Top Banner
Tulsa Pipeline Expo Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 August 28, 2012 Berne L. Mosley, Energy Projects Berne L. Mosley, Energy Projects Consulting, LLC Consulting, LLC
22

Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Mar 31, 2015

Download

Documents

Edward Chambley
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Tulsa Pipeline ExpoTulsa Pipeline Expo Fourth Annual MeetingFourth Annual Meeting

August 28, 2012August 28, 2012

Berne L. Mosley, Energy Projects Consulting, LLCBerne L. Mosley, Energy Projects Consulting, LLC

Page 2: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Infrastructure Trends -- Shale Gas as a Driver and the Associated “Ripple” Effects…

Pipeline / Storage ImpactsFlow ChangesRate ProceedingsInfrastructure Status

LNG ExportsFERC Export Terminals – StatusDOE /FE Commodity Export AuthorizationsEconomic Impacts

Page 3: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Changes in Historic PatternsTraditional southwest to northeast pipeline flow is changing…

Marcellus shale is closer to the traditional market areas, thus displacing gulf / southwest production…cheaper transportation costs, quicker access

Pipelines are getting FERC approval to reverse pipeline flow to provide the ability to export shale gas to Canada

Pipelines are experiencing low load factors in the central parts of their systems, and many are seeking to reverse flow and take ethane rich shale supplies to the natural gas liquids markets in the gulf

Page 4: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Rate ProceedingsWith low load factors in the central parts of their systems, some pipelines are responding with rate / tariff changes:

Columbia Gulf Transmission

Tennessee Gas Pipeline Corporation

Both revised mileage-based transportation rates to “postage stamp” rates to offset lost / diminished transportation services on their systems owing to shale gas development.

This trend is likely to continue…

Page 5: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Infrastructure Status

Approved Pipeline Projects -- 2012

Source -- http://ferc.gov/industries/gas/indus-act/pipelines/approved-projects.asp

Total 2,990 86.5 83,490

Page 6: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Infrastructure Status

Pending Pipeline Projects -- 2012

Source -- http://ferc.gov/industries/gas/indus-act/pipelines/pending-projects.asp

Total 2,627 165 93,725

Page 7: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.
Page 8: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Infrastructure Status

Page 9: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Infrastructure Status

Page 10: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Infrastructure Status

Page 11: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.
Page 12: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.
Page 13: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

DOE / Fossil Energy Commodity ExportsApplications Received by DOE/FE to Export Domestically Produced LNG from the Lower-48 States (as of June 15, 2012)

Source: Office of Oil and Gas Global Security and Supply, Office of Fossil Energy, U.S. Department of Energy

(1) FTA – Applications to export to free trade agreement (FTA) countries. The Natural Gas Act, as amended, has deemed FTA exports to be in the public interest and applications shall be authorized without modification or delay.

(2) Non-FTA applications require DOE to post a notice of application in the Federal Register for comments, protests and motions to intervene, and to evaluate the application to make a public interest consistency determination.

Page 14: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Economic Impacts - EIA Study January 2012*

* http://www.eia.gov/analysis/requests/fe/

DOE/FE provided four scenarios of export-related increases in natural gas demand (Figure 1) to be considered:

• 6 billion cubic feet per day (Bcf/d), phased in at a rate of 1 Bcf/d per year (low/slow scenario),• 6 Bcf/d phased in at a rate of 3 Bcf/d per year (low/rapid scenario),• 12 Bcf/d phased in at a rate of 1 Bcf/d per year (high/slow scenario), and• 12 Bcf/d phased in at a rate of 3 Bcf/d per year (high/rapid scenario).

Page 15: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

EIA Study - Summary of Results

Increased natural gas exports lead to:

higher domestic natural gas prices increased domestic natural gas production reduced domestic natural gas consumption increased natural gas imports from Canada via pipeline.

Page 16: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Questions???

Page 17: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Contact Information:

Berne L. Mosley, PresidentEnergy Projects Consulting, [email protected]

Page 18: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Appendix

Page 19: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.
Page 20: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.
Page 21: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Applications Received by DOE/FE to Export Domestically Produced LNG from the Lower-48 States (as of June 15, 2012)

Source: Office of Oil and Gas Global Security and Supply, Office of Fossil Energy, U.S. Department of Energy

Page 22: Tulsa Pipeline Expo Fourth Annual Meeting Fourth Annual Meeting August 28, 2012 Berne L. Mosley, Energy Projects Consulting, LLC.

Applications Received by DOE/FE to Export Domestically Produced LNG from the Lower-48 States (as of June 15, 2012) -- Footnotes

Source: Office of Oil and Gas Global Security and Supply, Office of Fossil Energy, U.S. Department of Energy