Top Banner
Sherry Bernhoft EPRI Program Manager IAEA EDF Technical Meeting on NPP Flexible Operations Paris, France September 2013 Transition to Flexible Plant Operations U.S.A. Update
23

Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

Jul 19, 2018

Download

Documents

ngokhue
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

Sherry Bernhoft EPRI Program Manager

IAEA EDF Technical Meeting on NPP Flexible Operations Paris, France

September 2013

Transition to Flexible Plant Operations U.S.A. Update

Page 2: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

2 © 2013 Electric Power Research Institute, Inc. All rights reserved.

EPRI Our History…

• Founded in 1972

• Independent, nonprofit center for public interest energy and environmental research

• Collaborative resource for the electricity sector

• Major offices in Palo Alto, CA; Charlotte, NC; Knoxville, TN – Laboratories in Knoxville,

Charlotte and Lenox, MA Chauncey Starr EPRI Founder

Page 3: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

3 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Collaboration

U.S. Nuclear Power Plants

Source: NEI Website, 2009

U.S. Participants Non-U.S. Participants Global

Breadth and Depth

• All U.S. nuclear owners/operators

• 102 reactors

• 20 countries, >220 reactors

• >75% of the world’s commercial nuclear units

Participants Encompass Most Nuclear Reactor Designs

Page 4: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

4 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Presentation Agenda

• Nuclear Power Plants in the U.S. • Challenges

• Growth of Renewals

• Transition Plan for NPP Flexible

Operations

Page 5: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

5 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Net Electrical Generation in the U.S.

Page 6: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

6 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Operating Licenses and License Renewal

Page 7: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

7 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Challenges Facing U.S. Nuclear Power Plants

• Public Acceptance Post-Fukushima

• Economics

• Extending the Plant Operating Licenses – Beyond 60 years

• Large Scale Integration of Renewables

Page 8: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

8 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Renewables – Today and Tomorrow

• Today ~ 4% of generation from Solar and Wind Power • Expected growth of > 60 GWs by 2022

Page 9: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

9 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Regional Projection Model for the U.S.

Total Energy

for Load

Imports Solar Geothermal Biomass

Wind Hydro+ Nuclear (New) Nuclear (Existing)

Gas New Coal Environmental Retrofit Existing Coal

0

400

800

1200

1600

2010 2015 2020 2025 2030 2035

TWh

0

400

800

1200

1600

2010 2015 2020 2025 2030 2035

TWh

0

400

800

1200

1600

2010 2015 2020 2025 2030 2035

TWh

0

400

800

1200

1600

2010 2015 2020 2025 2030 2035TW

h

MIDWEST WEST

EAST

SOUTH

Source: PRISM 2.0: The Value of Innovation In Environmental Controls (1026743)

Page 10: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

10 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Page 11: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

11 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Example - Growth of Solar in California

2012 Preliminary Actual 19% of total bundled retail sales

2020 Projected 33% of total bundled retail sales

2002 Actual 11% of total bundled retail sales

Total RPS-Eligible Procurement

~14,000 GWh

Projected RPS-Eligible Procurement

~26,000 GWh

Total RPS-Eligible Procurement

7,504 GWh

Page 12: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

12 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Projected Impact on Net Generation Lo

ad &

Net

Loa

d (M

W)

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

20,000

22,000

24,000

26,000

28,000

30,000

32,000

34,000

36,000

38,000

40,000

42,000

44,000

46,000

0:00 1:30 3:00 4:30 6:00 7:30 9:00 10:30 12:00 13:30 15:00 16:30 18:00 19:30 21:00 22:30 0:00

Load Net Load Wind Solar

Load, Wind & Solar Profiles – High Load CaseJanuary 2020

Win

d &

Sol

ar (M

W)

8,000 MW in 2 hours

6,300 MW in 2 hours

13,500 MW in 2 hours

8,000 MW in 2 hours

6,300 MW in 2 hours

13,500 MW in 2 hours

Illustrative Load, Wind, & Solar Profiles

Net Load = Total Customer Load – (Wind + Solar Generation) Source:

Page 13: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

13 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Net Load Pattern Changes 2012-2020

Source: CAISO

Page 14: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

14 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Success Path For Integration of Renewables

• Early Engagement and Coordination amongst Key Stakeholders

• Planning and Phased Approached to Implantation

• Recognize the ‘Paradigm’ Shift

NPP Owner/Operator

EPRI INPO

Owner Groups

NRC NERC FERC

OEM/NSSS Vendors

Fuel Suppliers

Transmission Grid Operator

Page 15: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

15 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Transition – Phased Approach

• Phase 1 – Identification of the Concerns

• Phase 2– What is possible based on current plant design?

• Phase 3 –Steps to Increase Flexible Operations

• Phase 4 – R&D to Support Long-Term Asset Management • Phase 5 – Understand the Economics and Plant Enhancements

Page 16: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

16 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Phase 1- Gap Matrix • Core/Fuel Performance:

– Power density – Fuel performance – Fuel cycle

• Safety Analysis: – Starting point for accidents?

• Low-cycle and High-cycle Fatigue: – Life limiting effects?

• Chemistry/ Source Term Effects • Effluent Management • Equipment ‘Wear and Tear’

– Reduced reliability? • Human Performance Challenges • Cost/Benefit

Page 17: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

17 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Phase 2 – What is Possible Today

• Define existing operating envelope: – Acceptable ramp rates – Analytical limitations – System/Equipment limitations – Instrumentation/Monitoring

Limitations • Protocol with Independent System

Operator (ISO): – How Frequent – How Fast – How Long – How Deep

• Training for Plant Staff

Page 18: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

18 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Phase 3 – Increased Maneuverability Needed? • Determine future maneuverability needs • Pinch-point analysis of plant limitations:

– Instrumentation, Monitoring and Controls Systems – Safety Analyses – Operating Practices – Plant modifications

• Cost-benefit analysis

Potential Plant Modifications:

Gray Control Rods

Boron Acid Recycle System

Additional Waste HUTs

Variable Drive Pump Controls

Core Monitoring Instrumentation

Page 19: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

19 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Phase 4 – Long-Term Asset Management R&D • Fuels and core management:

– Validation of codes for cyclical operations

– Control rod/blades operation • High-cycle and low cycle fatigue

management: – Additional locations impacted – Increased monitoring needed

• Impacts of Flow Induced Vibration (FIV) – Account for effects

• Flow Accelerated Corrosion (FAC) Program changes

• Equipment Wear and Tear: – Guidelines for assessment and

monitoring

Operating Experience for the fossil fleet shows that there is a latency effect in system wear and tear

Intertek Asset Integrity Management (AIM)

Page 20: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

20 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Phase 5 – Understand the Economics & Plant Enhancements • Develop economic model to understand the

cost of flexible operations: – Direct and indirect costs – Future mix of generations technologies

across a fleet – Feed into the cost of ancillary services

• Evaluate the risks: – Gather data and model into PRAs – Enhancement in Human Performance

• Plant Enhancements: – On-line monitoring systems for dynamic

plant operation – On-line fatigue and vibration monitoring – Improvements in Chemistry and water

management schemes

Page 21: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

21 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Next Steps

• Early 2014 Products – Gap Matrix – High-level guidelines to support

planning for the transition

• Utility Advisory Group – Support direction of R&D for

long-term asset management – Scoping and prioritization of

plant enhancements

Page 22: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

22 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Together…Shaping the Future of Electricity

Page 23: Transition to Flexible Plant Operations U.S.A. Update · Sherry Bernhoft EPRI Program Manager . IAEA EDF Technical Meeting on NPP Flexible Operations . Paris, France . September 2013

23 © 2013 Electric Power Research Institute, Inc. All rights reserved.

Renewable Portfolio Standard Policies..

www.dsireusa.org / March 2013.

29 states,+ Washington DC and 2

territories,have Renewable Portfolio

Standards (8 states and 2 territories have

renewable portfolio goals).