. : | - . . OPERATING DATA REPORT ~ 50-344 DOCKET NO. , DATE 8/3/81 | ' . COMPLETED BY G. J. Kent , | TELEPHONE 503/ss6-1713 Ext 294 OPERAT!NG STATUS Notes 4 Troian Nuclear Plant 1. Unit Name: None d hiv 1981 : 2. Reporting Perio : 3411 3. U-=1 Thermal Power'(MWt): 1216 4. Nameplate Rating (Gross MWe): 1130 5. Design Electrical Rating (Net MWe): ' 1122 i - 6. Maximum Dependable Capacity (Gross MWe): 1080 I 7. Maximum Dependable Capacity (Net MWe): , 8. If Changes Occur in Capacity Ratings (f rens Number 3 Through 7) Since Last Report. Give Reasons: - ! Ndne I i N= ' 9. Power LevelTo Which Restricted If Any(Net MWe): N/A 10. Reasons For Restrictions,if Anf: . ; _ ' This Month Yr.-to-Date Cumulative ' # ' _ . 11. Hours in Reportiag P riod _ 744 5087 43079 ~ 470 0 3062.3 25823.6 i 12. Number Of Hours Resctor Was Critical n 0 2171.8 13. Reactor Reserve Shutdown Hours 340.6 2908.8 24902.3 a 14. Hours Generator On.Line 0 0 1508.7 ' 15. Unit Reserve Shutdown Ho_a 9275355 77842037 AsoA19 16. Gross Therm! 5nergy Generated (MWH) ; 96966; 1028030 25403416 | 17. Gross Electrical f nergy Generated (MWH) _ _ . mm 90 ognu s ?1061104 1 18. Net Electrical Energy Generated (MWH) - 45.8 57.2 57.8 19. Unit Service Factor as R 57.2 61.3 | - 4 30. Unit Availsbility Facor 99.5 52 1 51.5 | 31. Unit Capseity Factorii'ang MDC Net) ' 28.2 49.7 49.2 1 ' 22. Unit Capacity Fsetor (U3ing DER Net) 40.2 7.3 0.9 23. Unit Forced Ourage Rate - . ; 24. Shutdowns Scheduled O~er Next 6 Months (Type. Date.and Durstion of Esch1: , j ~ None . ; i N/A ! 35. If Shut Down At End Of Report Period. Estimated Date of Startup. 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved . .! J INITIAL CRITICALITY ,,N/A N/A N/A N/A ' INITIA L ELECTRICITY N/A N/A 'OMMERCIAL OPERATION ' i 4 . l 0108210368 810806 .('lI7) 4 . DR ADOCK 05000 : ' . _ . . _ ,3 __, ,
5

Troian Nuclear Plant · 2020. 12. 30. · 81-12 81-0730 F 4.1 C 3.NA IIB VALVoli Utility worker inadvertently: hit'. MSIV solenoid for 'B' MSIV causJng it. to trip shut. Reactor trip

Apr 26, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Troian Nuclear Plant · 2020. 12. 30. · 81-12 81-0730 F 4.1 C 3.NA IIB VALVoli Utility worker inadvertently: hit'. MSIV solenoid for 'B' MSIV causJng it. to trip shut. Reactor trip

.

: |-

.

.

OPERATING DATA REPORT~

50-344DOCKET NO.,

DATE 8/3/81 |'

.

COMPLETED BY G. J. Kent,

| TELEPHONE 503/ss6-1713Ext 294

OPERAT!NG STATUS

Notes4

Troian Nuclear Plant1. Unit Name: Noned hiv 1981: 2. Reporting Perio :

34113. U-=1 Thermal Power'(MWt):

12164. Nameplate Rating (Gross MWe): 11305. Design Electrical Rating (Net MWe): '

1122i

- 6. Maximum Dependable Capacity (Gross MWe):1080

I 7. Maximum Dependable Capacity (Net MWe): ,

8. If Changes Occur in Capacity Ratings (f rens Number 3 Through 7) Since Last Report. Give Reasons:-

! Ndne

Ii

N=' 9. Power LevelTo Which Restricted If Any(Net MWe):N/A10. Reasons For Restrictions,if Anf: .

;__

_

' This Month Yr.-to-Date Cumulative'

# '

_.

11. Hours in Reportiag P riod _744 5087 43079

~

470 0 3062.3 25823.6i 12. Number Of Hours Resctor Was Critical

n 0 2171.813. Reactor Reserve Shutdown Hours

340.6 2908.8 24902.3a

14. Hours Generator On.Line0 0 1508.7'

15. Unit Reserve Shutdown Ho_a 9275355 77842037AsoA1916. Gross Therm! 5nergy Generated (MWH); 96966; 1028030 25403416|

17. Gross Electrical f nergy Generated (MWH) _ _ .

mm 90 ognu s ?10611041 18. Net Electrical Energy Generated (MWH) -

45.8 57.2 57.819. Unit Service Factor

as R 57.2 61.3 |-

4 30. Unit Availsbility Facor99.5 52 1 51.5 |

31. Unit Capseity Factorii'ang MDC Net) '

28.2 49.7 49.21 ' 22. Unit Capacity Fsetor (U3ing DER Net)

40.2 7.3 0.923. Unit Forced Ourage Rate

-

.

;24. Shutdowns Scheduled O~er Next 6 Months (Type. Date.and Durstion of Esch1: ,

j~

None.;

i

N/A! 35. If Shut Down At End Of Report Period. Estimated Date of Startup.

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved.

.!J INITIAL CRITICALITY ,,N/A N/A

N/A N/A'

INITIA L ELECTRICITYN/A N/A

'OMMERCIAL OPERATION'

i

4

.

l 0108210368 810806 .('lI7)4 .

DR ADOCK 05000:

'

.

_ . . .

_ _ . _ _ ,3 __, ,

Page 2: Troian Nuclear Plant · 2020. 12. 30. · 81-12 81-0730 F 4.1 C 3.NA IIB VALVoli Utility worker inadvertently: hit'. MSIV solenoid for 'B' MSIV causJng it. to trip shut. Reactor trip

, _. .-

. _. - .-

,

AVERAGE DAILY UNIT POWER LEVEL-

. ,,

DOCKETNO. 50-344

i UNIT Troian

UAYL 6.l.3.l.EL

COMPLETTD BY C - 3- Var

TELEPHONE 50_3/556-3713

1*

294*Ext..

i

MONTH July'1981,

'

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL(MWe-Net) (MWe Net)

g -7 g7 220,

j 2 -12 13 66

-31 -93 __g,

4 -34 20 423i

j $ -34 23 737

6 -34 22 1053_

| 7 23-33 1061 -

t

& -4 24 1060'

9 134 25 __ 732. -

10 71 26 714 '

,

11 -19 27 763'

1

!--

j 12 -19 23 816j

) 13 -17 9 837

14 -15 30 650_

-2115 3n 842

~3016-,

- .

.

.

INSTRUCTIONS-

1

On this farmst, list the aversge daily unit power level in MWe. Net for each day ir. the icp >rting month. Compute tothe nearest whule megswatt.

.

*1 (9/77)t'

..

r

.

t

.

W u --- ~. - --- - - - - - - - - - - - S~-

Page 3: Troian Nuclear Plant · 2020. 12. 30. · 81-12 81-0730 F 4.1 C 3.NA IIB VALVoli Utility worker inadvertently: hit'. MSIV solenoid for 'B' MSIV causJng it. to trip shut. Reactor trip

. ._ __ _ . _ _ . _ _ _ _ . _ - _ _ . . . - _ . _ _ _ - _ . _ . _ _ . - _ . _ . _ . _ _ _ _ _ _ . .. _ _ _ _

.

DOCKET NO. 50-344~

UNITSilUTDOWNS AND POWER REDUCTIONS,

UNIT NAME Tro9nDATE 8/3/81

COMPLETED BY c - T- roneREPORT MONTil July 1981 TELEPilONE 503/556-3713,

Ext. 294.

"t. _

} .!f kLicensee Eg hl,.$ E 3 Cause & Corrective

,

No. Date o; Eg s g& Event u o-3 Action to@ v? fu

' -,

[E 5 j g8 g . Report # . Prevent Recurrence'- ,

!

5-._

81-04 810501 S 173.5 C 1 NA NA NA' NA

81-05 810708 F 12.6 B 3 NA IIA NECFUN Load limit potentiameter was run up inpreparrtion for main turbine overspeed

*

test after initial warm up period.Control valve positipn increasedere- '

.

sulting in clearing P-7 and turbinetripped on ovgrapeed passing Reactortrip.

*

81-06 810709 F 9.8 B 4, NA IIA Filtu, liigh temperature on main turbina thrust

Flode 2 bearing and #2 main bearing. Two st,f rtFlaintal ne!! up strainers were.'found in the bearing

supply line and one itt the #2 bearingoil supply line which were removed as'

- required.

\ b81-07 810710 F 167.4' A 3 NA CB PUMPXX liigh temperatuce on lower radia? bear-

'ng of 'B' RCP with concurrent oili| j

reservoir alarm. Operators quickly',

[ [ ; reduced reactor power to <10% and tripp edthe pump. Reactor tripped on loi.p essurizet.

I 2 3 pressure f dom transient which followed.F: Forced Reason: Method: Exhibit G-Instructions Lower bearingS: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data replaced.

B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee,

C. Refueling J Automatic Sc:am. Event Report (LER) File (NUREG-,

D Regulatory Restriction ..

4 Other(Explain) 0161),

1 E-Opuator Training & License Examination -.

F-Administrative 5.

,' G-Operantonal Error (Explain) Exhibit I- Same Sourec.

(9/77) Il-Other (Explalu) ' .

'

|'

+i,

1 ,- , .. .t . .. ;. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -

Page 4: Troian Nuclear Plant · 2020. 12. 30. · 81-12 81-0730 F 4.1 C 3.NA IIB VALVoli Utility worker inadvertently: hit'. MSIV solenoid for 'B' MSIV causJng it. to trip shut. Reactor trip

_ . _ _.- --- - _ _ __. _ _ , _ _ _ _ . . _ . . _ . - ___ _ - _ _ _ . . _ __ _ __ . .- _ _ _ . . . _

,

. . .

UNITSilUTDOWNS AND POWER REDUCTIONS DOLKET NO. so-164UNIT NAME Trolano

DATE A/1/R1COMPLETED BY c .1 . Kent

REPORT MONill July 1981TELEPilCNE 301/556-3711

,Ext. 294

% -

.! E 3 .)Yf Licensee $ *,, fi Cause & Correceive-

'h Eg 5 2 s a: EventN". Dale v.*y j]o. Action toy

$E cM j di g Report # - Prevent Recurrence-.

6

81-08 810717 F 3.1 G 2 NA CII ~PUttPXX While valving in a second main feedpump for higher power operation, the,

,

operating, main feed pump tripped onlow suction pressure sensed in the 4

.

suction cross-connect line.'

81-09 810718 F 30.7 D 4 NA III DD11NX liigh steam generator. cation conddctivlt yFfode 2 forced power reduction and manual tripFlaintai ned of main turbine.

81-10 810719 F 1.1 Q 4 NA 4B ZZZZZZ 111 -111 Idvel in 'D' S/G trippe'd 'N' *

Ffode.2 / MFP and maih turbine off line.*

t!aintai ned .

81-11 810725 S 0 F NA NA NA NA Power reduced frodt to 70% per*

load dispatcher.81-12 81-0730 F 4.1 C 3 .NA IIB VALVoli Utility worker inadvertently: hit'

MSIV solenoid for 'B' MSIV causJng it.

.to trip shut. Reactor trip from 'B' .

S/G Lo-Lo level. '

I - 2 3 4-F: Forced Reason: Method: Exhibit G-InstructionsS: Scheduled A Equipinent Failure (Explain) 1-Manual for Preparation of Data

B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee.

C Refueling J.Automalle Sc.am. Event Report (LERI File (NUREG..

' 4 Other(Euplain) 0161)D Regulatory RestrictioriE Operator Training & License Examinailoti -

F.Administrelive $.

(9/77) ll Other (Explain).

Exhibit I .Same Sourcei'

G-Operational Error (Explain).

'..

e- r p - g.,t

Page 5: Troian Nuclear Plant · 2020. 12. 30. · 81-12 81-0730 F 4.1 C 3.NA IIB VALVoli Utility worker inadvertently: hit'. MSIV solenoid for 'B' MSIV causJng it. to trip shut. Reactor trip

Dockstt No: 50-344

.* . Date: TrojanCompleted by: - G. J. Kent.

* Telephone: 503/556-3713Ext. 294~ ,

1,

i SUMMARY OF OPERATING EXPERIENCE t

i|- OPERATION:

| The month began with the plant in cold shutdown. Heat up commenced July 2, 1981.; -The plant entered Mode 3 on July 3, 1981. As temperature and pressure approached

NOT & NOP evidence of a failed inner Reactor Vessel seal caused. personnel to shift ;'

to the outer 0-Ring seal. An unusual event (RERP) was declared July 3, 1981, when.

| RCS leakage exceeled STS limits due to A, B, and C RCS loop drains which had to be-torqued shut. Reload Physics Testing started July 4, 1981, with the plant enter-i

ing Mode 2 the same day. On July 10, 1981, the Reactor was manually tripped when.

1 'B' RCP lost oil to its lower bearing. The plant was' cooled down to 360*F whilerepairs were made to the pump. The Reactor was taken critical again on July 17,

| 1s81, but was shutdown to Mode 2 on July 18, 1981, due to high cation conductivityin the steam generator. The plant returned to power July 19, 1981, and went on to

,

complete Reload Physics Testing July 22, 1981. On July 30, 1981, the Reactor'; tripped on 'B' steam generator lo-lo level when a utility worker inadvertently

caused 'B' MSIV to shut while c1 caning on the main steam support structure. Theplant was recovered and closed out the month on-line producing power.

' MAJOR SAFETY RELATED MAINTENANCE:1:

| Work continued on improvement modifications to the Plant Security and Fire Pro-| tection Systems.

Vork continued on modifications of walls to improve seismic integrity.

I Work continued on several TMI-related design modifications.'B' RCP lower radial

i bearing replaced after loss of oil in lower reservoir. ;

~

Work completed on 'C' turbine generator preventative maintenanca and repair.;

I.ICENSE' CHANGES:'

~~.

None ,

f MLSCELLANEOUS:!

! . Work continued on Techt.ical Support Center.

! Electric Aux. Feed pump overheated, repairs in progress.!

h.

. .me

;

1

i

!

i

!J

E

1

!

i

.

. . . ~ - . . . , _ , . . , _ . , _ , < ~..% __.p._ . _ , _ _ ,,,,m.,., ,,y,,_ ,y, 3 , , . . ,y y., , , y. , ,.,9 ,.m.,