TT Assembly Structure TT Assembly Structure Reference-Reinforcement Reference-Reinforcement System: System: 1. 1. Description of the system Description of the system 2. 2. Assembling Procedure Assembling Procedure 3. 3. Production Production Project Board, march 2005 Project Board, march 2005 D.Orlandi – E.Vanzanella D.Orlandi – E.Vanzanella
10
Embed
TT Assembly Structure Reference-Reinforcement System: Description of the system
TT Assembly Structure Reference-Reinforcement System: Description of the system Assembling Procedure Production. Project Board, march 2005 D.Orlandi – E.Vanzanella. Description of the system. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
1.1.Description of the systemDescription of the system2.2.Assembling ProcedureAssembling Procedure
3.3.ProductionProduction
Project Board, march 2005 Project Board, march 2005 D.Orlandi – E.VanzanellaD.Orlandi – E.Vanzanella
Project Board, march 2005 Project Board, march 2005 D.Orlandi – E.VanzanellaD.Orlandi – E.Vanzanella
1.1.Description of the systemDescription of the system
There are 10 steel hooks (the There are 10 steel hooks (the green ones) with a additional green ones) with a additional mechanical device, to close mechanical device, to close together the flat beam with the together the flat beam with the machined surface of the hook machined surface of the hook itself.itself.
N. 8 steel brackets (2 each N. 8 steel brackets (2 each module) have a vertical module) have a vertical
regulation in order to level the regulation in order to level the vertical modules quite apart vertical modules quite apart
from the positioning of the flat from the positioning of the flat beambeam
Project Board, march 2005 Project Board, march 2005 D.Orlandi – E.VanzanellaD.Orlandi – E.Vanzanella
1.1.Description of the systemDescription of the system
N. 2 steel falling bases N. 2 steel falling bases (in the left picture) (in the left picture)
in order to get a vertical regulation in order to get a vertical regulation of the two central vertical square beams of the two central vertical square beams
reducing the flexion of the horizontalreducing the flexion of the horizontalloaded square beamloaded square beam
Project Board, march 2005 Project Board, march 2005 D.Orlandi – E.VanzanellaD.Orlandi – E.Vanzanella
2.2.Assembling ProcedureAssembling Procedure
1.1. The reinforcement assembly structureThe reinforcement assembly structure is ready to be loadedis ready to be loaded
Project Board, march 2005 Project Board, march 2005 D.Orlandi – E.VanzanellaD.Orlandi – E.Vanzanella
2.2.Assembling ProcedureAssembling Procedure
2.2. The flat beam is layed down on the existing supportsThe flat beam is layed down on the existing supports(green hooks) and it is closed toward (green hooks) and it is closed toward
their machined surfacestheir machined surfaces
Project Board, march 2005 Project Board, march 2005 D.Orlandi – E.VanzanellaD.Orlandi – E.Vanzanella
2.2.Assembling ProcedureAssembling Procedure
3.3. The first vertical module is layed down The first vertical module is layed down on the its two external holes by the green screws on the its two external holes by the green screws
and it is adjusted in the vertical directionand it is adjusted in the vertical direction
Project Board, march 2005 Project Board, march 2005 D.Orlandi – E.VanzanellaD.Orlandi – E.Vanzanella
2.2.Assembling ProcedureAssembling Procedure
4.4. When the first module is leveled, the othersWhen the first module is leveled, the othersare layed down in same manner using theare layed down in same manner using the
remaining braketsremaining brakets
Project Board, march 2005 Project Board, march 2005 D.Orlandi – E.VanzanellaD.Orlandi – E.Vanzanella
2.2.Assembling ProcedureAssembling Procedure
5.5. When all the modules are in right positionsWhen all the modules are in right positions(perfectly vertical) it is possible to connect them(perfectly vertical) it is possible to connect them
to the flat beam and finally to hangto the flat beam and finally to hangthe horizontal modules on it as usuallythe horizontal modules on it as usually
Project Board, march 2005 Project Board, march 2005 D.Orlandi – E.VanzanellaD.Orlandi – E.Vanzanella
2.2.Assembling ProcedureAssembling Procedure
It is important to remind thatIt is important to remind thatall those mechanical devicesall those mechanical devicesare completely removeableare completely removeable
In this configuration the distance In this configuration the distance between the vertical square between the vertical square
beams and the Target Tracker beams and the Target Tracker plane is about 20mmplane is about 20mm
Project Board, march 2005 Project Board, march 2005 D.Orlandi – E.VanzanellaD.Orlandi – E.Vanzanella
3.3.ProductionProduction
All the material needed to build the structure All the material needed to build the structure will be ready at the company (COMASUD), at will be ready at the company (COMASUD), at
the beginning of next weekthe beginning of next week
All the parts will be ready in two weeks of All the parts will be ready in two weeks of work work
(tree weeks from now)(tree weeks from now)
The executive drawings are just ready end The executive drawings are just ready end approvedapproved