OPERATING DATA REPORT~
50-344DOCKET NO.,
DATE 8/3/81 |'
.
COMPLETED BY G. J. Kent,
| TELEPHONE 503/ss6-1713Ext 294
OPERAT!NG STATUS
Notes4
Troian Nuclear Plant1. Unit Name: Noned hiv 1981: 2. Reporting Perio :
COMPLETED BY c - T- roneREPORT MONTil July 1981 TELEPilONE 503/556-3713,
Ext. 294.
"t. _
} .!f kLicensee Eg hl,.$ E 3 Cause & Corrective
,
No. Date o; Eg s g& Event u o-3 Action to@ v? fu
' -,
[E 5 j g8 g . Report # . Prevent Recurrence'- ,
!
5-._
81-04 810501 S 173.5 C 1 NA NA NA' NA
81-05 810708 F 12.6 B 3 NA IIA NECFUN Load limit potentiameter was run up inpreparrtion for main turbine overspeed
*
test after initial warm up period.Control valve positipn increasedere- '
.
sulting in clearing P-7 and turbinetripped on ovgrapeed passing Reactortrip.
*
81-06 810709 F 9.8 B 4, NA IIA Filtu, liigh temperature on main turbina thrust
Flode 2 bearing and #2 main bearing. Two st,f rtFlaintal ne!! up strainers were.'found in the bearing
supply line and one itt the #2 bearingoil supply line which were removed as'
- required.
\ b81-07 810710 F 167.4' A 3 NA CB PUMPXX liigh temperatuce on lower radia? bear-
'ng of 'B' RCP with concurrent oili| j
reservoir alarm. Operators quickly',
[ [ ; reduced reactor power to <10% and tripp edthe pump. Reactor tripped on loi.p essurizet.
I 2 3 pressure f dom transient which followed.F: Forced Reason: Method: Exhibit G-Instructions Lower bearingS: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data replaced.
B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee,
C. Refueling J Automatic Sc:am. Event Report (LER) File (NUREG-,
D Regulatory Restriction ..
4 Other(Explain) 0161),
1 E-Opuator Training & License Examination -.
F-Administrative 5.
,' G-Operantonal Error (Explain) Exhibit I- Same Sourec.
UNITSilUTDOWNS AND POWER REDUCTIONS DOLKET NO. so-164UNIT NAME Trolano
DATE A/1/R1COMPLETED BY c .1 . Kent
REPORT MONill July 1981TELEPilCNE 301/556-3711
,Ext. 294
% -
.! E 3 .)Yf Licensee $ *,, fi Cause & Correceive-
'h Eg 5 2 s a: EventN". Dale v.*y j]o. Action toy
$E cM j di g Report # - Prevent Recurrence-.
6
81-08 810717 F 3.1 G 2 NA CII ~PUttPXX While valving in a second main feedpump for higher power operation, the,
,
operating, main feed pump tripped onlow suction pressure sensed in the 4
.
suction cross-connect line.'
81-09 810718 F 30.7 D 4 NA III DD11NX liigh steam generator. cation conddctivlt yFfode 2 forced power reduction and manual tripFlaintai ned of main turbine.
81-10 810719 F 1.1 Q 4 NA 4B ZZZZZZ 111 -111 Idvel in 'D' S/G trippe'd 'N' *
Ffode.2 / MFP and maih turbine off line.*
t!aintai ned .
81-11 810725 S 0 F NA NA NA NA Power reduced frodt to 70% per*
load dispatcher.81-12 81-0730 F 4.1 C 3 .NA IIB VALVoli Utility worker inadvertently: hit'
MSIV solenoid for 'B' MSIV causJng it.
.to trip shut. Reactor trip from 'B' .
S/G Lo-Lo level. '
I - 2 3 4-F: Forced Reason: Method: Exhibit G-InstructionsS: Scheduled A Equipinent Failure (Explain) 1-Manual for Preparation of Data
B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee.
C Refueling J.Automalle Sc.am. Event Report (LERI File (NUREG..
| The month began with the plant in cold shutdown. Heat up commenced July 2, 1981.; -The plant entered Mode 3 on July 3, 1981. As temperature and pressure approached
NOT & NOP evidence of a failed inner Reactor Vessel seal caused. personnel to shift ;'
to the outer 0-Ring seal. An unusual event (RERP) was declared July 3, 1981, when.
| RCS leakage exceeled STS limits due to A, B, and C RCS loop drains which had to be-torqued shut. Reload Physics Testing started July 4, 1981, with the plant enter-i
ing Mode 2 the same day. On July 10, 1981, the Reactor was manually tripped when.
1 'B' RCP lost oil to its lower bearing. The plant was' cooled down to 360*F whilerepairs were made to the pump. The Reactor was taken critical again on July 17,
| 1s81, but was shutdown to Mode 2 on July 18, 1981, due to high cation conductivityin the steam generator. The plant returned to power July 19, 1981, and went on to
,
complete Reload Physics Testing July 22, 1981. On July 30, 1981, the Reactor'; tripped on 'B' steam generator lo-lo level when a utility worker inadvertently
caused 'B' MSIV to shut while c1 caning on the main steam support structure. Theplant was recovered and closed out the month on-line producing power.
' MAJOR SAFETY RELATED MAINTENANCE:1:
| Work continued on improvement modifications to the Plant Security and Fire Pro-| tection Systems.
Vork continued on modifications of walls to improve seismic integrity.
I Work continued on several TMI-related design modifications.'B' RCP lower radial
i bearing replaced after loss of oil in lower reservoir. ;
~
Work completed on 'C' turbine generator preventative maintenanca and repair.;
I.ICENSE' CHANGES:'
~~.
None ,
f MLSCELLANEOUS:!
! . Work continued on Techt.ical Support Center.
! Electric Aux. Feed pump overheated, repairs in progress.!