March 2017 Application Reference EN020001 Document Hinkley Point C Connection Project Trees and Hedges to be Removed or Affected Plans Section E - Tickenham Ridge 4.7.6D Regulation 5(2)(o) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009
6
Embed
Trees and Hedges to be Removed or Affected Plans Section E ...... · Application Reference EN020001 March 2017 Document Hinkley Point C Connection Project Trees and Hedges to be Removed
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
March 2017Application Reference EN020001
Do
cum
ent
Hinkley Point C Connection Project
Trees and Hedges to be Removed or Affected Plans Section E - Tickenham Ridge
4.7.6D
Regulation 5(2)(o) of the Infrastructure Planning(Applications: Prescribed Forms and Procedure)Regulations 2009
A48(M)
M48
M5
M4
WELLS
CARDIFF
NEWPORT
F
A
B
C
D
EG
H
B3130
B3124
B3124
B3124
A369
A369
A369
M5
M5
A369
A369
B3130
B3128
Clapton in Gordano
Sheepway
Portbury
Portbury
Wraxall
Stone-edgeBatch
WestHill
NorthWeston
Dry Hill
Woodhill
BackwellCommon
EastEnd
Bell PitBrow
TheSidelands
TheWarren
TheRipple
TheTriangle
ClaptonMoor
WestWood
West Hill
NAILSEA
PORTISHEAD
Bristol City Council
North Somerset Council
SECTION D
SECTION E
SECTION ESECTION F
SECTIONG
SECTIONF
8 14
32
132
7
33
129
134
29
132
117
24
138
15
125
16
120
127
142
18
49
23
67
Sheet 1 -E/TR/PS/1
Sheet 2 -E/TR/PS/2
Sheet 3 -E/TR/PS/3
Sheet 4 -E/TR/PS/4
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDERKEY PLAN FOR TREES AND HEDGES TO BE REMOVED OR AFFECTED PLANS
(REGULATION 5(2)(o))SECTION E
SHEET 1 OF 1NORTH SOMERSET COUNCIL
KeyORDER LIMITSLOCAL AUTHORITYBOUNDARYSECTION BOUNDARYSHEET INDEX
SITE MAP
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
GISA1
SCALE1:10,000
ISSUE
NG INVESTMENT No. APPLICATION No.
NG DRAWING No.
E/TR/KP/1
20897 EN020001DRAWING No.
13/NG/0103SHEET 1 OF 1 N/A
TitleISSUE CHK'D APP'DDRAW
NATIONAL GRID (HINKLEY POINT CCONNECTION PROJECT) ORDER
KEY PLAN FOR TREES AND HEDGES TO BEREMOVED OR AFFECTED PLANS
(REGULATION 5(2)(o))SECTION E
NORTH SOMERSET COUNCIL
COMMENTSDATE
0 200 400 600 800Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS,BY PERMISSION OF THE ORDNANCE SURVEY ON
NotesThis drawing is scaled at paper size A1, therefore anyprints taken at smaller sizes will affect accuracy of themeasurement units and should not be scaled against.
C
B MAY 2014 FOR DCO SUBMISSION JC LD JBC FEB 2016 UPDATED TO REFLECT THE
ORDER AS MADE JC LD JB
12
3
4
SITE MAP
COPYRIGHT N OT TO BE REPRODUCED W ITHOUT THE W RITTEN PERMISSION OF THE N ATION AL GRID ELECTRICITY TRAN SMISSION Plc
N G IN V ESTMEN T N o. APPLICATION N o.
N G DRAW IN G N o.
GISA1
SCALE1:2,500
SHEET 1 OF 4ISSUE
N ATION AL GRID (HIN KLEY POIN T C CON N ECTION PROJECT) ORDERTREES AN D HEDGES TO BE REMOV ED OR AFFECTED PLAN S
(REGULATION 5(2)(o))SECTION ESHEET 1 OF 4
N ORTH SOMERSET COUN CIL
DRAW IN G N o.
TitleISSUE CHK'D APP'DDRAW
N ATION AL GRID (HIN KLEY POIN T C CON N ECTION PROJECT) ORDER TREES AN D HEDGES TO BE
REMOV ED OR AFFECTED PLAN S(REGULATION 5(2)(o))
SECTION EN ORTH SOMERSET COUN CIL
COMMEN TSDATE
0 40 80 120 160 200Me tre s
Coord inate Syste m : British N ational GridUnits: Me treProje ction: Transve rse Me rcatorDatum : OSGB 1936Scale Factor: 0.9996
346476X Ce ntroid Coord inate : 172077Y Ce ntroid Coord inate :
Ke yORDER LIMITSLOCAL AUTHORITYBOUN DARYSECTION BOUN DARYTREES / HEDGES TO BEREMOV EDTREES TO BE PRUN ED /POLLARDEDTREES / HEDGES THAT MAYBE AFFECTEDHEDGES TO BE REMOV EDAN D REPLAN TED POSTCON STRUCTION
E/TR/PS/1
20897 EN 020001
13/N G/0104N /A
A AUG 2013 S.42/S.47 CON SULTATION ML JB PBB MAY 2014 FOR DCO SUBMISSION JC LD JB
PLEASE SEE N OTES ABOV EFOR REV ISION C COMMEN TSC MAY 2015 JC LD JB
N ote s
PLEASE SEE N OTES ABOV EFOR REV ISION D COMMEN TSD JUN E 2015 JC LD JB
This d rawing is scale d at p ap e r size A1, the re fore anyp rints take n at sm alle r size s will affe ct accuracy of them e asure m e nt units and should not b e scale d against. REV ISION C COMMEN TS:UPDATED TO CORRESPON D W ITH THE ARBORICULTURAL IMPACT ASSESSMEN T SUBMITTED W ITH THE EN V IRON MEN TAL STATEMEN TREV ISION D COMMEN TS:PLAN S UPDATED TO SHOW REV ISED ACTION FOR TREES/HEDGES FOLLOW IN G A REV IEW OF CON STRUCTION COMPOUN DS. SEE AREA MARKED ‘A’ ON SHEET 1.REV ISION E COMMEN TS:PLAN S UPDATED TO SHOW REV ISED ACTION FOR TREES/HEDGES IN AREAS MARKED ‘C’. THESE CHAN GES RESULT FROM ACTION S ARISIN G AT ISSUE SPECIFIC HEARIN GS.
F
PLEASE SEE N OTES ABOV EFOR REV ISION E COMMEN TSE JULY 2015 JC LD JB
SHEET 4 UPDATED TO REFLECTTHE ORDER AS MADEF FEB 2016 JC LD JB
12
3
4
SITE MAP
COPYRIGHT N OT TO BE REPRODUCED W ITHOUT THE W RITTEN PERMISSION OF THE N ATION AL GRID ELECTRICITY TRAN SMISSION Plc
N G IN V ESTMEN T N o. APPLICATION N o.
N G DRAW IN G N o.
GISA1
SCALE1:2,500
SHEET 2 OF 4ISSUE
N ATION AL GRID (HIN KLEY POIN T C CON N ECTION PROJECT) ORDERTREES AN D HEDGES TO BE REMOV ED OR AFFECTED PLAN S
(REGULATION 5(2)(o))SECTION ESHEET 2 OF 4
N ORTH SOMERSET COUN CIL
DRAW IN G N o.
TitleISSUE CHK'D APP'DDRAW
N ATION AL GRID (HIN KLEY POIN T C CON N ECTION PROJECT) ORDER TREES AN D HEDGES TO BE
REMOV ED OR AFFECTED PLAN S(REGULATION 5(2)(o))
SECTION EN ORTH SOMERSET COUN CIL
COMMEN TSDATE
0 40 80 120 160 200Me tre s
Coord inate Syste m : British N ational GridUnits: Me treProje ction: Transve rse Me rcatorDatum : OSGB 1936Scale Factor: 0.9996
347532X Ce ntroid Coord inate : 172618Y Ce ntroid Coord inate :
Ke yORDER LIMITSLOCAL AUTHORITYBOUN DARYSECTION BOUN DARYTREES / HEDGES TO BEREMOV EDTREES TO BE PRUN ED /POLLARDEDTREES / HEDGES THAT MAYBE AFFECTEDHEDGES TO BE REMOV EDAN D REPLAN TED POSTCON STRUCTION
E/TR/PS/2
20897 EN 020001
13/N G/0104N /A
A AUG 2013 S.42/S.47 CON SULTATION ML JB PBB MAY 2014 FOR DCO SUBMISSION JC LD JB
PLEASE SEE N OTES ABOV EFOR REV ISION C COMMEN TSC MAY 2015 JC LD JB
N ote s
PLEASE SEE N OTES ABOV EFOR REV ISION D COMMEN TSD JUN E 2015 JC LD JB
This d rawing is scale d at p ap e r size A1, the re fore anyp rints take n at sm alle r size s will affe ct accuracy of them e asure m e nt units and should not b e scale d against. REV ISION C COMMEN TS:UPDATED TO CORRESPON D W ITH THE ARBORICULTURAL IMPACT ASSESSMEN T SUBMITTED W ITH THE EN V IRON MEN TAL STATEMEN TREV ISION D COMMEN TS:PLAN S UPDATED TO SHOW REV ISED ACTION FOR TREES/HEDGES FOLLOW IN G A REV IEW OF CON STRUCTION COMPOUN DS. SEE AREA MARKED ‘A’ ON SHEET 1.REV ISION E COMMEN TS:PLAN S UPDATED TO SHOW REV ISED ACTION FOR TREES/HEDGES IN AREAS MARKED ‘C’. THESE CHAN GES RESULT FROM ACTION S ARISIN G AT ISSUE SPECIFIC HEARIN GS.
F
PLEASE SEE N OTES ABOV EFOR REV ISION E COMMEN TSE JULY 2015 JC LD JB
SHEET 4 UPDATED TO REFLECTTHE ORDER AS MADEF FEB 2016 JC LD JB
12
3
4
SITE MAP
COPYRIGHT N OT TO BE REPRODUCED W ITHOUT THE W RITTEN PERMISSION OF THE N ATION AL GRID ELECTRICITY TRAN SMISSION Plc
N G IN V ESTMEN T N o. APPLICATION N o.
N G DRAW IN G N o.
GISA1
SCALE1:2,500
SHEET 3 OF 4ISSUE
N ATION AL GRID (HIN KLEY POIN T C CON N ECTION PROJECT) ORDERTREES AN D HEDGES TO BE REMOV ED OR AFFECTED PLAN S
(REGULATION 5(2)(o))SECTION ESHEET 3 OF 4
N ORTH SOMERSET COUN CIL
DRAW IN G N o.
TitleISSUE CHK'D APP'DDRAW
N ATION AL GRID (HIN KLEY POIN T C CON N ECTION PROJECT) ORDER TREES AN D HEDGES TO BE
REMOV ED OR AFFECTED PLAN S(REGULATION 5(2)(o))
SECTION EN ORTH SOMERSET COUN CIL
COMMEN TSDATE
0 40 80 120 160 200Me tre s
Coord inate Syste m : British N ational GridUnits: Me treProje ction: Transve rse Me rcatorDatum : OSGB 1936Scale Factor: 0.9996
348443X Ce ntroid Coord inate : 173494Y Ce ntroid Coord inate :
Ke yORDER LIMITSLOCAL AUTHORITYBOUN DARYSECTION BOUN DARYTREES / HEDGES TO BEREMOV EDTREES TO BE PRUN ED /POLLARDEDTREES / HEDGES THAT MAYBE AFFECTEDHEDGES TO BE REMOV EDAN D REPLAN TED POSTCON STRUCTION
E/TR/PS/3
20897 EN 020001
13/N G/0104N /A
A AUG 2013 S.42/S.47 CON SULTATION ML JB PBB MAY 2014 FOR DCO SUBMISSION JC LD JB
PLEASE SEE N OTES ABOV EFOR REV ISION C COMMEN TSC MAY 2015 JC LD JB
N ote s
PLEASE SEE N OTES ABOV EFOR REV ISION D COMMEN TSD JUN E 2015 JC LD JB
This d rawing is scale d at p ap e r size A1, the re fore anyp rints take n at sm alle r size s will affe ct accuracy of them e asure m e nt units and should not b e scale d against. REV ISION C COMMEN TS:UPDATED TO CORRESPON D W ITH THE ARBORICULTURAL IMPACT ASSESSMEN T SUBMITTED W ITH THE EN V IRON MEN TAL STATEMEN TREV ISION D COMMEN TS:PLAN S UPDATED TO SHOW REV ISED ACTION FOR TREES/HEDGES FOLLOW IN G A REV IEW OF CON STRUCTION COMPOUN DS. SEE AREA MARKED ‘A’ ON SHEET 1.REV ISION E COMMEN TS:PLAN S UPDATED TO SHOW REV ISED ACTION FOR TREES/HEDGES IN AREAS MARKED ‘C’. THESE CHAN GES RESULT FROM ACTION S ARISIN G AT ISSUE SPECIFIC HEARIN GS.
F
PLEASE SEE N OTES ABOV EFOR REV ISION E COMMEN TSE JULY 2015 JC LD JB
SHEET 4 UPDATED TO REFLECTTHE ORDER AS MADEF FEB 2016 JC LD JB
12
3
4
SITE MAP
COPYRIGHT N OT TO BE REPRODUCED W ITHOUT THE W RITTEN PERMISSION OF THE N ATION AL GRID ELECTRICITY TRAN SMISSION Plc
N G IN V ESTMEN T N o. APPLICATION N o.
N G DRAW IN G N o.
GISA1
SCALE1:2,500
SHEET 4 OF 4ISSUE
N ATION AL GRID (HIN KLEY POIN T C CON N ECTION PROJECT) ORDERTREES AN D HEDGES TO BE REMOV ED OR AFFECTED PLAN S
(REGULATION 5(2)(o))SECTION ESHEET 4 OF 4
N ORTH SOMERSET COUN CIL
DRAW IN G N o.
TitleISSUE CHK'D APP'DDRAW
N ATION AL GRID (HIN KLEY POIN T C CON N ECTION PROJECT) ORDER TREES AN D HEDGES TO BE
REMOV ED OR AFFECTED PLAN S(REGULATION 5(2)(o))
SECTION EN ORTH SOMERSET COUN CIL
COMMEN TSDATE
0 40 80 120 160 200Me tre s
Coord inate Syste m : British N ational GridUnits: Me treProje ction: Transve rse Me rcatorDatum : OSGB 1936Scale Factor: 0.9996
348779X Ce ntroid Coord inate : 174783Y Ce ntroid Coord inate :
Ke yORDER LIMITSLOCAL AUTHORITYBOUN DARYSECTION BOUN DARYTREES / HEDGES TO BEREMOV EDTREES TO BE PRUN ED /POLLARDEDTREES / HEDGES THAT MAYBE AFFECTEDHEDGES TO BE REMOV EDAN D REPLAN TED POSTCON STRUCTION
E/TR/PS/4
20897 EN 020001
13/N G/0104N /A
A AUG 2013 S.42/S.47 CON SULTATION ML JB PBB MAY 2014 FOR DCO SUBMISSION JC LD JB
PLEASE SEE N OTES ABOV EFOR REV ISION C COMMEN TSC MAY 2015 JC LD JB
N ote s
PLEASE SEE N OTES ABOV EFOR REV ISION D COMMEN TSD JUN E 2015 JC LD JB
This d rawing is scale d at p ap e r size A1, the re fore anyp rints take n at sm alle r size s will affe ct accuracy of them e asure m e nt units and should not b e scale d against. REV ISION C COMMEN TS:UPDATED TO CORRESPON D W ITH THE ARBORICULTURAL IMPACT ASSESSMEN T SUBMITTED W ITH THE EN V IRON MEN TAL STATEMEN TREV ISION D COMMEN TS:PLAN S UPDATED TO SHOW REV ISED ACTION FOR TREES/HEDGES FOLLOW IN G A REV IEW OF CON STRUCTION COMPOUN DS. SEE AREA MARKED ‘A’ ON SHEET 1.REV ISION E COMMEN TS:PLAN S UPDATED TO SHOW REV ISED ACTION FOR TREES/HEDGES IN AREAS MARKED ‘C’. THESE CHAN GES RESULT FROM ACTION S ARISIN G AT ISSUE SPECIFIC HEARIN GS.
F
PLEASE SEE N OTES ABOV EFOR REV ISION E COMMEN TSE JULY 2015 JC LD JB
SHEET 4 UPDATED TO REFLECTTHE ORDER AS MADEF FEB 2016 JC LD JB