cupid
5 00Above
Cou nterBasin
600mm
x200
mm
SandsO
man
antislipf ullbody
porcel ain
Chrom
eArona
WallB asin
Mixer
Urinal-W
allHung-C
aro ma
TorresInvisiS uite
WC
-Wa llFaced-C
aroma
LedaC
areInvisiII Suite
WC
-Wa llFaced-C
aroma
OpalIIEasy
Height Suite
CO
N-01
PRC
-02
PPB-01
PCL-01
CO
N-02
20mm
x70
mm
redan d
blackM
T-89M
osaictile
Expose dBrickw
ork
MO
S-01
BRK-01
FLOO
RW
ALL
TMF-01
Recyled
TimberFloori ng
BHT
01Bluesto ne
Honed
Pav er
TMF-02
Timbe rFlooring
Polyu rethaneC
oatin gC
UR
-01
CU
R-02
Curtain w
all1Plaster board
PB-01
Curtain w
all2
CO
N-02
Concre te
CB
WB
UW
WC
01
WC
02
Ultralix
petiteN
29687
BRK-01
Brickwo rk
Luxspa ceBB5480
Deco
L EDEm
ergencyD
ECO
L EDM
S-BKLux
Aib218
LED2x18 W
LedIndustr ialBatten
Evolu tion
Electre safedouble
po werpoint
with
10 Aand
15Aoutl ets
Electre safetriple
powe rpoint
with
10A
and15A
out lets
10A
ga ngstandard
si zesw
itch
10A
di mable
standardsize
switch
10A
Gang
standards ize
switch
Gene ralN
otes-Alldim
ensions
tobe
verifiedon
sitepriorto
constru ctionand
dis crepenciesto
b eclarified
with
architect.-D
ono tscale
drawing s.referto
figur eddim
ens ionsonly.
-Archit ecturaldrawing s
areto
berea d
inconjunc tion
with
specific ationand
othe rconsultantsdocum
e ntation.-G
Fis
thebenchm
arkleveltaken
fro mthe
floorlevelof theexisting
building.-D
imen sions
arein
mm
.-This
d rawing
iscopy right.
1:10
North
Par apetD
etail201 6.01
Towerof Joy
JOH
ND
OYLE
06/03/2 016
Au thorC
he cker
A403
1 : 10Roof and Parapet Detail 01
2
10mm THICK GYPSUMBOARD TO MFTR'S DETAIL
STL. TRIANGLE KEELTO MFTR'S DETAIL
38 STL. MAIN KEELTO MFTR'S DETAIL
HANGING PARTOF VISIBLE KEEL
HANGING ROD/SUSPENDER
8mm THICKDOUBLE GLAZING
TO MFTR'SDETAIL
65x50 mm STL. WINDOW FRAME FIXED TO RHS
TO MFTR'S DETAIL
RSA 35x100 mmTO ENGR'S DETAIL
RHS 65x125mm TO ENGR'S DETAIL
PERFORATED STL GALV.CLIP ON METAL MESH
PANEL TO ARCH DETAIL
35x75 STL. MULLIONTO ENGR'S DETAIL
35x130 mm BASE PLATE TO ENGR'S DETAIL
FLASHING
SQUARE STL. PANEL
200x90x30mm PFCSTL.TO ENGR'S DETAIL
200x90x30mm PFC STL.TOENGR'S DETAIL
120x60 mm BASEPLATE TO ENGR'S
DETAIL
DRAINAGE LAYER
THERMALINSULATION
INSULATION
INSULATION
No.
Descriptio n
Date
1
Scale
Checke d
by
Draw
nby
Date
Project number
Consul tant
Addres sAddres sPhoneFaxe-m
ail
81-8 9BO
UVE R
IEST,
VIC3053
CO
NS TR
UC
TION
TYPEFIN
IS HES
FIXTUR
ESELEC
TRIC
AL
Polishe dC
oncreteC
oncre te
PaintedPlasterboard
Precas tConcrete
Cupid
5 00Above
Cou nterBasin
600mm
x200
mm
SandsO
man
antislipf ullbody
porcel ain
Chrom
eArona
WallB asin
Mixer
Urinal-W
allHung-C
aro ma
TorresInvisiS uite
WC
-Wa llFaced-C
aroma
LedaC
areInvisiII Suite
WC
-Wa llFaced-C
aroma
OpalIIEasy
Height Suite
CO
N-01
PRC
-02
PPB-01
PCL-01
CO
N-02
20mm
x70
mm
redan d
blackM
T-89M
osaictile
Expose dBrickw
ork
MO
S-01
BRK-01
FLOO
RW
ALL
TMF-01
Recyled
TimberFloori ng
BHT
01Bluesto ne
Honed
Pav er
TMF-02
Timbe rFlooring
Polyu rethaneC
oatin gC
UR
-01
CU
R-02
Curtain w
all1Plaster board
PB-01
Curtain w
all2
CO
N-02
Concre te
CB
WB
UW
WC
01
WC
02
Ultralix
petiteN
29687
BRK-01
Brickwo rk
Luxspa ceBB5480
Deco
L EDEm
ergencyD
ECO
L EDM
S-BKLux
Aib218
LED2x18 W
LedIndustr ialBatten
Evolu tion
Electre safedouble
po werpoint
with
10 Aand
15Aoutl ets
Electre safetriple
powe rpoint
with
10A
and15A
out lets
10A
ga ngstandard
si zesw
itch
10A
di mable
standardsize
switch
10A
Gang
standards ize
switch
Gene ralN
otes-Alldim
ensions
tobe
verifiedon
sitepriorto
constru ctionand
dis crepenciesto
b eclarified
with
architect.-D
ono tscale
drawing s.referto
figur eddim
ens ionsonly.
-Archit ecturaldrawing s
areto
berea d
inconjunc tion
with
specific ationand
othe rconsultantsdocum
e ntation.-G
Fis
thebenchm
arkleveltaken
fro mthe
floorlevelof theexisting
building.-D
imen sions
arein
mm
.-This
d rawing
iscopy right.
1:10
Sout hPar apet
Detail201 6.01
Towerof Joy
JOH
ND
OYLE
06/03/2 016
Au thorC
he cker
A404
1 : 10Core to Parapet Detail
1
8mm THICKDOUBLE GLAZINGTO MFTR'SDETAIL
65x50 mm STL. WINDOW FRAME FIXED TO RHSTO MFTR'S DETAIL
RSA 35x100 mmTO ENGR'S DETAIL
RHS 65x125mm TO ENGR'S DETAIL
PERFORATED STL GALV.CLIP ON METAL MESHPANEL TO ARCH DETAIL
35x75 STL. MULLIONTO ENGR'S DETAIL
35x130 mm BASE PLATE TO ENGR'S DETAIL
FLASHING
GRILL 550mm WIDTH
FLASHING
FLASHING TO CURTAINWALL STRUCTURE
150x120mm BRACKET TO ENGR'S DETAIL
PLASTER CLADDINGFIXED TO BATTEN
20x30mm THICK BATTEN FIXED TO PARAPET
ALUM. ROOF SHEET
100x120 BRACKET TO ENGR'SDETAIL
No.
Descriptio n
Date
1
Scale
Checke d
by
Draw
nby
Date
Project number
Consul tant
Addres sAddres sPhoneFaxe-m
ail
81-8 9BO
UVE R
IEST,
VIC3053
CO
NS TR
UC
TION
TYPEFIN
IS HES
FIXTUR
ESELEC
TRIC
AL
Polishe dC
oncreteC
oncre te
PaintedPlasterboard
Precas tConcrete
Cupid
5 00Above
Cou nterBasin
600mm
x200
mm
SandsO
man
antislipf ullbody
porcel ain
Chrom
eArona
WallB asin
Mixer
Urinal-W
allHung-C
aro ma
TorresInvisiS uite
WC
-Wa llFaced-C
aroma
LedaC
areInvisiII Suite
WC
-Wa llFaced-C
aroma
OpalIIEasy
Height Suite
CO
N-01
PRC
-02
PPB-01
PCL-01
CO
N-02
20mm
x70
mm
redan d
blackM
T-89M
osaictile
Expose dBrickw
ork
MO
S-01
BRK-01
FLOO
RW
ALL
TMF-01
Recyled
TimberFloori ng
BHT
01Bluesto ne
Honed
Pav er
TMF-02
Timbe rFlooring
Polyu rethaneC
oatin gC
UR
-01
CU
R-02
Curtain w
all1Plaster board
PB-01
Curtain w
all2
CO
N-02
Concre te
CB
WB
UW
WC
01
WC
02
Ultralix
petiteN
29687
BRK-01
Brickwo rk
Luxspa ceBB5480
Deco
L EDEm
ergencyD
ECO
L EDM
S-BKLux
Aib218
LED2x18 W
LedIndustr ialBatten
Evolu tion
Electre safedouble
po werpoint
with
10 Aand
15Aoutl ets
Electre safetriple
powe rpoint
with
10A
and15A
out lets
10A
ga ngstandard
si zesw
itch
10A
di mable
standardsize
switch
10A
Gang
standards ize
switch
Gene ralN
otes-Alldim
ensions
tobe
verifiedon
sitepriorto
constru ctionand
dis crepenciesto
b eclarified
with
architect.-D
ono tscale
drawing s.referto
figur eddim
ens ionsonly.
-Archit ecturaldrawing s
areto
berea d
inconjunc tion
with
specific ationand
othe rconsultantsdocum
e ntation.-G
Fis
thebenchm
arkleveltaken
fro mthe
floorlevelof theexisting
building.-D
imen sions
arein
mm
.-This
d rawing
iscopy right.
1:10
Wes tFac adeD
etails201 6.01
Towerof Joy
JOH
ND
OYLE
06/03/2 016
Au thorC
he cker
A405
1 : 10Facade to Core Details
1
8mm THICKDOUBLE GLAZINGTO MFTR'SDETAIL
65x50 mm STL. WINDOW FRAME FIXED TO RHSTO MFTR'S DETAIL
RSA 35x100 mmTO ENGR'S DETAIL
RHS 65x125mm TO ENGR'S DETAIL
PERFORATED STL GALV.CLIP ON METAL MESHPANEL TO ARCH DETAIL
35x75 STL. MULLIONTO ENGR'S DETAIL
35x130 mm BASE PLATE TO ENGR'S DETAIL
100x120mm BRACKET TO ENGR's DETAIL
GRILL 550mm WIDTH
RHS 65x125mm TO ENGR'S DETAIL
FLASH
No.
Descriptio n
Date
4
Scale
Checke d
by
Draw
nby
Date
Project number
Consul tant
Addres sAddres sPhoneFaxe-m
ail
81-8 9BO
UVE R
IEST,
VIC3053
CO
NS TR
UC
TION
TYPEFIN
IS HES
FIXTUR
ESELEC
TRIC
AL
Polishe dC
oncreteC
oncre te
PaintedPlasterboard
Precas tConcrete
Cupid
5 00Above
Cou nterBasin
600mm
x200
mm
SandsO
man
antislipf ullbody
porcel ain
Chrom
eArona
WallB asin
Mixer
Urinal-W
allHung-C
aro ma
TorresInvisiS uite
WC
-Wa llFaced-C
aroma
LedaC
areInvisiII Suite
WC
-Wa llFaced-C
aroma
OpalIIEasy
Height Suite
CO
N-01
PRC
-02
PPB-01
PCL-01
CO
N-02
20mm
x70
mm
redan d
blackM
T-89M
osaictile
Expose dBrickw
ork
MO
S-01
BRK-01
FLOO
RW
ALL
TMF-01
Recyled
TimberFloori ng
BHT
01Bluesto ne
Honed
Pav er
TMF-02
Timbe rFlooring
Polyu rethaneC
oatin gC
UR
-01
CU
R-02
Curtain w
all1Plaster board
PB-01
Curtain w
all2
CO
N-02
Concre te
CB
WB
UW
WC
01
WC
02
Ultralix
petiteN
29687
BRK-01
Brickwo rk
Luxspa ceBB5480
Deco
L EDEm
ergencyD
ECO
L EDM
S-BKLux
Aib218
LED2x18 W
LedIndustr ialBatten
Evolu tion
Electre safedouble
po werpoint
with
10 Aand
15Aoutl ets
Electre safetriple
powe rpoint
with
10A
and15A
out lets
10A
ga ngstandard
si zesw
itch
10A
di mable
standardsize
switch
10A
Gang
standards ize
switch
Gene ralN
otes-Alldim
ensions
tobe
verifiedon
sitepriorto
constru ctionand
dis crepenciesto
b eclarified
with
architect.-D
ono tscale
drawing s.referto
figur eddim
ens ionsonly.
-Archit ecturaldrawing s
areto
berea d
inconjunc tion
with
specific ationand
othe rconsultantsdocum
e ntation.-G
Fis
thebenchm
arkleveltaken
fro mthe
floorlevelof theexisting
building.-D
imen sions
arein
mm
.-This
d rawing
iscopy right.
1:10
Nort h
Fac adeD
e tails02201 6.01
Towerof Joy
JOH
ND
OYLE
06/03/2 016
Au thorC
he cker
A402
1 : 10North Facade Detail 02
2
8mm THICKDOUBLE GLAZING
TO MFTR'SDETAIL
65x50 mm STL. WINDOW FRAME FIXED TO RHS
TO MFTR'S DETAIL
RSA 35x100 mmTO ENGR'S DETAIL
RHS 65x125mm TO ENGR'S DETAIL
GRILL 550mm WIDTH
PERFORATED STL GALV.CLIP ON METAL MESH
PANEL TO ARCH DETAIL
35x75mm STL. MULLIONTO ENGR'S DETAIL
35x130 mm BASE PLATE TO ENGR'S DETAIL
30x20mm STL.RAISED FLOORJOIST TO MFTR'SDETAIL
STL. PEDESTAL
10 GYPSUM BOARDTO MFTR'S DETAIL
FLASHING
10mm THICK GYPSUMBOARD TO MFTR'S DETAIL
STL. TRIANGLE KEELTO MFTR'S DETAIL
38 STL. MAIN KEELTO MFTR'S DETAIL
HANGING PARTOF VISIBLE KEEL
HANGING ROD/SUSPENDER
SQUARE STL. PANEL
120x60mm BASE PLATETO ENGR'S DETAIL
STL PLATE 3 mmTHICK
No.
Descriptio n
Date
GROUND FLOOR
0
Level 01- MEZZANINE
4300
LEVEL 02
7950
LEVEL 12
45450
PARAPET
49200
RL LIFT MACHINE ROOM
52950
BASEMENT
-3400
2 1
RL LIFT OVER-RUN
51690
1A404
1A405
Scale
Checke d
by
Draw
nby
Date
Project number
Consul tant
Addres sAddres sPhoneFaxe-m
ail
81-8 9BO
UVE R
IEST,
VIC3053
CO
NS TR
UC
TION
TYPEFIN
IS HES
FIXTUR
ESELEC
TRIC
AL
Polishe dC
oncreteC
oncre te
PaintedPlasterboard
Precas tConcrete
Cupid
5 00Above
Cou nterBasin
600mm
x200
mm
SandsO
man
antislipf ullbody
porcel ain
Chrom
eArona
WallB asin
Mixer
Urinal-W
allHung-C
aro ma
TorresInvisiS uite
WC
-Wa llFaced-C
aroma
LedaC
areInvisiII Suite
WC
-Wa llFaced-C
aroma
OpalIIEasy
Height Suite
CO
N-01
PRC
-02
PPB-01
PCL-01
CO
N-02
20mm
x70
mm
redan d
blackM
T-89M
osaictile
Expose dBrickw
ork
MO
S-01
BRK-01
FLOO
RW
ALL
TMF-01
Recyled
TimberFloori ng
BHT
01Bluesto ne
Honed
Pav er
TMF-02
Timbe rFlooring
Polyu rethaneC
oatin gC
UR
-01
CU
R-02
Curtain w
all1Plaster board
PB-01
Curtain w
all2
CO
N-02
Concre te
CB
WB
UW
WC
01
WC
02
Ultralix
petiteN
29687
BRK-01
Brickwo rk
Luxspa ceBB5480
Deco
L EDEm
ergencyD
ECO
L EDM
S-BKLux
Aib218
LED2x18 W
LedIndustr ialBatten
Evolu tion
Electre safedouble
po werpoint
with
10 Aand
15Aoutl ets
Electre safetriple
powe rpoint
with
10A
and15A
out lets
10A
ga ngstandard
si zesw
itch
10A
di mable
standardsize
switch
10A
Gang
standards ize
switch
Gene ralN
otes-Alldim
ensions
tobe
verifiedon
sitepriorto
constru ctionand
dis crepenciesto
b eclarified
with
architect.-D
ono tscale
drawing s.referto
figur eddim
ens ionsonly.
-Archit ecturaldrawing s
areto
berea d
inconjunc tion
with
specific ationand
othe rconsultantsdocum
e ntation.-G
Fis
thebenchm
arkleveltaken
fro mthe
floorlevelof theexisting
building.-D
imen sions
arein
mm
.-This
d rawing
iscopy right.
1:50
Part sSec tion
B -B'0 2201 6.01
Towerof Joy
JOH
ND
OYLE
06/03/2 016
Au thorC
he cker
A306
1 : 50Part Section B-B' 02
1
No.
Descriptio n
Date
4
Scale
Checke d
by
Draw
nby
Date
Project number
Consul tant
Addres sAddres sPhoneFaxe-m
ail
81-8 9BO
UVE R
IEST,
VIC3053
CO
NS TR
UC
TION
TYPEFIN
IS HES
FIXTUR
ESELEC
TRIC
AL
Polishe dC
oncreteC
oncre te
PaintedPlasterboard
Precas tConcrete
Cupid
5 00Above
Cou nterBasin
600mm
x200
mm
SandsO
man
antislipf ullbody
porcel ain
Chrom
eArona
WallB asin
Mixer
Urinal-W
allHung-C
aro ma
TorresInvisiS uite
WC
-Wa llFaced-C
aroma
LedaC
areInvisiII Suite
WC
-Wa llFaced-C
aroma
OpalIIEa sy
Height Suite
CO
N-01
PRC
-02
PPB-01
PCL-01
CO
N-02
20mm
x70
mm
redan d
blackM
T-89M
osaictile
Expose dBrickw
ork
MO
S-01
BRK-01
FLOO
RW
ALL
TMF-01
Recyled
TimberFloori ng
BHT
01Bluesto ne
Honed
Pav er
TMF-02
Timbe rFlooring
Polyu rethaneC
oatin gC
UR
-01
CU
R-02
Curtain w
all1Plaster board
PB-01
Curtain w
all2
CO
N-02
Concre te
CB
WB
UW
WC
01
WC
02
Ultralix
petiteN
29687
BRK-01
Brickwo rk
Luxspa ceBB5480
Deco
L EDEm
ergencyD
ECO
L EDM
S-BKLux
Aib218
LED2x18 W
LedIndustr ialBatten
E volu tion
Electre safedouble
po werpoint
with
10 Aand
15Aoutl ets
Electre safetriple
powe rpoint
with
10A
and15A
out lets
10A
ga ngstandard
si zesw
itch
10A
di mable
standardsize
switch
10A
Gang
standards ize
switch
Gene ralN
otes-Alldim
ensions
tobe
verifiedon
sitepriorto
constru ctionand
dis crepenciesto
b eclarified
with
architect.-D
ono tscale
drawing s.referto
figur eddim
ens ionsonly.
-Archit ecturaldrawing s
areto
berea d
inconjunc tion
with
specific ationand
othe rconsultantsdocum
e ntation.-G
Fis
thebenchm
arkleveltaken
fro mthe
floorlevelof theexisting
building.-D
imen sions
arein
mm
.-This
d rawing
iscopy right.
1:10
Nort h
Fac adeD
e tails01201 6.01
Towerof Joy
JOH
ND
OYLE
06/03/2 016
Au thorC
he cker
A401
8mm THICKDOUBLE GLAZING
TO MFTR'SDETAIL
1 : 10North Facade Detail 01
1
65x50 mm STL. WINDOW FRAME FIXED TO RHS
TO MFTR'S DETAIL
RSA 35x100 mmTO ENGR'S DETAIL
RHS 65x125mm TO ENGR'S DETAIL
GRILL 550mm WIDTH
PERFORATED STL GALV.CLIP ON METAL MESH
PANEL TO ARCH DETAIL
35x75 STL. MULLIONTO ENGR'S DETAIL
35x130 mm BASE PLATE TO ENGR'S DETAIL
10mm THICK GYPSUM BOARD TO ENGR'S DETAIL
MINERAL WOOL INSULATION
100x50x150mm GALV.BRACKET TO ENGR'S
DETAIL
30x20mm STL. RAISED FLOORJOIST TO MFTR'S DETAIL
STL. PEDESTAL
10 GYPSUM BOARDTO MFTR'S DETAIL
FLASHING
120x60mm BASE PLATETO ENGR'S DETAIL
STL PLATE 3 mmTHICK
No.
Descriptio n
Date
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
81-89 BOUVERIE ST,VIC 3053
CONSTRUCTION TYPE FINISHES FIXTURES ELECTRICAL
Polished ConcreteConcrete
Painted PlasterboardPrecast Concrete
Cupid 500 Above Counter Basin
600mm x 200 mmSands Oman antislip full body porcelain
Chrome Arona Wall Basin Mixer
Urinal-Wall Hung-Caroma TorresInvisi Suite
WC-Wall Faced-Caroma Leda CareInvisi II Suite
WC-Wall Faced-Caroma Opal II EasyHeight Suite
CON- 01
PRC- 02
PPB- 01
PCL- 01
CON-02 20mm x 70 mm red and black MT-89Mosaic tile
Deco LED EmergencyDECOLEDMS- BKLux Aib 218 LED 2x18W LedIndustrial Batten Evolution
Electresafe double powerpointwith 10A and 15A outlets
Electresafe triple powerpointwith 10 A and 15A outlets
10 A gang standard size switch
10 A dimable standard sizeswitch
10 A Gang standard size switch
General Notes- All dimension s to be verified on site prior toconstructionand discrepencies to be clarified with architect.- Do not scale drawings. refer to figureddimensions only.- Architectural drawings are to be read inconjunction withspecification and other consultantsdocumentation.- GF is the benchmark level taken from the floorlevel of theexisting building.- Dimensions are in mm.- This drawing is copyright.
1 : 25
AxonometricDetail
2016.01
Tower of Joy
JOHN DOYLE
06/03/2016
AuthorChecker
A601
1 : 25Axonometric Detail
1
No. Description Date
8mm THICK DOUBLEGLAZING TO MFTR'SDETAIL
65x50 mm STL. WINDOWFRAME FIXED TO RHSTO MFTR'S DETAIL
Lux Aib 218 LED 2x18W Led Industrial Batten Evolution
50 mm Asterix Cladding Panels (900 x 2100 mm) with fire rated Sicaflex caulk at all joints.AX
BR
DA
MA
PC
CA
LI
CT
FPB
PB
WPB
VA
AS
Danpalon DP30 Honeycomb (900 x 1800 mm) with specific joins following manufacturer's specification.
Megaclad steel roof sheets (800 x 1200 mm) installed following manufacturer's specification.
Polished poured concrete slab
Studio selections satalite dyed nylon cut plush pile carpet
Existing Brick wall
Classic Mystique PUR Nocturne 1380 Linoleum
Wickes White Gloss Cermaic Floor Tiles (150 x 150mm) applied with black grout andsealant - Sellys Wet Area Silicone (black)
Painted 16mm Gyprock Standard Plasterboard (1200 x 2400 mm) for all fire-rated wall
Painted 10 mm Gyprock Standard Plasterboard (1200 x 2400mm)
10 mm mpoisture resistant plasterboard substratefor all wet areas
Polished Victorian Ash
Anti-slip Carborundum Hazard #60 over edge of stair tread
Reve wall-mount bathroom sinkVN
DS
BN
CB
SK
DS1
S0
TL
Bench to be specified by MVB
Kitchen cabinet
Vault under mount kitchen sink
Dining table to be specified by MVB
Working desk to be specified by MVB
Sofa to be specified by MVB
Caravell Smart one piece easy height elongated #9899000
- All dimension s to be verified on site prior to construction and discrepencies to be clarified with architect.- Do not scale drawings. refer to figured dimensions only.- Architectural drawings are to be read in conjunction with specification and other consultants documentation.- GF is the benchmark level taken from the floor level of the existing building.- Dimensions are in mm.- This drawing is copyright.
CONSTRUCTION TYPE FINISHES FIXTURES ELECTRICAL GENERAL NOTES
10 A 1 gang standard size switch
10 A 3 Gang standard size switch
10 A 1 dimable standard size switch
Electresafe triple powerpoint with 10A and 15A outlets
Electresafe double powerpoint with 10A and 15A outlets
Lux Aib 218 LED 2x18W Led Industrial Batten Evolution
50 mm Asterix Cladding Panels (900 x 2100 mm) with fire rated Sicaflex caulk at all joints.AX
BR
DA
MA
PC
CA
LI
CT
FPB
PB
WPB
VA
AS
Danpalon DP30 Honeycomb (900 x 1800 mm) with specific joins following manufacturer's specification.
Megaclad steel roof sheets (800 x 1200 mm) installed following manufacturer's specification.
Polished poured concrete slab
Studio selections satalite dyed nylon cut plush pile carpet
Existing Brick wall
Classic Mystique PUR Nocturne 1380 Linoleum
Wickes White Gloss Cermaic Floor Tiles (150 x 150mm) applied with black grout andsealant - Sellys Wet Area Silicone (black)
Painted 16mm Gyprock Standard Plasterboard (1200 x 2400 mm) for all fire-rated wall
Painted 10 mm Gyprock Standard Plasterboard (1200 x 2400mm)
10 mm mpoisture resistant plasterboard substratefor all wet areas
Polished Victorian Ash
Anti-slip Carborundum Hazard #60 over edge of stair tread
Reve wall-mount bathroom sinkVN
DS
BN
CB
SK
DS1
S0
TL
Bench to be specified by MVB
Kitchen cabinet
Vault under mount kitchen sink
Dining table to be specified by MVB
Working desk to be specified by MVB
Sofa to be specified by MVB
Caravell Smart one piece easy height elongated #9899000
- All dimension s to be verified on site prior to construction and discrepencies to be clarified with architect.- Do not scale drawings. refer to figured dimensions only.- Architectural drawings are to be read in conjunction with specification and other consultants documentation.- GF is the benchmark level taken from the floor level of the existing building.- Dimensions are in mm.- This drawing is copyright.
CONSTRUCTION TYPE FINISHES FIXTURES ELECTRICAL GENERAL NOTES
10 A 1 gang standard size switch
10 A 3 Gang standard size switch
10 A 1 dimable standard size switch
Electresafe triple powerpoint with 10A and 15A outlets
Electresafe double powerpoint with 10A and 15A outlets