Top Banner
TRANS-SIBERIAN GOLD PLC 26 June 2013 Annual General Meeting TRANS-SIBERIAN GOLD
14

TRANS-SIBERIAN GOLD PLC...and Atlas Copco ST2D •Underground truck Fambition FAMT-12T TRANS-SIBERIAN GOLD Asacha mine in operation (1) Asacha mine in operation (2) TRANS-SIBERIAN

Feb 14, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • TRANS-SIBERIAN GOLD PLC

    26 June 2013 Annual General Meeting

    TRANS-SIBERIAN GOLD

  • ASACHA – Underground Mine

    2011

    2012

    Q1

    2013

    April

    2013

    May

    2013

    YTD

    2013

    Mine

    development (metres)

    3,481 4,124 396 266 298 960

    Ore extracted

    (tonnes)

    34,537 127,646 45,352 16,289 16,121 77,762

    TRANS-SIBERIAN GOLD

  • ASACHA Processing plant

    2011

    2012

    Q1

    2013

    April

    2013

    May

    2013

    YTD

    2013

    Ore processed

    (tonnes)

    30,308 136,154 35,585

    10,006 14,235 59,826

    Gold grade (g/t) 9.35

    6.54

    6.36 6.79 6.27 6.41

    Silver grade

    (g/t)

    15.66 11.79

    9.80 12.20

    10.51 10.37

    Gold recovery

    (%)

    94.2 95.41 94.52 93.86 93.23 94.11

    Silver recovery

    (%)

    61.8 68.49 78.81 68.74

    69.21 74.69

    Gold in dore

    (oz)

    7,833 27,920

    6,826 2,025 2,621 11,472

    Silver in dore

    (oz)

    8,596 35,924 8,791 2,412 3,168 14,371

  • ASACHA Refining and sales

    2011

    2012

    Q1

    2013

    April

    2013

    May

    2013

    YTD

    2013

    Gold refined

    (oz)

    6,539 27,588 6,833 1,578 2,748 11,159

    Silver

    refined (oz)

    7,189 35,110 8,865 2,106 3,245 14,216

    Gold sales

    US$mill

    11.7 43.9 12.6 2.5 4.1 19.2

    Silver sales

    US$mill

    0.2 1.0 0.3 0.1 0.1 0.5

    TRANS-SIBERIAN GOLD

  • JORC Resource Estimate following 2012 Asacha exploration programme

    • 11,000 metres drilled on Asacha’s flanks in 2012

    • Asacha JORC resource update adds 321,000 oz. gold and 703,000 oz silver, net of 2011 and 2012 production (252,000 oz. of gold and 395,000 oz. of silver in Asacha’s Eastern zone identified in 2012)

    TRANS-SIBERIAN GOLD

  • JORC Resource as at 31 December 2012

    PROPERTY

    MEASURED

    +

    INDICATED

    Oz

    MEASURED,

    INDICATED &

    INFERRED

    Oz

    GRADE

    g/t

    (Au equiv.)

    CUT-OFF

    g/t

    Asacha 748,100 1,070,300 20.9 4.0

    Rodnikova 166,450 404,845 8.2 4.0

    TOTALS 914,550 1,475,145 - -

  • Asacha mine

    • Daily output of 500-600 tonnes of ore

    ensures continuous operation of the plant

    • Processing plant throughput is close to the designed 12,500 tonnes of ore per

    month

    • Major issue of concern – low grades and

    high dilution

  • 2012 major issue of concern: low grades and high dilution

    – fractured and fragile enclosing rocks in blocks close to surface

    – design disadvantages: • long hole blasting inappropriate for some

    parts of the mine • blasting scheme unsuitable for some blocks

    – shortcomings in earlier mine development: • advanced block preparation

    • inadequate and timely supporting – lack of underground machines – lack of experienced personnel

    TRANS-SIBERIAN GOLD

  • Measures taken following 2012 technical audit

    • New technical and managing staff – Technical director and Chief mine geologist, each with around 30 year practical experience

    • Measures to keep mining blocks’ integrity

    – minimise time lag between preparation of mining blocks and subsequent stoping – use rock drifts when preparing blocks for stoping

    • Measures to reduce dilution - short blocks stoping, recoverable protective pillars and supporting concrete pillars/ceilings, where

    appropriate - changes in blasting scheme, including drilling blasting holes parallel to the ore body, shallow blast -

    hole blasting where appropriate, less brisant explosives and drilling blasting holes with smaller diameters

    - smaller machines (scrapers and LHD) - stricter control on ore blasting and haulage to reduce volume of ore stored underground • Optimisation of work shifts

    • More attention to ore sampling, stockpiling and blending • VNIPI design institute to revisit Asacha in near future

    The aim – to achieve 8 g/t gold grade by the end of 2013 and 9 g/t by mid 2014

  • New underground machines

    • BU-80 rig with smaller diameter (65-75 mm instead of 105 mm)

    • Two underground LHD : Fambition FAML-3 and Atlas Copco ST2D

    • Underground truck Fambition FAMT-12T

    TRANS-SIBERIAN GOLD

  • Asacha mine in operation (1)

  • Asacha mine in operation (2)

    TRANS-SIBERIAN GOLD

  • Construction continued at site

    Post start-up major activities

    Mine site: Main fan is constructed, testing with participation of the manufacturer is planned.

    Plant: Ready for commissioning. Documentation in progress.

    Tailings storage facility: In operation. Documentation for commissioning in progress.

    TRANS-SIBERIAN GOLD

    Key facilities already

    commissioned: •Cyanide storage

    •Explosives storage •Power unit and power supply system •The camp

  • Rodnikova Deposit

    • Federal authorities prescribed the implementation by April 2014 of two provisions of the Licensing Agreement:

    – Finalisation of the design documentation

    – Commencement of work at the deposit

    • The pre-feasibility study will be finalised in 2013

    TRANS-SIBERIAN GOLD