True Handleless Guide
21

True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

Apr 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

True Handleless Guide

Page 2: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

Component ListUnit Dimensions10mm Wall BattensBase UnitsDrawersTower UnitsVertical ProfilesAppliance Profile Trim for towersBuilt Under AppliancesExternal Corner PostKitchen ExampleWorktopsHob PositionsSink PositionsWall Unit ConstructionBridging Units

True Handleless Fitting Video: https://youtu.be/d4NMZkKEFq8

2

True Handleless Guide - Contents

Page 3: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

Profiles & Fittings for Base units

3

Profiles & Fittings for Tower units

Joint Clip External CNR PK2 KQHCJCE - AluKQHBJCE - BlackKQHPJCE - Champagne

Wall Fixings

10mm Wall Battens 3.2m (supplied in pairs with Trim Pack Horizontal)

Trim Pack Horizontal 3.2m KQHCTPH - AluKQHBTPH - BlackKQHPTPH - Champagne

Trim Cap PK2KQHCTCH - AluKQHBTCH - BlackKQHPTCH - Champagne

Joint Clip Internal CNR PK2 KQHCJCI - AluKQHBJCI - BlackKQHPJCI - Champagne

Horizontal Trim Fixing Clips PK4 KQHXHTFC

Worktop fitting Bracket PK3 KQHXWFB

Trim Pack Vertical Single –with 26mm spacer2058mm High:KQHCTPVS20 - AluKQHBTPVS20 - BlackKQHPTPVS20 - Champagne2205mm High:KQHCTPVS22 - AluKQHBTPVS22 - BlackKQHPTPVS22 - Champagne

Trim Pack Vertical Double – with 26mm spacer2058mm High:KQHCTPVD20 - AluKQHBTPVD20 - BlackKQHPTPVD20 - Champagne2205mm High:2205mm - KQHCTPVD22 - Alu2205mm - KQHBTPVD22 - Black2205mm - KQHPTPVD22 - Champagne

Appliance Securing Extrusion 1.2m KQHCASE -AluKQHBASE - BlackKQHPASE - Champagne

Profile Fitting Tool

True Handleless Guide - Component List

Page 4: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

4

2198

735

735

140

907

10mm

601From wall including 19mm fascia

570

1463

Note: No Cornice or Pelmet is used on True Handleless

xx Worktop

610 Worktop

Unit Dimensions:

True Handleless Guide - Unit Dimensions

Corner Planning:

Cabinets set 10mm off the wall with spacer batten

TH corner post is 10mm smaller than standard to allow for this.

Wall units line up with base as standard

Page 5: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

5

Installing Floor Units & Battens

All base & tower units are pulled away from the wall by 10mm

2 x 3.2m 10mm Spacer batten supplied with horizontal rail

Fix the 10mm thick batten to the wall using suitable wall fixings (not supplied).

The top of the batten needs to be flush with top of the base unit, which is 875mm off the floor.

Position all units, level and join. Fix the units to the battens using angle brackets.

Note: Wall units do not require battens

10mm

Indicated units with Battens

875mm

2198mm

True Handleless Guide - 10mm Wall Battens

Page 6: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

Base Units

6

All Base cabinets are pre-notched for the horizontal trim.

Fit the horizontal trim flush with the front of the cabinet, this will sit 32mm above the carcase.

Seal all raw/exposed edges.

The front rail is positioned behind the cut out.

Use the jig to get the correct cut to fit the horizontal metal trim. The jig has 2 sides, a Standard 30mm router collet or flip the jig to suite a Profile cutter.

Wall unit top panels need to be reduced in depth by 24mm and re-edged with edging tape if adapting for use at base level.

Seal all raw/exposed edges.

True Handleless Guide - Base Units

Some units may need adapting, for example wall units used at base level.

Adapting a Base Unit

Page 7: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

7

Measure the length of the Horizontal trim also allowing for any end caps. When cutting the trim it is recommended that an aluminium saw blade is used. Tip: Spray with WD40 to give a better cut.

Deburr the cut profiles using a file or screwdriver. Any rough edges may prevent the end caps from being inserted correctly.

True Handleless Guide - Base Units

For corner situations use the internal & external connecting pieces, shown on page 3.

Fit the end cap at any terminating profiles. Measure the length of the horizontal trim before cutting and deduct 1.5mm for end caps.

Internal Corner Piece

External Corner Piece

End Cap

Internal Corner

External Corner

Page 8: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

8

Clamp the profile into position and drill holes in the trim profile using a 5mm bit. Drill a hole every 300mm, every other screw should be down into the cabinet side panel. Only drill through the aluminium, do not drill down into the base rail.

Use 40x4 mm screws in the unit sides.

For appliance spaces & against tall panels use the plastic brackets supplied for additional support.

If the Horizontal trim has to be joined, the join should be positioned where unit side panels meet, (if possible). Plastic brackets can be used to secure the join.

True Handleless Guide - Base Units

Page 9: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

9

All top drawers will be opened by pulling behind the fascia with the aid of the horizontal trim. These drawers should have the stick on buffer pads fitted to the back of the drawer fascia's whereas the push to open drawers do not.

Any subsequent drawers will have an INTIVO Tip-On Push to open mechanism fitted. (see next page)

All True Handleless kitchens will be spec'd with the INTIVO drawer system and not the standard Blum drawer box offer. These will come individually packed.

The drawer fascia brackets for the bottom drawer onlywill need to be re-positioned. Please see image below for where to mark the new holes using a bradawl.All measurements should be taken from the bottom of the fascia up as these do not change regardless of drawer size.

67

8m

m

224mm19mm

197.5mm

69.5mm

101.5mm

31.5mm31.5mm

True Handleless Guide - Drawers

New Bottom Drawer Position

TH drawer side panels have a new drilling.

The new drilling is 57mm up from the bottom, 19mm from the front of the panel and 224mm Centre to Centre. This new drilling is for the bottom drawer only to allow clearance for the INTIVO drawer box

All other drawers are fitted in their standard locations

Note. 900mm drawer runners are identified by an orange section on the runner.

57mm

Page 10: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

10

True Handleless Guide - Drawers

Drawer Gower Drawerbox Code Mechanism Strength Mechanism Product Code

300mm Shallow Drawer (143mm frontal)

GORLIDNT3 L1 153341

300mm Deep Drawer (290mm frontal)

GORLIDDT3 L1 153341

500mm Shallow Drawer (143mm frontal)

GORLIDNT5 L1 153341

500mm Deep Drawer (290mm frontal)

GORLIDDT5 L3 153342

600mm Shallow Drawer (143mm frontal)

GORLIDNT6 L3 153342

600mm Deep Drawer (290mm & 363mm frontal)

GORLIDDT6 L3 153342

900mm Shallow Drawer (143mm frontal)

GORLIDNT9N/A - Not required on

top drawers153343

900mm Deep Drawer (290mm & 363mm frontal)

GORLIDDT9 L5 153343

Intivo Drawer Mechanism Strengths:

The Blum Intivo tip-on mechanism is what makes the drawer push to open. These come in 3 strengths depending on the size of drawer it is fitted to. The table below shows which strength to use on which drawerbox.

Each mechanism is coloured differently and has an indicator table to state which strength mechanism you have.

On the right are the 3 strengths which coordinate with the table below.

Page 11: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

11

Points to note on Intivo drawer Runners:

Use the Blum distance gauge tool on all INTIVO operated drawers. Place the gauge tool onto the cabinet when the fascia is not fitted and adjust the wheel till the mechanism butts up to the 2.5mm lip.

This correctly sets the drawer 2.5mm from the edge of the cabinet to allow the push to open mechanism to work & line the drawers up correctly. (Do not fit the stick on buffers on push to open drawers)

The tool can also be used when the fascia is fitted but you must use the foot behind the fascia to set the 2.5mm required distance.

600 Drawers have 1 ‘L’ shape bracket fitted in the centre, screw though base of drawer box and into fascia

1

2

3

4

1

23

43

4

2

4

4

4

900 Drawers have 2 ‘L’ shape brackets fitted, screw though base of drawer box and into fascia

Synchronisation Bar must be fitted to both mechanisms work together simultaneously. On 900mm drawers only fit support bracket.

Depth Adjustment wheel

5

5

5

True Handleless Guide - Drawers

Page 12: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

12

True Handleless Guide - Tower Units

Double Vertical Rail

Single Vertical Rail

True Handleless Tower side panels are pre-cut for you

Single Vertical Rail - For use between a tower and an end panel - Sits in front of 1 cabinet end- 26mm packer between towers

Double Vertical Rail - For use between 2 towers- Sits in front of 2 cabinet ends- 26mm packer between towers

As with the base units use 10mm Spacer battens to bring the tower units 10mm off the wall to line up with the base units.

Install as below

Page 13: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

13

Vertical Profiles:

Screw a spacer batten in at the back of theunit.

Use sticky tape to position the vertical profile and clamp to the tall unit. Screw the profile in place, going through the side of the unit and into the spacer batten.

These instructions show the location & fitting of the vertical trims

True Handleless Guide - Tower Units

Page 14: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

14

Insert the trim into the vertical rail

Clamp in position using the profile fitting tool

Pilot drill for all screw positions into the aluminium profile

For the front appliance positions itmay be necessary to insert the

appliance and mark the hole positions before removing the appliance to pilot drill.

1

3

2

4

1

3

2

4The appliance profile trim is supplied 1200mm and can be cut to the correct size. Remove all sharp edges.

Appliance Profile Trim Built Under Appliances

Fit the kitchen fascia as standard, but the marking template should be 16mm lower than the norm. This is to ensure that the front can be used as a handle at the top profile.

Slide the dishwasher in and adjust to bringit up against the horizontal trim profile.

Trim

True Handleless Guide - Tower Units

Page 15: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

15

End of a run of base units:

External corner post

1 x 596 fascia (F6) Used as décor end panel and scribed into the wall. Leave a 2mm gap between the external corner post and the Fixed Fascia to match the working fascia that comes off the other side of the corner post.

Use edging tape down the spacer between the corner post and fascia as you would when edging the carcase behind a fascia

900mm Island or Breakfast Bar ends:Standard base units used with service void removed.

Wall units on legs on reverse. Top wall unit panel needs to be reduced in depth by 24mm and re-edged with edging tape. re-screwed from sides to allow for the rail. Use the jig to notch out the side panels as with the base sides. Use standard bottom panel.

2 x 396 (F4) fascia's on the end (no cutting required) Fixed

Filler into wall using a cut down fascia. This is important as the profile and depth must be the same as the top will be visible

3

4

4 31

2 2

1

1

5

5

2

1

Attach spacer to corner post and scribed down fascia

Screw though base into the spacer. Caution: This screw could break through the surface of the end panel if screwed too deep.

2mm

2mm

1

18mm Edging Tape

True Handleless Guide - External Corners

Page 16: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

16

True Handleless Guide - Example Kitchen

External corner post

596 fascia (F6) Used as décor end panel and scribed into the wall.

396 fascia (F4)

Wall units on legs on reverse. Top of wall units adjusted for Horizontal trim (See previous page)

Tall end panels trimmed to 2058mm carcase height with plinth running around below to achieve the floating end finish.

All plinth joints to be mitred for a neat finish

Wine cooler adjusted up to horizontal trim to reduce gap. Please ensure the plinth is adjusted back to the floor to hide wine cooler legs

LED Strip lighting used under worktop. Secure into recessed groove under the worktop with silicone so it adheres to the worktop better.

1

2

3

4

5

6

1

2

3

4

5

6

1

1

1

22

6

6

7

7

Page 17: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

Worktops

17

Worktop Brackets are supplied for laminate/ wood worktops only.

We recommend putting a silicone joint atthe front edge of the top profile to seal to the worktop.

Worktops to be a 610mm Deep.

610mm Worktop

For all Template & Fit worktops, battens are supplied by Sheridan.For all other Worktops, battens should still be used and will be supplied with your order.

True Handleless Guide - Worktops

Page 18: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

18

Battening Examples

True Handleless Guide - Worktops

In order to fully support the

2 x 32mm MR MDF battens (to match height of horizonal rail)

Battening 50mm back from front of cabinet to clear horizontal rail

Battening

Page 19: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

19

For deeper hobs or hobs on a 610 worktop, the Base unit front rail can be removed completely and the Horizontal Trim back can be cut down in size.

900 Worktop

XXHob cut out

Hob dimensions will vary depending on hob being installed. Refer to manufactures instructions. On island situations hobs can be set back 85mm from the front edge to avoid the horizontal trim.

Ensure hob is supported by battens around the full perimeter

Hob Position Example

Secure the Horizontal trim using silicone. The rest of the rail is screwed down into the front rail as standard.

85

For Larger sinks/hobs the horizontal trim back can be cut away using a compass/jig saw and metal cutting blade to remove the rear lip.

610 Worktop

10

26Front Rail

125

Set sinks back 85mm to avoid horizontal trim where possibleEnsure sink is supported by battens around the full perimeter.

The cut out for the sink is 85mm back from the front of the worktop to ensure no clash with the horizontal trim

Cut 190mm from the top of the back panel height to clear the sink bowl

Reduce the front rail to 26mm. 26mm is the minimum the rail can go whilst keeping enough material for the horizontal trim to bite into.

1

2

3

1

2

3

Sink Position Example:

85400mm sink cut out dimension

307Wall unit on legs 533

Drawer Pack void reduced

True Handleless Guide - Worktops

Page 20: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

20

Wall units are supplied with the wall handle trim pre fitted into the bottom panel

Fit the wall units as standard

Trim wall panels to carcase height which will be 2mm above and below the fascia.

1

1

True Handleless Guide - Wall Units

Page 21: True Handleless Guide - Adobetravisperkins.scene7.com/is/content/travisperkins/Benchmarx/BMX T… · True Handleless Guide - Tower Units Double Vertical Rail Single Vertical True

21

Bridging units need to be clad with decor panels due to the off-white cabinet being visible to the underside, therefore the aluminium handle trim will not work as an opening mechanism

For further information please watch the BMX True Handleless fitting video:

https://youtu.be/d4NMZkKEFq8

True Handleless Guide - Bridging Units

Blum piston buffer (SKU 297595) is supplied with the cabinet

Blum drilling jig (SKU 685732) should be used to drill the cabinet . This tool has 2 sides. You should use the 18mm side, align centrally with the cabinet and drill through. The jig will keep the drill bit straight through the cabinet panel.

Only use 1 piston per cabinet, positioned centrally

Bridging Unit Installation