Page 1: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

TRD Production at GSI

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

Page 2: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

Overview

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

- Status L5C1/L4C1

- Glue System

- Testing the Properties

- Summary

Page 3: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

30 Radiators Frames glued

21 Radiator Frames wired

23 Padplanes glued 2 Padplanes bad

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

Production Status L5C1

Page 4: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

19 Moduls tested with Fe55 Source

Closed with Tape

Gas ArCO2 70/30

HV-Anode 1620 V, HV-Drift -2000 V

O2 Concentration below 30ppm, Flush 40l/h, 8h

up to know Dark Current < 1nA

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

Testing Status L5C1

Page 5: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

Finally glued Chamber

2 Modul tested with Roentgen Source

Gas ArCO2 70/30

HV-Anode 1620 V, HV-Drift -2000 V

O2 Concentration below 10ppm, Flush 40l/h, 8h

up to know Dark Current < 1nA

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

Testing Status L5C1

Page 6: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

11 Radiators Frames glued

5 Radiator Frames wired

5 Padplanes glued

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

Production Status L4C1

Page 7: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

1 Moduls tested with Fe55 Source

Closed with Tape

Gas ArCO2 70/30

HV-Anode 1620 V, HV-Drift -2000 V

O2 Concentration below 30ppm, Flush 40l/h, 8h

up to know Dark Current < 1nA

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

Testing Status L4C1

Page 8: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

Problem with Glue System

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

- Used Araldit AW 106/AW116 with Hardener HV953U

- Sticky surface after curing time

- Problem in Producing Hardener HV 953 U since 2004

Page 9: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

Decision

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

- Stop the TRD Production

Mechanical and electrical Properties

Chemical Composition was changed

- Get a Charge of an modifcated Hardener to test the

mech. and electr. Properties

Page 10: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

Test mechanical Properties

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

- cured Glue min. 24h under different

climatic Conditions

Shore Hardness is 60

- Observed Different Surface Quality, it depends on the

Huminidity and the retention time in Air

Humidity rel. 2% - 50%Temperature 23 º C – 40 º C

one Sample cured in NitrogenAtmosphere

Page 11: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

Test Electrical Properties

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

- under different Climatic Conditions

Volume Resistivity 300 G – 8 T Ohm cm

Humidity

rel. 2% - 50%

Temperature

23 º C – 40 º C

one Sample has

cured in Nitrogen

Atmosphere

Page 12: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

CONCLUSION

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

- Orderd and distributed Hardener

to finished the TRD Production

- Additional Ageing Test

Page 13: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

SUMMARY

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

- Delay of 6 weeks in the Production Scale

- 4 L5C1and 4 L4C1 finished to shipped to HD End of October

- Production Mode to build 2 TRD Chambers / 7 Working Days

Page 14: TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005

Thank you

Sandra Schwab, Anja B. Steffen

Gert Augustinski, Andre Radu,

Heinz W. Daues

and all the Students