Exhibit B.2 Huawei Technical Site Survey Report for Existing Sites Disclaimer : All commitments and compliances set out in each of the Exhibit of this Master Agreement have been duly clarified and confirmed, of which shall be a consecutive part of the Contract Documents, any changes from the one signed thereof will only be made upon prior written approval from PT Smart Telecom. Vendor acknowledges and understands that the interpretation of Purchaser in respect of any matter set forth in the relevant Exhibit shall apply in any circumstance, whether or not a discrepancy may exist, and in addition to the provision of stringent requirement applies as Vendor obligations under the Contract Documents. Notwithstanding the foregoing, Vendor warrants that the performance of Works by Vendor in respect of the specific matters in accordance with provisions set out in any Exhibit must be at all times in full compliance with, and not causing any delay to, the Required Critical Milestone Dates. Any request by Vendor of Purchaser’s review, verification and/or approval in whatsoever manner shall in no circumstances waives or reduces each and/or overall Vendor’s responsibilities with respect to the supply and delivery of each Project Item, Equipment, or Service within Network or NETWORK Platform on Turnkey Basis to meet the Network Requirements or Platform Requirements (as the case may be) under the Contract Documents.
37

TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Dec 26, 2015

Download

Documents

Sampel Template
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Exhibit B.2

Huawei Technical Site Survey Report for Existing Sites

Disclaimer:

All commitments and compliances set out in each of the Exhibit of this Master Agreement have been duly clarified and confirmed, of which shall be a consecutive part of the Contract Documents, any changes from the one signed thereof will only be made upon prior written approval from PT Smart Telecom.

Vendor acknowledges and understands that the interpretation of Purchaser in respect of any matter set forth in the relevant Exhibit shall apply in any circumstance, whether or not a discrepancy may exist, and in addition to the provision of stringent requirement applies as Vendor obligations under the Contract Documents.

Notwithstanding the foregoing, Vendor warrants that the performance of Works by Vendor in respect of the specific matters in accordance with provisions set out in any Exhibit must be at all times in full compliance with, and not causing any delay to, the Required Critical Milestone Dates. Any request by Vendor of Purchaser’s review, verification and/or approval in whatsoever manner shall in no circumstances waives or reduces each and/or overall Vendor’s responsibilities with respect to the supply and delivery of each Project Item, Equipment, or Service within Network or NETWORK Platform on Turnkey Basis to meet the Network Requirements or Platform Requirements (as the case may be) under the Contract Documents.

Page 2: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Doc. Name: Exhibit B.2 Site Survey detailed sites-wise design [Contract No]

Exhibit B.2

Huawei Technical Site Survey Report for Existing Sites

All commitments and compliances set out in each of the Exhibit of this Master Agreement have been duly clarified and confirmed, of which shall be a consecutive part of the Contract Documents, any changes from the one signed thereof will only be made upon prior written approval from PT Smart Telecom.

Vendor acknowledges and understands that the interpretation of Purchaser in respect of any matter set forth in the relevant Exhibit shall apply in any circumstance, whether or not a discrepancy may exist, and in addition to the provision of stringent requirement applies as Vendor obligations under the Contract Documents.

Notwithstanding the foregoing, Vendor warrants that the performance of Works by Vendor in respect of the specific matters in accordance with provisions set out in any Exhibit must be at all times in full compliance with, and not causing any delay to, the Required Critical Milestone Dates. Any request by Vendor of Purchaser’s review, verification and/or approval in whatsoever manner shall in no circumstances waives or reduces each and/or overall Vendor’s responsibilities with respect to the supply and delivery of each Project Item, Equipment, or Service within Network or NETWORK Platform on Turnkey Basis to meet the Network Requirements or Platform Requirements (as the case may be) under the Contract Documents.

Page 3: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Technical Site Survey Report

Site ID

Vendor ID

Site Name

Site Address

SMARTFREN Contact Person

Huawei Contact Person Cisuritami

Surveyor

Survey Date

C19
Author: Isi dengan ZTE ID, lihat pada database
C21
Author: Isi dengan site id (site name)
Page 4: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Technical Site Survey Report

Page 5: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Site Survey Report (CDMA Site)

All information contained herein the document is confidential! Page 5

1. Current Information

1.1 Site information

Survey Items Survey Contents

Site ID: ZTE_0234

Address: Jl. Kramat Pulo, Kec. Senen - Jakarta Pusat

Longitude (E): 106.8457 ° Latitude(S): -6.18245 ° Elevation:

Property type Equipment room location Installation type

High rise building Roof Fan room ShelterGovernment premises Platform Pump room Equipment roomPublic housing estate Water tank Meter room CabinetVillage type housing Floor no.: CTERThe link Elevator room Other : Private shopping arcade Need to climb ladder Other: Greenfield Other : Greenfield

Site type

Site attach Smart Mobile 8 Tower Provider Protelindo

Defined by coverage Indoor Outdoor

Defined by equipment location Indoor Outdoor

Site type: Rooftop Greenfield BSC&RNC&CN Others :

Tower type: Angular Tubular Mini Pole Others:

Tower/Pole Height 9m Building Height: 15m (mandatory when using rooftop site)

Wiring way of cable: Not Applicable Applicable, Way of Installation :

Available Not Available

Height of anti-static floor Anti Static Floor Connected to

Access Restriction Yes No Specific Reason:

Twenty-four hours Yes No Specific time: 09:00 - 16:00

Prior appointment for access ( person to be informed before site access )

Yes No

Contact: Mrs. Mira keeper

Phone:

Fax: Day before : 1

Site access key

Need Access Key Yes No

Need Landlord Key Yes No

Need Other Access Key Yes No

Please specific:

Equipment delivery method Lift Stairs Other Direct, crane etc..

Remarks

Site location information

Site Name: Ruko Kramat

Site environment checking

Existing anti-static floor

Site access information

E5
Author: ZTE ID
M7
Author: kasih tanda -
I23
Author: Jika shelter CKD maka beri status Available, jika shelter permanen maka beri status Not Available
H24
Author: Jika shelter CKD maka ukur jarak dari lantai ke dasar CKD
J24
Author: jika shelter CKD maka connected to SHELTER
Page 6: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Site Survey Report (CDMA Site)

All information contained herein the document is confidential! Page 6

1.2 Existing Equipment information

CDMA800 CDMA1900

System CDMA800 CDMA1900 Rectifier Rack 19' Others:Rack Qty 1 1 1

Power supply

AC DC

Voltage: 220 V Voltage: 52.7 VDC

Electricity PLN : 13.2 KVA Current Load : 40.7 A

Main Breaker at KWH : 3x20 A Max Rectifier Module : qty :

Three phases Single phase Rectifier Module Equipped : qty :

Current Load Load R: 5.81 A Each Rectifier Module Capacity : 50 A

Load S: 5.46 A Max Battery Bank Qty : 2 Bank

Load T: 2.77 A Battery Bank Equopped Qty : 2 Bank

Rectifier MCB capacity at ACPDB: 3x16 A Each Battery Capacity : 150 AH

Spare Breaker Qty: 1:3Px16A,2:1Px4A,1:1Px6A LLVD 1 MCB spare (qty&spare) : 2x16A,2x32A,1x63A,2x100A

LLVD 2 MCB spare (qty&spare) : 1x16A,2x32A,2x63A

Qty of Available Breaker Slots: N/A Total output current: 170 A (including battery charging load)

Input Capacity: 13.2 Output Capacity: 3.0888 Load current: 40.7 A

Air Conditioner : 2 x 2 pk :condition: Good Total output power: 8959 W (including battery charging load)

x pk :condition: Load power : 2144.89 W

DC Fan : x set :condition:

Type: FT12-150 (12V,150AH) Brand: LEOCH Model: AGM GEL Manufacture date: 05 Jul 2013

Battery Visual Condition Check (No Leakage, No Corrosion, No Crack, No Swollen, etc.)

Battery Group Block -1 Block -2 Block -3 Block -4Bank -1 OK OK OKBank -2 OK OK OK

Bank -3 - - - -

Bank -4 - - - -

Battery Voltage Measurement :

Battery Group Block -1 Block -2 Block -3 Block -4

Bank -1 13.3 V 13.3 V 13.3 V 13.3 V

Bank -2 13.3 V 13.3 V 13.3 V 13.3 V

Bank -3

Bank -4 - - - -

Grounding

Grounding bar Qty (Outdoor): 3 Spare GND port Qty (Outdoor): 1;3;5

Grounding bar Qty (Indoor): 1 Spare GND port Qty (Indoor): 11

Grounding Resistance Measurement : (Ohm) Grounding Bar Material: Indoor Aluminum

Outdoor Aluminum

Total hole Qty: 12 Spare Qty: -

Notes:

Length Pole GPS:

Length Of GPS Cable to BTS: 35 m

GPS Antenna Height: RT. 15 + 3

Remarks

Existing equipmentconfiguration information

Feeder outlet(FEP)

Existing GPS System

H47
Author: Voltage default PLN. Jika pengukuran hasil nya kurang dari toleransi +-5% maka tuliskan data aktual
H48
Author: Voltage*Cap*3
F59
Author: 9000 BTUH = 1PK
G67
Author: tulis "OK" jika baterai dalam kondisi baik
H77
Author: Cek bak kontrol juga
H79
ISI
I83
Author: dari pinggir tower ke luar
I85
Author: tower: from ground for roof top: RT + antena GPS heigh
Page 7: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Site Survey Report (CDMA Site)

All information contained herein the document is confidential! Page 7

1.3 Existing Feeder & Antenna and Civil Work Information

Feeder

System Type Main feeder type

CDMA800 1/2” feeder 7/8” feeder 5/4” feeder

CDMA1900 1/2” feeder 7/8” feeder 5/4” feeder

Other 1/2” feeder 7/8” feeder 5/4” feeder

System Type 1/2 Jumper length(m) 1/2 Jumper Qty Connector type

CDMA800 5m 6 DML-DMS

CDMA1900 5m 6 DML-DMS

Other

Antenna type CDMA800 CDMA1900 Other

Model Downtilt (º) Jumper length(m) Feeder length(m)Remark

1 MOBI MB800-65-17DE14 0 2 RT. 15 + 7 3 50m co anntena

2 MOBI MB800-65-17DE14 145 2 RT. 15 + 7 3 35m co anntena

3 MOBI MB800-65-17DE14 235 3 RT. 15 + 7 3 35m co anntena

4

Antenna type CDMA800 CDMA1900 Other

Model Downtilt (º) Jumper length(m) Feeder length(m)Remark

N/A N/A

Antenna type CDMA800 CDMA1900 Other

Model Downtilt (º) Jumper length(m) Feeder length(m)

Remark

Remarks:N/A

Pole

Pole No. Total length(m) Spare length(m) Antenna No.

1 9 RF: 3 MW:2

Note: Spare length = Usable length minus existing antenna length.

Civil workSpace available for new equipment (indoor/outdoor): Yes No

Type of existing foundation: Concrete Steel Base Frame Dimension:

Access Road Flat Roof/Ground Equipment Room Outlook Equipment Room Inside

0° 30° 60° 90°

120° 150° 180° 210°

240° 270° 300° 330°

360°

Pole/Leg photoPole1 Pole2 Pole3 Pole4

Pole5 Pole6 Pole7 Pole8

Remarks

Indoor Jumper

Outdoor Antenna and

Cable

Ant. No.

Azimuth (º)

Ant. Height (Building+Pole/

Tower) (m)

Ant. No.

Azimuth (º)

Ant. Height (Building+Pole/

Tower) (m)

Ant. No.

Azimuth (º)

Ant. Height (Building+Pole/

Tower) (m)

Overview photo of site

Radio environment photo

M121
Author: all antena in pole
Page 8: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Site Survey Report (CDMA Site)

All information contained herein the document is confidential! Page 8

1. Current Information

1.1 Site information

Survey Contents

Jl. Kramat Pulo, Kec. Senen - Jakarta Pusat

Elevation:

Installation type

Protelindo

UP/DOWN

09:00 - 16:00

Prior appointment for access ( person to be informed before site access )

Ruko Kramat

H5
Author: Site ID (Site Name)
Page 9: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Site Survey Report (CDMA Site)

All information contained herein the document is confidential! Page 9

1.2 Existing Equipment information

6

4

2x16A,2x32A,1x63A,2x100A

1x16A,2x32A,2x63A

(including battery charging load)

(including battery charging load)

Block -4

-

-

Block -4

13.3 V

13.3 V

-

1;3;5

11

Cuprum

Cuprum

Page 10: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Site Survey Report (CDMA Site)

All information contained herein the document is confidential! Page 10

1.3 Existing Feeder & Antenna and Civil Work Information

Main feeder type

Remark

co anntena

co anntena

co anntena

Remark

Remark

Remarks:N/A

Page 11: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

2. New equipment information

2.1 SummaryNew Equipment for LTE (eNodeB) without PowerNew Equipment for LTE (eNodeB) including PowerNew Equipment for MicrowaveNew Equipment for Router/Switch

2.2 Preliminary Solution

2.2.1 LTE (eNodeB)Power Rack/Cabinet Qty: Power supply AC DC Dimension: 600mm(W)×600mm(D)×2000mm(H)

Oudoor Cabinet (BBU) Qty: Power supply AC DC Dimension:

Indoor Rack (BBU) Qty: 1 Power supply AC DC Dimension:

Installation

Enough space for Power Rack/CabinetEnough space for BBU Cabinet/RackNot enough space for BBU Rack, Insert BBU in existing 19" RackNeed dismantle, Details :

BBU Qty: 1 Power supply AC DC Dimension: 442mm(W)×310mm(D)×86mm(H)

RRU Qty: 3 Power supply AC DC Dimension: 482mm(W)×270mm(D)×140mm(H)

HUB/SUBHUB Qty: Power supply AC DC Dimension: 442mm(W)x220mm(D)x 43.6mm(H)

Installation

Enough space for BBU : existing 19" Rack Inside New Power CabinetEnough space for HUB/SUBHUB in: existing 19" Rack Inside New Power CabinetLinked-mount for RRU, ( Indoor Outdoor )Steel frame for RRU, ( Indoor Outdoor )Pole-mount for RRU, ( Indoor Outdoor )

Structural stability Yes Future checking

DC outdoor LPB Qty: LPB(Lighting Protect Box)

Installation Wall-mount Steel frame Others: Pole-mount

DC indoor LPB Qty:

Installation Wall-mount Steel frame Others: Use Existing

Indoor Grounding bar propose Qty: 0 Outdoor Grounding bar Qty: 0

Power type Equipment Qty Installation type Position

DC Rectifier 1 pole-mount Ground Other: Indoor OutdoorRectifier Module 2 pole-mount Ground Other Indoor OutdoorBattery (Bank) 2 pole-mount Ground Other Indoor OutdoorDC distribution box 1 pole-mount Ground Other Indoor Outdoor

AC Breaker Qty: capacity: Phase:AC distribution box pole-mount Wall-mount Indoor Outdoor

Battery

New Battery Yes NoNew Battery Cabinet Yes NoNew Battery Replacement Yes NoHow many bank battery can be inserted to exsiting battery rack? bank blockIs there available space to propose new battery rack? Yes No

Implementation summary

Siteconfiguration information(preliminary stage)

Power configuration information (preliminary stage)

C12
Author: cabinet new power
C13
Author: TMC cabinet
C14
Author: Existing
Page 12: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Cable

Power cable

eNodeB(DCDU)-Rectifier DC length: 2 m

eNodeB-MCB AC length: NA m

DC power(Rectifier) - MCB AC length: 8 m

m

power rack/cabinet GND cable length: 10 m

Cable for Indoor or outdoor coverage site?

Indoor RRU-MCB AC power cable length: NA m

RRU-Rectifier or DCDU DC power cable length: (1*60 + 2*40) m

Fiber length (BTS to RRU) : (1*60 + 2*40) m

BBU GND cable length : 10 m

Outdoor Cable type Sct1 Sct2 Sct3 Sct4 Sct5 Sct6

Feeder cable (BTS to Ant.) (Qty*Length(m))

Feeder/jumper cable (RRU to Ant.) (Qty*Length(m))4x3 4x3 4x3

DC Indoor LPB - DC outdoor LPB DC power cable (Qty*Length(m))DC outdoor LPB - RRU (Qty*Length(m))

RRU GND cable length (m) 10 10 10

Fiber cable (BTS to RRU) (Qty*Length(m))(1*60 + 2*40) m

Feeder cable trayNew vertical cable tray required: Yes No length:

New horizontal cable tray required: Yes No length:

Transmission cable type: Optical Cable Transmission cable connector: LC-FC

Transmission cable length: 10 m

RRU installation

Indoor Outdoor

1/2” Jumper length (RRU to existing feeder system)Feeder/Jumper length (RRU to Antenna)

Sct1: 3 m Feeder/Jumper type: 1/2" 7/8"

Cell1: m Qty: Sct2: 3 m Feeder/Jumper type: 1/2" 7/8"

Cell2: m Qty: Sct3: 3 m Feeder/Jumper type: 1/2" 7/8"

Cell3: m Qty: Sct4: m Feeder/Jumper type: 1/2" 7/8"

Sct5: m Feeder/Jumper type: 1/2" 7/8"

Sct6: m Feeder/Jumper type: 1/2" 7/8"

Length Pole of GPS antenna m

Length Of GPS Cable to BBU 30 m

GPS Antenna Height 3.5 m

Cable type Φ9mm 1/2" 7/8" RG-8U

Delete antenna

Ant. Model Ant. Model Ant. No. Ant. Model

1 1

2 2

3 3

4 4

Add antenna

Ant. Model Ant. height (m) Azimuth (°) Downtilt (°) Remark

N1 1 ADU451816v01 42 40 0 Az follow existingN2 2 ADU451816v01 42 40 120

N3 3 ADU451816v01 42 40 240

N4 4

N/A N/A

N/A N/A

Civil work

Propose new foundation outdoor: Yes No Dimension:

Propose new sun shield: Yes No

Propose extend shelter : Yes No

Propose new air conditioner : Yes No qty : x pk

Propose upgrade electricity : …… VA, from …. VA to : …. VA

Comments:

Equipment No Equipment name Qty Dimension

1 1

2

3

4

5

Remarks

DC Indoor LPB – rectifier length:

Proposed GPS System (if any)

Antenna suggestion (preliminary stage)

Ant. No.

PoleNo./Tower leg

Ant. No.

PoleNo.

PoleNo.

New Ant.

PoleNo./Tower leg

Pole/Towerheight(m)

Obsolete equipment list

H80
Author: dari pinggir tower ke luar
H82
Author: green field from ground RT from bottom of pole
H92
Author: mAgl = Building + Pole
J92
Author: mAgl = Building + Pole
H93
Author: mAgl = Building + Pole
J93
Author: mAgl = Building + Pole
H94
Author: mAgl = Building + Pole
J94
Author: mAgl = Building + Pole
Page 13: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

2. New equipment information

2.1 Summary

2.2 Preliminary Solution

2.2.1 LTE (eNodeB)600mm(W)×600mm(D)×2000mm(H)

442mm(W)×310mm(D)×86mm(H)

482mm(W)×270mm(D)×140mm(H)

442mm(W)x220mm(D)x 43.6mm(H)

Inside New BBU CabinetInside New BBU Cabinet

Position

Outdoor Outdoor Outdoor Outdoor

Outdoor

Page 14: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

5/4"

5/4"

5/4"

5/4"

5/4"

5/4"

Remark

Dimension

Page 15: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

2.2.2 TransmissionEquipment Type: MW Optical Transceiver HDSL Direct connect to 2M wire

Transmission Medium: MW Optical Fiber HDSL 2M wire FE/RJ45

Transmission Cable Type: E1 T1 75ohm 120ohm Others: Fiber

ODF Type: FC SC DDF Type: LSA

Existing Microwave Antena Load Info(All Existing Antena)

Item Tower LegFar end site

Antenna Brand Antenna Type Azimuth Operator Configuration RemarkSite ID Site Name

1 A

2 B

3 C

4

5

6

7

8

9Existing IDU/ODU (Microwave)

Item Far end site IDU Type Capacity Config ODU Link Frequency

RemarkSite ID Site Name Type Suband Hi,Lo Tx Rx Frame Type

1

2345678910

Existing Transport

ItemFar end site

CapacityEquipment

RemarkSite ID Site Name Type Available Port

1 Mux/Router2345678910

Remarks:

Proposed New Antenna Information for Smartfren

Item Far End ID far End Site Name Antena Size Antena Height Tower Leg Azimuth Remark

1

2

3

456

New Proposed IDU/ODUItem Far end site IDU Type Capacity Config ODU

RemarkSite ID Site Name Type Hi,Lo Frame Type

1234567

New Proposed Transport

Item

Far end site

Capacity

Equipment Space Power MCB

RemarkSite ID Site Name Type Requirement Port (OK/NOK) (Watt) (Axpcs)

1234567

8

9

10

Cable length Information

Item Length (Meters/pc) Qty Remark

DC Power Cable from IDU to rectifier

If Cable layout from IDU to bottom of tower (all direction)

Ethernet cable from IDU to BBU

2M Trunk cable from IDU to DDF (If any)E1 Jumper from existing DDF to Proposed DDF (if any)IDU grounding cable to grounding pointOptical Patch cord from IDU to ODF

Distance from ODU Grounding cable to Grounding Point

MW mounting pole Information (new Proposed)

ItemFar End Site

Mounting Pole Dia.Mounting Pole height Mounting Pole Leg Mounting Pole azzimuth

Site ID Site name

1

2

3456789

Existing Outdoor Busbar on Tower(From down to top)

Amount of busbar on tower Set

Height of busbar 1 Meter

Height of busbar 2 Meter

Height of busbar 3 Meter

Remarks:

Existing Transmission

Antenna Size

Antena height

Antena frequency

ODU Frame Support

Transport Type

Proposed Transmission

New Antenna Space Available

ODU Frame Support

Transport Type Cabinet/

Subrack qty

Remark: The cable length must be measured from proposed New Installation Position (cabinet/19" subrack, IDU, rectifier, DCPDB, etc)

Page 16: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

2.2.3 New Transport Auxiliary Information

NEW EQUIPMENT

Insert in existing 19" RackInsert in new Indoor 19" Rack/Outdoor BBU CabinetInsert in new Power RackNeed dismantle, details :

-Power Alocation : * MCB Allocation-1: _______; Capacity: _______ * MCB Allocation-2: _______; Capacity: _______- Power Cables (Blue & Black): * Blue Cable Length : _______m * Black Cable Length : _______m * Yellow Green Cable Length : _______m * Connect to : _______

- FE Cables: * Length : _______m * Connect to : _______ * Port Number : _______- Optical Cables/Patch Core: * Length : _______m * Connect to : _______ * Port Number : _______ * Peer connector type : ___FC/SC____- Optical Cables/Patch Core: * Length : _______m * Connect to : _______ * Port Number : _______ * Peer connector type : ___FC/SC____- E1 Cable : * Length : _______m * Connect to : _______ * Port Number : _______ * Peer connector type : _______

Remarks:

-Position NEW EQUIPMENT:* Position NEW EQUIPMENT:

Page 17: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Site Photo Check ListSN Detail Photo Taken Number of Photos

A Site Overview Photo1 Access Road

2 Existing Site Front View

3 Existing Site Gate

4 Existing Surrounding View

5 Existing Tower (overview)

6 Existing Tower (Leg A)

7 Existing Tower (Leg B)

8 Existing Tower (Leg C)

9 Existing Tower (Leg D)

10 Existing Shelter & Foundation, Stairs etc

11 Existing Oudoor Foundation

B Existing Equipment Information1 Power

a Existing KWH Meter

b Existing main MCB at KWH meter

c Existing ACPDB

d Existing AC Current Load

e Existing Air Conditioner (indoor site)

f Existing DC Fan (indoor site)

g Existing Rectifier Cabinet

h Existing DC Current Load

i Existing DCPDB internal (at rectifier rack)

j Existing DCPDB external (outside rectifier rack)

k Existing Battery System

l Others: (Specify)

2 RF

a Existing RF Antenna

b RF Component in Sector 1

c RF Component in Sector 2

d RF Component in Sector 3

3 Microwave

IDU

a IDU Rack 1 over view

b IDU Rack 2 over view

c IDU-1 Installation Label

d IDU-1 Factory Label

e IDU-2 Installation Label

f IDU-2 Factory Label

g IDU-3 Installation Label

h IDU-3 Factory Label

i IDU-4 Installation Label

j IDU-4 Factory Label

k IDU-5 Installation Label

l IDU-5 Factory LabelODU and Antenna

a Photo of MW Antenna

b Photo of MW Antenna

c Antenna-1 Total View

d Antenna-1 Factory Label

e Antenna-1 Installation Label

f Waveguide Interface to Antenna-1 (if have)

g ODU-1 Frame Label (1+0 or 1+1)-if have

h ODU-1 Factory Label

i ODU-1 Installation Label

j Others: (Specify)

k Antenna-2 Total View

l Antenna-2 Factory Label

m Antenna-2 Installation Label

n Waveguide Interface to Antenna-2 (if have)

o ODU-2 Frame Label (1+0 or 1+1)-if have

p ODU-2 Factory Label

q ODU-2 Installation Label

r Others: (Specify)

4 Indoor/Outdoor Shelter

a Existing Cable Ladder

b Existing Indoor Grounding Bar

c Existing Outdoor Grounding Bar

d Existing Inlet grounding bar

e Existing Inlet

f Existing Transmission Equipment

g Existing DDF

h Tower Busbar 1

i Tower Busbar 2

j Tower Busbar 3

k Existing NE

l Existing NE

m Existing NE

n Existing NE

o Existing NE

p Others: (Specify)

5 Existing ODF, DDF & FIBER

a Existing ODF

b Existing ODF

c Existing DDF

d Existing DDF

e Existing Fiber

f Existing Fiber

C Panoramic Surroundings Overview

1 0 degree

2 30 degree

3 60 degree

4 90 degree

5 120 degree

6 150 degree

7 180 degree

8 210 degree

9 240 degree

10 270 degree

11 300 degree

12 330 degree

D New Equipment Proposal1 Proposed New Indoor Equipment LTE

2Proposed New Vertical Cable Ladder For Cabinet

3 Proposed Cable Routing for LTE

4 Proposed New Inlet for LTE

5Proposed Reuse existing MGB for LTE (Indoor)

6Proposed Reuse Existing MGB on Tower for LTE (Outdoor)

7 Proposed new MGB on Tower for LTE

8 Proposed AC Power System

9 Proposed New RF Antenna & RRU

10 Proposed Jumper from Antenna to RRU

11 Proposed New GPS Antenna for LTE

12 Proposed New Outdoor cabinet

13 Proposed Rectifier System

14 Proposed New Battery

15 Proposed New Cable Ladder

16 Proposed Transmission Equipment (IDU)

17 Proposed Transmission Equipment (ODU)

18Proposed MW Antenna Position, and Direction to far end

19 Proposed Router Equipment

20 Proposed Switch Equipment

21 Proposed ODF/OTB Equipment

22Others: (Specify : new rack, cable route, new DCPDB, etc)

Comment:

Page 18: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

3. Site PhotoA Site Overview Photo

Access Road Existing Site Front View

Existing Site Gate Existing Surrounding View

Existing Tower (overview) Existing Tower (Leg A)

Existing Tower (Leg B) Existing Tower (Leg C)

Page 19: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Existing Tower (Leg D) Existing Shelter & Foundation, Stairs etc

Existing Oudoor Foundation

B Existing Equipmet Information1 POWER

Existing KWH Meter Existing main MCB at KWH Meter

Existing ACPDB Existing AC Current Load

Page 20: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Existing Air Conditioner (indoor site) Existing DC Fan (indoor site)

Existing Rectifier Cabinet Existing DC Current Load

Existing DCPDB internal (at rectifier rack) Existing DCPDB external (outside rectifier rack)

Existing Battery System Others: (Specify)

Page 21: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

2 RF

Existing RF Antenna RF Component in Sector 1

RF Component in Sector 2 RF Component in Sector 3

3 MICROWAVE

IDU Rack 1 Over View IDU Rack 2 Over View

IDU-1 Installation Label IDU-1 Factory Label

Page 22: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

IDU-2 Installation Label IDU-2 Factory Label

IDU-3 Installation Label IDU-3 Factory Label

IDU-4 Installation Label IDU-4 Factory Label

IDU-5 Installation Label IDU-5 Factory Label

Page 23: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

ODU`

Photo of MW Antenna Photo of MW Antenna

Antenna-1 Total View Antenna-1 Factory Label

Antenna-1 Installation Label Waveguide Interface to Antenna-1 (if have)

ODU-1 Frame Label (1+0 or 1+1)-if have ODU-1 Factory Label

Page 24: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

`

ODU-1 Installation Label Others: (Specify)

Antenna-2 Total View Antenna-2Factory Label

Antenna-2 Installation Label Waveguide Interface to Antenna-2 (if have)

ODU-2 Frame Label (1+0 or 1+1)-if have ODU-2Factory Label

Page 25: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

`

ODU-2 Installation Label Others: (Specify)

4 INDOOR/OUTDOOR SHELTER/CORE ROOM`

Existing Cable Ladder Existing Indoor Grounding Bar

`

Existing Outdoor Grounding Bar Existing Inlet grounding bar

Existing Inlet Existing Transmission Equipment

Page 26: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

`

Existing DDF Tower Busbar 1

`

Tower Busbar 2 Tower Busbar 3

`

Existing NE Existing NE

Existing NE Existing NE

Page 27: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Existing NE Others(Spesify)

5 EXISTING ODF,DDF & FIBER

Existing ODF Existing ODF

Existing DDF Existing DDF

Existing Fiber Existing Fiber

Page 28: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

C Panoramic Surroundings Overview

EN 0° EN 30°

EN 60° EN 90°

EN 120° EN 150°

EN 180° EN 210°

Page 29: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

EN 240° EN 270°

EN 300° EN 330°

D New Equipment Proposal

Proposed New Indoor Equipment LTE Proposed New Vertical Cable Ladder For Cabinet

Proposed Cable Routing for LTE Proposed New Inlet for LTE

Page 30: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Proposed Reuse existing MGB for LTE (Indoor) Proposed Reuse Existing MGB on Tower for LTE (Outdoor)

Proposed new MGB on Tower for LTE Proposed AC Power System

Proposed New RF Antenna & RRU Proposed Jumper from Antenna to RRU

Proposed New GPS Antenna for LTE Proposed New Outdoor cabinet

Page 31: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Proposed Rectifier System Proposed New Battery

Proposed New Cable Ladder Proposed Transmission Equipment (IDU)

Proposed Transmission Equipment (ODU) Proposed MW Antenna Position, and Direction to far end

Proposed Router Equipment Proposed Switch Equipment

Page 32: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Proposed ODF/OTB Equipment Others: (Specify : new rack, cable route, new DCPDB, etc)

Page 33: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

`4.1 Current RAN system configuration from SMART

SHELTER EXISTING TANPA TRAY

4.2 Preliminary stage RAN system configuration

SHELTER LAYOUT DENGAN PROPOSED TANPA TRAY

Page 34: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

4.3 Commecial stage RAN system configuration

TOWER LAYOUT

4.4 Existing Equipment room layout

SHELTER LAYOUT DENGAN PROPOSED DENGAN TRAY

Page 35: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

4.5 Equipment room cable routing

SHELTER LAYOUT DENGAN PROPOSED DENGAN TRAY DENGAN KABEL ROUTE (DITAMBAH ROUTE UNTUK KABEL TRANSMISI)

4.6 Rooftop site layout and cable routing

site LAYOUT/ ROOF TOP LAYOUT

Page 36: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

SHELTER EXISTING TANPA TRAY

SHELTER LAYOUT DENGAN PROPOSED TANPA TRAY

Page 37: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

TOWER LAYOUT

SHELTER LAYOUT DENGAN PROPOSED DENGAN TRAY

Page 38: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

SHELTER LAYOUT DENGAN PROPOSED DENGAN TRAY DENGAN KABEL ROUTE (DITAMBAH ROUTE UNTUK KABEL TRANSMISI)

site LAYOUT/ ROOF TOP LAYOUT

Page 39: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Site Survey Report (GSM and UMTS Site)

5.Survey Memorandum

Signature of SMARTFREN representative:

Date:

Signature of HUAWEI’s representative:

Date:

Note: This survey report provides the basic data for equipment commissioning, and shall not be modified once confirmed by both parties. If the user needs to modify the data due to special reasons, contact the local office of HUAWEI in time. HUAWEI shall not be responsible for the delay in project implementation due to the modification of the survey results required by the user.

SMARTFREN comments

HUAWEI’s comments

Page 40: TSSR Existing Site-Smartfren v6 15092014(eNodeB+TX+SW) (6)

Site Survey Report (GSM and UMTS Site)

Note: This survey report provides the basic data for equipment commissioning, and shall not be modified once confirmed by both parties. If the user needs to modify the data due to special reasons, contact the local office of HUAWEI in time. HUAWEI shall not be responsible for the delay in project implementation due to the