Top Banner
Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team
20

Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Dec 17, 2015

Download

Documents

Kathlyn Reeves
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Tribal Transportation Safety Program Funding

Craig GenzlingerFederal Lands Highways

TTP Team

Page 2: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Overview

Tribal Safety Management System Tribal Safety Program Funding

– MAP-21– Eligible Activities– Application Process– Timeframes

Page 3: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

SMS Plan(s)

Strategic Plan Implementation Plan Partners included FHWA, BIA, DOT

and Tribal representatives Strategic Plan identified eight

emphasis areas for Indian Lands based on available data.

Page 4: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Strategic Plan Emphasis Areas

Decision Making Process Data Collection Run off the Road Crashes Occupant Protection / Child Restraint Alcohol / Drug Impaired Driving Other Driver Behavior and Awareness Drivers Under 35 Pedestrian Safety

Page 5: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.
Page 6: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

SMS Implementation Activities

Continues Steering Committee with Federal and Tribal Representation.

Tribal Safety Summits Tribal Safety Plans. Model Tribal Safety Improvement

Program Data Collection and Analysis

Page 7: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

SMS Implementation Activities

Safety Education and Training. Case Studies and Peer Exchanges. Tribal Safety Awards Program. Safety Research. Marketing and Outreach. Other Safety Activities. Evaluation and Performance

Measures.

Page 8: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

SMS Implementation Plan

Guide for tribal safety– Past and present – Safety set aside in previous

Implementation Plan Will continue to be a guide Coordinated with Safety Set Aside.

Page 9: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

MAP-21 Section 1119

Section 1119 of Map-21 authorizes the establishment of the tribal safety program by setting aside not more than 2 percent of the funds made available under the tribal transportation program for each fiscal year. The funds are to be allocated based on an identification and analysis of highway safety issues and opportunities on tribal lands.

Approximately $9,000,000

Page 10: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Eligible Activities

Tribal Safety Plans Enforcement and EMS Education Programs Engineering Improvements Funding goals for each category

Page 11: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Tribal Safety Plans

40% goal in year one Allow for all tribes to develop a

safety plan to identify and prioritize needs.

Intent is to meet all requests if tribe has no existing plan.

Maximum funding of $10,000 Can apply to update plan, but

reduced amount.

Page 12: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Other Safety Planning Acitivties

Data Collection Data Analysis and Improvement Road Safety Audits Ranked based upon:

– Included in an existing safety plan– Funds leveraged with others– Part of a comprehensive safety

approach

Page 13: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Enforcement and EMS

20% goal in year one Emergency communications equipment Traffic enforcement activities Coordinated with BIA IHSP Ranked based upon:

– Data– In a current safety plan– Leveraging of funds– Comprehensive approach

Page 14: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Education

10% Goal in year one Public Service Announcements SMS Activities Programs to inform or address driver behavior Ranked based upon:

– Data– In a current safety plan– Leveraging of funds– Comprehensive approach

Page 15: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Engineering Improvements

30% Goal in year one Roadway Improvements Extensive list in Guidance Ranked based upon:

– Data– In a RSA, Engineering Study, etc– Facility ownership– Leveraging of funds– Years since last safety construction project– Comprehensive approach

Page 16: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Application Process

Application being developed for each project type– Safety Planning– Education– Enforcement– Engineering Projects

Can apply for multiple projects– Encouraged to do so

Projects Ranked by BIA, FHWA and Tribes

Page 17: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Timeframes for 2013January 4 Issue Call for Projects in the Federal Register March 1 Tribe submits application to the FLH TTPSF Coordinator March 31 Review Committee completes review and ranks applications

April 15 * Successful applicants will be notified of funds to be received, unsuccessful applicants notified and fund distribution process initiated.

April 19 Issue Call for Projects in the Federal Register June 14 Tribe submits application to the FLH TTPSF Coordinator July 12 Review Committee completes review and ranks applications

July 26 * Successful applicants will be notified of funds to be received, unsuccessful applicants notified and fund distribution process initiated.

Page 18: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Complete Guidance and Applications Add to Program Delivery Guide Distribute thru TTAP and other

sources Federal Register Notice

What’s next

Page 19: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.
Page 20: Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.

Craig Genzlinger406-441-3910