Top Banner
101 Room name 101 1 A101 SIM DOOR TAG ROOM TAG SECTION www.gregerseninteriors.com Scale Date Drawn By Checked By Project Number 1/4" = 1'-0" 5/20/2011 9:30:27 AM A0.0 Cover Sheet Trillium Hospital Administration Building Checker Author Issue Date 12 TRILLIUM HOSPITAL ADMINISTRATION BUILDING 1518 DIVISADERO AVE SAN FRANCISCO, CA 95114 No. Description Date GENERAL NOTES: 1. PRIOR TO COMMENCING THE WORK, THE CONTRACTOR SHALL EXAMINE ALL CONTRACT DOCUMENTS, FIELD CONDITIONS, DIMENSIONS, ETC. FOR ACCURACY AND TO CONFIRM THAT THE WORK IS BUILDABLE AS SHOWN. THE CONTRACTOR SHALL PROMPTLY INFORM THE ARCHITECT, IN WRITING, OF ANY DISCREPANCIES AND SHALL OBTAIN CLARIFICATION FROM THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK IN QUESTION OR WITH ANY RELATED WORK. 2. THE CONTRACTOR SHALL VERIFY AND COORDINATE WALLS AND FRAMING THAT REQUIRE A NON-TYPICAL THICKNESS DUE TO STRUCTURAL, ELECTRICAL, MECHANICAL, EQUIPMENT, OR OTHER REQUIREMENTS. 3. ALL STUD WALLS AND PARTITION FRAMING SHALL MEET STRUCTURAL REQUIREMENTS OF THE LATEST EDITION OF THE UBC AND THE CALIFORNIA ADMENDMENTS. 5. VERIFY MOUNTING HEIGHTS OF BACKING PLATES AND SPECIAL STRUCTURAL SUPPORT REQUIREMENTS WITH EQUIPMENT MANUFACTURERS BEFORE INSTALLING BACKING PLATES AND SUPPORT. 6. ALL THROUGH-PENETRATION FIRE STOPS SHALL COMPLY WITH UBC SECTION 714. 7. WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER-DRIVEN PINS IN NON- PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS. 8. ALL DOORS AND PENETRATIONS IN WALLS AND PARTITIONS SHALL MAINTAIN THE REQUIRED FIRE PROTECTION RATING OF THAT WALL OR PARTITION. WHERE A CONFLICT BETWEEN PARTITION RATING AND DOOR/FRAME RATING OCCURS NOTIFY ARCHITECT PRIOR TO PROCEEDING. 9. ALL INTERIOR FINISHES IN ONE-HOUR RATED AREAS SHALL BE CONSTRUCTED WITH CLASS 2 MATERIALS. ALL OTHER MATERIALS SHALL BE CLASS 3 FIRE-RESISTANT MATERIALS, PER THE LATEST CODES AND STATUTES. 10. TYPICAL DOOR LEG IS 4" OFF WALL ADJACENT PERPENDICULAR WALL OR PARTITION. 11. ALL DOOR HARDWARE SHALL COMPLY WITH THE CURRENT REQUIREMENTS AND GUIDELINES FOR ACCESS BY THE PHYSICALLY DISABLED (TITLE-24). 12. PROVIDE WEATHER STRIPPING FOR DOORS SEPARATING CONDITIONED AND UNCONDITIONED SPACES PER TITLE 24. 13. ALL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A SPECIAL KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT, EXCEPTION PER UBC. PROVIDE READILY VISIBLE DURABLE SIGN ON OR ADJACENT TO THE DOOR, STATING "THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS." LETTERS SHALL BE 1" HIGH ON A CONTRASTING BACKGROUND. 14. PROVIDE EXIT SIGNS PER UBC AND CALIFORNIA ADMENDMENTS 15. A FLOOR PLAN PROVIDING EMERGENCY PROCEDURAL INFORMATION SHALL BE POSTED AT EVERY STAIRWAY AND ELEVATOR LANDING, AND IMMEDIATELY INSIDE ALL PUBLIC ENTRANCES TO THE BUILDING. INFORMATION SHALL INCLUDE BUT NOT LIMITED TO THE FOLLOWING: A. LOCATION OF EXITS AND FIRE ALARM INITIATING STATIONS. B. DESCRIPTION OF FIRE ALARM HORN AND STROBE. C. FIRE DEPARTMENT EMERGENCY TELEPHONE NUMBER 9-1-1. D. THE PROHIBITION OF THE USE OF ELEVATORS DURING EMERGENCIES. E. INSTRUCTIONS TO BE FOLLOWED BY AMBULATORY, NON-AMBULATORY, AND PHYSICALLY DISABLED PERSONS IN THE EVENT OF AN EMERGENCY. SIGN SHALL BE PRINTED WITH A MIN. OF 3/16 INCH HIGH NON-DECORATIVE LETTERING PROVIDING A SHARP CONTRAST TO THE BACKGROUND. THE INFORMATION SHALL INCLUDE THE FLOOR LEVEL AND BE POSTED SO THAT THE BOTTOM EDGE OF SUCH SIGNAGE IS LOCATED NOT MORE THAN 4' ABOVE THE FLOOR. (TITLE 19, CCR, SECTION 3.09). 16. FIRE EXTINGUISHERS ARE TO BE LOCATED AS REQUIRED BY THE GOVERNING REGULATORY AGENCIES. 17. FIRE SPRINKLERS SHALL COMPLY WITH UBC CHAPTER 9 AND UBC STD 9-1. FIRE SPRINKLER PLANS SHALL BE SUBMITTED FOR REVIEW TO THE PROPER REVIEWING AGENCY PRIOR TO CONSTRUCTION. CONCEALED SPACES SHOULD BE SPRINKLERED. 18. A COMPLEMENT OF FIRE EXTINGUISHERS WITH A MIN. CLASSIFICATION OF 2A10BC SHALL BE MOUNTED SO THAT THE MAX. TRAVEL DISTANCE TO AN EXTINGUISHER, ON A FLOOR BY FLOOR BASIS, IS 75 FEET. IN ACCORDANCE WITH THE UFC STANDARD, THE TOP OF THE FIRE EXTINGUISHERS SHALL BE MOUNTED NO HIGHER THAN FIVE FEET FROM THE FLOOR. EXTINGUISHERS WHICH ARE NOT READILY VISIBLE FROM ALL DIRECTIONS SHALL BE PROVIDED WITH SIGNAGE TO INDICATE THEIR LOCATION. (UFC 1002) 19. APPROVED STAIRWAY IDENTIFICATION SIGNS SHALL BE LOCATED AT EACH FLOOR LEVEL WITHIN ALL ENCLOSED STAIRWELLS. THE SIGN SHALL IDENTIFY THE STAIRWAY, INDICATE WHETHER THERE IS ROOF ACCESS, THE FLOOR LEVEL, AND THE LOWER AND UPPER TERMINUS OF THE STAIRWAY. THE SIGN SHALL BE PLACED APPROXIMATELY 5' ABOVE THE FLOOR LANDING IN A POSITION WHICH IS READILY VISIBLE WHEN THE DOOR IS IN THE OPEN OR CLOSED POSITION. SEE APPENDIX C OF THE UNIFORM FIRE CODE. (UFC SECTION 1210.4) 20. AS MUCH AS PRACTICAL, RE-USE ITEMS FROM ELSEWHERE IN THE BUILDING. VERIFY WITH OWNER WHICH ITEMS WILL BE RE-USED. 21. CONTRACTOR TO MAINTAIN CODE COMPLYING EXITING AND SPRINKLERS DURING CONSTRUCTION. 22. THE AUTOMATIC FIRE SPRINKLER SYSTEM IS REQUIRED TO BE MODIFIED IN THIS BUILDING. THE DESIGNER/INSTALLER SHALL SUBMIT PERMIT DRAWINGS, COMPLYING WITH THE REQUIREMENTS OF NFPA 13, INCLUDING HYDRAULIC CALCULATIONS, EARTHQUAKE BRACING AND HANGER FASTENER CALCULATIONS, TO THE DISTRICT FOR REVIEW AND PERMIT. (CFC 1001.3/1003) 23. COMPLIANCE WITH CFC ARTICLE 87 "FIRESAFETY DURING CONSTRUCTION, ALTERATION OR DEMOLITION OF A BUILDING" IS MANDATORY. 24. (E) BUILDING ENVELOPE COMPLIES WITH TITLE24 UNDER PREVIOUS SUBMITTAL. PROPOSED CHANGES DO NOT DECREASE ENVELOPE PERFORMANCE. SYMBOL LEGEND: PROJECT DATA: PROJECT TEAM: SCOPE OF WORK: DEFERRED SUBMITTALS: VICINITY MAP: BUILDING CODES: 2001 CALIFORNIA BUILDING CODE BASED ON THE 1997 EDITION OF THE UBC 2001 CALIFORNIA PLUMBING CODE, BASED ON 2000 UPC 2001 CALIFORNIA MECHANICAL CODE, BASED ON 2000 UMC 2004 CALIFORNIA ELECTRIC CODE BASED ON 2002 NEC 2005 BUILDING ENERGY EFFICIENCY STANDARDS 2001 CALIFORNIA FIRE CODE LEGAL JURISDICTION: CITY OF SAN JOSE, CA SAN JOSE FIRE DISTRICT, CA APN: 678-16-8 PLANNING ZONE: IP-B CONSTRUCTION TYPE: V-N BUILDING OCCUPANCY: B, F-1, S-2 FIRE PROTECTION: BUILDING IS PROVIDED WITH AUTOMATIC FIRE SPRINKLER SYSTEM THROUGHOUT SITE AREA: 29.88 ACRES BUILDING AREA: 125,000 SF AREA OF IMPROVEMENT: 125,000 SF PARKING PROVIDED: SEE SHEET G0.04 FOR PARKING ANALYSIS DEFERRED SUBMITTAL ITEMS SHALL BE REVIEWED AND APPROVED BY THE ARCHITECT OR THE ENGINEER OF RECORD PRIOR TO SUBMITTAL FOR THE BUILDING OFFICIAL FOR APPROVAL. DEFERRAL OF ANY ITEM SHALL HAVE APPROVAL OF THE BUILDING OFFICIAL OF THEIR DESIGN AND SUBMITTAL DOCUMENTS PRIOR TO ANY INSTALLATION. 1/ FIRE SPRINKLER SYSTEM 2/ HIGH LEVEL STOCK RACK 3/ BURN-IN CHAMBER SEISMIC ATTACHMENT 4/ TOOLS INSTALLATIONS ARE TO BE UNDER SEPARATE PERMIT. NEW WORK: TENANT IMPROVEMENT OF OFFICE, STORAGE, AND MANUFACTURING AREA. NEW TRASH ENCLOSURE, AND NEW EXTERIOR DOORS WILL BE INSTALLED. DEMOLITION: 1. INTERIOR NON-STRUCTURAL PARTITIONS, FINISHES, FIXTURES, EQUIPMENT AS INDICATED ARE TO BE REMOVED. PROJECT LOCATION CLIENT : JDFHALEFHLAEU LAIEHLAIWUEHFLWE 1901 SDF;S ROAD SAN FRANCISCO, CA. PHONE: (415) 165-7234 FAX: (415) 165-7210 CONTACT: DJFA ALKJSHFLAW STRUCTURAL ENGINEER: IRELAND ENGINEERING 43551 MISSION BLVD., STE. 110 FREMONT, CA. 94539 PHONE: 510.438.9632 FAX: 510.438.0689 CONTACT: ASDF ASDFHAJS FACILITIES DEVELOPMENT: SIGMATECH FACILITIES DEVELOPMENT 3333 BOWERS AVE., STE. 130 SANTA CLARA, CA 95050 PHONE: (408) 988-4345 FAX: (408) 748-1826 CONTACT: ASDF IOUF WU MECHANICAL ENGINEER: SILICON VALLEY MECHANICAL 980 N. 11TH ST. SAN JOSE, CA. 95112 PHONE: 408.885.0500 FAX: 408.885.0505 CONTACT: ERAE ADFHALWF ARCHITECT: ACADEMY OF ART UNITVERSITY 2900 STOCKTON STREET SAN FRANCISCO, CA. 94102 PHONE: 415.681.6453 FAX: 415.68.2632 CONTACT: UOIU NAO;NFN ELECTRICAL ENGINEER: MIDSTATE ELECTRIC, INC. 1855 KIRKMONT DR. SAN JOSE, CA. 95124 PHONE: 408.374.9077 FAX: 408.266.0565 CONTACT: ASD ALSDFA GENERAL CONTRACTOR: DEVCON CONSTRUCTION, INC. 690 GILBRALTAR DR. MILPITAS, CA 95035 PHONE: (408) 942-8200 FAX: (408) 262-2342 CONTACT: MARK JOHNSON PLUMBING ENGINEER: METRO PLUMBING 834 LENZEN AVE. SAN JOSE, CA. 95126 PHONE: 408.287.7551 FAX: 408.287.0831 CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan Level 2 A3.1 Ceiling Plan Level 1 A3.2 Ceiling Plan Level 2 A4.0 Exterior Elevations and Building Sections A5.1 Interior Elevations - 1 A5.2 Interior Elevations - 2 A6.1 Finishes Plan Level 1 A6.2 Finishes Plan Level 2 A7.1 Furniture Plan Level 1 A7.2 Furniture Plan Level 2 A8.0 Door and Room/ Finishes Schedules A9.0 Interior Details
15

TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

Jul 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

101

Room name101

1A101

SIM

DOOR TAG

ROOM TAG

SECTION

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

1/4" = 1'-0"

5/20

/201

1 9:

30:2

7 AM

A0.0

Cover Sheet

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

TRILLIUM HOSPITALADMINISTRATION BUILDING

1518 DIVISADERO AVESAN FRANCISCO, CA 95114

No. Description Date

GENERAL NOTES:1. PRIOR TO COMMENCING THE WORK, THE CONTRACTOR SHALL EXAMINE ALL CONTRACTDOCUMENTS, FIELD CONDITIONS, DIMENSIONS, ETC. FOR ACCURACY AND TO CONFIRMTHAT THE WORK IS BUILDABLE AS SHOWN. THE CONTRACTOR SHALL PROMPTLY INFORMTHE ARCHITECT, IN WRITING, OF ANY DISCREPANCIES AND SHALL OBTAIN CLARIFICATIONFROM THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK IN QUESTION OR WITH ANYRELATED WORK.

2. THE CONTRACTOR SHALL VERIFY AND COORDINATE WALLS AND FRAMING THATREQUIRE A NON-TYPICAL THICKNESS DUE TO STRUCTURAL, ELECTRICAL, MECHANICAL,EQUIPMENT, OR OTHER REQUIREMENTS.

3. ALL STUD WALLS AND PARTITION FRAMING SHALL MEET STRUCTURAL REQUIREMENTS OFTHE LATEST EDITION OF THE UBC AND THE CALIFORNIA ADMENDMENTS.

5. VERIFY MOUNTING HEIGHTS OF BACKING PLATES AND SPECIAL STRUCTURAL SUPPORTREQUIREMENTS WITH EQUIPMENT MANUFACTURERS BEFORE INSTALLING BACKINGPLATES AND SUPPORT.

6. ALL THROUGH-PENETRATION FIRE STOPS SHALL COMPLY WITH UBC SECTION 714.

7. WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER-DRIVEN PINS IN NON-PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING ORDAMAGING THE EXISTING REINFORCING BARS.

8. ALL DOORS AND PENETRATIONS IN WALLS AND PARTITIONS SHALL MAINTAIN THEREQUIRED FIRE PROTECTION RATING OF THAT WALL OR PARTITION. WHERE A CONFLICTBETWEEN PARTITION RATING AND DOOR/FRAME RATING OCCURS NOTIFY ARCHITECTPRIOR TO PROCEEDING.

9. ALL INTERIOR FINISHES IN ONE-HOUR RATED AREAS SHALL BE CONSTRUCTED WITHCLASS 2 MATERIALS. ALL OTHER MATERIALS SHALL BE CLASS 3 FIRE-RESISTANTMATERIALS, PER THE LATEST CODES AND STATUTES.

10. TYPICAL DOOR LEG IS 4" OFF WALL ADJACENT PERPENDICULAR WALL OR PARTITION.

11. ALL DOOR HARDWARE SHALL COMPLY WITH THE CURRENT REQUIREMENTS ANDGUIDELINES FOR ACCESS BY THE PHYSICALLY DISABLED (TITLE-24).

12. PROVIDE WEATHER STRIPPING FOR DOORS SEPARATING CONDITIONED ANDUNCONDITIONED SPACES PER TITLE 24.

13. ALL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF ASPECIAL KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT, EXCEPTION PER UBC.PROVIDE READILY VISIBLE DURABLE SIGN ON OR ADJACENT TO THE DOOR, STATING "THISDOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS." LETTERS SHALL BE 1" HIGH ONA CONTRASTING BACKGROUND.

14. PROVIDE EXIT SIGNS PER UBC AND CALIFORNIA ADMENDMENTS

15. A FLOOR PLAN PROVIDING EMERGENCY PROCEDURAL INFORMATION SHALL BEPOSTED AT EVERY STAIRWAY AND ELEVATOR LANDING, AND IMMEDIATELY INSIDE ALLPUBLIC ENTRANCES TO THE BUILDING. INFORMATION SHALL INCLUDE BUT NOT LIMITED TOTHE FOLLOWING:

A. LOCATION OF EXITS AND FIRE ALARM INITIATING STATIONS.B. DESCRIPTION OF FIRE ALARM HORN AND STROBE.C. FIRE DEPARTMENT EMERGENCY TELEPHONE NUMBER 9-1-1.D. THE PROHIBITION OF THE USE OF ELEVATORS DURING EMERGENCIES.E. INSTRUCTIONS TO BE FOLLOWED BY AMBULATORY, NON-AMBULATORY, ANDPHYSICALLY DISABLED PERSONS IN THE EVENT OF AN EMERGENCY.

SIGN SHALL BE PRINTED WITH A MIN. OF 3/16 INCH HIGH NON-DECORATIVE LETTERINGPROVIDING A SHARP CONTRAST TO THE BACKGROUND. THE INFORMATION SHALLINCLUDE THE FLOOR LEVEL AND BE POSTED SO THAT THE BOTTOM EDGE OF SUCHSIGNAGE IS LOCATED NOT MORE THAN 4' ABOVE THE FLOOR. (TITLE 19, CCR, SECTION 3.09).

16. FIRE EXTINGUISHERS ARE TO BE LOCATED AS REQUIRED BY THE GOVERNINGREGULATORY AGENCIES.

17. FIRE SPRINKLERS SHALL COMPLY WITH UBC CHAPTER 9 AND UBC STD 9-1. FIRESPRINKLER PLANS SHALL BE SUBMITTED FOR REVIEW TO THE PROPER REVIEWINGAGENCY PRIOR TO CONSTRUCTION. CONCEALED SPACES SHOULD BE SPRINKLERED.

18. A COMPLEMENT OF FIRE EXTINGUISHERS WITH A MIN. CLASSIFICATION OF 2A10BC SHALLBE MOUNTED SO THAT THE MAX. TRAVEL DISTANCE TO AN EXTINGUISHER, ON A FLOOR BYFLOOR BASIS, IS 75 FEET. IN ACCORDANCE WITH THE UFC STANDARD, THE TOP OF THE FIREEXTINGUISHERS SHALL BE MOUNTED NO HIGHER THAN FIVE FEET FROM THE FLOOR.EXTINGUISHERS WHICH ARE NOT READILY VISIBLE FROM ALL DIRECTIONS SHALL BEPROVIDED WITH SIGNAGE TO INDICATE THEIR LOCATION. (UFC 1002)

19. APPROVED STAIRWAY IDENTIFICATION SIGNS SHALL BE LOCATED AT EACH FLOORLEVEL WITHIN ALL ENCLOSED STAIRWELLS. THE SIGN SHALL IDENTIFY THE STAIRWAY,INDICATE WHETHER THERE IS ROOF ACCESS, THE FLOOR LEVEL, AND THE LOWER ANDUPPER TERMINUS OF THE STAIRWAY. THE SIGN SHALL BE PLACED APPROXIMATELY 5'ABOVE THE FLOOR LANDING IN A POSITION WHICH IS READILY VISIBLE WHEN THE DOORIS IN THE OPEN OR CLOSED POSITION. SEE APPENDIX C OF THE UNIFORM FIRE CODE.(UFC SECTION 1210.4)

20. AS MUCH AS PRACTICAL, RE-USE ITEMS FROM ELSEWHERE IN THE BUILDING. VERIFYWITH OWNER WHICH ITEMS WILL BE RE-USED.

21. CONTRACTOR TO MAINTAIN CODE COMPLYING EXITING AND SPRINKLERS DURINGCONSTRUCTION.

22. THE AUTOMATIC FIRE SPRINKLER SYSTEM IS REQUIRED TO BE MODIFIED IN THISBUILDING. THE DESIGNER/INSTALLER SHALL SUBMIT PERMIT DRAWINGS, COMPLYING WITHTHE REQUIREMENTS OF NFPA 13, INCLUDING HYDRAULIC CALCULATIONS, EARTHQUAKEBRACING AND HANGER FASTENER CALCULATIONS, TO THE DISTRICT FOR REVIEW ANDPERMIT. (CFC 1001.3/1003)

23. COMPLIANCE WITH CFC ARTICLE 87 "FIRESAFETY DURING CONSTRUCTION, ALTERATIONOR DEMOLITION OF A BUILDING" IS MANDATORY.

24. (E) BUILDING ENVELOPE COMPLIES WITH TITLE24 UNDER PREVIOUS SUBMITTAL.PROPOSED CHANGES DO NOT DECREASE ENVELOPE PERFORMANCE.

SYMBOL LEGEND: PROJECT DATA:

PROJECT TEAM:

SCOPE OF WORK: DEFERRED SUBMITTALS:

VICINITY MAP:

BUILDING CODES:2001 CALIFORNIA BUILDING CODE BASED ON THE 1997 EDITION OF THE UBC2001 CALIFORNIA PLUMBING CODE, BASED ON 2000 UPC2001 CALIFORNIA MECHANICAL CODE, BASED ON 2000 UMC2004 CALIFORNIA ELECTRIC CODE BASED ON 2002 NEC2005 BUILDING ENERGY EFFICIENCY STANDARDS2001 CALIFORNIA FIRE CODE

LEGAL JURISDICTION: CITY OF SAN JOSE, CASAN JOSE FIRE DISTRICT, CA

APN: 678-16-8

PLANNING ZONE: IP-B

CONSTRUCTION TYPE: V-N

BUILDING OCCUPANCY:B, F-1, S-2

FIRE PROTECTION: BUILDING IS PROVIDED WITH AUTOMATIC FIRE SPRINKLER SYSTEMTHROUGHOUT

SITE AREA: 29.88 ACRES

BUILDING AREA: 125,000 SF

AREA OF IMPROVEMENT: 125,000 SF

PARKING PROVIDED: SEE SHEET G0.04 FOR PARKING ANALYSIS

DEFERRED SUBMITTAL ITEMS SHALL BE REVIEWED AND APPROVED BY THEARCHITECT OR THE ENGINEER OF RECORD PRIOR TO SUBMITTAL FOR THEBUILDING OFFICIAL FOR APPROVAL.DEFERRAL OF ANY ITEM SHALL HAVE APPROVAL OF THE BUILDING OFFICIAL OFTHEIR DESIGN AND SUBMITTAL DOCUMENTS PRIOR TO ANY INSTALLATION.

1/ FIRE SPRINKLER SYSTEM2/ HIGH LEVEL STOCK RACK3/ BURN-IN CHAMBER SEISMIC ATTACHMENT4/ TOOLS INSTALLATIONS ARE TO BE UNDER SEPARATE PERMIT.

NEW WORK:

TENANT IMPROVEMENT OF OFFICE, STORAGE, ANDMANUFACTURING AREA. NEW TRASH ENCLOSURE, AND NEWEXTERIOR DOORS WILL BE INSTALLED.

DEMOLITION:

1. INTERIOR NON-STRUCTURAL PARTITIONS,FINISHES, FIXTURES, EQUIPMENT AS INDICATED ARETO BE REMOVED.

PROJECT LOCATION

CLIENT : JDFHALEFHLAEU LAIEHLAIWUEHFLWE1901 SDF;S ROADSAN FRANCISCO, CA.PHONE: (415) 165-7234FAX: (415) 165-7210CONTACT: DJFA ALKJSHFLAW

STRUCTURAL ENGINEER:IRELAND ENGINEERING43551 MISSION BLVD., STE. 110FREMONT, CA. 94539PHONE: 510.438.9632FAX: 510.438.0689CONTACT: ASDF ASDFHAJS

FACILITIES DEVELOPMENT:SIGMATECH FACILITIES DEVELOPMENT3333 BOWERS AVE., STE. 130SANTA CLARA, CA 95050PHONE: (408) 988-4345FAX: (408) 748-1826CONTACT: ASDF IOUF WU

MECHANICAL ENGINEER:SILICON VALLEY MECHANICAL980 N. 11TH ST.SAN JOSE, CA. 95112PHONE: 408.885.0500FAX: 408.885.0505CONTACT: ERAE ADFHALWF

ARCHITECT:ACADEMY OF ART UNITVERSITY2900 STOCKTON STREETSAN FRANCISCO, CA. 94102PHONE: 415.681.6453FAX: 415.68.2632CONTACT: UOIU NAO;NFN

ELECTRICAL ENGINEER:MIDSTATE ELECTRIC, INC.1855 KIRKMONT DR.SAN JOSE, CA. 95124PHONE: 408.374.9077FAX: 408.266.0565CONTACT: ASD ALSDFA

GENERAL CONTRACTOR:DEVCON CONSTRUCTION, INC.690 GILBRALTAR DR.MILPITAS, CA 95035PHONE: (408) 942-8200FAX: (408) 262-2342CONTACT: MARK JOHNSON

PLUMBING ENGINEER:METRO PLUMBING834 LENZEN AVE.SAN JOSE, CA. 95126PHONE: 408.287.7551FAX: 408.287.0831CONTACT: SDFASD ALSDFKS

SHEET INDEX:Sheet Number Sheet Name

A0.0 Cover SheetA1.0 Demolition PlansA2.1 Floor Plan Level 1A2.2 Floor Plan Level 2A3.1 Ceiling Plan Level 1A3.2 Ceiling Plan Level 2A4.0 Exterior Elevations and Building SectionsA5.1 Interior Elevations - 1A5.2 Interior Elevations - 2A6.1 Finishes Plan Level 1A6.2 Finishes Plan Level 2A7.1 Furniture Plan Level 1A7.2 Furniture Plan Level 2A8.0 Door and Room/ Finishes SchedulesA9.0 Interior Details

Page 2: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

DN DN

DN

UP UP

UP

21 3 4 5 6 7 98 1110

B

C

A

D

E

FA4.0

6

A4.04

A4.0 5

A5.2

13

14

15

16

21 3 4 5 6 7 98 11

11

10

B

C

A

D

E

FA4.0

6

A4.04

A4.0 5

50' - 9 3/4"

29' -

0 1

/2"

A5.13

2

4

1

A5.1

5

8

7

6

A5.1

9

11

1012

A5.1 13

14

15

16

A5.21

2

3

4

A5.2 5

6

7

8A5.2

9

10

11

12

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

1/16" = 1'-0"

5/20

/201

1 9:

30:2

8 AM

A1.0

Demolition Plans

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

1/16" = 1'-0"2 Demolition Plan Level 2

1/16" = 1'-0"1 Demolition Plan Level 1

Page 3: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

UP UP

UP

30' - 4 3/8" 5' - 0 1/2"

13' - 5 5/8" 61' - 3 3/8" 15' - 3 5/16" 98' - 11 3/16"

15' -

0 1

/2"

4' - 0 11/16" 11' - 3" 4' - 2 13/16"

5' -

5"

5' -

3"5'

- 0

21/3

2"

28' - 6 3/8"

10' -

9 7

/16"

2' -

2"9'

- 4"

2' -

0"

20' -

11

11/1

6"

1' - 4"

28' - 11 3/8" 6' - 11 3/4" 6' - 10"

11' - 3 1/8"

24' -

8"

24' -

5"

16' -

6 1

/4"

22' -

0 1

/16"

22' -

4 1

1/16

"

7' - 10 1/4"

6' -

7 3/

16"

82' - 8 7/16"

1' -

6"12

' - 9

"

11' - 0 7/8"

6' - 10" 2' - 5 1/4" 6' - 3"

8' -

5 1/

2"

17' -

11

1/8"

10' -

2"

21' -

6 7

/32"

3' -

2 15

/32"

9' -

6 1/

2"

28' -

0"

1' -

10 3

1/32

"

17' - 5"

9' - 7 7/8"5' - 10"

24' - 6" 36' - 1 1/2"

10' - 5 3/4"

16' -

10

13/1

6"7'

- 2

3/4"

10' -

1"

15' - 0 5/8" 5' - 2 1/8" 17' - 1 25/32" 5' - 0 23/32" 11' - 11 1/2" 12' - 0"

14' - 7 1/8"

1' - 1 1/8" 7' - 8 1/16" 5' - 0 1/8" 13' - 8 1/16"

13' -

6 5

/8"

14' -

1 1

5/16

"

1' -

11"

12' -

5 9

/16"

11' -

9 9

/16"

10' -

0"

10' -

0"

7' - 3 15/16" 12' - 4 5/8" 11' - 11" 25' - 11 5/16"17

' - 1

1 5/

16"

11' - 3 5/8" 11' - 5 1/8" 12' - 4 5/8"

6' - 0 5/8"

12' - 2 3/8" 13' -

7 1

5/32

"0'

- 8"

13' -

8 9

/32"

7' - 1 15/16" 14' - 11 9/16" 12' - 3 1/8" 12' - 2 1/4" 10' - 0 15/16" 10' - 0 1/8" 10' - 0 1/8" 9' - 11 1/2" 7' - 9 3/8"

10' -

2 7

/16"

36' -

2 7

/32"

5' -

8 5/

32"

4' -

11 1

5/16

"

8' - 0 1/2"

A4.0

6

A4.04

A4.0 5

A5.13

2

4

1

A5.1

5

8

7

6

A5.1

9

11

1012

A5.1 13

14

15

16

A5.21

2

3

4

A5.2 5

6

7

8A5.2

9

10

11

12

A9.02

Sim

A9.03

Sim

Entrance87

Staircase88

Staircase89

Entrance90

FUTURE1

FUTURE1

WOMEN'S RR3

COMP4

STOR5

CONF6

PO7

PO8

PO9

CONF10

CORRIDOR11

OPEN OFFICE12

CONF13

CONF14

PO15

CONF16

MEN'S RR2

CONF18

CONF19

CONF20

MAIL21

CONF22

STOR23

PRESENTATION24

CLASSROOM25

RR26

TRAINING27

TRAINING28

CONF29

COPY30

BREAK31

CLASSROOM32

HALLWAY34

LOBBY35

DEMO36

HALLWAY38

PRESENTATION40

ELEC41

MECH42

RR43

RR44

ELEV174

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

5/20

/201

1 9:

30:2

8 AM

A2.1

Floor Plan Level 1

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

1/8" = 1'-0"1 Level 1 Floor Plan

Page 4: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

DNDN

DN

A4.0

6

A4.04

A4.0 5

1A4.0

2A4.0

42' - 9 1/8"17

' - 2

19/

32"

12' -

2 1

/2"

13' -

3 1

5/32

"

18' - 9 13/16" 23' - 6 5/16"

10' - 1 1/4" 12' - 11 13/16"

10' - 0" 12' - 1 5/8" 10' - 0" 9' - 5"

12' - 1 5/8" 10' - 0" 10' - 0" 9' - 5"

12' -

0"

12' -

0"

12' - 3 3/4" 12' - 1 1/8" 8' - 0 1/8" 17' - 6 13/16"

7' - 8 1/2" 30' - 4 9/16"

12' -

9 1

/8"

16' -

6 5

/16"

12' -

6 2

7/32

"10

' - 1

1/4

"

15' -

1 1

5/32

"8'

- 11

1/4

"17

' - 9

1/1

6"10

' - 1

1/4

"

12' - 3 7/8"3' - 8 3/8"4' - 7 3/4"1' - 11 1/2"4' - 11 1/2" 8' - 6 3/8"

1' -

11"4' -

2 1/

4"2' -

3 1/

2"

12' -

0"

12' -

0"

9' - 6" 10' - 0" 12' - 1 5/8" 9' - 10 3/8"

22' - 0 5/8" 10' - 0" 9' - 10 3/8"

31' - 9 5/8" 10' - 2 1/4"

43' -

10

19/3

2"

12' -

0 1

/2"

31' -

5 3

/32"

A5.2

13

14

15

16

APP LAB46

STOR47

CONF48

OFFICE49

CONF50

PO51

CONF52

CONF53

CONF54

STOR55

PO56

PO57

PO58

MEN'S RR59

WOMEN'S RR60

SOFTWARE LAB61

HARDWARE LAB62

PO63

MAC64

PO65

PO66

PO67

PO68

PO69

PO70

CONF71

BOARDROOM72

PAN73

CONF74

ELEC75

COPY76

CONF77

CONF79

PO80

BREAK81

MEN'S RR59

IDF83

STOR84

STOR85

CONF86

CLOSET97

SHOWER98

SHOWER99

CLOSET100

SHOWER101

SHOWER102

ELEV173

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

5/20

/201

1 9:

30:2

9 AM

A2.2

Floor Plan Level 2

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

1/8" = 1'-0"1 Level 2 Floor Plan

Page 5: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

21 3 4 5 6 7 98 1110

B

C

A

D

E

F

A4.0

6

A4.04

A4.0 5

1A4.0

2A4.0

A5.13

2

4

1

A5.1

5

8

7

6

A5.1

9

11

1012

A5.1 13

14

15

16

A5.21

2

3

4

A5.2 5

6

7

8A5.2

9

10

11

12

A5.2

13

14

15

16

A9.01

Sim

2' x 4' Parabolic Troffer Light

2' x 2' Parabolic Troffer Light

8" Incandescent Can Light

100W Hemispheric Pendant Light

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

As indicated

5/20

/201

1 9:

30:3

2 AM

A3.1

Ceiling Plan Level 1

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

1/8" = 1'-0"1 Level 1

1/4" = 1'-0"Ceiling Symbols

Page 6: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

21 3 4 5 6 7 98 1110

B

C

A

D

E

F

A4.0

6

A4.04

A4.0 5

1A4.0

2A4.0

A5.2

13

14

15

16

A9.05

Sim

2' x 4' Parabolic Troffer Light

2' x 2' Parabolic Troffer Light

8" Incandescent Can Light

100W Hemispheric Pendant Light

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

As indicated

5/20

/201

1 9:

30:3

5 AM

A3.2

Ceiling Plan Level 2

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

1/8" = 1'-0"1 Level 2

1/4" = 1'-0"Ceiling Symbols

Page 7: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

Level 10' - 0"

Level 218' - 0"

Roof Level36' - 0"

21 3 4 5 6 7 98 1110

Level 10' - 0"

Level 218' - 0"

Roof Level36' - 0"

BC ADEF

Level 10' - 0"

Level 218' - 0"

Roof Level36' - 0"

BC ADEF

Level 10' - 0"

Level 218' - 0"

Roof Level36' - 0"

B CA D E F

Level 10' - 0"

Level 218' - 0"

Roof Level36' - 0"

21 3 4 5 6 7 98 1110

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

3/32" = 1'-0"

5/20

/201

1 9:

30:5

6 AM

A4.0

Exterior Elevationsand Building

Sections

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

3/32" = 1'-0"1 Longitudinal Section

3/32" = 1'-0"2 Section 1

3/32" = 1'-0"4 East Elevation 3/32" = 1'-0"5 West Elevation

3/32" = 1'-0"6 South Elevation

Page 8: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

Level 10' - 0"

E1

A4.0

Level 10' - 0"

Level 10' - 0"

E 1A4.0

Level 10' - 0"

3

77

A9.04

Sim

A9.06

Sim

66 B

Level 10' - 0"

B

Level 10' - 0"

D

Level 10' - 0"

A9.010

Sim

Level 10' - 0"

D

Level 10' - 0"

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

1/4" = 1'-0"

5/20

/201

1 9:

31:0

0 AM

A5.1

Interior Elevations -1

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

1/4" = 1'-0"1 Presentation room - East 1/4" = 1'-0"2 Presentation Room - South

1/4" = 1'-0"3 Presentation room - West 1/4" = 1'-0"4 Presentation Room - North

1/4" = 1'-0"5 Conference Room - South 1/4" = 1'-0"6 Conference Room - West

1/4" = 1'-0"7 Conference Room - North 1/4" = 1'-0"8 Conference Room - East

1/4" = 1'-0"9 Typ. Multi-Stall Bath - South 1/4" = 1'-0"11 Typ. Multi-Stall Bath - North

1/4" = 1'-0"10 Typ. Multi-Stall Bath - East 1/4" = 1'-0"12 Typ. Multi-Stall Bath - West

1/4" = 1'-0"13 Typ. Single Bath - East 1/4" = 1'-0"14 Typ. Single Bath - South

1/4" = 1'-0"15 Typ. Single Bath - West 1/4" = 1'-0"16 Typ. Single Bath - North

Page 9: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

E 56

Level 10' - 0"

Level 10' - 0"

5 6

Level 10' - 0"

A9.011

Sim

A9.012

Sim

A9.013

Sim

A9.014

Sim

A9.015

SimLevel 1

0' - 0"Level 1

0' - 0"

4

Level 10' - 0"

6 7 E1

A4.0 6 E1

A4.0

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

1/4" = 1'-0"

5/20

/201

1 9:

31:0

4 AM

A5.2

Interior Elevations -2

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

1/4" = 1'-0"1 Typ. Private Office - West 1/4" = 1'-0"2 Typ. Private Office - North

1/4" = 1'-0"3 Typ. Private Office - East 1/4" = 1'-0"4 Typ. Private Office - South

1/4" = 1'-0"5 Lobby - East 1/4" = 1'-0"6 Lobby - South

1/4" = 1'-0"7 Lobby - West 1/4" = 1'-0"8 Lobby - North

1/4" = 1'-0"9 Break Room - North 1/4" = 1'-0"10 Break Room - East

1/4" = 1'-0"11 Break Room - South 1/4" = 1'-0"12 Break Room - West

1/4" = 1'-0"13 Boardroom - North 1/4" = 1'-0"14 Boardroom - East

1/4" = 1'-0"15 Boardroom - South 1/4" = 1'-0"16 Boardroom - West

Page 10: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

UP UP

UP

1 2

34

7

9 13

15

29

30

31

32

33

34

353637

38

39

40

41

42

4344

4647

48 49

50

51 52 53 54 55 56 57

58

59

12

14

63

64

115

Entrance87

Staircase88

Staircase89

118

119

Entrance90

FUTURE1

FUTURE1

MEN'S RR2

WOMEN'S RR3

COMP4

STOR5

CONF6

PO7

PO8

PO9

CONF10

CORRIDOR11

OPEN OFFICE12

CONF13

CONF14

PO15

CONF16

SERVER17

CONF18

CONF19

CONF20

MAIL21

CONF22

STOR23

PRESENTATION24

CLASSROOM25

RR26

TRAINING27

TRAINING28

CONF29

COPY30

BREAK31

CLASSROOM32

HALLWAY34

LOBBY35

DEMO36

HALLWAY38

PRESENTATION40

ELEC41

MECH42

RR43

RR44

ELEV174

126

127

128

138

A9.07

Sim

A9.08

Sim

A9.013

Sim

Finish Legend

Carpet

Concrete

Hardwood

Heavy Duty Carpet

Linoleum

Polished Concrete

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

5/20

/201

1 9:

31:1

2 AM

A6.1

Finishes Plan Level1

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

1/8" = 1'-0"1 Finishes Plan Level 1

Page 11: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

DNDN

DN

17

18

23

24

71

72

73

74 75 76 77 78 79 80 81

82

83

84

85868788

89 90 91929394

95

96

97

98 99

100101102103

104 105 106 107

108

109

APP LAB46

STOR47

CONF48

OFFICE49

CONF50

PO51

CONF52

CONF53

CONF54

STOR55

PO56

PO57

PO58

MEN'S RR59

WOMEN'S RR60

SOFTWARE LAB61

HARDWARE LAB62

PO63

MAC64

PO65

PO66

PO67

PO68

PO69

PO70

CONF71

BOARDROOM72

PAN73

CONF74

ELEC75

COPY76

CONF77

CONF79

PO80

BREAK81

MAC ROOM82

IDF83

STOR84

STOR85

CONF86

CLOSET97

SHOWER98

SHOWER99

CLOSET100

SHOWER101

SHOWER102

ELEV173

120

121

122

123

124

125

136

Finish Legend

Carpet

Hardwood

Heavy Duty Carpet

Linoleum

Polished Concrete

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

5/20

/201

1 9:

31:1

8 AM

A6.2

Finishes Plan Level2

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

1/8" = 1'-0"1 Finishes Plan Level 2

Page 12: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

UP UP

UP

21 3 4 5 6 7 98 11

11

10

B

C

A

D

E

F

A4.0

6

A4.04

A4.0 5

1A4.0

2A4.0

A5.13

2

4

1

A5.1

5

8

7

6

A5.1

9

11

1012

A5.1 13

14

15

16

A5.21

2

3

4

A5.2 5

6

7

8A5.2

9

10

11

12

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

5/20

/201

1 9:

31:3

3 AM

A7.1

Furniture Plan Level1

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

1/8" = 1'-0"1 Furniture Plan Level 1

Page 13: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

DNDN

DN

21 3 4 5 6 7 98 1110

B

C

A

D

E

F

A4.0

6

A4.04

A4.0 5

1A4.0

2A4.0

A5.2

13

14

15

16

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

5/20

/201

1 9:

32:0

6 AM

A7.2

Furniture Plan Level2

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

1/8" = 1'-0"1 Furniture Plan Level 2

Page 14: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

5/20

/201

1 9:

32:0

6 AM

A8.0

Door and Room/Finishes Schedules

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

Door Schedule

Family Height Level Mark Fire RatingFrame

Material Frame Type FinishConstructio

n Type

Single-Flush 7' - 0" Level 1 1Single-Flush 7' - 0" Level 1 2Single-Flush 7' - 0" Level 1 3Single-Flush 7' - 0" Level 1 4Single-Flush 7' - 0" Level 1 7Single-Flush 7' - 0" Level 1 9Single-Flush 7' - 0" Level 1 13Single-Flush 7' - 0" Level 1 15Single-Flush 7' - 0" Level 2 17Single-Flush 7' - 0" Level 2 18Single-Flush 7' - 0" Level 2 23Single-Flush 7' - 0" Level 2 24Single-Flush 7' - 0" Level 1 29Single-Flush 7' - 0" Level 1 30Single-Flush 7' - 0" Level 1 31Single-Flush 7' - 0" Level 1 32Single-Flush 7' - 0" Level 1 33Single-Flush 7' - 0" Level 1 34Single-Flush 7' - 0" Level 1 35Single-Flush 7' - 0" Level 1 36Single-Flush 7' - 0" Level 1 37Single-Flush 7' - 0" Level 1 38Single-Flush 7' - 0" Level 1 39Single-Flush 7' - 0" Level 1 40Single-Flush 7' - 0" Level 1 41Single-Flush 7' - 0" Level 1 42Single-Flush 7' - 0" Level 1 43Single-Flush 7' - 0" Level 1 44Single-Flush 7' - 0" Level 1 46Single-Flush 7' - 0" Level 1 47Single-Flush 7' - 0" Level 1 48Single-Flush 7' - 0" Level 1 49Single-Flush 7' - 0" Level 1 50Single-Flush 7' - 0" Level 1 51Single-Flush 7' - 0" Level 1 52Single-Flush 7' - 0" Level 1 53Single-Flush 7' - 0" Level 1 54Single-Flush 7' - 0" Level 1 55Single-Flush 7' - 0" Level 1 56Single-Flush 7' - 0" Level 1 57Single-Flush 7' - 0" Level 1 58Single-Flush 7' - 0" Level 1 59Single-Flush 7' - 0" Level 1 12Single-Flush 7' - 0" Level 1 14Single-Flush 7' - 0" Level 1 63Single-Flush 7' - 0" Level 1 64Single-Flush 7' - 0" Level 2 71Single-Flush 7' - 0" Level 2 72Single-Flush 7' - 0" Level 2 73Single-Flush 7' - 0" Level 2 74Single-Flush 7' - 0" Level 2 75Single-Flush 7' - 0" Level 2 76Single-Flush 7' - 0" Level 2 77Single-Flush 7' - 0" Level 2 78Single-Flush 7' - 0" Level 2 79Single-Flush 7' - 0" Level 2 80Single-Flush 7' - 0" Level 2 81Single-Flush 7' - 0" Level 2 82Single-Flush 7' - 0" Level 2 83Single-Flush 7' - 0" Level 2 84Single-Flush 7' - 0" Level 2 85Single-Flush 7' - 0" Level 2 86Single-Flush 7' - 0" Level 2 87Single-Flush 7' - 0" Level 2 88Single-Flush 7' - 0" Level 2 89Single-Flush 7' - 0" Level 2 90Single-Flush 7' - 0" Level 2 91Single-Flush 7' - 0" Level 2 92Single-Flush 7' - 0" Level 2 93Single-Flush 7' - 0" Level 2 94Single-Flush 7' - 0" Level 2 95Single-Flush 7' - 0" Level 2 96Single-Flush 7' - 0" Level 2 97Single-Flush 7' - 0" Level 2 98Single-Flush 7' - 0" Level 2 99Single-Flush 7' - 0" Level 2 100Single-Flush 7' - 0" Level 2 101Single-Flush 7' - 0" Level 2 102Single-Flush 7' - 0" Level 2 103Single-Flush 7' - 0" Level 2 104Single-Flush 7' - 0" Level 2 105Single-Flush 7' - 0" Level 2 106Single-Flush 7' - 0" Level 2 107Single-Flush 7' - 0" Level 2 108Single-Flush 7' - 0" Level 2 109Single-Flush 7' - 0" Level 1 115Single-Flush 7' - 0" Level 1 118Single-Flush 7' - 0" Level 1 119Single-Flush 7' - 0" Level 2 120Single-Flush 7' - 0" Level 2 121Single-Flush 7' - 0" Level 2 122Single-Flush 7' - 0" Level 2 123Single-Flush 7' - 0" Level 2 124Single-Flush 7' - 0" Level 2 125Single-Flush 7' - 0" Level 1 126Single-Flush 7' - 0" Level 1 127Single-Flush 7' - 0" Level 1 128Curtain Wall Sgl Glass 7' - 8 1/4" Level 1Curtain Wall-Store Front-Dbl 7' - 8 1/4" Level 1Curtain Wall-Store Front-Dbl 7' - 8 1/4" Level 1Curtain Wall Sgl Glass 7' - 8 1/4" Level 1 130Curtain Wall-Store Front-Dbl 7' - 8 1/4" Level 1 131Single-Flush 7' - 0" Level 2 136Single-Flush 7' - 0" Level 1 137Single-Flush 7' - 0" Level 1 138

Finish Schedule

Name NumberCeilingFinish Base Finish Wall Finish Comments Floor Finish

Room 155Room 156Room 157Room 158HALLWAY 159HALLWAY 160HALLWAY 161 Polished ConcreteStaircase 162Staircase 163STOR 164ELEC 165OPEN OFFICE 166OPEN OFFICE 167HALLWAY 168OPEN OFFICE 169OPEN OFFICE 170HALLWAY 171OPEN OFFICE 172ELEV 173ELEV 174Room 175 LinoleumRoom 176 Linoleum

Finish Schedule

Name NumberCeilingFinish Base Finish Wall Finish Comments Floor Finish

HALLWAY 105 Polished ConcreteHALLWAY 106 Polished ConcreteHALLWAY 107 Polished ConcreteHALLWAY 108 Polished ConcreteOPEN OFFICE 109 Heavy Duty CarpetHALLWAY 110HALLWAY 111HALLWAY 112HALLWAY 113HALLWAY 114HALLWAY 115HALLWAY 116HALLWAY 117HALLWAY 118HALLWAY 119HALLWAY 120 Heavy Duty CarpetHALLWAY 121 Polished ConcreteHALLWAY 122 Polished ConcreteHALLWAY 123 Polished ConcreteHALLWAY 124 Polished ConcreteHALLWAY 125HALLWAY 126HALLWAY 127OPEN OFFICE 128OPEN OFFICE 129 Heavy Duty CarpetOPEN OFFICE 130OPEN OFFICE 131HALLWAY 132Room 133HALLWAY 134HALLWAY 135HALLWAY 136HALLWAY 137HALLWAY 138OPEN OFFICE 139OPEN OFFICE 140OPEN OFFICE 141OPEN OFFICE 142OPEN OFFICE 143OPEN OFFICE 144HALLWAY 145OPEN OFFICE 146OPEN OFFICE 147OPEN OFFICE 148OPEN OFFICE 149OPEN OFFICE 150OPEN OFFICE 151HALLWAY 152HALLWAY 153Room 154

Finish Schedule

Name NumberCeilingFinish Base Finish Wall Finish Comments Floor Finish

FUTURE 1MEN'S RR 2WOMEN'S RR 3 LinoleumCOMP 4 LinoleumSTOR 5 LinoleumCONF 6 CarpetPO 7 CarpetPO 8 CarpetPO 9 CarpetCONF 10 CarpetCORRIDOR 11 Polished ConcreteOPEN OFFICE 12 Heavy Duty CarpetCONF 13 CarpetCONF 14 CarpetPO 15 CarpetCONF 16 CarpetSERVER 17 LinoleumCONF 18 CarpetCONF 19 CarpetCONF 20 CarpetMAIL 21 LinoleumCONF 22 CarpetSTOR 23 LinoleumPRESENTATION 24 HardwoodCLASSROOM 25 CarpetRR 26TRAINING 27 CarpetTRAINING 28 CarpetCONF 29 LinoleumCOPY 30 LinoleumBREAK 31 LinoleumCLASSROOM 32 Carpet

33HALLWAY 34 Polished ConcreteLOBBY 35 Polished ConcreteDEMO 36 CarpetRoom 37HALLWAY 38 Polished ConcreteRoom 39PRESENTATION 40 HardwoodELEC 41 LinoleumMECH 42 LinoleumRR 43RR 44HALLWAY 45APP LAB 46 LinoleumSTOR 47 LinoleumCONF 48 CarpetOFFICE 49 HardwoodCONF 50 HardwoodPO 51 CarpetCONF 52 CarpetCONF 53 CarpetCONF 54 CarpetSTOR 55 LinoleumPO 56 CarpetPO 57 CarpetPO 58 CarpetMEN'S RR 59WOMEN'S RR 60 LinoleumSOFTWARE LAB 61 LinoleumHARDWARE LAB 62 LinoleumPO 63 CarpetMAC 64 LinoleumPO 65 CarpetPO 66 CarpetPO 67 CarpetPO 68 CarpetPO 69 CarpetPO 70 CarpetCONF 71 CarpetBOARDROOM 72 HardwoodPAN 73 LinoleumCONF 74 CarpetELEC 75 LinoleumCOPY 76 LinoleumCONF 77 CarpetHALLWAY 78CONF 79 CarpetPO 80 CarpetBREAK 81 LinoleumMAC ROOM 82 LinoleumIDF 83 LinoleumSTOR 84 LinoleumSTOR 85 LinoleumCONF 86 CarpetEntrance 87 Polished ConcreteStaircase 88 ConcreteStaircase 89 ConcreteEntrance 90 Polished ConcreteSHOWER 91 LinoleumCLOSET 92 LinoleumSHOWER 93 LinoleumSHOWER 94 LinoleumSHOWER 95 LinoleumCLOSET 96 LinoleumCLOSET 97 LinoleumSHOWER 98 LinoleumSHOWER 99 LinoleumCLOSET 100 LinoleumSHOWER 101 LinoleumSHOWER 102 LinoleumHALLWAY 103 Polished ConcreteHALLWAY 104 Polished Concrete

Page 15: TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet Name A0.0 Cover Sheet A1.0 Demolition Plans A2.1 Floor Plan Level 1 A2.2 Floor Plan

45° ± 10°

METAL STUD BRACE SCHEDULEBRACE LENGTH 3-5/8" STUD 6" STUDUP TO 7'-11" 20 GA. 20 GA.

8'-0" TO 9'-11" 18 GA. 20 GA.

10'-0" TO 11'-11" 16 GA. 20 GA.

12'-0" TO 13'-11" 14 GA. 20 GA.

14'-0" TO 15'-11" - 18 GA.

16'-0" TO 17'-11" - 18 GA.

18 AND 20 GA. (8'-0" O.C.); 14 GA. (12'-0"

O.C.)ALTERNATE DIRECTION, EVERY OTHER BRACE.

6"

(3) #10 S.M.S.

METAL STUD BRACE PERSCHEDULEBELOW. (8' O.C. FOR 20 GA.12 GA. CLIP W/(3) #10 S.M.S. TO TOPTRACKGYPSUM BD.

IF INTERSECTING WALLS ARE LESSTHAN 12'-0" O.C. AND TOPTRACKIS CONTINUOUS BETWEEN WALLS,BRACING MAY BE OMITTED.

METAL STUDS

ACOUSTICAL BLANKET, SEERCPWHERE OCCURS

CEILING HEIGHTSEE RCP

3/4" GAP

3/4"

2 1/2" M

IN.

EMBED

INSULATION (WHERE OCCURS)

GYPSUM BOARD

METAL STUDS

(2) #10 S.M.S. @ 24" O.C.

CONT. 16 GA. METAL DEEP LEGTRACK ANCHORED TO DECKABOVE.

FRICTION FIT TOP RUNNER INTODEEP LEG TRACK (LEAVE 3/4"GAP)

12 GA. X 3" WIDE PLATE

(2) 3/8" HILTI-III EXP. ANCHORS

CONCRETE / METAL DECK

3/4" GAP

3/4"

INSULATION (WHERE OCCURS)

GYPSUM BOARD

METAL STUDS

POWDER DRIVEN FASTENERS@ 24" O.C. MAX. (RAMSET #3348)

CONT. 16 GA. METAL DEEP LEGTRACK ANCHORED TO DECKABOVE.

FRICTION FIT TOP RUNNER INTODEEP LEG TRACK (LEAVE 3/4"GAP)

CONCRETE / METAL DECK

GYPSUM BOARD

METAL STUDS

POWDER DRIVENFASTENERS@24" O.C.. RAMSET #3348

FINISHED FLOOR ANDBASE(PER FINISH PLANS)0'-0"TOP OF CONC. SLAB

ACOUSTICINSULATION(WHERE OCCURS)

ACOUSTICSEALANT(WHERE OCCURS)

45° ± 10°

(E) WOOD ROOF ASSEMBLY

(E) PURLIN BEYOND

(E) GLULAM

(3) 10d x 2-1/2" MIN.

METAL STUD BRACING

D SIDELIGHT JAMB AT DOOR

C SIDELIGHT HEAD (JAMB SIM.)

E SIDELITE SILL

A JAMB (HEAD SIM.) AT DOOR

B SILL AT DOOR

ALIGN W/ DOOR FRAME

VIEWLIGHT

ALUM. FRAME

GYP. BOARD

METAL STUD FRAMING

ALUM. FRAME

FINISH FLOOR

ALUM. FRAME

VIEWLIGHT

DOOR

3/8" DOOR UNDERCUT

FINISH FLOOR

GYP. BOARD

ALUM. DOOR FRAME

WOOD DOOR

METAL STUD FRAMING

METAL RUNNERSEALANT

OR MATCH EXISTING

FINISH TO MATCH EXISTING

VIEWLIGHT

CARPET TO CONCRETEB

CARPET TO RESILIENT FLOORINGA

CARPET

VINYL TRA NSITIONSTRIPTO MA TCH WALL BA SE

CONC.

CARPET

VINYL TRA NSITIONSTRIPTO MA TCH WALL BA SE

RESI LIEN T F LOORING

NOTE : MA X. 1/2" HE IGHT FOR TRANSITION SILL

1/2"

MAX.

1/2"

MAX.

CERAMIC TI LE OR SLA TETHINSETMORTAR. SEE FI NISH PLAN

CONT' S.STL . SCREED

CARPET

(E) CONC. SLAB

FIN. FLR.

SEA LED CONC.

VINYL TRA NSITI ON STRIP

VCT

FIN. FLR.

1/4" MAX. TYP.

MIRROR

SENSOROPERATEDELECTRONIC HANDWASHING FAUCET

2 1/2" X 21/2"X 1/4" AT 3'-0"MAX. (CENTERBETWEEN EACHLAVATORY, TYP.)

TYPICALANGLE TOANGLE

ANGLES TOMTL. STUD

PROVIDE16 GA.STUD ATEVERYSUPORTANGLE

INSULATEUNDERSINKH.W. PIPES &DRAIN, TYP.

METAL STUD

SCHEDULEDFLOOR,SEE FINISH PLANAND SCHEDULE

2" WELD,TYP.

S S SUPPORT ANGLESILICONE CAULK (CLEAR)

CLEARKNEESPACE

SOLID SURFACECOUNTERTOP WITHEASED EDGES OVER 3/4"SUBSTRATE

SS-1

SOLID SURFACE SPLASH

1'-0"

1/8

2'-10"MAX

6"

2'-0"

4"

F.F.

2"

2'-3" M

IN

8" MIN

6" MAX

9" M

IN

1_2"

STUD BACKING ANDSUPPORT.TOP AND BOTTOMADJUSTABLE SHELVING

3/4" PLYWOODCONSTRUCTIONTHROUGHOUTP. LAM. ON ALL EXPOSED SURFACES

WHITE MELAMINE LAMINATE ONALLEXPOSED INTERIOR SURFACESSCHEDULED HARDWAREPERSPECIFICATIONS

PRE LAMINATE ON UNDERSIDEOFCABINET

1'-4"

4"4"

BLOCKING AS REQ'D

SCHEDULED SINK AND FAUCET

MELAMINE BACK PANEL

DOOR

1/8" STEEL BRACKET CONTINUOUSACROSS BACK OF DOOR -FASTENTO TOE KICK WITH WOOD SCREWS

SCHEDULED BASEANDFLOOR COVERING

4"

1 1/2"

1/2"

2"

2'-3" M

IN

8" MIN

6" MAX

9" M

IN

ONE ADJUSTABLE SHELF

DOOR

BASE AS SCHEDULED

DRAWER

WHITE MELAMINEINTERIOR

3/4" MDFCONSTRUCTIONTHROUGHOUT

P. LAM. ON ALL EXPOSED SURFACES

HARDWARE AS SCHEDULED

2'-10"

T.O.

COU

NTER

TOP

4"

3"

TYP.

TYP.

6"3"

3"

1/4"

2'-0"

1 1/2"

1/4"

5"

P. LAM. COUNTERTOP WITH 4"HIGH SPLASH OVER 3/4" MDFSCRIBE TO FIT, PL-2

3_4"

3/4" THICK PLYWOODCOUNTERTOP IN P.LAM.FINISH WITH DRIPLESSEDGE TO MATCH (E)

DRAWER FACE IN P.LAM.FINISH, TYP.3/4" THICK CABINETANDDOOR FACELINE OF DRAWER GUIDE, TYP.

WHITE MELAMINEINTERIORFINISH

BASE AS SCHEDULED

1/2" GAP, TYP.

3"

4"EQ.

EQ.

EQ.

11 __ 2"

2'-0"U.O.N.

3/4"

2'-10"

4"

EQ.

0'-0"TOP OF CONC. SLAB

WEDGES CUT FROM 2X'S.INSTALL @ 12" O.C. (2) #8F.H.WOOD SCREWS TOP ANDBOTTOM

PLYWOOD CASEWORK

(2) #8 F.H. WOOD SCREWSTOP AND BOTTOM (12" O.C.HORIZ.)

2X CONT. FIRE TREATED NAILERS

3/8" HILTI KB-III EXPANSION ANCHORS@ 12" O.C. WITH 2" DIA. WASHERS(TEST TO 1350 LBS.) 2 1/2" EMBED.

#8 X 2-1/2" F.H. WOODSCREW@ 6" O.C. (TYP. ALL AROUND)

www.gregerseninteriors.com

Scale

Date

Drawn By

Checked By

Project Number

As indicated

5/20

/201

1 9:

32:1

2 AM

A9.0

Interior Details

Trillium Hospital

AdministrationBuilding

CheckerAuthor

Issue Date12

No. Description Date

3" = 1'-0"1

1 - TYPICAL PARTION 6" ABOVE LAY-INCEILING

3" = 1'-0"2

2 - TYPICAL PARTION PERPENDICULARTO METAL DECK ABOVE

3" = 1'-0"3

3 - TYPICAL PARTION PARALLEL TOMETAL DECK ABOVE

3" = 1'-0"4 4 - TYPICAL PARTION BASE

3" = 1'-0"5

5 - DIAGONAL BRACE PERPENDICULARTO (E) WOOD ROOF PURLIN

3" = 1'-0"6 7 - ALUMINUM DOOR FRAME DETAILS

12" = 1'-0"7

8 - THRESHOLD AND TRANSITIONDETAILS

12" = 1'-0"8

9 - FLOOR FINISH TRANSITIONS: STONETILES TO CARPET

12" = 1'-0"9

10 - FLOOR FINISH TRANSITIONS: CONC.TO VCT

1 1/2" = 1'-0"10

11 - ACCESSIBLE COUNTERTOPLAVATORY

1 1/2" = 1'-0"11 12 - UPPER CABINET, TYP.

1 1/2" = 1'-0"12 13 - LOWER CABINET WITH SINK, TYP.

1 1/2" = 1'-0"13

14 - LOWER CABINET WITH 1 DRAWER,TYP.

1 1/2" = 1'-0"14

15 - LOWER CABINET WITH 4 DRAWERS,TYP.

3" = 1'-0"15 16 - BASE CABINET - FRONT