Top Banner
Transbay Transit Center Project Sh i W ll dE ti C t ti 301 Mission Buttress Shoring W all and Excavation Construction Structural Assessment June 8 2010 1 June 8, 2010
22

Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Mar 20, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Transbay Transit Center ProjectSh i W ll d E ti C t ti

301 Mission Buttress Shoring Wall and Excavation Construction

Structural Assessment

June 8 2010

1

June 8, 2010

Page 2: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

• Subsurface conditions and Transit Centre box

• Excavation process

• Movement analyses

• Movement monitoringMovement monitoring

• Summary

Page 3: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

1852 Shoreline and Site ConditionsRelative to the DTX and the TerminalRelative to the DTX and the Terminal

3

Page 4: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Borehole Locations and Adjacent 3rd Party Geotechnical Data

Page 5: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Train Box and Superstructure:Transverse Section

Underside of base mat: -41 ft NAVD88

Page 6: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Vertical Section Along Minna Street

Page 7: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Water Level Contours

Page 8: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

• Subsurface conditions and Transit Centre box

• Excavation process

• Movement analyses

• Movement monitoringMovement monitoring

• Summary

Page 9: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Construction of train box inside temporary braced shoring wall

40

20

0

Bracing C@ Depth 28ft

Bracing B@ Depth 16.5ft

Bracing A@ Depth 5.5ft

FILL

Bracing C@ Depth 28ft

Bracing B@ Depth 16.5ft

Bracing A@ Depth 5.5ft

Bracing C@ Depth 28ft

Bracing B@ Depth 16.5ft

Bracing A@ Depth 5.5ft

Typical SoilProfileCL-17 (3 ft) CL-18 (20 ft) CL-33 (40 ft)

43ft 43ft 43ft

80

60

40

Dep

th, f

t BAYMUD

43ft 43ft 43ft

-1 0 1 2

Cumulative Lateral

140

120

100

-1 0 1 2

Cumulative Lateral-1 0 1 2

Cumulative Lateral

COLMASAND

Exca

vatio

n

0 20 40 60Distance from Excavation, ft

CL-20 CL-21 CL-35 CL-36

CL-17 CL-18 CL-33 CL-34

SPTCWall

Line 23

Line 22

Displacement, in Displacement, in Displacement, in

MMTProject

BARTProject

1994j

1969/70

Photo courtesy of San Francisco Public Library

Page 10: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Soil-Cement Walls – Sequence of Installationq1) Mixing of First

Primary Panel

2) Mixing of Second Primary Panel

3) Mixing of Secondary Panel Between TwoPanel Between Two Primary Panels

10

Page 11: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

DMM Rig during constructability trials Installation of Beamconstructability trials

111111

Page 12: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Typical Cross Lot BracingDeep Excavation Along The EmbarcaderoMuni Metro Turnback Project

Page 13: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Typical Diagonal Bracing of Deep ExcavationsGap Building and EBMUD Wet Weather BuildingGap Building and EBMUD Wet Weather Building

13 13

Page 14: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Many ways of providing internal support t d tito deep excavations

Page 15: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

• Subsurface conditions and Transit Centre box

• Excavation process

• Movement analyses

• Movement monitoringMovement monitoring

• Summary

Page 16: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

West Base Case I

Page 17: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

East Base Case I

Page 18: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

• Subsurface conditions and Transit Centre box

• Excavation process

• Movement analyses

• Movement monitoringMovement monitoring

• Summary

Page 19: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Ground and Wall Monitoring Instrumentation

Page 20: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Monitoring ground movements

Extensometer Real time extensometer & inclinometer installationte so ete

Inclinometers and extensometers(sub surfacedisplacements).

Can be real time or manualInclinometer (x, y, 0.002 in/ft)Extensometer (z, +/- 0.01 inch)

Inclinometer and logging deviceInclinometer and logging device

Page 21: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Deep settlement marker and levelling points

Page 22: Transbay Transit Center Project Sh i W ll d E ti C t ti ...

Summary

•Established ground and groundwater conditionsS f l t t bilit t i l f h i ll•Successful constructability trials of shoring walls

•Excavation processes identified•Calibrated soil models using numerical analysis g ymethods•Predicted ground movements•General ground and water movement controlsGeneral ground and water movement controls established for general conditions•Shoring wall package is ready for market.