Top Banner
TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report
23

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

Dec 16, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

TURAS Work Package Leaders Meeting:

Dublin - April 2013

Work Package 2 – progress report

Page 2: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

WP 2 Task progress

Page 3: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.2 – Universal evaluation model for green infrastructure drivers and barriers Task leaders: Rome (supported by Uni of La Sapienza)

Timetable: M1 – M24 [Deliverable M16]

Delivered:

Italian version - comprehensive evaluation of Rome green infrastructure

English version - universally applicable framework to evaluate green infrastructure implementation in TURAS in WP2 partner cities

Annex - a comprehensive bibliography of international urban green infrastructure guidance, policy and best practice.

Page 4: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.2 – Universal evaluation model for green infrastructure drivers and barriers

Activities – still to be completed:

Encapsulate ecosystem service value into arguments and supportive data to favour the retention of green spaces and land.

Assessment of transferability of economic evaluation model to London greenspace (IfS?);

Development of universal urban assessment model and impact on reduction of urban ecological footprint.

ww

w.fe

elh

om

ein

rom

e.c

om

Green wall - Rome

Page 5: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.3 – Design and establish field experiments investigating state-of-the-art in urban green infrastructure design (green roofs & walls)

Task leaders: Stuttgart Group (supported by UEL & Barking Riverside).

Timetable: M1 to M24 [Deliverables M18, M20]

Activities:

Stuttgart:

Ongoing negotiations for location of green wall following competition

Legal and council approval problems with original site

Hope to have it resolved soon and begin installation.

New proposed green wall location - Rathausplatz Ludwigsburg

Page 6: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.3 – Design and establish field experiments investigating state-of-the-art in urban green infrastructure design (green roofs & walls)

Activities:

Stuttgart:

A prototype wall has been built at the Helix Pflanzen GmbH site in Kornwestheim at their own cost.

Data on water and temperature being generated.

Establishing research projects at the University of Stuttgart.

Baumwand – prototype green wall

Page 7: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.3 – Design and establish field experiments investigating state-of-the-art in urban green infrastructure design (green roofs & walls)

Activities:

Stuttgart:

Helix is also engaged in the maintenance process of the baubotanical Platanenkubus in Nagold.

Represents an additional opportunity to collect climate data to inform the research on green walls and urban comfort zones.

Plane-Tree-Cube Nagold

Page 8: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.3 – Design and establish field experiments investigating state-of-the-art in urban green infrastructure design (green roofs & walls)

Activities:

London: The Phase 1 green roof experiment at Barking Riverside continues to be monitored and results disseminated through a variety of formats.

This has included:

Barking Riverside Phase 1 green roof experiment

Using the site as a case demonstration facility for international visitors;

Undergraduate and postgraduate research projects;

A TURAS site meeting for Work Package leaders;

Development of best practice guidance documents for Local Authorities;

Page 9: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.3 – Design and establish field experiments investigating state-of-the-art in urban green infrastructure design (green roofs & walls)

Activities:

London: The Phase 1 green roof experiment at Barking Riverside continues to be monitored and results disseminated through a variety of formats.

This has included:

Barking Riverside Phase 1 green roof experiment

Development of guidance for developers and architects on design of urban green infrastructure for biodiversity.

Dissemination to WP4: green infrastructure design for water attenuation and development of secondary waste products as green roof construction elements.

Page 10: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.3 – Design and establish field experiments investigating state-of-the-art in urban green infrastructure design (green roofs & walls)

Activities:

London: Phase 2 green roof experiment - to manipulate the water retention capacity of a series of experimental green roof test platforms and monitor the performance of vegetation and colonisation by flora and targeted fauna.

www.organicroofs.co.uk

Series of delays but almost there:

Original school site development delayed.

Temporary buildings unable to take loadings.

Cost of purchasing containers beyond TURAS budget.

Weather delayed containers positioning on site.

H&S issues of working on a large scale construction site.

Page 11: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.3 – Design and establish field experiments investigating state-of-the-art in urban green infrastructure design (green roofs & walls)

Activities:

London: Phase 2 green roof. Expected completion end May 2013.

Barking Riverside Phase 2 green roof experiment construction

Page 12: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.3 – Design and establish field experiments investigating state-of-the-art in urban green infrastructure design (green roofs & walls)

Activities – still to be implemented:

Journal publication (in preparation)

Dr Chloe Molineux – Development of alternative sustainable aggregates for use as green roof substrates AND microbial communities of green roofs.

Dr Gyongyver Kadas – survey methodologies for green roofs and invertebrate diversity dynamics in relation to green roof age.

Kinga Owczarek – investigating the link between green roof water attenuation and age AND the use of novel recycled products as green roof construction elements.

Caroline Nash – floral availability and green roof design

Page 13: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.4 – Landscape design: incorporating art, creativity and regional habitat charateristics

Task leaders: UEL (supported by IfS, Barking Riverside).

Timetable: M1 to M24 [Deliverables M24]

Activities:

Barking Riverside:

Bro

wn

field

lan

dscap

ing

@ B

ark

ing

R

ivers

ide

2012 monitoring of landscaping completed including establishing an experimental control area on nearby ‘soft‘ landscaping area of Barking Riverside development;

Interim report produced for Natural England as part of support agreement for urban ecology PhD studentship (£10K).

Page 14: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.4 – Landscape design: incorporating art, creativity and regional habitat charateristics

Task leaders: UEL (supported by IfS, Barking Riverside).

Timetable: M1 to M24 [Deliverables M24]

Activities: UEL:

UEL’s Beetle Bump Creation and monitoring of the Beetle

Bump brownfield nature reserve

Planning installation of Green Man sculpture as the first art showcased at the reserve

Times Higher Education Award Shortlist

Design publication in Essex Naturalist journal.

Page 15: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.4 – Landscape design: incorporating art, creativity and regional habitat charateristics

Task leaders: UEL (supported by IfS, Barking Riverside).

Timetable: M1 to M24 [Deliverables M24]

Activities:

Urban landscaping guidance document

Institute for Sustainability & UEL:

Guidance document produced to disseminate TURAS best practice for urban GI design into the Poplar HARCA redevelopment case study.

Uploaded on TURAS website.

Page 16: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.4 – Landscape design: incorporating art, creativity and regional habitat charateristics

Activities – still to be implemented:

Projects are currently in development to further the study of recycled substrates as habitat to support biodiversity to link to WP4.

Dissemination of T2.3 research throughout the TURAS project network and through journal publication. Journal publication in preparation – Nash & Connop, Urban landscape design for

brownfield biodiversity.

Page 17: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.5 – Pilot test design tools from T2.3 & T2.4 at Barking Riverside and disseminate

Task leaders: UEL (supported by Barking Riverside).

Timetable: M18 to M36 [Deliverables M30]

Activities:

Working with developers, architects and landscape designers to identify opportunities to feed into Barking Riverside masterplan

Feeding biodiverse landscape design guidance into Poplar HARCA case study site.

Identifying additional opportunitites for implementation (e.g Sainsburys on Sanofi site).

SuDs guidance for London Boroughs of Tower Hamlets and Newham.

Barking Riverside Development (artists impression)

Page 18: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.5 – Pilot test design tools from T2.3 & T2.4 at Barking Riverside and disseminate

Activities – still to be implemented:

Experimental results only just starting to emerge, so too early for delivery of Task 2.5. Work still outstanding includes: 

Disseminate best practice design from T2.2 through landscape-scale installation of green roof systems and landscape design from Barking Riverside.

Monitoring of the case study installations to investigate real-time benefits of green roof systems and landscape-scale connectivity of green infrastructure at the case study site.

We are very much on track to deliver this both at the Barking Riverside site and further afield.

Page 19: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Task 2.6 – Visions, feasibility strategies and guidance tools

Task leaders: La Sapienza (IFS, UEL, Univ. of Stuttgart).

Timetable: M12 to M60 [Deliverables M36]

Activity pending as dependent on integration of other WP2 Tasks: It has been agreed that the format of Task 2.6 will be an urban GI design

handbook.

To include:

Model for urban GI implementation.

Summary of TURAS WP2 case studies and results.

All WP2 partners to identify local and international case study examples of innovation in urban GI design and management (and other TURAS partners??)

Olympic Park – Green roof

Page 20: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

WP 2Significant results

Preparation of the green infrastructure model for local authorities;

 

Establishment of the design principles for novel green roof experiment centre at Barking Riverside.

 

Determination of Ludwigsburg to be involved with TURAS and host the experimental green wall system.

 

Establishment of Beetle Bump at UEL which led to an Higher Education Award shortlisting.

 

The landscape design and green roof experimentation received a Highly Commended Award in the 2012 Integrated Habitats Design Competition.

After only one year of the project and very early in the experimental process, interest in WP2 of TURAS, use of Barking Riverside as a dissemination showcase, and demand for green infrastructure design guidance has exceeded expectation.

Page 21: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

WP 2 Deliverables

Del. no.

Deliverable name

Lead beneficiary

Nature

Dissemination level

Delivery date from Annex 1 (proj month)

Actual/Foresact delivery dateDd/mm/yyyy

StatusNo submitted/submitteed

Comments

D2.3 Report and recommendations for other participating cities

2 R Public 36 30/09/2014 Not submitted

On target for deadline

Page 22: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

TABLE 2. MILESTONES

Milestone

no. Milestone

name

Lead beneficiary

Delivery date from

Annex I dd/mm/yyyy

Achieved Yes/No

Actual / Forecast

achievement date

dd/mm/yyyy

Comments

MS 7 Economic evaluation model

2 Month 16 Yes Available on TURAS PPA website

MS 8 Establishment of new green roof design test facility

2 Month 18 No 31/05/2013 Phase 1 experimental facility operational, landscaping experimental area operational plus additional area on UEL campus. Phase 2 green roof experiment under construction (for more details see description for London in Task 2.3 progress)

MS 9 Design guidelines

2 Month 20 On target

MS 10 Multidisciplinary approach guidelines

2 Month 24 On target

MS 11 Case study 2 Month 24 On target MS 12 Multi-

functionality guidelines

2 Month 30 On target

MS 13 Facilities testing showcase

Month 30 On target

MS 14 Synergistic evaluation of data dissemination

Month 36 On target

WP 2 Milestones

Page 23: TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY TURAS Work Package Leaders Meeting: Dublin - April 2013 Work Package 2 – progress report.

TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY

Future planning

Experimental and case study monitoring and data analysis.

Journal article publication.

Working with all WP2 partners towards dissemination targets, with particular focus on Task 2.6.

Continuing to develop current and future dissemination opportunities:

Transport for London; Olympics Park design and management; Bouygues (London Rd Barking); Drain London; Thames Water; SuDs guidance; London Business Districts; Poplar HARCA; Taylor Wimpey (Barking); Greater Thames Marshes Nature Improvement Area, V&A and Natural History Museum and Tate Modern.

Investigation of poor uptake of green wall competion.

Identifying opportunities for collaboration and integration with other WPs.