Top Banner
MA MB MC MD open open Production & Performance Facility Consulting 121 Gates Ave. Brooklyn, NY 11238 tel: 718.789.8169 fax: 718.789.1023 [email protected] Project: Date: Scale: Db: NYHS SMITH AUDITORIUM 1/4" = 1'0" cb 10/28/11 Lighting Plot/oh equipment TS 03 VENUE SPECIFICATIONS FOH Truss SL Box Boom SR Box Boom AV Control Lighting Control 60Amp 3PH Comp. SW DN DN Mezz.Rail +11'7" 26° 12 113 L14/26 26° 13 103 L14/26 26° 2 113 L14/26 26° 1 123 L14/26 9 181 L7 19° 8 91 L14/19 19° 7 92 L14/19 26° 6 93 L14/26 26° 5 94 L14/26 26° 4 95 L14/26 36° 3 96 L14/36 50° 2 97 L14/50 1 181 L7 50° 3 61 L14/50 36° 2 62 L14/36 26° 3 72 L14/26 19° 2 71 L14/19 TS 1 21 L11/TS 50° 3 74 L14/50 36° 2 73 L14/36 TS 1 22 L11/TS NEAR BOX BOOM LEFT FAR BOX BOOM LEFT NEAR BOX BOOM RIGHT FAR BOX BOOM RIGHT OVERHEAD ELECTRIC L11/TS L11/TS NEAR BOX BOOM LEFT FAR BOX BOOM LEFT NEAR BOX BOOM RIGHT FAR BOX BOOM RIGHT 26° 3 63 L14/26 19° 2 64 L14/19 TS 1 11 L11/TS TS 1 12 L11/TS 1 181 L7 19° 2 87 L14/19 19° 3 86 L14/19 26° 4 85 L14/26 26° 5 84 L14/26 26° 6 83 L14/26 50° 8 81 L14/50 9 181 L7 7 34 L12 6 35 L12 4 36 L12 3 37 L12 8 33 L12 10 32 L12 11 31 L12 5 181 L7 9 181 L7 36° 7 82 L14/36 TS 4 1 L11/TS 26° 24 121 L13/26 26° 1 111 L13/26 WFL 23 180 L6 TS 18 2 L11/TS TI 15 4 L11/TI 17 183 L7 12 183 L7 8 183 L7 TS 9 5 L11/TS TS 7 6 L11/TS WFL 2 180 L6 26° 1 102 L13/26 26° 8 112 L13/26 36° 7 55 L14/36 TRUSS L L11/TS 36° 1 54 L14/36 36° 2 53 L14/36 19° 6 51 L14/19 TS 5 7 L11/TS 3 501 L2 5 501 L2 4 501 L2 6 501 L2 10 501 L2 11 501 L2 14 501 L2 13 501 L2 TS 16 3 L11/TS 22 501 L2 20 501 L2 21 501 L2 19 501 L2 19° 3 45 36° 2 41 L14/36 26° 5 101 L13/26 26° 6 44 L14/26 36° 7 43 L14/36 36° 8 42 L14/36 26° 4 122 L13/26 26° 3 52 L14/26 TRUSS R TRUSS C Note: FOH Truss moved upstage on this drawing for clarity 36° 37 151 L15 36° 36 152 L15 50° 35 141 L13/50 50° 34 131 L13/50 36° 33 143 L13/36 36° 32 133 L13/36 36° 31 153 L15 36° 30 154 L15 70° 29 136 L13/70 50° 28 141 L13/50 50° 27 131 L13/50 36° 26 143 L13/36 36° 25 155 L15 36° 24 156 L15 36° 23 157 L15 70° 22 136 L13/70 50° 21 141 L13/50 36° 20 133 L13/36 36° 19 170 L13/36 36° 18 144 L13/36 50° 17 131 L13/50 70° 16 137 L13/70 36° 14 159 L15 36° 13 160 L15 50° 11 142 L13/50 36° 12 134 L13/36 50° 10 132 L13/50 70° 9 137 L13/70 36° 8 161 L15 36° 7 162 L15 36° 6 144 L13/36 36° 5 134 L13/36 50° 4 142 L13/50 50° 3 132 L13/50 36° 2 163 L15 36° 1 164 L15 36° 15 158 L15 vid proj vid cam
5

TS 03 - New-York Historical Societyl7 50° 613l14/50 ° 2 62l14/36 26° 372 l14/26 9° 2 l14/19 71 ts 1 21 l11/ts 50° 3 74 l14/50 ° 732 l14/36 ts 1 22 l11/ts near box boom left far

Feb 04, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TS 03 - New-York Historical Societyl7 50° 613l14/50 ° 2 62l14/36 26° 372 l14/26 9° 2 l14/19 71 ts 1 21 l11/ts 50° 3 74 l14/50 ° 732 l14/36 ts 1 22 l11/ts near box boom left far
Page 2: TS 03 - New-York Historical Societyl7 50° 613l14/50 ° 2 62l14/36 26° 372 l14/26 9° 2 l14/19 71 ts 1 21 l11/ts 50° 3 74 l14/50 ° 732 l14/36 ts 1 22 l11/ts near box boom left far
Page 3: TS 03 - New-York Historical Societyl7 50° 613l14/50 ° 2 62l14/36 26° 372 l14/26 9° 2 l14/19 71 ts 1 21 l11/ts 50° 3 74 l14/50 ° 732 l14/36 ts 1 22 l11/ts near box boom left far

W.C W.CW.CW.C

W.CW.CW.C

W.C W.C

Production & Performance Facility Consulting121 Gates Ave. Brooklyn, NY 11238tel: 718.789.8169 fax: [email protected]

Project:

Date: Scale:

Db:

NYHS - SMITH AUDITORIUM

1/4" = 1'0"

cb

03/06/17

Orch. Level Groundplan

TS 01

VENUE SPECIFICATIONS

A

B

C

D

E

F

G

H

J

K

AV F1 AV F2 AV F3

AV F4

Rem. Showcontrol

DS roll drops ( 10)

MS Black out drops ( 3)

US Roman Shade (5)LED lighting trough

Line of balcony above

Proj. surface when closed ( typ.)

Mechoshades ( blackout)

plugs availible for steps

Stage+0'-0"

-2'-1"

-1'-5"

+0'-0"+0'-4" +0'-0"

R. SMITH GREAT HALL

Hallway ( x-over)To Loading DockUS Wall Proj. surface ( white)

12'-1

0 1/

2"

75'-3"

25'-0

"

7'-4

"

12'-3"

Page 4: TS 03 - New-York Historical Societyl7 50° 613l14/50 ° 2 62l14/36 26° 372 l14/26 9° 2 l14/19 71 ts 1 21 l11/ts 50° 3 74 l14/50 ° 732 l14/36 ts 1 22 l11/ts near box boom left far
Page 5: TS 03 - New-York Historical Societyl7 50° 613l14/50 ° 2 62l14/36 26° 372 l14/26 9° 2 l14/19 71 ts 1 21 l11/ts 50° 3 74 l14/50 ° 732 l14/36 ts 1 22 l11/ts near box boom left far