MEASUREMENT OF THE TRACK GEOMETRY
MARCH 2015 Research, Planning & Coordination Department 2
MEASUREMENT OF THE TRACK GEOMETRY
MARCH 2015 Research, Planning & Coordination Department 3
Measurement of the track geometry.
Measurements have done EN 13848 standarts.
So measurement saparate two topic,
1) Geometric measurement
2) Dynamic measurement
MEASUREMENT OF TRACK GEOMETRY GEOMETRİC MEASUREMENT
MARCH 2015 Research, Planning & Coordination Department 4
1) Geometric Measurement
This measurement have done seven parameters,
a)Location
b)Right Longitundial level
c)Left Longitundial Level
d)Right Alignment
e)Left Alignment
f)Twist
g)Cant
MEASUREMENT OF TRACK GEOMETRY GEOMETRİC MEASUREMENT
MARCH 2015 Research, Planning & Coordination Department 5
a)Location: Location seen Kilometers Location + Meters Location
For example 300+450, means measurement location is 300 Km and 450 meter.
b)Right Longitundial Level: Means; increase the kilometre direction, on right rail of track measure two point height level difference.
c)Left Longitundial Level : Means; increase the kilometre direction, on left rail of track measure two point height level difference.
d)Rigt Alignment : Means increase the kilometre direction, espeacially in to curve right rail and straight line right rail two point versine deference.
e)Left Alignment : Means increase the kilometre direction, espeacially in to curve left rail and straight line left rail two point versine deference.
f)Twist: Means cross section surface three point is true dimensions but one point is not true point.
g) Cant :Means in the curve diffrense height level of short rail and long rail.
MEASUREMENT OF TRACK GEOMERTY MEASUREMENT TOOLS
MARCH 2015 Research, Planning & Coordination Department 6
Expectations of a measurement vehicle
Track measurement vehicle that be attuned to today’s technology
must take into account amplitude and phase convinience when
measuring.
Measurement vehicles with multiple functions
In last years there is a certain inclining to multiple function
vehicles.
These vehicles measure the track parameters while considering
them at the same time.
It is logical that all paramaters that belongs to other specialties is
measured by one vehicle .
MEASUREMENT OF TRACKS GEOMETRY GEOMETRİC MEASUREMENT TROLLEY
MARCH 2015 Research, Planning & Coordination Department 7
Crabb Measurement Troleys
MEASUREMENT OF TRACK GEOMETRİC MEASUREMENT
MARCH 2015 Research, Planning & Coordination Department 8
Example Of Geometric Measurement Graphics
MEASUREMENT OF TRACK GEOMETRY GEOMETRIC MEASUREMENT VEHICLES
MARCH 2015 Research, Planning & Coordination Department 9
Roger 800;
120 Km/h Geometric Track and Catenary Measurement Machine
MEASUREMENT OF TRACK GEOMETRY GEOMETRIC MEASUREMENT VEHICLES
MARCH 2015 Research, Planning & Coordination Department 10
Track Geometry Measurement
• Track Gauge
• Alignment
• Twist
• Cross Level
• Longitudinal Level
• Rail Profile Measurement
• Rail Profile
• Rail Wear
• Wheel/Rail Contact Geometry
Signalling
• Radio Communication System
• Coded Current Automatic Block –
BACC
• ETCS & SCMT Eurobalise
• SSC Trasponder
• Wireless Communication Networks
Localization System
• Data Depot System
Track Measurement & Inspection
• Condition of rail fastenings (V•CUBE)
• Rail running surfaces (V•CUBE)
• Sleepers (V•CUBE)
• Ballast bed and signalling equipment on the
track (V•CUBE)
• Track Head Inspection
• Fishplate Inspection
Rail Corrugation Measurement
• Short, Medium and Long Wavebands
Components
Overhead Line Measurement & Inspection
• Overhead Line (OHL) Geometry
• Contact Wire Wear
Video Inspection
• Overview video from the perspective of a
locomotive driver
Tunnel & Clearance Measurement
• Tunnel Clearance Gauge
• Clearance Gauge of Railway Structures
ROGER 800
Measuring systems
MEASUREMENT OF TRACK GEOMETRY GEOMETRIC MEASUREMENT VEHICLES
MARCH 2015 Research, Planning & Coordination Department 11
Geometric Track Measurement Trains For High Speed Tracks
MEASUREMENT OF TRACK GEOMETRY GEOMETRIC MEASUREMENT VEHICLES
MARCH 2015 Research, Planning & Coordination Department 12
Standart and optional measuring systems on PİRİ REİS
Characteristics of TCDD High Speed train
�Operational measuring speed 250 km/h
�CAF train model YHT65001
�6 units train
�1st unit totally dedicated to measuring
equipment / meeting area
�6th unit modified for integration of systems
for bi-directional operations
Characteristics of TCDD High Speed train
�Operational measuring speed 250 km/h
�CAF train model YHT65001
�6 units train
st�1 unit totally dedicated to measuring equipment / meeting
area
th�6 unit modified for integration of systems for bi-directional
operations
MEASUREMENT OF TRACK GEOMETRY GEOMETRIC MEASUREMENT VEHICLES
MARCH 2015 Research, Planning & Coordination Department 13
Track Geometry Parameters
• �Kilometrical ground
measurement
• Measurement Speed
• Signs for structures such ad
bridges, tunnels, switches
• Left & Right leveling
• Line clearance and
differences (rail distance)
• Cant and Criss-cross level
• Left and Right rail flash
• Bending
• Curve values
Standart and optional measuring systems on PİRİ REİS
MEASUREMENT OF TRACK GEOMETRY GEOMETRIC MEASUREMENT VEHICLES
MARCH 2015 Research, Planning & Coordination Department 14
Rail Profile
This system gives information on the
wearing of the Rail. It is the
basic information used to keep the quality
of the ride over the
defined thresholds.
Parameters
�Left & Right rail interiors section profile
�Left & Right rail vertical wear
�Left & Right rail horizontal wear
�Left & Right rail wear at 45°angle
�Internal holes of the Left & Right rail
�The wear percentage of the Left & Right
rail cork section (loss
of cork)
Standart and optional measuring systems on PİRİ REİS
MEASUREMENT OF TRACK GEOMETRY GEOMETRIC MEASUREMENT VEHICLES
MARCH 2015 Research, Planning & Coordination Department 15
Video Inspection
Installed video view
�2 driver's sight (1 by coach)
�4 rear view (2 by coach and
1 by side)
�2 underframe for Wheel/Rail
Contact
�2 roof cameras for
pantograph interaction
Standart and optional measuring systems on PİRİ REİS
LIMIT VALUES
TRACK MAINTENANCE
MARCH 2015 Research, Planning & Coordination Department 16
DESCRIPTION
MAİNTENANCE MACHİNES
MEASUREMENT MACHİNES
TRACK MAINTENANCE DESCRIPTION
MARCH 2015 Research, Planning & Coordination Department 17
Description
The track besides static and dynamic forces that effects the railway from track geometry operation loads, air condition and other foctors (like chemical and nature effects) effects the track.
Tracks have certain life cycle and in case of pass that time, tracks must be renewed or maintenance with railway maintenance machines.
The track measure and the faults find on the track than maintenance machines use solve this fault.
TRACK MAINTENANCE MAIN MAINTANENCE MACHINES
MARCH 2015 Research, Planning & Coordination Department 18
•Track Renew Machines
•Balast Cleaning Machines
•Tamping Machines
•Switch Tamping Machines
•Balast Regülator Machines
•Stabilizatör Machines
•Rail Grinding Machines
•Rail Welding Machines
TRACK MAINTENANCE MACHINES TRACK RENEWAL TRAINS
MARCH 2015 Research, Planning & Coordination Department 19
Track renewal trains
Track renewal trains changes rails and sleepers swiftly.
Track renewal train starts operation with enough sleepers
loaded to sleepers vagon. There is one empty vagon on
that train. Existing sleepers lifted to this empty vagon with
the support of crane. This crane lifts the new sleepers to
machine and machine lay the new ones to track. At the
same time the machine change rail on the track and lay
the new rail to the track.
TRACK MAINTENANCE MACHINES TRACK RENEWAL TRAINS VİDEO
MARCH 2015 Research, Planning & Coordination Department 20
TRACK MAINTENANCE MACHINES BALLAST CLEANING MACHINE
MARCH 2015 Research, Planning & Coordination Department 21
Ballast cleaning
Ballast cleaning machines takes polluted ballasts on
tracks and cleans ballast with sieves on the machine. It
lays the standard ballast ( 2-6 cm ) to the track and rolls
out the non-standart ballast and unclean materials.
It provides elasticity to track.
TRACK MAINTENANCE MACHINES BALAST CLEANİNG MACHİNES VİDEO
MARCH 2015 Research, Planning & Coordination Department 22
TRACK MAINTENANCE MACHINES DYNAMIC TRACK STABILIZATOR DGS
MARCH 2015 Research, Planning & Coordination Department 23
Dynamic track stabilizator DGS
Parameters that ensure track stabilizasion effect are,
Stabilization frequency
Hydraulic cylinder which effects vertical force to stabilization
aggregate
Process speed
Dynamic impact force
The first three parameters are configured freely on work process
however, dynamic impact is figured by stabilization aggregate’s
eccentric loads.
TRACK MAINTENANCE MACHINES TAMPING MACHINES
MARCH 2015 Research, Planning & Coordination Department 24
Tamping Machines
Tamping machines repair of longitundial level fault,
alignment fault, cant fault and twist fault on track. First
machine give axes and than repair it special tamping
unıts.
TRACK MAINTENANCE MACHINES TAMPING MACHINES VIDEO
MARCH 2015 Research, Planning & Coordination Department 25
TRACK MAINTENANCE MACHINES SWITCH TAMPING MACHINES
MARCH 2015 Research, Planning & Coordination Department 26
Switch Tamping Machines
The same procudure of tamping machines repairs but
this machine use switches.
TRACK MAINTENANCE MACHINES SWITCH TAMPING MACHINES VIDEO
MARCH 2015 Research, Planning & Coordination Department 27
TRACK MAINTENANCE MACHINES BALAST REGULATOR MACHINES
MARCH 2015 Research, Planning & Coordination Department 28
Balast Regulator Machines
Machine has some blades. Machine give balast profile of
platform with this blades.
TRACK MAINTENANCE MACHINES BALAST REGULATOR MACHINES VIDEO
MARCH 2015 Research, Planning & Coordination Department 29
TRACK MAINTENANCE MACHINES DYNAMIC TRACK STABILIZATOR DGS
MARCH 2015 Research, Planning & Coordination Department 30
Effects of stabilization frequency
Volume compressing with dynamic tamping stabilizator
Compressing between two sleepers and ballast shoulder
compressing is less effective then stabilization. Because
stabilization effects whole ballast area. It’s called volume
compressing. Volume compressing effects x-y-z axis.
Operation tool of stabilizator machine holds two rails with
vibrating aggregate. It applicates vertical load and track
vibrates horizontally.
Operation frequency could be figured as 0 or 45 Hz.
Generally it’s figured as 28-35 Hz.
TRACK MAINTENANCE MACHINES DYNAMIC TRACK STABILIZATOR DGS VIDEO
MARCH 2015 Research, Planning & Coordination Department 31
TRACK MAINTENANCE MACHINES RAIL GRINDING MACHINE
MARCH 2015 Research, Planning & Coordination Department 32
Rail grinding
Rail grinding shapes the rail as a new profile. It prelongs
the rail lifecycle. Rail grinding should be done after rail
amplitude reaches 0,05 mm for economic reasons.
TRACK MAINTENANCE MACHINES RAIL WELDING MACHINES
MARCH 2015 Research, Planning & Coordination Department 33
Rail Welding Machines
Rail welding machines welding two rails surface with
elektrik arc and flushbut systems.
TRACK MAINTENANCE MAINTENANCE STANDART AND WARNING LIMIT VALUES
MARCH 2015 Research, Planning & Coordination Department 34
Maintanence standart values and warning limit values
Values evaulate with EN 13231 Standarts.
Values called three forms IL, IAL, AL
When certain standard values crossed, There will be need a
plan for maintanance as soon as possible.
When certain warning limit values crossed, error point must be
repaired or slow course area must be organized at that point.
For track lay-out maintanance standart and warning limit
values are shown in figure on the next page.
TRACK MAINTENANCE MAINTENANCE STANDART AND WARNING LIMIT VALUES
MARCH 2015 Research, Planning & Coordination Department 35
For rail distance limit values are in order shown table below.
On narrow radius curves there will be need excessive rail
distance.
TRACK MAINTENANCE RAIL HEAD SECTION PROFILE MAINTENANCE ST. VALUES
MARCH 2015 Research, Planning & Coordination Department 36
Rail head section profile maintanance standart values
Intervene in the rail head is possible only if the defect effects
the high speed course, rail wheel or rail durability.
v
[km/s]
Acceptable radius
deviation
[mm]
120 < v ≤ 140 ± 1.5
140 < v ≤ 160 ± 0.7
v > 160 ± 0.5
TRACK MAINTENANCE MAİNTENANCE PERİOTS
MARCH 2015 Research, Planning & Coordination Department 37
Typical maintanance periods
Tamping 4-5 years
Grinding 1-3 years
Ballast gradation 12-15 years
Rail change 10-15 years
Wooden sleepers renewal 20-30 years
Concrete sleepers renewal 30-40 years
Fastenings 10-30 years
Ballast renewal 20-30 years
Soil amendment >40 years
TRACK MAINTENANCE NORMS
MARCH 2015 Research, Planning & Coordination Department 38
EN 13803-1 Track Design Parameters
UIC 722 İmproving of infrastructure
EN 13230 - Concrete Sleepers-General
EN 13674-1 Rail Standarts
EN 14730-1 Alüminothermit Welding Procodure Approve
EN 15085-2 The welding of railway vehicles and Components
EN 15594 Electrod Welding Of Rails Standarts
EN 14587-2 Flashbutt Welding Standarts
EN 14730-2 Alüminothermit Welder Levels
EN 14730-1 Alüminothermit Welding Approve
TRACK MAINTENANCE NORMS
MARCH 2015 Research, Planning & Coordination Department 39
EN 13848-1 Characterization of track geometry
EN 50215 Try Railway machine before instruction
EN 13848-2 Measuring devices-Track recording vehicles
EN 13848-3 Measuring Devices Of Railway Maintanence Machines
UIC 518 Railway Vehicles Tests of Dynamic and Safety
UIC 519 Calculation of Equivalence Conicity
UIC 712 Rail Defects
UIC 714 Track Clasification
UIC 703 Track Characteristics
UIC IF7-96 High Speed Lines Maintanence