Top Banner
TRD MEETING@CERN August 2007 A. Marín (GSI) 06/12/22 STATUS TRD COOLING STATUS TRD COOLING TRD STATUS MEETING August 2007 TRD STATUS MEETING August 2007
7

TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.

Dec 19, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

STATUS TRD COOLINGSTATUS TRD COOLING

TRD STATUS MEETING August 2007TRD STATUS MEETING August 2007

Page 2: TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

• Pressure sensors/relief valves:•Available•Pre-Assembly needs to be done (end of August?)•Installation needs to be done

• Improvement/modification of the cooling plant•Add an alarm on the total flow. Will be done by the cooling group. 2-3 weeks because of holidays.

• Remote control.• Jorge managed to connect to PLC• A. Agustinus will provide generic framework end of August

Page 3: TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

Status of remote controlStatus of remote control

Page 4: TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

Status of remote controlStatus of remote control

Page 5: TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

• Test with SM-mockup:•Being assembled ( finished end of next week)•Star test @CERN in all sectors on week 34

Page 6: TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

PipesPipes

4315 bended pipes ready to be gluedpipes glued for ~2 SM in Muenster+~1.3 in HD

Page 7: TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

Thermal ScreenThermal Screen

Connections at cooling plant ready