Exhibit B.2 Huawei Technical Site Survey Report for Existing Sites Disclaimer : All commitments and compliances set out in each of the Exhibit of this Master Agreement have been duly clarified and confirmed, of which shall be a consecutive part of the Contract Documents, any changes from the one signed thereof will only be made upon prior written approval from PT Smart Telecom. Vendor acknowledges and understands that the interpretation of Purchaser in respect of any matter set forth in the relevant Exhibit shall apply in any circumstance, whether or not a discrepancy may exist, and in addition to the provision of stringent requirement applies as Vendor obligations under the Contract Documents. Notwithstanding the foregoing, Vendor warrants that the performance of Works by Vendor in respect of the specific matters in accordance with provisions set out in any Exhibit must be at all times in full compliance with, and not causing any delay to, the Required Critical Milestone Dates. Any request by Vendor of Purchaser’s review, verification and/or approval in whatsoever manner shall in no circumstances waives or reduces each and/or overall Vendor’s responsibilities with respect to the supply and delivery of each Project Item, Equipment, or Service within Network or NETWORK Platform on Turnkey Basis to meet the Network Requirements or Platform Requirements (as the case may be) under the Contract Documents.
37
Embed
TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Exhibit B.2
Huawei Technical Site Survey Report for Existing Sites
Disclaimer:
All commitments and compliances set out in each of the Exhibit of this Master Agreement have been duly clarified and confirmed, of which shall be a consecutive part of the Contract Documents, any changes from the one signed thereof will only be made upon prior written approval from PT Smart Telecom.
Vendor acknowledges and understands that the interpretation of Purchaser in respect of any matter set forth in the relevant Exhibit shall apply in any circumstance, whether or not a discrepancy may exist, and in addition to the provision of stringent requirement applies as Vendor obligations under the Contract Documents.
Notwithstanding the foregoing, Vendor warrants that the performance of Works by Vendor in respect of the specific matters in accordance with provisions set out in any Exhibit must be at all times in full compliance with, and not causing any delay to, the Required Critical Milestone Dates. Any request by Vendor of Purchaser’s review, verification and/or approval in whatsoever manner shall in no circumstances waives or reduces each and/or overall Vendor’s responsibilities with respect to the supply and delivery of each Project Item, Equipment, or Service within Network or NETWORK Platform on Turnkey Basis to meet the Network Requirements or Platform Requirements (as the case may be) under the Contract Documents.
Huawei Technical Site Survey Report for Existing Sites
All commitments and compliances set out in each of the Exhibit of this Master Agreement have been duly clarified and confirmed, of which shall be a consecutive part of the Contract Documents, any changes from the one signed thereof will only be made upon prior written approval from PT Smart Telecom.
Vendor acknowledges and understands that the interpretation of Purchaser in respect of any matter set forth in the relevant Exhibit shall apply in any circumstance, whether or not a discrepancy may exist, and in addition to the provision of stringent requirement applies as Vendor obligations under the Contract Documents.
Notwithstanding the foregoing, Vendor warrants that the performance of Works by Vendor in respect of the specific matters in accordance with provisions set out in any Exhibit must be at all times in full compliance with, and not causing any delay to, the Required Critical Milestone Dates. Any request by Vendor of Purchaser’s review, verification and/or approval in whatsoever manner shall in no circumstances waives or reduces each and/or overall Vendor’s responsibilities with respect to the supply and delivery of each Project Item, Equipment, or Service within Network or NETWORK Platform on Turnkey Basis to meet the Network Requirements or Platform Requirements (as the case may be) under the Contract Documents.
Technical Site Survey Report
Site ID
Vendor ID
Site Name
Site Address
SMARTFREN Contact Person
Huawei Contact Person Cisuritami
Surveyor
Survey Date
C19
Author: Isi dengan ZTE ID, lihat pada database
C21
Author: Isi dengan site id (site name)
Technical Site Survey Report
Site Survey Report (CDMA Site)
All information contained herein the document is confidential! Page 5
1. Current Information
1.1 Site information
Survey Items Survey Contents
Site ID: ZTE_0234
Address: Jl. Kramat Pulo, Kec. Senen - Jakarta Pusat
Property type Equipment room location Installation type
High rise building Roof Fan room ShelterGovernment premises Platform Pump room Equipment roomPublic housing estate Water tank Meter room CabinetVillage type housing Floor no.: CTERThe link Elevator room Other : Private shopping arcade Need to climb ladder Other: Greenfield Other : Greenfield
Site type
Site attach Smart Mobile 8 Tower Provider Protelindo
Defined by coverage Indoor Outdoor
Defined by equipment location Indoor Outdoor
Site type: Rooftop Greenfield BSC&RNC&CN Others :
Tower type: Angular Tubular Mini Pole Others:
Tower/Pole Height 9m Building Height: 15m (mandatory when using rooftop site)
Wiring way of cable: Not Applicable Applicable, Way of Installation :
Available Not Available
Height of anti-static floor Anti Static Floor Connected to
Access Restriction Yes No Specific Reason:
Twenty-four hours Yes No Specific time: 09:00 - 16:00
Prior appointment for access ( person to be informed before site access )
Yes No
Contact: Mrs. Mira keeper
Phone:
Fax: Day before : 1
Site access key
Need Access Key Yes No
Need Landlord Key Yes No
Need Other Access Key Yes No
Please specific:
Equipment delivery method Lift Stairs Other Direct, crane etc..
Remarks
Site location information
Site Name: Ruko Kramat
Site environment checking
Existing anti-static floor
Site access information
E5
Author: ZTE ID
M7
Author: kasih tanda -
I23
Author: Jika shelter CKD maka beri status Available, jika shelter permanen maka beri status Not Available
H24
Author: Jika shelter CKD maka ukur jarak dari lantai ke dasar CKD
J24
Author: jika shelter CKD maka connected to SHELTER
Site Survey Report (CDMA Site)
All information contained herein the document is confidential! Page 6
Model Downtilt (º) Jumper length(m) Feeder length(m)Remark
N/A N/A
Antenna type CDMA800 CDMA1900 Other
Model Downtilt (º) Jumper length(m) Feeder length(m)
Remark
Remarks:N/A
Pole
Pole No. Total length(m) Spare length(m) Antenna No.
1 9 RF: 3 MW:2
Note: Spare length = Usable length minus existing antenna length.
Civil workSpace available for new equipment (indoor/outdoor): Yes No
Type of existing foundation: Concrete Steel Base Frame Dimension:
Access Road Flat Roof/Ground Equipment Room Outlook Equipment Room Inside
0° 30° 60° 90°
120° 150° 180° 210°
240° 270° 300° 330°
360°
Pole/Leg photoPole1 Pole2 Pole3 Pole4
Pole5 Pole6 Pole7 Pole8
Remarks
Indoor Jumper
Outdoor Antenna and
Cable
Ant. No.
Azimuth (º)
Ant. Height (Building+Pole/
Tower) (m)
Ant. No.
Azimuth (º)
Ant. Height (Building+Pole/
Tower) (m)
Ant. No.
Azimuth (º)
Ant. Height (Building+Pole/
Tower) (m)
Overview photo of site
Radio environment photo
M121
Author: all antena in pole
Site Survey Report (CDMA Site)
All information contained herein the document is confidential! Page 8
1. Current Information
1.1 Site information
Survey Contents
Jl. Kramat Pulo, Kec. Senen - Jakarta Pusat
Elevation:
Installation type
Protelindo
UP/DOWN
09:00 - 16:00
Prior appointment for access ( person to be informed before site access )
Ruko Kramat
H5
Author: Site ID (Site Name)
Site Survey Report (CDMA Site)
All information contained herein the document is confidential! Page 9
1.2 Existing Equipment information
6
4
2x16A,2x32A,1x63A,2x100A
1x16A,2x32A,2x63A
(including battery charging load)
(including battery charging load)
Block -4
-
-
Block -4
13.3 V
13.3 V
-
1;3;5
11
Cuprum
Cuprum
Site Survey Report (CDMA Site)
All information contained herein the document is confidential! Page 10
1.3 Existing Feeder & Antenna and Civil Work Information
Main feeder type
Remark
co anntena
co anntena
co anntena
Remark
Remark
Remarks:N/A
2. New equipment information
2.1 SummaryNew Equipment for LTE (eNodeB) without PowerNew Equipment for LTE (eNodeB) including PowerNew Equipment for MicrowaveNew Equipment for Router/Switch
2.2 Preliminary Solution
2.2.1 LTE (eNodeB)Power Rack/Cabinet Qty: Power supply AC DC Dimension: 600mm(W)×600mm(D)×2000mm(H)
Oudoor Cabinet (BBU) Qty: Power supply AC DC Dimension:
Indoor Rack (BBU) Qty: 1 Power supply AC DC Dimension:
Installation
Enough space for Power Rack/CabinetEnough space for BBU Cabinet/RackNot enough space for BBU Rack, Insert BBU in existing 19" RackNeed dismantle, Details :
BBU Qty: 1 Power supply AC DC Dimension: 442mm(W)×310mm(D)×86mm(H)
RRU Qty: 3 Power supply AC DC Dimension: 482mm(W)×270mm(D)×140mm(H)
HUB/SUBHUB Qty: Power supply AC DC Dimension: 442mm(W)x220mm(D)x 43.6mm(H)
Installation
Enough space for BBU : existing 19" Rack Inside New Power CabinetEnough space for HUB/SUBHUB in: existing 19" Rack Inside New Power CabinetLinked-mount for RRU, ( Indoor Outdoor )Steel frame for RRU, ( Indoor Outdoor )Pole-mount for RRU, ( Indoor Outdoor )
Installation Wall-mount Steel frame Others: Use Existing
Indoor Grounding bar propose Qty: 0 Outdoor Grounding bar Qty: 0
Power type Equipment Qty Installation type Position
DC Rectifier 1 pole-mount Ground Other: Indoor OutdoorRectifier Module 2 pole-mount Ground Other Indoor OutdoorBattery (Bank) 2 pole-mount Ground Other Indoor OutdoorDC distribution box 1 pole-mount Ground Other Indoor Outdoor
AC Breaker Qty: capacity: Phase:AC distribution box pole-mount Wall-mount Indoor Outdoor
Battery
New Battery Yes NoNew Battery Cabinet Yes NoNew Battery Replacement Yes NoHow many bank battery can be inserted to exsiting battery rack? bank blockIs there available space to propose new battery rack? Yes No
Implementation summary
Siteconfiguration information(preliminary stage)
Power configuration information (preliminary stage)
C12
Author: cabinet new power
C13
Author: TMC cabinet
C14
Author: Existing
Cable
Power cable
eNodeB(DCDU)-Rectifier DC length: 2 m
eNodeB-MCB AC length: NA m
DC power(Rectifier) - MCB AC length: 8 m
m
power rack/cabinet GND cable length: 10 m
Cable for Indoor or outdoor coverage site?
Indoor RRU-MCB AC power cable length: NA m
RRU-Rectifier or DCDU DC power cable length: (1*60 + 2*40) m
Fiber length (BTS to RRU) : (1*60 + 2*40) m
BBU GND cable length : 10 m
Outdoor Cable type Sct1 Sct2 Sct3 Sct4 Sct5 Sct6
Feeder cable (BTS to Ant.) (Qty*Length(m))
Feeder/jumper cable (RRU to Ant.) (Qty*Length(m))4x3 4x3 4x3
DC Indoor LPB - DC outdoor LPB DC power cable (Qty*Length(m))DC outdoor LPB - RRU (Qty*Length(m))
RRU GND cable length (m) 10 10 10
Fiber cable (BTS to RRU) (Qty*Length(m))(1*60 + 2*40) m
Feeder cable trayNew vertical cable tray required: Yes No length:
New horizontal cable tray required: Yes No length:
Antenna Brand Antenna Type Azimuth Operator Configuration RemarkSite ID Site Name
1 A
2 B
3 C
4
5
6
7
8
9Existing IDU/ODU (Microwave)
Item Far end site IDU Type Capacity Config ODU Link Frequency
RemarkSite ID Site Name Type Suband Hi,Lo Tx Rx Frame Type
1
2345678910
Existing Transport
ItemFar end site
CapacityEquipment
RemarkSite ID Site Name Type Available Port
1 Mux/Router2345678910
Remarks:
Proposed New Antenna Information for Smartfren
Item Far End ID far End Site Name Antena Size Antena Height Tower Leg Azimuth Remark
1
2
3
456
New Proposed IDU/ODUItem Far end site IDU Type Capacity Config ODU
RemarkSite ID Site Name Type Hi,Lo Frame Type
1234567
New Proposed Transport
Item
Far end site
Capacity
Equipment Space Power MCB
RemarkSite ID Site Name Type Requirement Port (OK/NOK) (Watt) (Axpcs)
1234567
8
9
10
Cable length Information
Item Length (Meters/pc) Qty Remark
DC Power Cable from IDU to rectifier
If Cable layout from IDU to bottom of tower (all direction)
Ethernet cable from IDU to BBU
2M Trunk cable from IDU to DDF (If any)E1 Jumper from existing DDF to Proposed DDF (if any)IDU grounding cable to grounding pointOptical Patch cord from IDU to ODF
Distance from ODU Grounding cable to Grounding Point
MW mounting pole Information (new Proposed)
ItemFar End Site
Mounting Pole Dia.Mounting Pole height Mounting Pole Leg Mounting Pole azzimuth
Site ID Site name
1
2
3456789
Existing Outdoor Busbar on Tower(From down to top)
Amount of busbar on tower Set
Height of busbar 1 Meter
Height of busbar 2 Meter
Height of busbar 3 Meter
Remarks:
Existing Transmission
Antenna Size
Antena height
Antena frequency
ODU Frame Support
Transport Type
Proposed Transmission
New Antenna Space Available
ODU Frame Support
Transport Type Cabinet/
Subrack qty
Remark: The cable length must be measured from proposed New Installation Position (cabinet/19" subrack, IDU, rectifier, DCPDB, etc)
2.2.3 New Transport Auxiliary Information
NEW EQUIPMENT
Insert in existing 19" RackInsert in new Indoor 19" Rack/Outdoor BBU CabinetInsert in new Power RackNeed dismantle, details :
-Power Alocation : * MCB Allocation-1: _______; Capacity: _______ * MCB Allocation-2: _______; Capacity: _______- Power Cables (Blue & Black): * Blue Cable Length : _______m * Black Cable Length : _______m * Yellow Green Cable Length : _______m * Connect to : _______
- FE Cables: * Length : _______m * Connect to : _______ * Port Number : _______- Optical Cables/Patch Core: * Length : _______m * Connect to : _______ * Port Number : _______ * Peer connector type : ___FC/SC____- Optical Cables/Patch Core: * Length : _______m * Connect to : _______ * Port Number : _______ * Peer connector type : ___FC/SC____- E1 Cable : * Length : _______m * Connect to : _______ * Port Number : _______ * Peer connector type : _______
Remarks:
-Position NEW EQUIPMENT:* Position NEW EQUIPMENT:
Site Photo Check ListSN Detail Photo Taken Number of Photos
Proposed ODF/OTB Equipment Others: (Specify : new rack, cable route, new DCPDB, etc)
`4.1 Current RAN system configuration from SMART
SHELTER EXISTING TANPA TRAY
4.2 Preliminary stage RAN system configuration
SHELTER LAYOUT DENGAN PROPOSED TANPA TRAY
4.3 Commecial stage RAN system configuration
TOWER LAYOUT
4.4 Existing Equipment room layout
SHELTER LAYOUT DENGAN PROPOSED DENGAN TRAY
4.5 Equipment room cable routing
SHELTER LAYOUT DENGAN PROPOSED DENGAN TRAY DENGAN KABEL ROUTE (DITAMBAH ROUTE UNTUK KABEL TRANSMISI)
4.6 Rooftop site layout and cable routing
site LAYOUT/ ROOF TOP LAYOUT
SHELTER EXISTING TANPA TRAY
SHELTER LAYOUT DENGAN PROPOSED TANPA TRAY
TOWER LAYOUT
SHELTER LAYOUT DENGAN PROPOSED DENGAN TRAY
SHELTER LAYOUT DENGAN PROPOSED DENGAN TRAY DENGAN KABEL ROUTE (DITAMBAH ROUTE UNTUK KABEL TRANSMISI)
site LAYOUT/ ROOF TOP LAYOUT
Site Survey Report (GSM and UMTS Site)
5.Survey Memorandum
Signature of SMARTFREN representative:
Date:
Signature of HUAWEI’s representative:
Date:
Note: This survey report provides the basic data for equipment commissioning, and shall not be modified once confirmed by both parties. If the user needs to modify the data due to special reasons, contact the local office of HUAWEI in time. HUAWEI shall not be responsible for the delay in project implementation due to the modification of the survey results required by the user.
SMARTFREN comments
HUAWEI’s comments
Site Survey Report (GSM and UMTS Site)
Note: This survey report provides the basic data for equipment commissioning, and shall not be modified once confirmed by both parties. If the user needs to modify the data due to special reasons, contact the local office of HUAWEI in time. HUAWEI shall not be responsible for the delay in project implementation due to the