UNIVERSIDAD NACIONAL DEL SANTA FALCULTAD DE INGENIERIA CIVIL - LABORATORIO DE ESTRUCTURAS

CURSO: PROGRAMACION DE OBRASDOCENTE. LUZ ALVAREZ ASTOALUMNO: ELVIS JACK MENDOZA ESQUIVEL

Ítem Descripción Und.

OE.1 Obras provisionales, trabajos preliminares, seguridad y salud.OE.1.1 Obras provisionales y trabajos preliminares

Construcciones provisionales

OE.1.1.1.1 ALMACÉN, OFICINAS Y CASETA DE GUARDIA glb

OE.1.1.1.3 CARTEL DE OBRA DE 2.40 X 3.60 m u

OE.1.1.1.5 CERCO PROVISIONAL m

OE.1.1.1.6 SERVICIOS HIGIÉNICOS OBRA (URINARIO + DUCHA) glb

OE.1.1.1.7 CONSUMO DE ENERGIA ELECTRICA Y AGUA glb

OE.1.1.2 Trabajos preliminares

OE.1.1.2.1 Limpieza del terreno manual m2

OE.1.1.3 Trazos, niveles y replanteo

OE.1.1.31 Trazo, niveles y replanteo preliminar m2

OE.1.2 Seguridad y salud

OE.1.2.1 Señalización y Seguridad glb

OE.1.2.1.1 Limpieza Permanente de la Obra glb

OE.1.2.1.2 Charlas de Seguridad en Obra glb

Page 2: Trabajo Clase - Lab Estructuras Civil Gantt

OE.1.2.1.3 Prevencionismo de Seguridad en Obra mes

OE.1.2.1.4 Equipo de protección personal (EPP) mes

OE.2 Estructuras.OE.2.1 Movimiento de tierras

OE.2.1.2 Excavaciones de zanjas

OE.2.1.2.1 Excavaciones de Zanjas y/o Zapatas m3

OE.2.1.2.2 Excavaciones de cimientos ( en terreno natural con pico y lampa) m3

OE.2.1.3 Cortes m3

OE.2.1.4 Rellenos

OE.2.1.4.1 Relleno con material propio m3

OE.2.1.5 Nivelación interior y apisonado m2

OE.2.1.6 Eliminación de material excedente m3

OE.2.2 OBRAS DE CONCRETO SIMPLE

OE.2.2.1 Cimientos corridos 1:10 + 30% P.G. m3

OE.2.2.3 Solados para Zapatas e=2", 1:12 C:H m2

OE.2.2.6 Sobrecimientos

OE.2.2.6.1 Para el concreto C:H 1:8 + 25% P.M. m3

OE.2.2.6.2 Para el encofrado y desencofrado m2

Page 3: Trabajo Clase - Lab Estructuras Civil Gantt

OE.2.2.9 Falsopiso e=4" 1:8 C:H m2

OE.2.2.9.1 reglado

OE.2.2.9.1 vaciado

OE.2.3 OBRAS DE CONCRETO ARMADO

OE.2.3.1 ZAPATAS

OE.2.3.1.1 Concreto f'c=210 kg/cm2 m3

OE.2.3.1.2 Acero Fy=4200 Kg/cm2 kg

OE.2.3.2 VIGAS DE CIMENTACIÓN

OE.2.3.2.1 Concreto fc=210kg/cm2 m3

OE.2.3.2.2 Encofrado y Desencofrado m2

OE.2.3.2.3 Acero Fy=4200 Kg/cm2 kg

OE.2.3.3 PLACAS

OE.2.3.3.1 Concreto fc=210kg/cm2 m3

OE.2.3.3.2 Encofrado y Desencofrado m2

OE.2.3.3.3 Acero Fy=4200 Kg/cm2 m3

OE.2.3.4 VIGAS

OE.2.3.4.1 Concreto fc=210kg/cm2 m3

OE.2.3.4.2 Encofrado y Desencofrado m2

OE.2.3.4.3 Acero Fy=4200 Kg/cm2 kg

Page 4: Trabajo Clase - Lab Estructuras Civil Gantt

OE.2.3.4.4 curado m3

OE.2.3.5 COLUMNAS

OE.2.3.5.1 Concreto fc=210kg/cm2 m3

OE.2.3.5.2 Encofrado y Desencofrado m2

OE.2.3.5.3 Acero Fy=4200 Kg/cm2 kg

OE.2.3.5.4 curado m3

OE.2.3.6 VARIOS

OE.2.3.6.1 ESTRUCTURA METÁLICA EN TECHO m2

COSTO DIRECTOGASTOS GENERALES (10%)

UTILIDADES (10%)SUB TOTALI.G.V (18%)

DESEMBOLSO PARCIAL PROGRAMADODESEMBOLSO ACUMULADO PROGRAMADO

AVANCE PARCIAL DE OBRAAVANCE ACUMULADO DE OBRA

Page 5: Trabajo Clase - Lab Estructuras Civil Gantt

m2/dia N° DIAS CALENDARIOS METRADO DÍAS PRECIO PARCIAL 1 2 3 4 5

1 1 3000 3000 S/. 3,000.00

100%

1 1 1709.86 1709.86 S/. 1,709.86

100%

280 1 134.9 37772 S/. 37,772.00

100%

1 1000 1000 S/. 1,000.00

100%

1 1 13561.21 13561.21 S/. 13,561.21

100%

280 1 0.49 137.2 S/. 137.20

100%

280 1 3.4 952 S/. 952.00

100%

1 1 3000 3000 S/. 3,000.00

100%

1 1 1000 1000 S/. 1,000.00

100%

1 1 3000 3000 S/. 3,000.00

Page 6: Trabajo Clase - Lab Estructuras Civil Gantt

100%

1 1 3000 3000 S/. 3,000.00

100%

1 1 4322 4322 S/. 4,322.00

100%

126 5 37.8 4762.8 S/. 4,762.80

100%

120 4 S/. 0.00

100%

40 1 12.1 484

15 1 25 375

280 2 6.33 1772.4

134.06 1 22.7 3043.21875

40.00 2 170.9 6836

80.00 1 29.1 2328

40.00 1 254.79 10191.6

80.00 2 42.77 3421.6

Page 7: Trabajo Clase - Lab Estructuras Civil Gantt

280.00 2 34.9 9772

280.00 1

280.00 1

25.00 2 393 9825

120.00 1 4.3 516

20.00 2 400.9 8018

42.00 1 65.38 2745.96

180.00 1 4.3 774

120.00 4 398.2 47784

240.00 2 60.47 14512.8

230.00 2 4.3 989

50.00 4 419.88 20994

78.00 4 63 4914

300.00 1 4.3 1290

Page 8: Trabajo Clase - Lab Estructuras Civil Gantt

78.00 1

40.00 4 423.02 16920.8

80.00 4 75.75 6060

350.00 3 4.3 1505

160.00 1

138.00 3 610 84180

COSTO DIRECTO S/. 216,955.85GASTOS GENERALES (10%) S/. 21,695.58

UTILIDADES (10%) S/. 21,695.58SUB TOTAL S/. 260,347.02I.G.V (18%) S/. 46,862.46

DESEMBOLSO PARCIAL PROGRAMADO S/. 307,209.48DESEMBOLSO ACUMULADO PROGRAMADO S/. 307,209.48

AVANCE PARCIAL DE OBRA 63.62%AVANCE ACUMULADO DE OBRA 63.62%

Page 9: Trabajo Clase - Lab Estructuras Civil Gantt

6 7 8 9 10 11 12

Page 10: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 4,762.80

100%

S/. 0.00

100%

S/. 484.00

100%

S/. 375.00

100%

S/. 1,772.40

100%

S/. 3,043.22

100%

S/. 6,836.00

100%

Page 11: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 9,825.00

100%

S/. 516.00

100%

S/. 2,745.96

100%

S/. 774.00

100%

S/. 14,512.80

100%

S/. 989.00

100%

Page 12: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 216,955.85S/. 21,695.58S/. 21,695.58

S/. 260,347.02S/. 46,862.46

S/. 307,209.48S/. 307,209.48

63.62%63.62%

S/. 216,955.85

Page 13: Trabajo Clase - Lab Estructuras Civil Gantt

13 14 15 16 17 18 19 20 21 22 23

Page 14: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 2,328.00

100%

Page 15: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 9,772.00

100%

S/. 8,018.00

100%

S/. 47,784.00

100%

Page 16: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 216,955.85S/. 21,695.58S/. 21,695.58

S/. 260,347.02S/. 46,862.46

S/. 307,209.48S/. 307,209.48

63.62%63.62%

Page 17: Trabajo Clase - Lab Estructuras Civil Gantt

24 25 26 27 28 29 30 31 32 33 34

Page 18: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 10,191.60

100%

S/. 3,421.60

100%

Page 19: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 9,772.00

100%

Page 20: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 4,230.20 S/. 12,690.60

25% 75%

S/. 6,060.00

100%

S/. 6,060.00

100%

S/. 216,955.85 S/. 124,068.60S/. 21,695.58 S/. 12,406.86S/. 21,695.58 S/. 12,406.86

S/. 260,347.02 S/. 148,882.32S/. 46,862.46 S/. 26,798.82

S/. 307,209.48 S/. 175,681.14S/. 307,209.48 S/. 482,890.62

63.62% 36.38%63.62% 100.00%

Page 21: Trabajo Clase - Lab Estructuras Civil Gantt

35 36 37 38 39 40 41 42 43 44

Page 22: Trabajo Clase - Lab Estructuras Civil Gantt
Page 23: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 20,994.00

100%

S/. 4,914.00

100%

Page 24: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 1,290.00

100%

S/. 124,068.60S/. 12,406.86S/. 12,406.86

S/. 148,882.32S/. 26,798.82

S/. 175,681.14S/. 482,890.62

36.38%100.00%

S/. 124,068.60

Page 25: Trabajo Clase - Lab Estructuras Civil Gantt

45 46 47 48 49 50 51 52 53 54

Page 26: Trabajo Clase - Lab Estructuras Civil Gantt
Page 27: Trabajo Clase - Lab Estructuras Civil Gantt
Page 28: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 84,180.00

100%

S/. 124,068.60S/. 12,406.86S/. 12,406.86

S/. 148,882.32S/. 26,798.82

S/. 175,681.14S/. 482,890.62

36.38%100.00%

Page 29: Trabajo Clase - Lab Estructuras Civil Gantt

S/.

S/. 3,000.00

S/. 1,709.86

S/. 37,772.00

S/. 1,000.00

S/. 13,561.21

S/. 137.20

S/. 952.00

S/. 3,000.00

S/. 1,000.00

S/. 3,000.00

Page 30: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 3,000.00

S/. 4,322.00

S/. 4,762.80

S/. 484.00

S/. 375.00

S/. 1,772.40

S/. 3,043.22

S/. 6,836.00

S/. 2,328.00

S/. 10,191.60

S/. 3,421.60

Page 31: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 9,772.00

S/. 9,825.00

S/. 516.00

S/. 8,018.00

S/. 2,745.96

S/. 774.00

S/. 47,784.00

S/. 14,512.80

S/. 989.00

S/. 20,994.00

S/. 4,914.00

Page 32: Trabajo Clase - Lab Estructuras Civil Gantt

S/. 1,290.00

S/. 16,920.80

S/. 6,060.00

S/. 6,060.00

S/. 84,180.00

S/. 256,844.45

S/. 25,684.44

S/. 25,684.44

S/. 308,213.34

S/. 55,478.40

S/. 363,691.74

Page 33: Trabajo Clase - Lab Estructuras Civil Gantt

PLANILLAS DE METRADO

OBRA CULMINACION DEL POOL DE AULAS DE LA UNIVERSIDAD NACIONAL DEL SANTA

PROP. UNIVERSIDAD NACIONAL DEL SANTA

UBIC. AV. UNIVERSITARIA

ESPECIALIDAD: ESTRUCTURAS

Item Partida Nº veces

01.00.00 OBRAS PROVISIONALES

01.01.00 CONSTRUCCIONES PROVISIONALES

01.01.01 ALMACEN , OFICINA Y CASETA DE GUARDIANIA

Almacen , Oficina Y Caseta De Guardiania 1.00

01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA

Cartel de obra de 3.60 x 2.40 m 1.00

01.01.03 POZO DE ALMACENAMIENTO DE AGUA

Pozo de agua de medidas de 3.00 x 2.00 x 1.00 m 1.00

01.01.04 CERCO PROVISONAL DE ESTERAS

Cerco Perimetrico 2.00

1.00

01.02.00 INSTALACIONES PROVISIONALES

01.02.01 AGUA PARA LA CONSTRUCCION

Agua para la construccion 1.00

01.02.02 ENERGIA ELECTRICA PROVISIONAL

Energia para la construccion 1.00

02.00.00 TRABAJOS PRELIMINARES

02.01.00 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS

TRANSPORTE DE EQUIPOS Y HERRAMIENTAS 1.00

02.02.00 LIMPIEZA DE TERRENO MANUAL

Area de pasadizo y pool de aulas 1.00

escalera 1.00

02.03.00 TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA

Area de pasadizo y pool de aulas 1.00

escalera 1.00

02.04.00 DEMOLICION DE VEREDA

Area de veredas 2.00

1.00

2.00

Nº de Elemento

Page 34: Trabajo Clase - Lab Estructuras Civil Gantt

1.00

1.00

2.00

2.00

02.05.00 DEMOLICION DE MUROS DE ALBAÑILERIA

de muros perimetrales 1.00

03.00.00 MOVIMIENTO DE TIERRAS

03.01.00 EXCAVACION MANUAL PARA ZAPATAS, V.C. Y CIMIENTOS CORRIDOS

EN ZAPATAS

Z-01 EN PASADIZO 1.00 2.00

Z-02 EN PASADIZO 1.00 2.00

Z-03 EN PASADIZO 1.00 1.00

Z-04 EN PASADIZO 1.00 2.00

Z-05 EN PASADIZO 1.00 2.00

Z-06 EN PASADIZO 1.00 2.00

Z-07 EN PASADIZO 1.00 2.00

EN VIGA DE CIMENTACION

EJE 5 TRAMO E-G VC25X50 1.00 1.00

EJE 5 TRAMO L-M VC25X50 1.00 1.00

EJE 9 TRAMO E-G VC25X50 1.00 1.00

EJE 9 TRAMO L-M VC25X50 1.00 1.00

EJE E TRAMO 4-9 VC25X50 1.00 1.00

EJE G TRAMO 5-9 VC25X50 1.00 1.00

EJE L TRAMO 7-9 VC25X50 1.00 1.00

EJE M TRAMO 4-9 VC25X50 1.00 1.00

CIMIENTOS CORRIDOS

EJE 5 TRAMO E-G,L-M 1.00 2.00

03.02.00 EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL

CAJA DE ASCENSOR

AREA TOTAL 1.00 1.00

CISTERNA

CISTERNA 1.00 1.00

03.03.00 CORTE SUPERFICIAL MANUAL HASTA 0.20 MT

Area de pasadizo y pool de aulas 1.00

escalera 1.00Area de vacio 2.00Area de semisotano 1.00Area de cisterna 1.00

03.04.00 ACARREO INTERNO (MATERIAL PROCEDENTE DE CORTE Y EXCAVACION)

EXCAVACION MANUAL Y A MAQUINA 1.00

CORTE SUPERFICIAL MANUAL HASTA 0.20 MT 1.00

DEMOLICON DE VEREDA Y MUROS 1.00

ESPONJAMIENTO

Page 35: Trabajo Clase - Lab Estructuras Civil Gantt

03.05.00 RELLENO COMPACTADO CON EQUIPO MATERIAL DE PRESTAMO

Relleno de zapatas

Relleno de viga de cimentacion

Relleno de cisterna

03.06.00 CONFORMACION DE SUB RASANTES PARA PISOS Y VEREDAS

Area de pasadizo y pool de aulas 1.00

escalera 1.00pabellones A Y B 2.00Area de vacio 2.00

03.07.00 AFIRMADO COMPACTADO E=4"

Area de pasadizo y pool de aulas 1.00

escalera 1.00pabellones A Y B 2.00

area verde 2.00

area verde 1.00

area verde 2.00Area de vacio 2.00

03.08.00 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

ACARREO INTERNO (MATERIAL PROCEDENTE DE CORTE Y EX 1.00

04.00.00 OBRAS DE CONCRETO SIMPLE

04.01.00 SOLADO MEZCLA 1:12 (C:H ), E=2"

ZAPATAS

Z-01 EN PASADIZO 1.00 2.00

Z-02 EN PASADIZO 1.00 2.00

Z-03 EN PASADIZO 1.00 1.00

Page 36: Trabajo Clase - Lab Estructuras Civil Gantt

Z-04 EN PASADIZO 1.00 2.00

Z-05 EN PASADIZO 1.00 2.00

Z-06 EN PASADIZO 1.00 2.00

Z-07 EN PASADIZO 1.00 2.00

VIGA DE CIMENTACION

EJE 5 TRAMO E-G VC25X50 1.00 1.00

EJE 5 TRAMO L-M VC25X50 1.00 1.00

EJE 9 TRAMO E-G VC25X50 1.00 1.00

EJE 9 TRAMO L-M VC25X50 1.00 1.00

EJE E TRAMO 4-9 VC25X50 1.00 1.00

EJE G TRAMO 5-9 VC25X50 1.00 1.00

EJE L TRAMO 7-9 VC25X50 1.00 1.00

EJE M TRAMO 4-9 VC25X50 1.00 1.00

SEMISOTANO Y ASCENSOR

AREA TOTAL 1.00 1.00

04.02.00 CIMIENTO CORRDOS 1:10 (C:H)+25% P.M.

EJE E TRAMO 4-9 1.00 1.00

EJE G TRAMO 4-9 1.00 1.00

EJE L TRAMO 7-9 1.00 1.00

EJE M TRAMO 4-9 1.00 1.00

EJE 5 TRAMO E-G 1.00 1.00

EJE 7 TRAMO E-G 1.00 1.00

EJE 9 TRAMO L-M 1.00 1.00

EJE 5 TRAMO L-M 1.00 1.00

EJE 7 TRAMO L-M 1.00 1.00

EJE 9 TRAMO L-M 1.00 1.00

EJE 5 TRAMO E-G,L-M 1.00 2.00

04.03.00 SOBRECIMIENTO - CONCRETO CICLOPEO 1: 8 (C:H) + 25% P.M .

EJE 5 TRAMO E-G,L-M 1.00 2.00

04.04.00 SOBRECIMIENTO- ENCOFRADO Y DESENCOFRADO

EJE 5 TRAMO E-G,L-M 1.00 4.00

04.05.00 FALSO PISO DE E=4'' 1:8 (C:H)

Area de ss.hh. 2.00

Area de semisotano 1.00

04.06.00 VEREDA DE CONCRETO E=4" F'C=140KG/CM2

Area de vereda 2.00

Area de vereda 1.00

Area de vereda 1.00

05.00.00 OBRAS DE CONCRETO ARMADO

Page 37: Trabajo Clase - Lab Estructuras Civil Gantt

05.01.00 PLATEA DE CIMENTACION

05.01.01 CONCRETO EN PLATEA DE CIMENTACION F'c = 210 KG/CM2

EN SEMISOTANO 1.00

05.01.02 ACERO FY = 4200KG/CM2 GRADO 60 EN PLATEA DE CIMENTACION

05.02.00 ZAPATAS

05.02.01 CONCRETO PARA ZAPATAS F'c = 210 KG/CM2

Z-01 EN PASADIZO 1.00 2.00

Z-02 EN PASADIZO 1.00 2.00

Z-03 EN PASADIZO 1.00 1.00

Z-04 EN PASADIZO 1.00 2.00

Z-05 EN PASADIZO 1.00 2.00

Z-06 EN PASADIZO 1.00 2.00

Z-07 EN PASADIZO 1.00 2.00

05.02.02 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS

Z-01 EN PASADIZO 1.00 2.00

Z-02 EN PASADIZO 1.00 2.00

Z-03 EN PASADIZO 1.00 1.00

Z-04 EN PASADIZO 1.00 2.00

Z-05 EN PASADIZO 1.00 2.00

Z-06 EN PASADIZO 1.00 2.00

Z-07 EN PASADIZO 1.00 2.00

05.02.03 ACERO FY = 4200KG/CM2 GRADO 60 EN ZAPATAS

05.03.00 VIGAS DE CIMENTACION

05.03.01 CONCRETO PARA VIGAS DE CIMENTACION F'c = 210 KG/CM2

EJE E TRAMO 4-5 1.00 1.00

EJE E TRAMO 5-7 1.00 1.00

EJE E TRAMO 7-9 1.00 1.00

EJE G TRAMO 5-7 1.00 1.00

EJE G TRAMO 7-9 1.00 1.00

EJE L TRAMO 5-7 1.00 1.00

EJE L TRAMO 7-9 1.00 1.00

EJE M TRAMO 4-5 1.00 1.00

EJE M TRAMO 5-7 1.00 1.00

EJE M TRAMO 7-9 1.00 1.00

EJE F TRAMO 2-3 1.00 1.00

EJE LL TRAMO 2-3 1.00 1.00

EJE 4 TRAMO B-C 1.00 1.00

EJE 4 TRAMO C-D 1.00 1.00

EJE 4 TRAMO N-O 1.00 1.00

EJE 4 TRAMO O-P 1.00 1.00

EJE 5 TRAMO E-G 1.00 1.00

EJE 7 TRAMO E-G 1.00 1.00

EJE 9 TRAMO E-G 1.00 1.00

Page 38: Trabajo Clase - Lab Estructuras Civil Gantt

EJE 5 TRAMO L-M 1.00 1.00

EJE 7 TRAMO L-M 1.00 1.00

EJE 9 TRAMO L-M 1.00 1.00

05.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION

EJE E TRAMO 4-5 1.00 2.00

EJE E TRAMO 5-7 1.00 2.00

EJE E TRAMO 7-9 1.00 2.00

EJE G TRAMO 5-7 1.00 2.00

EJE G TRAMO 7-9 1.00 2.00

EJE L TRAMO 5-7 1.00 2.00

EJE L TRAMO 7-9 1.00 2.00

EJE M TRAMO 4-5 1.00 2.00

EJE M TRAMO 5-7 1.00 2.00

EJE M TRAMO 7-9 1.00 2.00

EJE F TRAMO 2-3 1.00 2.00

EJE LL TRAMO 2-3 1.00 2.00

EJE 4 TRAMO B-C 1.00 2.00

EJE 4 TRAMO C-D 1.00 2.00

EJE 4 TRAMO N-O 1.00 2.00

EJE 4 TRAMO O-P 1.00 2.00

EJE 5 TRAMO E-G 1.00 2.00

EJE 7 TRAMO E-G 1.00 2.00

EJE 9 TRAMO E-G 1.00 2.00

EJE 5 TRAMO L-M 1.00 2.00

EJE 7 TRAMO L-M 1.00 2.00

EJE 9 TRAMO L-M 1.00 2.00

05.03.03 ACERO FY = 4200KG/CM2 GRADO 60 EN VIGAS DE CIMENTACION

Ver planilla de metrados de acero

05.04.00 SOBRECIMIENTO ARMADO

05.04.01 CONCRETO PARA SOBRECIMIENTO ARMADO F'c = 175 KG/CM2

EJE E TRAMO 4-9 1.00 1.00

EJE G TRAMO 4-9 1.00 1.00

EJE L TRAMO 7-9 1.00 1.00

EJE M TRAMO 4-9 1.00 1.00

EJE 5 TRAMO E-G 1.00 1.00

EJE 7 TRAMO E-G 1.00 1.00

EJE 9 TRAMO L-M 1.00 1.00

EJE 5 TRAMO L-M 1.00 1.00

EJE 7 TRAMO L-M 1.00 1.00

EJE 9 TRAMO L-M 1.00 1.00

05.04.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO ARMADO

EJE E TRAMO 4-9 2.00 1.00

EJE G TRAMO 4-9 2.00 1.00

Page 39: Trabajo Clase - Lab Estructuras Civil Gantt

EJE L TRAMO 7-9 2.00 1.00

EJE M TRAMO 4-9 2.00 1.00

EJE 5 TRAMO E-G 2.00 1.00

EJE 7 TRAMO E-G 2.00 1.00

EJE 9 TRAMO L-M 2.00 1.00

EJE 5 TRAMO L-M 2.00 1.00

EJE 7 TRAMO L-M 2.00 1.00

EJE 9 TRAMO L-M 2.00 1.00

05.04.03 ACERO FY = 4200KG/CM2 GRADO 60 EN SOBRECIMIENTO ARMADO

Ver planilla de metrados de acero

05.05.00 COLUMNAS

05.05.01 CONCRETO EN COLUMNAS F'c = 210 KG/CM2 POOL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

CUARTO PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

QUINTO PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

CUARTO PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

QUINTO PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

PASADIZO

Page 40: Trabajo Clase - Lab Estructuras Civil Gantt

PRIMER PISOColumna C-04 1.00 2.00Columna C-05 1.00 2.00Columna C-06 1.00 2.00Columna C-07 1.00 2.00Columna C-08 1.00 2.00Columna C-09 1.00 10.00Columna C-10 1.00 4.00

SEGUNDO PISOColumna C-04 1.00 2.00Columna C-05 1.00 2.00Columna C-06 1.00 2.00Columna C-07 1.00 2.00Columna C-08 1.00 2.00Columna C-09 1.00 10.00Columna C-10 1.00 4.00

TERCER PISOColumna C-04 1.00 2.00Columna C-05 1.00 2.00Columna C-06 1.00 2.00Columna C-07 1.00 2.00Columna C-08 1.00 2.00Columna C-09 1.00 10.00Columna C-10 1.00 4.00

CUARTO PISOColumna C-04 1.00 2.00Columna C-05 1.00 2.00Columna C-06 1.00 2.00Columna C-07 1.00 2.00Columna C-08 1.00 2.00Columna C-09 1.00 10.00Columna C-10 1.00 4.00

QUINTO PISOColumna C-04 1.00 2.00Columna C-05 1.00 2.00Columna C-06 1.00 2.00Columna C-07 1.00 2.00Columna C-08 1.00 2.00Columna C-09 1.00 10.00Columna C-10 1.00 4.00

05.05.02 COLUMNAS DE CONFINAMIENTO CONCRETO F'c = 175 KG/CM2 POOL DE AULAS

Page 41: Trabajo Clase - Lab Estructuras Civil Gantt

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISOCOLUMNA C-10 1.00 20.00

CUARTO PISOCOLUMNA C-10 1.00 20.00

QUINTO PISOCOLUMNA C-10 1.00 20.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISOCOLUMNA C-10 1.00 20.00

CUARTO PISOCOLUMNA C-10 1.00 20.00

QUINTO PISOCOLUMNA C-10 1.00 20.00

05.05.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS POOL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

CUARTO PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

QUINTO PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

CUARTO PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

Page 42: Trabajo Clase - Lab Estructuras Civil Gantt

QUINTO PISOCOLUMNA C-01 1.00 5.00COLUMNA C-02 1.00 3.00COLUMNA C-03 1.00 4.00

PASADIZO

PRIMER PISOColumna C-04 1.00 2.00Columna C-05 1.00 2.00Columna C-06 1.00 2.00Columna C-07 1.00 2.00Columna C-08 1.00 2.00Columna C-09 1.00 10.00Columna C-10 1.00 4.00

SEGUNDO PISOColumna C-04 1.00 2.00Columna C-05 1.00 2.00Columna C-06 1.00 2.00Columna C-07 1.00 2.00Columna C-08 1.00 2.00Columna C-09 1.00 10.00Columna C-10 1.00 4.00

TERCER PISOColumna C-04 1.00 2.00Columna C-05 1.00 2.00Columna C-06 1.00 2.00Columna C-07 1.00 2.00Columna C-08 1.00 2.00Columna C-09 1.00 10.00Columna C-10 1.00 4.00

CUARTO PISOColumna C-04 1.00 2.00Columna C-05 1.00 2.00Columna C-06 1.00 2.00Columna C-07 1.00 2.00Columna C-08 1.00 2.00Columna C-09 1.00 10.00Columna C-10 1.00 4.00

QUINTO PISOColumna C-04 1.00 2.00Columna C-05 1.00 2.00Columna C-06 1.00 2.00Columna C-07 1.00 2.00

Page 43: Trabajo Clase - Lab Estructuras Civil Gantt

Columna C-08 1.00 2.00Columna C-09 1.00 10.00Columna C-10 1.00 4.00

COLUMNAS DE CONFINAMIENTO POOL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISOCOLUMNA C-10 1.00 20.00

CUARTO PISOCOLUMNA C-10 1.00 20.00

QUINTO PISOCOLUMNA C-10 1.00 20.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISOCOLUMNA C-10 1.00 20.00

CUARTO PISOCOLUMNA C-10 1.00 20.00

QUINTO PISOCOLUMNA C-10 1.00 20.00

05.05.04 ACERO FY=4200kg/cm2 GRADO 60 EN COLUMNAS COLUMNAS PRINCIPALES

COLUMNAS DE CONFINAMIENTO

05.06.00 PLACAS

05.06.01 CONCRETO EN PLACAS F'c = 210 KG/CM2 POOL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISOEje A' TRAMO 1'-4' PL-01 1.00 1.00Eje A' TRAMO 1'-4' PL-01 1.00 2.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

CUARTO PISOEje A' TRAMO 1'-4' PL-01 1.00 1.00Eje A' TRAMO 1'-4' PL-01 1.00 2.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00

Page 44: Trabajo Clase - Lab Estructuras Civil Gantt

Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

QUINTO PISOEje A' TRAMO 1'-4' PL-01 1.00 1.00Eje A' TRAMO 1'-4' PL-01 1.00 2.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISOEje A' TRAMO 1'-4' PL-01 1.00 1.00Eje A' TRAMO 1'-4' PL-01 1.00 2.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

CUARTO PISOEje A' TRAMO 1'-4' PL-01 1.00 1.00Eje A' TRAMO 1'-4' PL-01 1.00 2.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

QUINTO PISOEje A' TRAMO 1'-4' PL-01 1.00 1.00Eje A' TRAMO 1'-4' PL-01 1.00 2.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

PASADIZO

Page 45: Trabajo Clase - Lab Estructuras Civil Gantt

SEMISOTANO Perimetro de semisotano PL-04 1.00 1.00

1.00 1.00

1.00 1.00

1.00 1.00

1.00 1.00

1.00 1.00

1.00 1.00

1.00 1.00

PRIMER PISO Caja de ascensor PL-04 1.00 1.00Caja de ascensor PL-04 1.00 1.00PL-05 1.00 4.00PL-06 1.00 2.00

SEGUNDO PISOPL-04 1.00 1.00PL-04 1.00 1.00PL-05 1.00 4.00PL-06 1.00 2.00

TERCER PISOPL-04 1.00 1.00PL-04 1.00 1.00PL-05 1.00 4.00PL-06 1.00 2.00

CUARTO PISOPL-04 1.00 1.00PL-04 1.00 1.00PL-05 1.00 4.00PL-06 1.00 2.00

QUINTO PISOPL-04 1.00 1.00PL-04 1.00 1.00PL-05 1.00 4.00PL-06 1.00 2.00

AZOTEAPL-04 1.00 1.00

05.06.02 ENCOFRADO Y DESENCOFRADO EN PLACAS POOL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISO

Page 46: Trabajo Clase - Lab Estructuras Civil Gantt

Eje A' TRAMO 1'-4' PL-01 1.00 1.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

CUARTO PISOEje A' TRAMO 1'-4' PL-01 1.00 1.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

QUINTO PISOEje A' TRAMO 1'-4' PL-01 1.00 1.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISOEje A' TRAMO 1'-4' PL-01 1.00 1.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

CUARTO PISOEje A' TRAMO 1'-4' PL-01 1.00 1.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

QUINTO PISOEje A' TRAMO 1'-4' PL-01 1.00 1.00Eje D' TRAMO 2'-3' PL-02 1.00 1.00Eje E' TRAMO 2'-3' PL-02 1.00 1.00Eje H' TRAMO 2'-3' PL-02 1.00 1.00Eje D'-E' TRAMO 3'-4' PL-03 1.00 1.00

PASADIZO

SEMISOTANO Perimetro de semisotano PL-04 1.00 1.00

1.00 1.00

Page 47: Trabajo Clase - Lab Estructuras Civil Gantt

PRIMER PISO Caja de ascensor PL-04 1.00 1.00Caja de ascensor PL-04 1.00 2.00PL-05 1.00 4.00PL-06 1.00 2.00

SEGUNDO PISOPL-04 1.00 1.00PL-04 1.00 2.00PL-05 1.00 4.00PL-06 1.00 2.00

TERCER PISOPL-04 1.00 1.00PL-04 1.00 2.00PL-05 1.00 4.00PL-06 1.00 2.00

CUARTO PISOPL-04 1.00 1.00PL-04 1.00 2.00PL-05 1.00 4.00PL-06 1.00 2.00

QUINTO PISOPL-04 1.00 1.00PL-04 1.00 2.00PL-05 1.00 4.00PL-06 1.00 2.00

AZOTEAPL-04 1.00 1.00

05.06.03 ACERO FY=4200kg/cm2 GRADO 60 EN PLACASPlacas

05.07.00 VIGAS

05.07.01 Concreto en vigas f'c=210 Kg/cm²

POOL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00

Page 48: Trabajo Clase - Lab Estructuras Civil Gantt

Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

CUARTO PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

QUINTO PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00

Page 49: Trabajo Clase - Lab Estructuras Civil Gantt

Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

CUARTO PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

QUINTO PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00

Page 50: Trabajo Clase - Lab Estructuras Civil Gantt

Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

PASADIZO

PRIMER PISOEje 4 tramo A-B VP15X70 1.00 1.00Eje 4 tramo B-C VP15X70 1.00 1.00Eje 4 tramo C-D VP15X70 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 5 tramo E-M VP30X60 1.00 1.00Eje 5 tramo E-G VP15X60 1.00 1.00Eje 5 tramo G-L VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 6 tramo I-J VCH 25X20 1.00 1.00Eje 7 tramo E-G VP15X50 1.00 1.00Eje 7 tramo LL-M VP15X50 1.00 1.00Eje 9 tramo E-G VP15X50 1.00 1.00Eje 9 tramo LL-M VP15X50 1.00 1.00Tramo G-L VP VARIABLE 1.00 1.00Eje 4 tramo N-O VP15X70 1.00 1.00Eje 4 tramo O-P VP15X70 1.00 1.00Eje 4 tramo P-Q VP15X70 1.00 1.00Eje B tramo 4-5 Variable 1.00 1.00Eje C tramo 4-5 Variable 1.00 1.00Eje D tramo 4-5 Variable 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje G tramo 5-9 VP15X50 1.00 1.00Eje H tramo 3-5 VCH30X20 1.00 1.00Eje I tramo 5-8 VCH25X20 1.00 1.00Eje J tramo 5-8 VCH25X20 1.00 1.00Eje K tramo 3-5 VCH30X20 1.00 1.00Eje L tramo 5-9 VP15X50 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje N tramo 4-5 Variable 1.00 1.00Eje O tramo 4-5 Variable 1.00 1.00Eje P tramo 4-5 Variable 1.00 1.00Eje 2 tramo F-H Variable 1.00 1.00Eje 3 tramo F-H Variable 1.00 1.00Eje 2 tramo K-L Variable 1.00 1.00

Page 51: Trabajo Clase - Lab Estructuras Civil Gantt

Eje 3 tramo K-L Variable 1.00 1.00Eje F tramo 1-2 VP15X70 1.00 1.00Eje F tramo 2-3 VP15X70 1.00 1.00Eje LL tramo 1-2 VP15X70 1.00 1.00Eje LL tramo 2-3 VP15X70 1.00 1.00Viga VA 15X20 1.00 1.00

SEGUNDO PISOEje 4 tramo A-B VP15X70 1.00 1.00Eje 4 tramo B-C VP15X70 1.00 1.00Eje 4 tramo C-D VP15X70 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 5 tramo G-L VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 6 tramo I-J VCH 25X20 1.00 1.00Eje 7 tramo E-G VP15X50 1.00 1.00Eje 7 tramo LL-M VP15X50 1.00 1.00Eje 9 tramo E-G VP15X50 1.00 1.00Eje 9 tramo LL-M VP15X50 1.00 1.00Tramo G-L VP 15X60 1.00 1.00Eje 4 tramo N-O VP15X70 1.00 1.00Eje 4 tramo O-P VP15X70 1.00 1.00Eje 4 tramo P-Q VP15X70 1.00 1.00Eje B tramo 4-5 Variable 1.00 1.00Eje C tramo 4-5 Variable 1.00 1.00Eje D tramo 4-5 Variable 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje G tramo 5-9 VP15X50 1.00 1.00Eje H tramo 3-5 VCH30X20 1.00 1.00Eje I tramo 5-8 VCH25X20 1.00 1.00Eje J tramo 5-8 VCH25X20 1.00 1.00Eje K tramo 3-5 VCH30X20 1.00 1.00Eje L tramo 5-9 VP15X50 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje N tramo 4-5 Variable 1.00 1.00Eje O tramo 4-5 Variable 1.00 1.00Eje P tramo 4-5 Variable 1.00 1.00Eje 2 tramo F-H Variable 1.00 1.00Eje 3 tramo F-H Variable 1.00 1.00Eje 2 tramo K-L Variable 1.00 1.00Eje 3 tramo K-L Variable 1.00 1.00Eje F tramo 1-2 VP15X70 1.00 1.00Eje F tramo 2-3 VP15X70 1.00 1.00Eje LL tramo 1-2 VP15X70 1.00 1.00Eje LL tramo 2-3 VP15X70 1.00 1.00Viga VA 15X20 1.00 1.00

Page 52: Trabajo Clase - Lab Estructuras Civil Gantt

TERCER PISOEje 4 tramo A-B VP15X70 1.00 1.00Eje 4 tramo B-C VP15X70 1.00 1.00Eje 4 tramo C-D VP15X70 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 5 tramo G-L VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 6 tramo I-J VCH 25X20 1.00 1.00Eje 7 tramo E-G VP15X50 1.00 1.00Eje 7 tramo LL-M VP15X50 1.00 1.00Eje 9 tramo E-G VP15X50 1.00 1.00Eje 9 tramo LL-M VP15X50 1.00 1.00Tramo G-L VP 15X60 1.00 1.00Eje 4 tramo N-O VP15X70 1.00 1.00Eje 4 tramo O-P VP15X70 1.00 1.00Eje 4 tramo P-Q VP15X70 1.00 1.00Eje B tramo 4-5 Variable 1.00 1.00Eje C tramo 4-5 Variable 1.00 1.00Eje D tramo 4-5 Variable 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje G tramo 5-9 VP15X50 1.00 1.00Eje H tramo 3-5 VCH30X20 1.00 1.00Eje I tramo 5-8 VCH25X20 1.00 1.00Eje J tramo 5-8 VCH25X20 1.00 1.00Eje K tramo 3-5 VCH30X20 1.00 1.00Eje L tramo 5-9 VP15X50 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje N tramo 4-5 Variable 1.00 1.00Eje O tramo 4-5 Variable 1.00 1.00Eje P tramo 4-5 Variable 1.00 1.00Eje 2 tramo F-H Variable 1.00 1.00Eje 3 tramo F-H Variable 1.00 1.00Eje 2 tramo K-L Variable 1.00 1.00Eje 3 tramo K-L Variable 1.00 1.00Eje F tramo 1-2 VP15X70 1.00 1.00Eje F tramo 2-3 VP15X70 1.00 1.00Eje LL tramo 1-2 VP15X70 1.00 1.00Eje LL tramo 2-3 VP15X70 1.00 1.00Viga VA 15X20 1.00 1.00

Page 53: Trabajo Clase - Lab Estructuras Civil Gantt

CUARTO PISOEje 4 tramo A-B VP15X70 1.00 1.00Eje 4 tramo B-C VP15X70 1.00 1.00Eje 4 tramo C-D VP15X70 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 5 tramo G-L VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 6 tramo I-J VCH 25X20 1.00 1.00Eje 7 tramo E-G VP15X50 1.00 1.00Eje 7 tramo LL-M VP15X50 1.00 1.00Eje 9 tramo E-G VP15X50 1.00 1.00Eje 9 tramo LL-M VP15X50 1.00 1.00Tramo G-L VP 15X60 1.00 1.00Eje 4 tramo N-O VP15X70 1.00 1.00Eje 4 tramo O-P VP15X70 1.00 1.00Eje 4 tramo P-Q VP15X70 1.00 1.00Eje B tramo 4-5 Variable 1.00 1.00Eje C tramo 4-5 Variable 1.00 1.00Eje D tramo 4-5 Variable 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje G tramo 5-9 VP15X50 1.00 1.00Eje H tramo 3-5 VCH30X20 1.00 1.00Eje I tramo 5-8 VCH25X20 1.00 1.00Eje J tramo 5-8 VCH25X20 1.00 1.00Eje K tramo 3-5 VCH30X20 1.00 1.00Eje L tramo 5-9 VP15X50 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje N tramo 4-5 Variable 1.00 1.00Eje O tramo 4-5 Variable 1.00 1.00Eje P tramo 4-5 Variable 1.00 1.00Eje 2 tramo F-H Variable 1.00 1.00Eje 3 tramo F-H Variable 1.00 1.00Eje 2 tramo K-L Variable 1.00 1.00Eje 3 tramo K-L Variable 1.00 1.00Eje F tramo 1-2 VP15X70 1.00 1.00Eje F tramo 2-3 VP15X70 1.00 1.00Eje LL tramo 1-2 VP15X70 1.00 1.00Eje LL tramo 2-3 VP15X70 1.00 1.00Viga VA 15X20 1.00 1.00

Page 54: Trabajo Clase - Lab Estructuras Civil Gantt

QUINTO PISOEje 4 tramo A-B VP15X70 1.00 1.00Eje 4 tramo B-C VP15X70 1.00 1.00Eje 4 tramo C-D VP15X70 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 5 tramo G-L VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 6 tramo I-J VCH 25X20 1.00 1.00Eje 7 tramo E-G VP15X50 1.00 1.00Eje 7 tramo LL-M VP15X50 1.00 1.00Eje 9 tramo E-G VP15X50 1.00 1.00Eje 9 tramo LL-M VP15X50 1.00 1.00Eje 9Tramo G-L VP 30x60 1.00 1.00Eje 4 tramo N-O VP15X70 1.00 1.00Eje 4 tramo O-P VP15X70 1.00 1.00Eje 4 tramo P-Q VP15X70 1.00 1.00Eje B tramo 4-5 Variable 1.00 1.00Eje C tramo 4-5 Variable 1.00 1.00Eje D tramo 4-5 Variable 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje G tramo 5-9 VP15X50 1.00 1.00Eje H tramo 3-5 VCH30X20 1.00 1.00Eje I tramo 5-8 VCH25X20 1.00 1.00Eje J tramo 5-8 VCH25X20 1.00 1.00Eje K tramo 3-5 VCH30X20 1.00 1.00Eje L tramo 5-9 VP15X50 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje N tramo 4-5 Variable 1.00 1.00Eje O tramo 4-5 Variable 1.00 1.00Eje P tramo 4-5 Variable 1.00 1.00Eje 2 tramo F-H Variable 1.00 1.00Eje 3 tramo F-H Variable 1.00 1.00Eje 2 tramo K-L Variable 1.00 1.00Eje 3 tramo K-L Variable 1.00 1.00Eje F tramo 1-2 VP15X70 1.00 1.00Eje F tramo 2-3 VP15X70 1.00 1.00Eje LL tramo 1-2 VP15X70 1.00 1.00Eje LL tramo 2-3 VP15X70 1.00 1.00Viga VA 15X20 1.00 1.00

05.07.02 Viga de confinamiento Concreto f'c=175 Kg/cm²

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISO 1.00 1.00

CUARTO PISO 1.00 1.00

QUINTO PISO 1.00 1.00

Page 55: Trabajo Clase - Lab Estructuras Civil Gantt

POOL DE AULAS BLOQUE DERECHO

TERCER PISO 1.00 1.00

CUARTO PISO 1.00 1.00

QUINTO PISO 1.00 1.00DINTELES 2.00 5.00

05.07.03 Encofrado y desencofrado en vigas

POOL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

CUARTO PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

QUINTO PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00

Page 56: Trabajo Clase - Lab Estructuras Civil Gantt

Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

CUARTO PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00

Page 57: Trabajo Clase - Lab Estructuras Civil Gantt

Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

QUINTO PISOEje A' Tramo 1'-4' VP30X70 1.00 1.00Eje B' Tramo 2'-3' VP30X70 1.00 1.00Eje C' Tramo 2'-3' VP30X70 1.00 1.00Eje D' Tramo 2'-3' VP25X70 1.00 1.00Eje E' Tramo 2'-3' VP25X70 1.00 1.00Eje F' Tramo 2'-3' VP30X70 1.00 1.00Eje G' Tramo 2'-3' VP30X70 1.00 1.00Eje H' Tramo 1'-4' VP30X70 1.00 1.00Eje 2' Tramo A'-B' VA25X20 1.00 1.00Eje 2' Tramo B'-H' VP25X70 1.00 1.00Eje 3' Tramo A'-B' VA25X20 1.00 1.00Eje 3' Tramo B'-H' VP25X70 1.00 1.00Eje 1' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 4' Tramo A'-B' VA15X70 1.00 1.00Eje 3'-4' Tramo D'-E' VCH 15X20 1.00 1.00

PASADIZO

PRIMER PISOEje 4 tramo A-B VP15X70 1.00 1.00Eje 4 tramo B-C VP15X70 1.00 1.00Eje 4 tramo C-D VP15X70 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 5 tramo E-G VP15X60 1.00 1.00Eje 5 tramo G-L VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 6 tramo I-J VCH 25X20 1.00 1.00Eje 7 tramo E-G VP15X50 1.00 1.00Eje 7 tramo LL-M VP15X50 1.00 1.00Eje 9 tramo E-G VP15X50 1.00 1.00Eje 9 tramo LL-M VP15X50 1.00 1.00Tramo G-L VP VARIABLE 1.00 1.00Tramo G-L VP VARIABLE 1.00 1.00Tramo G-L VP VARIABLE 1.00 1.00Eje 4 tramo N-O VP15X70 1.00 1.00Eje 4 tramo O-P VP15X70 1.00 1.00Eje 4 tramo P-Q VP15X70 1.00 1.00Eje B tramo 4-5 Variable 1.00 1.00Eje C tramo 4-5 Variable 1.00 1.00Eje D tramo 4-5 Variable 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00

Page 58: Trabajo Clase - Lab Estructuras Civil Gantt

Eje G tramo 5-9 VP15X50 1.00 1.00Eje H tramo 3-5 VCH30X20 1.00 1.00Eje I tramo 5-8 VCH25X20 1.00 1.00Eje J tramo 5-8 VCH25X20 1.00 1.00Eje K tramo 3-5 VCH30X20 1.00 1.00Eje L tramo 5-9 VP15X50 1.00 1.00Eje M tramo 4-9 VP30X20 1.00 1.00Eje N tramo 4-5 Variable 1.00 1.00Eje O tramo 4-5 Variable 1.00 1.00Eje P tramo 4-5 Variable 1.00 1.00Eje 2 tramo F-H Variable 1.00 1.00Eje 3 tramo F-H Variable 1.00 1.00Eje 2 tramo K-L Variable 1.00 1.00Eje 3 tramo K-L Variable 1.00 1.00Eje F tramo 1-2 VP15X70 1.00 1.00Eje F tramo 2-3 VP15X70 1.00 1.00Eje LL tramo 1-2 VP15X70 1.00 1.00Eje LL tramo 2-3 VP15X70 1.00 1.00Viga VA 15X20 1.00 1.00

SEGUNDO PISOEje 4 tramo A-B VP15X70 1.00 1.00Eje 4 tramo B-C VP15X70 1.00 1.00Eje 4 tramo C-D VP15X70 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 5 tramo E-G VP15X60 1.00 1.00Eje 5 tramo G-L VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 6 tramo I-J VCH 25X20 1.00 1.00Eje 7 tramo E-G VP15X50 1.00 1.00Eje 7 tramo LL-M VP15X50 1.00 1.00Eje 9 tramo E-G VP15X50 1.00 1.00Eje 9 tramo LL-M VP15X50 1.00 1.00Tramo G-L VP VARIABLE 1.00 1.00Eje 4 tramo N-O VP15X70 1.00 1.00Eje 4 tramo O-P VP15X70 1.00 1.00Eje 4 tramo P-Q VP15X70 1.00 1.00Eje B tramo 4-5 Variable 1.00 1.00Eje C tramo 4-5 Variable 1.00 1.00Eje D tramo 4-5 Variable 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje G tramo 5-9 VP15X50 1.00 1.00Eje H tramo 3-5 VCH30X20 1.00 1.00Eje I tramo 5-8 VCH25X20 1.00 1.00Eje J tramo 5-8 VCH25X20 1.00 1.00Eje K tramo 3-5 VCH30X20 1.00 1.00Eje L tramo 5-9 VP15X50 1.00 1.00

Page 59: Trabajo Clase - Lab Estructuras Civil Gantt

Eje M tramo 4-9 VP30X20 1.00 1.00Eje N tramo 4-5 Variable 1.00 1.00Eje O tramo 4-5 Variable 1.00 1.00Eje P tramo 4-5 Variable 1.00 1.00Eje 2 tramo F-H Variable 1.00 1.00Eje 3 tramo F-H Variable 1.00 1.00Eje 2 tramo K-L Variable 1.00 1.00Eje 3 tramo K-L Variable 1.00 1.00Eje F tramo 1-2 VP15X70 1.00 1.00Eje F tramo 2-3 VP15X70 1.00 1.00Eje LL tramo 1-2 VP15X70 1.00 1.00Eje LL tramo 2-3 VP15X70 1.00 1.00Viga VA 15X20 1.00 1.00

TERCER PISOEje 4 tramo A-B VP15X70 1.00 1.00Eje 4 tramo B-C VP15X70 1.00 1.00Eje 4 tramo C-D VP15X70 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 5 tramo E-G VP15X60 1.00 1.00Eje 5 tramo G-L VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 6 tramo I-J VCH 25X20 1.00 1.00Eje 7 tramo E-G VP15X50 1.00 1.00Eje 7 tramo LL-M VP15X50 1.00 1.00Eje 9 tramo E-G VP15X50 1.00 1.00Eje 9 tramo LL-M VP15X50 1.00 1.00Tramo G-L VP VARIABLE 1.00 1.00Eje 4 tramo N-O VP15X70 1.00 1.00Eje 4 tramo O-P VP15X70 1.00 1.00Eje 4 tramo P-Q VP15X70 1.00 1.00Eje B tramo 4-5 Variable 1.00 1.00Eje C tramo 4-5 Variable 1.00 1.00Eje D tramo 4-5 Variable 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje G tramo 5-9 VP15X50 1.00 1.00Eje H tramo 3-5 VCH30X20 1.00 1.00Eje I tramo 5-8 VCH25X20 1.00 1.00Eje J tramo 5-8 VCH25X20 1.00 1.00Eje K tramo 3-5 VCH30X20 1.00 1.00Eje L tramo 5-9 VP15X50 1.00 1.00Eje M tramo 4-9 VP30X20 1.00 1.00Eje N tramo 4-5 Variable 1.00 1.00Eje O tramo 4-5 Variable 1.00 1.00Eje P tramo 4-5 Variable 1.00 1.00Eje 2 tramo F-H Variable 1.00 1.00Eje 3 tramo F-H Variable 1.00 1.00

Page 60: Trabajo Clase - Lab Estructuras Civil Gantt

Eje 2 tramo K-L Variable 1.00 1.00Eje 3 tramo K-L Variable 1.00 1.00Eje F tramo 1-2 VP15X70 1.00 1.00Eje F tramo 2-3 VP15X70 1.00 1.00Eje LL tramo 1-2 VP15X70 1.00 1.00Eje LL tramo 2-3 VP15X70 1.00 1.00Viga VA 15X20 1.00 1.00

CUARTO PISOEje 4 tramo A-B VP15X70 1.00 1.00Eje 4 tramo B-C VP15X70 1.00 1.00Eje 4 tramo C-D VP15X70 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 5 tramo E-G VP15X60 1.00 1.00Eje 5 tramo G-L VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 6 tramo I-J VCH 25X20 1.00 1.00Eje 7 tramo E-G VP15X50 1.00 1.00Eje 7 tramo LL-M VP15X50 1.00 1.00Eje 9 tramo E-G VP15X50 1.00 1.00Eje 9 tramo LL-M VP15X50 1.00 1.00Tramo G-L VP VARIABLE 1.00 1.00Eje 4 tramo N-O VP15X70 1.00 1.00Eje 4 tramo O-P VP15X70 1.00 1.00Eje 4 tramo P-Q VP15X70 1.00 1.00Eje B tramo 4-5 Variable 1.00 1.00Eje C tramo 4-5 Variable 1.00 1.00Eje D tramo 4-5 Variable 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje G tramo 5-9 VP15X50 1.00 1.00Eje H tramo 3-5 VCH30X20 1.00 1.00Eje I tramo 5-8 VCH25X20 1.00 1.00Eje J tramo 5-8 VCH25X20 1.00 1.00Eje K tramo 3-5 VCH30X20 1.00 1.00Eje L tramo 5-9 VP15X50 1.00 1.00Eje M tramo 4-9 VP30X20 1.00 1.00Eje N tramo 4-5 Variable 1.00 1.00Eje O tramo 4-5 Variable 1.00 1.00Eje P tramo 4-5 Variable 1.00 1.00Eje 2 tramo F-H Variable 1.00 1.00Eje 3 tramo F-H Variable 1.00 1.00Eje 2 tramo K-L Variable 1.00 1.00Eje 3 tramo K-L Variable 1.00 1.00Eje F tramo 1-2 VP15X70 1.00 1.00Eje F tramo 2-3 VP15X70 1.00 1.00Eje LL tramo 1-2 VP15X70 1.00 1.00Eje LL tramo 2-3 VP15X70 1.00 1.00

Page 61: Trabajo Clase - Lab Estructuras Civil Gantt

Viga VA 15X20 1.00 1.00

QUINTO PISOEje 4 tramo A-B VP15X70 1.00 1.00Eje 4 tramo B-C VP15X70 1.00 1.00Eje 4 tramo C-D VP15X70 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 3 tramo E-M VP30X60 1.00 1.00Eje 5 tramo E-G VP15X60 1.00 1.00Eje 5 tramo G-L VP30X60 1.00 1.00Eje 5 tramo E-G VP15X50 1.00 1.00Eje 6 tramo I-J VCH 25X20 1.00 1.00Eje 7 tramo E-G VP15X50 1.00 1.00Eje 7 tramo LL-M VP15X50 1.00 1.00Eje 9 tramo E-G VP15X50 1.00 1.00Eje 9 tramo LL-M VP15X50 1.00 1.00Eje 9Tramo G-L VP VP 30x60 1.00 1.00Eje 4 tramo N-O VP15X70 1.00 1.00Eje 4 tramo O-P VP15X70 1.00 1.00Eje 4 tramo P-Q VP15X70 1.00 1.00Eje B tramo 4-5 Variable 1.00 1.00Eje C tramo 4-5 Variable 1.00 1.00Eje D tramo 4-5 Variable 1.00 1.00Eje E tramo 4-9 VP30X20 1.00 1.00Eje G tramo 5-9 VP15X50 1.00 1.00Eje H tramo 3-5 VCH30X20 1.00 1.00Eje I tramo 5-8 VCH25X20 1.00 1.00Eje J tramo 5-8 VCH25X20 1.00 1.00Eje K tramo 3-5 VCH30X20 1.00 1.00Eje L tramo 5-9 VP15X50 1.00 1.00Eje M tramo 4-9 VP30X20 1.00 1.00Eje N tramo 4-5 Variable 1.00 1.00Eje O tramo 4-5 Variable 1.00 1.00Eje P tramo 4-5 Variable 1.00 1.00Eje 2 tramo F-H Variable 1.00 1.00Eje 3 tramo F-H Variable 1.00 1.00Eje 2 tramo K-L Variable 1.00 1.00Eje 3 tramo K-L Variable 1.00 1.00Eje F tramo 1-2 VP15X70 1.00 1.00Eje F tramo 2-3 VP15X70 1.00 1.00Eje LL tramo 1-2 VP15X70 1.00 1.00Eje LL tramo 2-3 VP15X70 1.00 1.00

Encofrado en viga de confinamiento

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISO 1.00 1.00

CUARTO PISO 1.00 1.00

QUINTO PISO 1.00 1.00

Page 62: Trabajo Clase - Lab Estructuras Civil Gantt

POOL DE AULAS BLOQUE DERECHO

TERCER PISO 1.00 1.00

CUARTO PISO 1.00 1.00

QUINTO PISO 1.00 1.00

DINTELES 2.00 5.00

05.07.04 Acero FY=4200kg/cm2 GRADO 60 en VIGAS

vigas principales

vigas de confinamiento

05.08.00 Losas Aligeradas

05.08.01 Concreto en losa aligerada f'c=210 Kg/cm²

PASADIZO

PRIMER PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

SEGUNDO PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Page 63: Trabajo Clase - Lab Estructuras Civil Gantt

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

TERCER PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

CUARTO PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

Page 64: Trabajo Clase - Lab Estructuras Civil Gantt

QUINTO PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

POOL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

CUARTO PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

QUINTO PISO

Page 65: Trabajo Clase - Lab Estructuras Civil Gantt

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

CUARTO PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

QUINTO PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

Page 66: Trabajo Clase - Lab Estructuras Civil Gantt

05.08.02 Encofrado y Desencofrado Normal en losas aligeradas

PASADIZO

PRIMER PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

SEGUNDO PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

TERCER PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Page 67: Trabajo Clase - Lab Estructuras Civil Gantt

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

CUARTO PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

QUINTO PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Page 68: Trabajo Clase - Lab Estructuras Civil Gantt

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

POOL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

CUARTO PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

QUINTO PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Page 69: Trabajo Clase - Lab Estructuras Civil Gantt

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

CUARTO PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

QUINTO PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

05.08.03 Acero FY=4200kg/cm2 GRADO 60 en losa aligerada

05.08.04 Ladrillo hueco de arcilla 15x30x30 cm para techo aligerado

PASADIZO

PRIMER PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Page 70: Trabajo Clase - Lab Estructuras Civil Gantt

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

SEGUNDO PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

TERCER PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Page 71: Trabajo Clase - Lab Estructuras Civil Gantt

Paño L-M tramo 7-9 1.00 1.00

CUARTO PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

QUINTO PISO

Paño A-B tramo 4-5 1.00 1.00

Paño B-C tramo 4-5 1.00 1.00

Paño C-D tramo 4-5 1.00 1.00

Paño E-M tramo 4-5 1.00 1.00

Paño N-O tramo 4-5 1.00 1.00

Paño O-P tramo 4-5 1.00 1.00

Paño P-Q tramo 4-5 1.00 1.00

Paño F-H tramo 1-2 1.00 1.00

Paño F-H tramo 2-3 1.00 1.00

Paño K-LL tramo 1-2 1.00 1.00

Paño K-LL tramo 2-3 1.00 1.00

Paño E-G tramo 5-7 1.00 1.00

Paño E-G tramo 7-9 1.00 1.00

Paño G-I tramo 5-8 1.00 1.00

Paño I-J tramo 5-6 1.00 1.00

Paño J-L tramo 5-8 1.00 1.00

Paño L-M tramo 5-7 1.00 1.00

Paño L-M tramo 7-9 1.00 1.00

POOL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISO

Page 72: Trabajo Clase - Lab Estructuras Civil Gantt

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

CUARTO PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

QUINTO PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

Page 73: Trabajo Clase - Lab Estructuras Civil Gantt

CUARTO PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

QUINTO PISO

Paño A'-B' tramo 2'-3' 1.00 1.00

Paño B'-C' tramo 2'-3' 1.00 1.00

Paño C'-D' tramo 2'-3' 1.00 1.00

Paño D'-E' tramo 2'-3' 1.00 1.00

Paño E'-F' tramo 2'-3' 1.00 1.00

Paño F'-G' tramo 2'-3' 1.00 1.00

Paño G'-H' tramo 2'-3' 1.00 1.00

Paño A'-B' tramo 1'-2' 1.00 1.00

Paño A'-B' tramo 3'-4' 1.00 1.00

Paño G'-H' tramo 3'-4' 1.00 1.00

05.09.00 Losas Maciza

05.09.01 Concreto en losa maciza f'c=175 Kg/cm²

PASADIZO

Techo de semisotano 1.00 1.00

Techo de ascensor 1.00 1.00

POLL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

CUARTO PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

QUINTO PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

CUARTO PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

Page 74: Trabajo Clase - Lab Estructuras Civil Gantt

QUINTO PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

05.09.02 Encofrado y desencofrado normal en losa maciza

PASADIZO

Techo de semisotano 1.00 1.00

Techo de ascensor 1.00 1.00

POLL DE AULAS

POOL DE AULAS BLOQUE IZQUIERDO

TERCER PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

CUARTO PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

QUINTO PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

POOL DE AULAS BLOQUE DERECHO

TERCER PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

CUARTO PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

QUINTO PISO

Paño D'-E' tramo 3'-4' En SS.HH. 1.00 1.00

05.09.03 Acero fy=4200 Kg/cm² grado 60 en losa maciza

05.10.00 SARDINEL REFORZADO

05.10.01 Concreto en sardinel reforzado f'c=140 Kg/cm²

SEGÚN CORTE A-A 1.00 1.00

1.00 1.00

SEGÚN CORTE B-B 1.00 1.00

1.00 1.00

SEGÚN CORTE C-C 1.00 2.00

1.00 2.00

SEGÚN CORTE D-D 1.00 2.00

1.00 2.00

SEGÚN CORTE E-E 1.00 2.00

Page 75: Trabajo Clase - Lab Estructuras Civil Gantt

1.00 2.00

SEGÚN CORTE F-F 1.00 2.00

1.00 2.00

05.10.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES REFORZADO

SEGÚN CORTE A-A 1.00 1.00

SEGÚN CORTE B-B 1.00 1.00

SEGÚN CORTE C-C 1.00 2.00

SEGÚN CORTE D-D 1.00 2.00

SEGÚN CORTE E-E 1.00 2.00

SEGÚN CORTE F-F 1.00 2.00

05.10.03 ACERO Fy = 4200KG/CM2 GRADO 60 EN SARDINELE REFORZADO

05.11.00 CISTERNA DE CONCRETO

05.11.01 Concreto en CISTERNA f'c=175 Kg/cm²

MUROS 1.00 2.00

MUROS 1.00 2.00

BASE 1.00 1.00

TECHO 1.00 1.00

05.11.02 ENCOFRADO Y DESENCOFRADO EN CISTERNA

LADO 1 1.00 1.00

LADO 2 1.00 1.00

FONDO 1.00 1.00

05.11.03 ACERO Fy = 4200KG/CM2 GRADO 60 EN CISTERNA

Page 76: Trabajo Clase - Lab Estructuras Civil Gantt

PLANILLAS DE METRADO

CULMINACION DEL POOL DE AULAS DE LA UNIVERSIDAD NACIONAL DEL SANTA PRESUP.

UNIVERSIDAD NACIONAL DEL SANTA HECHO : G.P.H.G.

AV. UNIVERSITARIA FECHA : MAYODEL 2011

ESPECIALIDAD: ESTRUCTURAS

Long (m) Anch (m) Alt (m) Parcial Total Und

GLB

1.00 1.00

UND

1.00 1.00

GLB

1.00 1.00

ML

17.55 35.10 110.20

75.10 75.10

GLB

1.00 1.00

GLB

1.00 1.00

1.00 GLB

1.00

Area cad M2

954.70 954.70 929.42

25.28 -25.28

Area cad M2

954.70 954.70 929.42

25.28 -25.28

M2

14.38 1.45 41.70 152.80

7.80 1.45 11.31

5.75 1.33 15.30

Page 77: Trabajo Clase - Lab Estructuras Civil Gantt

2.00 4.63 9.26

2.83 2.83

16.97 33.94

19.23 38.46

M2

3.11 2.85 8.86 8.86

EXCAVACION MANUAL PARA ZAPATAS, V.C. Y CIMIENTOS CORRIDOS 153.13 M3

142.32

4.45 1.000 2.000 17.800

3.36 1.500 2.000 20.160

2.30 2.300 2.000 10.580

3.50 1.600 2.000 22.400

2.10 1.000 2.000 8.400

1.60 1.600 2.000 10.240

8.79 1.500 2.000 52.740

10.59

0.80 0.500 1.500 0.600

1.43 0.500 1.500 1.073

0.85 0.500 1.500 0.638

0.85 0.500 1.500 0.638

2.63 0.500 1.500 1.973

3.03 0.500 1.500 2.273

1.90 0.500 1.500 1.425

2.63 0.500 1.500 1.973

0.55 0.500 0.400 0.220

214.97 M3

41.63 4.000 166.520

3.55 5.150 2.650 48.449

Area cad483.22 0.20 96.64 61.96 M3

25.28 0.20 -5.06

44.13 0.20 -17.65

41.63 0.20 -8.33

18.23 0.20 -3.65

ACARREO INTERNO (MATERIAL PROCEDENTE DE CORTE Y EXCAVACION) 567.89 M3

368.10 368.10

61.96 61.96

161.66 0.15 24.25

1.25

Page 78: Trabajo Clase - Lab Estructuras Civil Gantt

114.30 M3

8.35 80.66

12.39

6.11

12.27

4.01

5.32

32.21

4.80

0.27

0.49

0.29

0.29

0.89

1.03

0.65

0.89

Area cad28.84 1.00 28.84

Area cad M2

954.70 954.70 368.28

25.28 -25.28

236.44 -472.88

44.13 -88.26

954.70 954.70 200.61 M2

25.28 -25.28

236.44 -472.88

17.71 -35.42

19.25 -19.25

56.50 -113.00

44.13 -88.26

M3

567.89 567.89 567.89

119.85 M2

71.16

4.45 1.000 ------ 8.90

3.36 1.500 ------ 10.08

2.30 2.300 ------ 5.29

Page 79: Trabajo Clase - Lab Estructuras Civil Gantt

3.50 1.600 ------ 11.20

2.10 1.000 ------ 4.20

1.60 1.600 ------ 5.12

8.79 1.500 ------ 26.37

7.06

0.80 0.500 ------ 0.40

1.43 0.500 ------ 0.72

0.85 0.500 ------ 0.43

0.85 0.500 ------ 0.43

2.63 0.500 ------ 1.32

3.03 0.500 ------ 1.52

1.90 0.500 ------ 0.95

2.63 0.500 ------ 1.32

41.63 ------ 41.63

8.48 M3

7.85 0.500 0.400 1.57

7.85 0.500 0.400 1.57

3.27 0.500 0.400 0.65

7.85 0.500 0.400 1.57

2.38 0.500 0.400 0.48

2.38 0.500 0.400 0.48

2.38 0.500 0.400 0.48

2.38 0.500 0.400 0.48

2.38 0.500 0.400 0.48

2.38 0.500 0.400 0.48

0.65 0.500 0.400 0.26

0.06 M3

0.65 0.150 0.300 0.06

0.78 M2

0.65 0.300 0.78

67.96 M2

19.50 39.00

28.96 28.96

150.01 M2

32.35 64.70

55.23 55.23

30.08 30.08

Page 80: Trabajo Clase - Lab Estructuras Civil Gantt

AREA CAD 20.82 M3

41.63 0.50 20.82

ACERO FY = 4200KG/CM2 GRADO 60 EN PLATEA DE CIMENTACION 0.00 KG

35.58 M3

4.45 1.000 0.500 4.450 17.36

3.36 1.500 0.500 5.040

2.30 2.300 0.500 2.645 18.22

3.50 1.600 0.500 5.600

2.10 1.000 0.500 2.100

1.60 1.600 0.500 2.560

8.79 1.500 0.500 13.185

M2

4.45 1.000 21.800 137.20

3.36 1.500 19.440

2.30 2.300 9.200

3.50 1.600 20.400

2.10 1.000 12.400

1.60 1.600 12.800

8.79 1.500 41.160

0.00 KG

8.36 M3

1.95 0.250 0.500 0.244

3.90 0.250 0.500 0.488

3.50 0.250 0.500 0.438

3.80 0.250 0.500 0.475

3.50 0.250 0.500 0.438

3.80 0.250 0.500 0.475

3.50 0.250 0.500 0.438

1.95 0.250 0.500 0.244

3.90 0.250 0.500 0.488

3.50 0.250 0.500 0.438

2.25 0.250 0.500 0.281

2.25 0.250 0.500 0.281

3.70 0.250 0.500 0.463

3.70 0.250 0.500 0.463

3.70 0.250 0.500 0.463

3.70 0.250 0.500 0.463

2.38 0.250 0.500 0.298

2.38 0.250 0.500 0.298

2.38 0.250 0.500 0.298

Page 81: Trabajo Clase - Lab Estructuras Civil Gantt

2.38 0.250 0.500 0.298

2.38 0.250 0.500 0.298

2.38 0.250 0.500 0.298

66.88 M2

1.95 0.500 1.950

3.90 0.500 3.900

3.50 0.500 3.500

3.80 0.500 3.800

3.50 0.500 3.500

3.80 0.500 3.800

3.50 0.500 3.500

1.95 0.500 1.950

3.90 0.500 3.900

3.50 0.500 3.500

2.25 0.500 2.250

2.25 0.500 2.250

3.70 0.500 3.700

3.70 0.500 3.700

3.70 0.500 3.700

3.70 0.500 3.700

2.38 0.500 2.380

2.38 0.500 2.380

2.38 0.500 2.380

2.38 0.500 2.380

2.38 0.500 2.380

2.38 0.500 2.380

ACERO FY = 4200KG/CM2 GRADO 60 EN VIGAS DE CIMENTACION 0.00 KG

2.47 M3

7.85 0.150 0.400 0.47

7.85 0.150 0.400 0.47

3.27 0.150 0.400 0.20

7.85 0.150 0.400 0.47

2.38 0.150 0.400 0.14

2.38 0.150 0.400 0.14

2.38 0.150 0.400 0.14

2.38 0.150 0.400 0.14

2.38 0.150 0.400 0.14

2.38 0.150 0.400 0.14

32.88 M2

7.85 0.400 6.28

7.85 0.400 6.28

Page 82: Trabajo Clase - Lab Estructuras Civil Gantt

3.27 0.400 2.62

7.85 0.400 6.28

2.38 0.400 1.90

2.38 0.400 1.90

2.38 0.400 1.90

2.38 0.400 1.90

2.38 0.400 1.90

2.38 0.400 1.90

ACERO FY = 4200KG/CM2 GRADO 60 EN SOBRECIMIENTO ARMADO

0.00 KG

85.13 M3

Area

0.310 2.500 3.88

0.260 2.500 1.95

0.190 2.500 1.90

Area

0.310 2.500 3.88

0.260 2.500 1.95

0.190 2.500 1.90

Area

0.310 2.500 3.88

0.260 2.500 1.95

0.190 2.500 1.90

Area

0.310 2.500 3.88

0.260 2.500 1.95

0.190 2.500 1.90

Area

0.310 2.500 3.88

0.260 2.500 1.95

0.190 2.500 1.90

Area

0.310 2.500 3.88

0.260 2.500 1.95

0.190 2.500 1.90

Page 83: Trabajo Clase - Lab Estructuras Civil Gantt

0.300 0.400 4.000 0.96

0.070 4.000 0.56

0.113 4.100 0.92

0.217 4.000 1.74

0.143 4.100 1.17

0.120 4.000 4.80

0.150 0.250 2.850 0.43

0.300 0.400 2.600 0.62

0.070 2.600 0.36

0.113 2.700 0.61

0.217 2.600 1.13

0.143 2.700 0.77

0.120 2.600 3.12

0.150 0.250 2.700 0.41

0.300 0.400 2.600 0.62

0.070 2.600 0.36

0.113 2.700 0.61

0.217 2.600 1.13

0.143 2.700 0.77

0.120 2.700 3.24

0.150 0.250 2.700 0.41

0.300 0.400 2.600 0.62

0.070 2.600 0.36

0.113 2.700 0.61

0.217 2.600 1.13

0.143 2.700 0.77

0.120 2.600 3.12

0.150 0.250 2.700 0.41

0.300 0.400 2.600 0.62

0.070 2.600 0.36

0.113 2.700 0.61

0.217 2.600 1.13

0.143 2.700 0.77

0.120 2.600 3.12

0.150 0.250 2.700 0.41

Page 84: Trabajo Clase - Lab Estructuras Civil Gantt

3.15 M3

0.150 0.250 0.700 0.52

0.150 0.250 0.700 0.52

0.150 0.250 0.700 0.52

0.150 0.250 0.700 0.52

0.150 0.250 0.700 0.52

0.150 0.250 0.700 0.52

1,010.53 M2

Perimetro

2.800 2.500 35.00

2.400 2.500 18.00

2.000 2.500 20.00

Perimetro

2.800 2.500 35.00

2.400 2.500 18.00

2.000 2.500 20.00

Perimetro

2.800 2.500 35.00

2.400 2.500 18.00

2.000 2.500 20.00

Perimetro

2.800 2.500 35.00

2.400 2.500 18.00

2.000 2.500 20.00

Perimetro

2.800 2.500 35.00

2.400 2.500 18.00

2.000 2.500 20.00

Page 85: Trabajo Clase - Lab Estructuras Civil Gantt

Area

2.800 2.500 35.00

2.400 2.500 18.00

2.000 2.500 20.00

Perimetro

1.400 4.000 11.20

0.942 4.000 7.54

1.800 4.100 14.76

2.600 4.000 20.80

2.200 4.100 18.04

1.400 4.000 56.00

0.800 2.850 9.12

1.400 2.600 7.28

0.942 2.600 4.90

1.800 2.700 9.72

2.600 2.600 13.52

2.200 2.700 11.88

1.400 2.600 36.40

0.800 2.700 8.64

1.400 2.600 7.28

0.942 2.600 4.90

1.800 2.700 9.72

2.600 2.600 13.52

2.200 2.700 11.88

1.400 2.700 37.80

0.800 2.700 8.64

1.400 2.600 7.28

0.942 2.600 4.90

1.800 2.700 9.72

2.600 2.600 13.52

2.200 2.700 11.88

1.400 2.600 36.40

0.800 2.700 8.64

1.400 2.600 7.28

0.942 2.600 4.90

1.800 2.700 9.72

2.600 2.600 13.52

Page 86: Trabajo Clase - Lab Estructuras Civil Gantt

2.200 2.700 11.88

1.400 2.600 36.40

0.800 2.700 8.64

Perimetro

0.800 0.670 10.72

Perimetro

0.800 0.670 10.72

Perimetro

0.800 0.670 10.72

Perimetro

0.800 0.670 10.72

Perimetro

0.800 0.670 10.72

Perimetro

0.800 0.670 10.72

0.00 kg

0.00

0.00

9.190 0.300 2.500 6.89 205.99 M3

0.500 0.150 2.500 0.38

4.340 0.250 2.500 2.71

4.340 0.250 2.500 2.71

8.380 0.300 2.500 6.29

0.500 0.250 2.500 0.31

0.500 0.150 2.500 0.19

4.700 0.150 3.000 2.11

9.190 0.300 2.500 6.89

0.500 0.150 2.500 0.38

4.340 0.250 2.500 2.71

Page 87: Trabajo Clase - Lab Estructuras Civil Gantt

4.340 0.250 2.500 2.71

8.380 0.300 2.500 6.29

0.500 0.250 2.500 0.31

0.500 0.150 2.500 0.19

4.700 0.150 3.000 2.11

9.190 0.300 2.500 6.89

0.500 0.150 2.500 0.38

4.340 0.250 2.500 2.71

4.340 0.250 2.500 2.71

8.380 0.300 2.500 6.29

0.500 0.250 2.500 0.31

0.500 0.150 2.500 0.19

4.700 0.150 3.000 2.11

9.190 0.300 2.500 6.89

0.500 0.150 2.500 0.38

4.340 0.250 2.500 2.71

4.340 0.250 2.500 2.71

8.380 0.300 2.500 6.29

0.500 0.250 2.500 0.31

0.500 0.150 2.500 0.19

4.700 0.150 3.000 2.11

9.190 0.300 2.500 6.89

0.500 0.150 2.500 0.38

4.340 0.250 2.500 2.71

4.340 0.250 2.500 2.71

8.380 0.300 2.500 6.29

0.500 0.250 2.500 0.31

0.500 0.150 2.500 0.19

4.700 0.150 3.000 2.11

9.190 0.300 2.500 6.89

0.500 0.150 2.500 0.38

4.340 0.250 2.500 2.71

4.340 0.250 2.500 2.71

8.380 0.300 2.500 6.29

0.500 0.250 2.500 0.31

0.500 0.150 2.500 0.19

4.700 0.150 3.000 2.11

Page 88: Trabajo Clase - Lab Estructuras Civil Gantt

4.340 0.250 3.200 3.47

0.800 0.250 3.200 0.64

2.380 0.250 3.200 1.90

6.930 0.250 3.200 5.54

1.480 0.250 3.200 1.18

0.200 0.150 3.400 0.10

0.300 0.250 3.200 0.24

3.630 0.250 3.200 2.90

7.580 0.250 6.400 12.13

1.500 0.250 1.500 -0.56

1.600 0.150 4.550 4.37

1.300 0.150 4.250 1.66

7.580 0.250 3.000 5.69

1.500 0.250 1.500 -0.56

1.600 0.150 3.000 2.88

1.300 0.150 2.700 1.05

7.580 0.250 3.000 5.69

1.500 0.250 1.500 -0.56

1.600 0.150 3.000 2.88

1.300 0.150 2.700 1.05

7.580 0.250 3.000 5.69

1.500 0.250 1.500 -0.56

1.600 0.150 3.000 2.88

1.300 0.150 2.700 1.05

7.580 0.250 3.000 5.69

1.500 0.250 1.500 -0.56

1.600 0.150 3.000 2.88

1.300 0.150 2.700 1.05

7.580 0.250 3.500 6.63

Perimetro

Page 89: Trabajo Clase - Lab Estructuras Civil Gantt

20.380 2.500 50.95 1863.51 M2

9.170 2.500 22.93

9.170 2.500 22.93

18.950 2.500 47.38

9.070 3.000 27.21

Perimetro

20.380 2.500 50.95

9.170 2.500 22.93

9.170 2.500 22.93

18.950 2.500 47.38

9.070 3.000 27.21

Perimetro

20.380 2.500 50.95

9.170 2.500 22.93

9.170 2.500 22.93

18.950 2.500 47.38

9.070 3.000 27.21

Perimetro

20.380 2.500 50.95

9.170 2.500 22.93

9.170 2.500 22.93

18.950 2.500 47.38

9.070 3.000 27.21

Perimetro

20.380 2.500 50.95

9.170 2.500 22.93

9.170 2.500 22.93

18.950 2.500 47.38

9.070 3.000 27.21

Perimetro

20.380 2.500 50.95

9.170 2.500 22.93

9.170 2.500 22.93

18.950 2.500 47.38

9.070 3.000 27.21

Perimetro

10.930 3.200 34.98

30.350 3.200 97.12

Page 90: Trabajo Clase - Lab Estructuras Civil Gantt

17.660 6.400 113.02

1.500 1.500 -4.50

3.800 4.550 69.16

2.900 4.250 24.65

17.660 3.000 52.98

1.500 1.500 -4.50

3.800 3.000 45.60

2.900 2.700 15.66

17.660 3.000 52.98

1.500 1.500 -4.50

3.800 3.000 45.60

2.900 2.700 15.66

17.660 3.000 52.98

1.500 1.500 -4.50

3.800 3.000 45.60

2.900 2.700 15.66

17.660 3.000 52.98

1.500 1.500 -4.50

3.800 3.000 45.60

2.900 2.700 15.66

17.660 3.500 61.81

0.00 kg

216.01 M3

9.490 0.300 0.700 1.99

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

8.000 0.250 0.700 1.40

8.000 0.250 0.700 1.40

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

Page 91: Trabajo Clase - Lab Estructuras Civil Gantt

8.780 0.300 0.700 1.84

3.640 0.300 0.700 0.76

22.160 0.250 0.700 3.88

3.640 0.250 0.200 0.18

22.160 0.250 0.700 3.88

4.530 0.150 0.700 0.48

4.530 0.150 0.700 0.48

4.500 0.150 0.700 0.47

4.700 0.150 0.200 0.14

9.490 0.300 0.700 1.99

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

8.000 0.250 0.700 1.40

8.000 0.250 0.700 1.40

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

8.780 0.300 0.700 1.84

3.640 0.300 0.700 0.76

22.160 0.250 0.700 3.88

3.640 0.250 0.200 0.18

22.160 0.250 0.700 3.88

4.530 0.150 0.700 0.48

4.530 0.150 0.700 0.48

4.500 0.150 0.700 0.47

4.700 0.150 0.200 0.14

9.490 0.300 0.700 1.99

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

8.000 0.250 0.700 1.40

8.000 0.250 0.700 1.40

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

8.780 0.300 0.700 1.84

3.640 0.300 0.700 0.76

22.160 0.250 0.700 3.88

3.640 0.250 0.200 0.18

22.160 0.250 0.700 3.88

Page 92: Trabajo Clase - Lab Estructuras Civil Gantt

4.530 0.150 0.700 0.48

4.530 0.150 0.700 0.48

4.500 0.150 0.700 0.47

4.700 0.150 0.200 0.14

9.490 0.300 0.700 1.99

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

8.000 0.250 0.700 1.40

8.000 0.250 0.700 1.40

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

8.780 0.300 0.700 1.84

3.640 0.300 0.700 0.76

22.160 0.250 0.700 3.88

3.640 0.250 0.200 0.18

22.160 0.250 0.700 3.88

4.530 0.150 0.700 0.48

4.530 0.150 0.700 0.48

4.500 0.150 0.700 0.47

4.700 0.150 0.200 0.14

9.490 0.300 0.700 1.99

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

8.000 0.250 0.700 1.40

8.000 0.250 0.700 1.40

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

8.780 0.300 0.700 1.84

3.640 0.300 0.700 0.76

22.160 0.250 0.700 3.88

3.640 0.250 0.200 0.18

22.160 0.250 0.700 3.88

4.530 0.150 0.700 0.48

4.530 0.150 0.700 0.48

4.500 0.150 0.700 0.47

4.700 0.150 0.200 0.14

9.490 0.300 0.700 1.99

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

8.000 0.250 0.700 1.40

8.000 0.250 0.700 1.40

Page 93: Trabajo Clase - Lab Estructuras Civil Gantt

8.000 0.300 0.700 1.68

8.000 0.300 0.700 1.68

8.780 0.300 0.700 1.84

3.640 0.300 0.700 0.76

22.160 0.250 0.700 3.88

3.640 0.250 0.200 0.18

22.160 0.250 0.700 3.88

4.530 0.150 0.700 0.48

4.530 0.150 0.700 0.48

4.500 0.150 0.700 0.47

4.700 0.150 0.200 0.14

2.650 0.150 0.700 0.28

3.700 0.150 0.700 0.39

3.700 0.150 0.700 0.39

12.520 0.300 0.600 2.25

7.360 0.300 0.600 1.32

2.430 0.150 0.500 0.18

7.660 0.150 0.500 0.57

2.430 0.150 0.500 0.18

2.190 0.250 0.200 0.11

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

7.470 0.150 1.150 1.29

3.530 0.150 0.700 0.37

3.530 0.150 0.700 0.37

3.000 0.150 0.700 0.31

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

10.200 0.300 0.200 0.61

7.400 0.150 0.500 0.56

2.050 0.300 0.200 0.12

4.570 0.250 0.200 0.23

4.570 0.250 0.200 0.23

2.050 0.300 0.200 0.12

7.400 0.150 0.500 0.56

10.200 0.300 0.200 0.61

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

Page 94: Trabajo Clase - Lab Estructuras Civil Gantt

0.300 0.949 0.28

2.050 0.150 0.700 0.22

2.250 0.150 0.700 0.24

2.050 0.150 0.700 0.22

2.250 0.150 0.700 0.24

28.700 0.150 0.200 0.86

2.650 0.150 0.700 0.28

3.700 0.150 0.700 0.39

3.700 0.150 0.700 0.39

12.520 0.300 0.600 2.25

2.430 0.150 0.500 0.18

7.660 0.150 0.500 0.57

2.430 0.150 0.500 0.18

2.190 0.250 0.200 0.11

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

7.470 0.150 0.600 0.67

3.530 0.150 0.700 0.37

3.530 0.150 0.700 0.37

3.000 0.150 0.700 0.31

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

10.200 0.300 0.200 0.61

7.400 0.150 0.500 0.56

2.050 0.300 0.200 0.12

4.570 0.250 0.200 0.23

4.570 0.250 0.200 0.23

2.050 0.300 0.200 0.12

7.400 0.150 0.500 0.56

10.200 0.300 0.200 0.61

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

2.050 0.150 0.700 0.22

2.250 0.150 0.700 0.24

2.050 0.150 0.700 0.22

2.250 0.150 0.700 0.24

28.700 0.150 0.200 0.86

Page 95: Trabajo Clase - Lab Estructuras Civil Gantt

2.650 0.150 0.700 0.28

3.700 0.150 0.700 0.39

3.700 0.150 0.700 0.39

12.520 0.300 0.600 2.25

2.430 0.150 0.500 0.18

7.660 0.150 0.500 0.57

2.430 0.150 0.500 0.18

2.190 0.250 0.200 0.11

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

7.470 0.150 0.600 0.67

3.530 0.150 0.700 0.37

3.530 0.150 0.700 0.37

3.000 0.150 0.700 0.31

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

10.200 0.300 0.200 0.61

7.400 0.150 0.500 0.56

2.050 0.300 0.200 0.12

4.570 0.250 0.200 0.23

4.570 0.250 0.200 0.23

2.050 0.300 0.200 0.12

7.400 0.150 0.500 0.56

10.200 0.300 0.200 0.61

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

2.050 0.150 0.700 0.22

2.250 0.150 0.700 0.24

2.050 0.150 0.700 0.22

2.250 0.150 0.700 0.24

28.700 0.150 0.200 0.86

Page 96: Trabajo Clase - Lab Estructuras Civil Gantt

2.650 0.150 0.700 0.28

3.700 0.150 0.700 0.39

3.700 0.150 0.700 0.39

12.520 0.300 0.600 2.25

2.430 0.150 0.500 0.18

7.660 0.150 0.500 0.57

2.430 0.150 0.500 0.18

2.190 0.250 0.200 0.11

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

7.470 0.150 0.600 0.67

3.530 0.150 0.700 0.37

3.530 0.150 0.700 0.37

3.000 0.150 0.700 0.31

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

10.200 0.300 0.200 0.61

7.400 0.150 0.500 0.56

2.050 0.300 0.200 0.12

4.570 0.250 0.200 0.23

4.570 0.250 0.200 0.23

2.050 0.300 0.200 0.12

7.400 0.150 0.500 0.56

10.200 0.300 0.200 0.61

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

2.050 0.150 0.700 0.22

2.250 0.150 0.700 0.24

2.050 0.150 0.700 0.22

2.250 0.150 0.700 0.24

28.700 0.150 0.200 0.86

Page 97: Trabajo Clase - Lab Estructuras Civil Gantt

2.650 0.150 0.700 0.28

3.700 0.150 0.700 0.39

3.700 0.150 0.700 0.39

12.520 0.300 0.600 2.25

2.430 0.150 0.500 0.18

7.660 0.150 0.500 0.57

2.430 0.150 0.500 0.18

2.190 0.250 0.200 0.11

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

2.580 0.150 0.500 0.19

7.360 0.300 0.600 1.32

3.530 0.150 0.700 0.37

3.530 0.150 0.700 0.37

3.000 0.150 0.700 0.31

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

10.200 0.300 0.200 0.61

7.400 0.150 0.500 0.56

2.050 0.300 0.200 0.12

4.570 0.250 0.200 0.23

4.570 0.250 0.200 0.23

2.050 0.300 0.200 0.12

7.400 0.150 0.500 0.56

10.200 0.300 0.200 0.61

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

0.300 0.949 0.28

2.050 0.150 0.700 0.22

2.250 0.150 0.700 0.24

2.050 0.150 0.700 0.22

2.250 0.150 0.700 0.24

28.700 0.150 0.200 0.86

8.95 M3

32.950 0.150 0.200 0.99

32.950 0.150 0.200 0.99

32.950 0.150 0.200 0.99

Page 98: Trabajo Clase - Lab Estructuras Civil Gantt

32.950 0.150 0.200 0.99

32.950 0.150 0.200 0.99

32.950 0.150 0.200 0.99

10.060 0.150 0.200 3.02

1664.58 M2

Perimetro

9.490 1.200 11.39

8.000 1.300 10.40

8.000 1.300 10.40

8.000 1.000 8.00

8.000 1.000 8.00

8.000 1.300 10.40

8.000 1.300 10.40

8.780 1.200 10.54

3.640 0.250 0.91

22.160 1.450 32.13

3.640 0.250 0.91

22.160 1.450 32.13

4.530 1.200 5.44

4.530 1.200 5.44

4.500 1.200 5.40

4.700 0.400 1.88

Perimetro

9.490 1.200 11.39

8.000 1.300 10.40

8.000 1.300 10.40

8.000 1.000 8.00

8.000 1.000 8.00

8.000 1.300 10.40

8.000 1.300 10.40

8.780 1.200 10.54

3.640 0.250 0.91

22.160 1.450 32.13

3.640 0.250 0.91

22.160 1.450 32.13

4.530 1.200 5.44

4.530 1.200 5.44

4.500 1.200 5.40

4.700 0.400 1.88

Perimetro

9.490 1.200 11.39

Page 99: Trabajo Clase - Lab Estructuras Civil Gantt

8.000 1.300 10.40

8.000 1.300 10.40

8.000 1.000 8.00

8.000 1.000 8.00

8.000 1.300 10.40

8.000 1.300 10.40

8.780 1.200 10.54

3.640 0.250 0.91

22.160 1.450 32.13

3.640 0.250 0.91

22.160 1.450 32.13

4.530 1.200 5.44

4.530 1.200 5.44

4.500 1.200 5.40

4.700 0.400 1.88

Perimetro

9.490 1.200 11.39

8.000 1.300 10.40

8.000 1.300 10.40

8.000 1.000 8.00

8.000 1.000 8.00

8.000 1.300 10.40

8.000 1.300 10.40

8.780 1.200 10.54

3.640 0.250 0.91

22.160 1.450 32.13

3.640 0.250 0.91

22.160 1.450 32.13

4.530 1.200 5.44

4.530 1.200 5.44

4.500 1.200 5.40

4.700 0.400 1.88

Perimetro

9.490 1.200 11.39

8.000 1.300 10.40

8.000 1.300 10.40

8.000 1.000 8.00

8.000 1.000 8.00

8.000 1.300 10.40

8.000 1.300 10.40

8.780 1.200 10.54

3.640 0.250 0.91

22.160 1.450 32.13

3.640 0.250 0.91

22.160 1.450 32.13

Page 100: Trabajo Clase - Lab Estructuras Civil Gantt

4.530 1.200 5.44

4.530 1.200 5.44

4.500 1.200 5.40

4.700 0.400 1.88

Perimetro

9.490 1.200 11.39

8.000 1.300 10.40

8.000 1.300 10.40

8.000 1.000 8.00

8.000 1.000 8.00

8.000 1.300 10.40

8.000 1.300 10.40

8.780 1.200 10.54

3.640 0.250 0.91

22.160 1.450 32.13

3.640 0.250 0.91

22.160 1.450 32.13

4.530 1.200 5.44

4.530 1.200 5.44

4.500 1.200 5.40

4.700 0.400 1.88

Perimetro

2.650 1.350 3.58

3.700 1.350 5.00

3.700 1.350 5.00

3.200 1.300 4.16

9.410 0.700 6.59

2.430 0.600 1.46

7.660 1.100 8.43

2.430 0.600 1.46

2.190 0.250 0.55

2.580 0.600 1.55

2.580 0.600 1.55

2.580 0.800 2.06

2.580 0.800 2.06

7.470 1.140 8.52

7.470 0.150 1.12

7.470 1.140 8.52

3.530 1.350 4.77

3.530 1.350 4.77

3.000 1.350 4.05

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

10.200 0.300 3.06

Page 101: Trabajo Clase - Lab Estructuras Civil Gantt

7.400 0.600 4.44

2.050 0.300 0.61

1.710 0.250 0.43

1.710 0.250 0.43

2.050 0.300 0.61

7.400 0.600 4.44

10.200 0.300 3.06

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

2.050 1.350 2.77

2.250 1.350 3.04

2.050 1.350 2.77

2.250 1.350 3.04

28.700 0.150 4.31

Perimetro

2.650 1.350 3.58

3.700 1.350 5.00

3.700 1.350 5.00

3.200 1.300 4.16

9.410 0.700 6.59

2.430 0.600 1.46

7.660 1.100 8.43

2.430 0.600 1.46

2.190 0.250 0.55

2.580 0.600 1.55

2.580 0.600 1.55

2.580 0.800 2.06

2.580 0.800 2.06

7.470 1.150 8.59

3.530 1.350 4.77

3.530 1.350 4.77

3.000 1.350 4.05

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

10.200 0.300 3.06

7.400 0.600 4.44

2.050 0.300 0.61

1.710 0.250 0.43

1.710 0.250 0.43

2.050 0.300 0.61

7.400 0.600 4.44

Page 102: Trabajo Clase - Lab Estructuras Civil Gantt

10.200 0.300 3.06

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

2.050 1.350 2.77

2.250 1.350 3.04

2.050 1.350 2.77

2.250 1.350 3.04

28.700 0.150 4.31

Perimetro

2.650 1.350 3.58

3.700 1.350 5.00

3.700 1.350 5.00

3.200 1.300 4.16

9.410 0.700 6.59

2.430 0.600 1.46

7.660 1.100 8.43

2.430 0.600 1.46

2.190 0.250 0.55

2.580 0.600 1.55

2.580 0.600 1.55

2.580 0.800 2.06

2.580 0.800 2.06

7.470 1.150 8.59

3.530 1.350 4.77

3.530 1.350 4.77

3.000 1.350 4.05

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

10.200 0.300 3.06

7.400 0.600 4.44

2.050 0.300 0.61

1.710 0.250 0.43

1.710 0.250 0.43

2.050 0.300 0.61

7.400 0.600 4.44

10.200 0.300 3.06

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

Page 103: Trabajo Clase - Lab Estructuras Civil Gantt

1.000 1.240 1.24

1.000 1.240 1.24

2.050 1.350 2.77

2.250 1.350 3.04

2.050 1.350 2.77

2.250 1.350 3.04

28.700 0.150 4.31

Perimetro

2.650 1.350 3.58

3.700 1.350 5.00

3.700 1.350 5.00

3.200 1.300 4.16

9.410 0.700 6.59

2.430 0.600 1.46

7.660 1.100 8.43

2.430 0.600 1.46

2.190 0.250 0.55

2.580 0.600 1.55

2.580 0.600 1.55

2.580 0.800 2.06

2.580 0.800 2.06

7.470 1.150 8.59

3.530 1.350 4.77

3.530 1.350 4.77

3.000 1.350 4.05

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

10.200 0.300 3.06

7.400 0.600 4.44

2.050 0.300 0.61

1.710 0.250 0.43

1.710 0.250 0.43

2.050 0.300 0.61

7.400 0.600 4.44

10.200 0.300 3.06

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

2.050 1.350 2.77

2.250 1.350 3.04

2.050 1.350 2.77

2.250 1.350 3.04

Page 104: Trabajo Clase - Lab Estructuras Civil Gantt

28.700 0.150 4.31

Perimetro

2.650 1.350 3.58

3.700 1.350 5.00

3.700 1.350 5.00

3.200 1.300 4.16

9.410 0.700 6.59

2.430 0.600 1.46

7.660 1.100 8.43

2.430 0.600 1.46

2.190 0.250 0.55

2.580 0.600 1.55

2.580 0.600 1.55

2.580 0.800 2.06

2.580 0.800 2.06

7.360 1.500 11.04

3.530 1.350 4.77

3.530 1.350 4.77

3.000 1.350 4.05

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

10.200 0.300 3.06

7.400 0.600 4.44

2.050 0.300 0.61

1.710 0.250 0.43

1.710 0.250 0.43

2.050 0.300 0.61

7.400 0.600 4.44

10.200 0.300 3.06

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

1.000 1.240 1.24

2.050 1.350 2.77

2.250 1.350 3.04

2.050 1.350 2.77

2.250 1.350 3.04

32.950 0.400 13.18

32.950 0.400 13.18

32.950 0.400 13.18

Page 105: Trabajo Clase - Lab Estructuras Civil Gantt

32.950 0.400 13.18

32.950 0.400 13.18

32.950 0.400 13.18

10.060 0.400 40.24

0.00 KG

0.00

0.00

162.46 M3

Area cad m3/m2

4.930 - 0.088 0.43

3.700 1.600 0.088 0.52

3.700 1.600 0.088 0.52

11.920 2.050 0.088 2.14

3.530 1.600 0.088 0.49

3.700 1.600 0.088 0.52

5.330 - 0.088 0.47

1.600 2.050 0.088 0.29

1.600 2.250 0.088 0.31

1.600 2.050 0.088 0.29

1.600 2.250 0.088 0.31

2.430 3.900 0.088 0.83

2.430 3.500 0.088 0.74

10.600 - 0.088 0.93

2.200 1.450 0.088 0.28

10.600 - 0.088 0.93

2.430 3.900 0.088 0.83

2.430 3.500 0.088 0.74

Area cad m3/m2

4.930 - 0.088 0.43

3.700 1.600 0.088 0.52

3.700 1.600 0.088 0.52

11.920 2.050 0.088 2.14

3.530 1.600 0.088 0.49

3.700 1.600 0.088 0.52

5.330 - 0.088 0.47

1.600 2.050 0.088 0.29

1.600 2.250 0.088 0.31

1.600 2.050 0.088 0.29

Page 106: Trabajo Clase - Lab Estructuras Civil Gantt

1.600 2.250 0.088 0.31

2.430 3.900 0.088 0.83

2.430 3.500 0.088 0.74

10.600 - 0.088 0.93

2.200 1.450 0.088 0.28

10.600 - 0.088 0.93

2.430 3.900 0.088 0.83

2.430 3.500 0.088 0.74

Area cad m3/m2

4.930 - 0.088 0.43

3.700 1.600 0.088 0.52

3.700 1.600 0.088 0.52

11.920 2.050 0.088 2.14

3.530 1.600 0.088 0.49

3.700 1.600 0.088 0.52

5.330 - 0.088 0.47

1.600 2.050 0.088 0.29

1.600 2.250 0.088 0.31

1.600 2.050 0.088 0.29

1.600 2.250 0.088 0.31

2.430 3.900 0.088 0.83

2.430 3.500 0.088 0.74

10.600 - 0.088 0.93

2.200 1.450 0.088 0.28

10.600 - 0.088 0.93

2.430 3.900 0.088 0.83

2.430 3.500 0.088 0.74

Area cad m3/m2

4.930 - 0.088 0.43

3.700 1.600 0.088 0.52

3.700 1.600 0.088 0.52

11.920 2.050 0.088 2.14

3.530 1.600 0.088 0.49

3.700 1.600 0.088 0.52

5.330 - 0.088 0.47

1.600 2.050 0.088 0.29

1.600 2.250 0.088 0.31

1.600 2.050 0.088 0.29

1.600 2.250 0.088 0.31

2.430 3.900 0.088 0.83

2.430 3.500 0.088 0.74

10.600 - 0.088 0.93

2.200 1.450 0.088 0.28

10.600 - 0.088 0.93

2.430 3.900 0.088 0.83

2.430 3.500 0.088 0.74

Page 107: Trabajo Clase - Lab Estructuras Civil Gantt

Area cad m3/m2

4.930 - 0.088 0.43

3.700 1.600 0.088 0.52

3.700 1.600 0.088 0.52

11.920 2.050 0.088 2.14

3.530 1.600 0.088 0.49

3.700 1.600 0.088 0.52

5.330 - 0.088 0.47

1.600 2.050 0.088 0.29

1.600 2.250 0.088 0.31

1.600 2.050 0.088 0.29

1.600 2.250 0.088 0.31

2.430 3.900 0.088 0.83

2.430 3.500 0.088 0.74

10.600 - 0.088 0.93

2.200 1.450 0.088 0.28

10.600 - 0.088 0.93

2.430 3.900 0.088 0.83

2.430 3.500 0.088 0.74

M3/M2

3.650 7.500 0.088 2.40

3.750 7.500 0.088 2.46

3.750 7.500 0.088 2.46

3.610 7.250 0.088 2.29

3.830 7.500 0.088 2.51

3.710 7.500 0.088 2.43

3.510 7.500 0.088 2.30

3.650 0.600 0.088 0.19

3.650 0.600 0.088 0.19

3.520 0.630 0.088 0.19

M3/M2

3.650 7.500 0.088 2.40

3.750 7.500 0.088 2.46

3.750 7.500 0.088 2.46

3.610 7.250 0.088 2.29

3.830 7.500 0.088 2.51

3.710 7.500 0.088 2.43

3.510 7.500 0.088 2.30

3.650 0.600 0.088 0.19

3.650 0.600 0.088 0.19

3.520 0.630 0.088 0.19

M3/M2

Page 108: Trabajo Clase - Lab Estructuras Civil Gantt

3.650 7.500 0.088 2.40

3.750 7.500 0.088 2.46

3.750 7.500 0.088 2.46

3.610 7.250 0.088 2.29

3.830 7.500 0.088 2.51

3.710 7.500 0.088 2.43

3.510 7.500 0.088 2.30

3.650 0.600 0.088 0.19

3.650 0.600 0.088 0.19

3.520 0.630 0.088 0.19

M3/M2

3.650 7.500 0.088 2.40

3.750 7.500 0.088 2.46

3.750 7.500 0.088 2.46

3.610 7.250 0.088 2.29

3.830 7.500 0.088 2.51

3.710 7.500 0.088 2.43

3.510 7.500 0.088 2.30

3.650 0.600 0.088 0.19

3.650 0.600 0.088 0.19

3.520 0.630 0.088 0.19

M3/M2

3.650 7.500 0.088 2.40

3.750 7.500 0.088 2.46

3.750 7.500 0.088 2.46

3.610 7.250 0.088 2.29

3.830 7.500 0.088 2.51

3.710 7.500 0.088 2.43

3.510 7.500 0.088 2.30

3.650 0.600 0.088 0.19

3.650 0.600 0.088 0.19

3.520 0.630 0.088 0.19

M3/M2

3.650 7.500 0.088 2.40

3.750 7.500 0.088 2.46

3.750 7.500 0.088 2.46

3.610 7.250 0.088 2.29

3.830 7.500 0.088 2.51

3.710 7.500 0.088 2.43

3.510 7.500 0.088 2.30

3.650 0.600 0.088 0.19

3.650 0.600 0.088 0.19

3.520 0.630 0.088 0.19

Page 109: Trabajo Clase - Lab Estructuras Civil Gantt

1,856.71 M2

Area cad

4.930 - 4.93

3.700 1.600 5.92

3.700 1.600 5.92

11.920 2.050 24.44

3.530 1.600 5.65

3.700 1.600 5.92

5.330 - 5.33

1.600 2.050 3.28

1.600 2.250 3.60

1.600 2.050 3.28

1.600 2.250 3.60

2.430 3.900 9.48

2.430 3.500 8.51

10.600 - 10.60

2.200 1.450 3.19

10.600 - 10.60

2.430 3.900 9.48

2.430 3.500 8.51

Area cad

4.930 - 4.93

3.700 1.600 5.92

3.700 1.600 5.92

11.920 2.050 24.44

3.530 1.600 5.65

3.700 1.600 5.92

5.330 - 5.33

1.600 2.050 3.28

1.600 2.250 3.60

1.600 2.050 3.28

1.600 2.250 3.60

2.430 3.900 9.48

2.430 3.500 8.51

10.600 - 10.60

2.200 1.450 3.19

10.600 - 10.60

2.430 3.900 9.48

2.430 3.500 8.51

Area cad

4.930 - 4.93

3.700 1.600 5.92

3.700 1.600 5.92

11.920 2.050 24.44

3.530 1.600 5.65

Page 110: Trabajo Clase - Lab Estructuras Civil Gantt

3.700 1.600 5.92

5.330 - 5.33

1.600 2.050 3.28

1.600 2.250 3.60

1.600 2.050 3.28

1.600 2.250 3.60

2.430 3.900 9.48

2.430 3.500 8.51

10.600 - 10.60

2.200 1.450 3.19

10.600 - 10.60

2.430 3.900 9.48

2.430 3.500 8.51

Area cad

4.930 - 4.93

3.700 1.600 5.92

3.700 1.600 5.92

11.920 2.050 24.44

3.530 1.600 5.65

3.700 1.600 5.92

5.330 - 5.33

1.600 2.050 3.28

1.600 2.250 3.60

1.600 2.050 3.28

1.600 2.250 3.60

2.430 3.900 9.48

2.430 3.500 8.51

10.600 - 10.60

2.200 1.450 3.19

10.600 - 10.60

2.430 3.900 9.48

2.430 3.500 8.51

Area cad

4.930 - 4.93

3.700 1.600 5.92

3.700 1.600 5.92

11.920 2.050 24.44

3.530 1.600 5.65

3.700 1.600 5.92

5.330 - 5.33

1.600 2.050 3.28

1.600 2.250 3.60

1.600 2.050 3.28

1.600 2.250 3.60

2.430 3.900 9.48

Page 111: Trabajo Clase - Lab Estructuras Civil Gantt

2.430 3.500 8.51

10.600 - 10.60

2.200 1.450 3.19

10.600 - 10.60

2.430 3.900 9.48

2.430 3.500 8.51

3.650 7.500 27.38

3.750 7.500 28.13

3.750 7.500 28.13

3.610 7.250 26.17

3.830 7.500 28.73

3.710 7.500 27.83

3.510 7.500 26.33

3.650 0.600 2.19

3.650 0.600 2.19

3.520 0.630 2.22

3.650 7.500 27.38

3.750 7.500 28.13

3.750 7.500 28.13

3.610 7.250 26.17

3.830 7.500 28.73

3.710 7.500 27.83

3.510 7.500 26.33

3.650 0.600 2.19

3.650 0.600 2.19

3.520 0.630 2.22

3.650 7.500 27.38

3.750 7.500 28.13

3.750 7.500 28.13

3.610 7.250 26.17

3.830 7.500 28.73

3.710 7.500 27.83

3.510 7.500 26.33

3.650 0.600 2.19

3.650 0.600 2.19

3.520 0.630 2.22

3.650 7.500 27.38

Page 112: Trabajo Clase - Lab Estructuras Civil Gantt

3.750 7.500 28.13

3.750 7.500 28.13

3.610 7.250 26.17

3.830 7.500 28.73

3.710 7.500 27.83

3.510 7.500 26.33

3.650 0.600 2.19

3.650 0.600 2.19

3.520 0.630 2.22

3.650 7.500 27.38

3.750 7.500 28.13

3.750 7.500 28.13

3.610 7.250 26.17

3.830 7.500 28.73

3.710 7.500 27.83

3.510 7.500 26.33

3.650 0.600 2.19

3.650 0.600 2.19

3.520 0.630 2.22

3.650 7.500 27.38

3.750 7.500 28.13

3.750 7.500 28.13

3.610 7.250 26.17

3.830 7.500 28.73

3.710 7.500 27.83

3.510 7.500 26.33

3.650 0.600 2.19

3.650 0.600 2.19

3.520 0.630 2.22

0.00 Kg

15,460.42 UND

Area cad Und/m2

4.930 - 8.330 41.07

3.700 1.600 8.330 49.31

3.700 1.600 8.330 49.31

11.920 2.050 8.330 203.55

3.530 1.600 8.330 47.05

3.700 1.600 8.330 49.31

5.330 - 8.330 44.40

1.600 2.050 8.330 27.32

1.600 2.250 8.330 29.99

Page 113: Trabajo Clase - Lab Estructuras Civil Gantt

1.600 2.050 8.330 27.32

1.600 2.250 8.330 29.99

2.430 3.900 8.330 78.94

2.430 3.500 8.330 70.85

10.600 - 8.330 88.30

2.200 1.450 8.330 26.57

10.600 - 8.330 88.30

2.430 3.900 8.330 78.94

2.430 3.500 8.330 70.85

Area cad

4.930 - 8.330 41.07

3.700 1.600 8.330 49.31

3.700 1.600 8.330 49.31

11.920 2.050 8.330 203.55

3.530 1.600 8.330 47.05

3.700 1.600 8.330 49.31

5.330 - 8.330 44.40

1.600 2.050 8.330 27.32

1.600 2.250 8.330 29.99

1.600 2.050 8.330 27.32

1.600 2.250 8.330 29.99

2.430 3.900 8.330 78.94

2.430 3.500 8.330 70.85

10.600 - 8.330 88.30

2.200 1.450 8.330 26.57

10.600 - 8.330 88.30

2.430 3.900 8.330 78.94

2.430 3.500 8.330 70.85

Area cad

4.930 - 8.330 41.07

3.700 1.600 8.330 49.31

3.700 1.600 8.330 49.31

11.920 2.050 8.330 203.55

3.530 1.600 8.330 47.05

3.700 1.600 8.330 49.31

5.330 - 8.330 44.40

1.600 2.050 8.330 27.32

1.600 2.250 8.330 29.99

1.600 2.050 8.330 27.32

1.600 2.250 8.330 29.99

2.430 3.900 8.330 78.94

2.430 3.500 8.330 70.85

10.600 - 8.330 88.30

2.200 1.450 8.330 26.57

10.600 - 8.330 88.30

2.430 3.900 8.330 78.94

Page 114: Trabajo Clase - Lab Estructuras Civil Gantt

2.430 3.500 8.330 70.85

Area cad

4.930 - 8.330 41.07

3.700 1.600 8.330 49.31

3.700 1.600 8.330 49.31

11.920 2.050 8.330 203.55

3.530 1.600 8.330 47.05

3.700 1.600 8.330 49.31

5.330 - 8.330 44.40

1.600 2.050 8.330 27.32

1.600 2.250 8.330 29.99

1.600 2.050 8.330 27.32

1.600 2.250 8.330 29.99

2.430 3.900 8.330 78.94

2.430 3.500 8.330 70.85

10.600 - 8.330 88.30

2.200 1.450 8.330 26.57

10.600 - 8.330 88.30

2.430 3.900 8.330 78.94

2.430 3.500 8.330 70.85

Area cad

4.930 - 8.330 41.07

3.700 1.600 8.330 49.31

3.700 1.600 8.330 49.31

11.920 2.050 8.330 203.55

3.530 1.600 8.330 47.05

3.700 1.600 8.330 49.31

5.330 - 8.330 44.40

1.600 2.050 8.330 27.32

1.600 2.250 8.330 29.99

1.600 2.050 8.330 27.32

1.600 2.250 8.330 29.99

2.430 3.900 8.330 78.94

2.430 3.500 8.330 70.85

10.600 - 8.330 88.30

2.200 1.450 8.330 26.57

10.600 - 8.330 88.30

2.430 3.900 8.330 78.94

2.430 3.500 8.330 70.85

Page 115: Trabajo Clase - Lab Estructuras Civil Gantt

3.650 7.500 8.330 228.03

3.750 7.500 8.330 234.28

3.750 7.500 8.330 234.28

3.610 7.250 8.330 218.02

3.830 7.500 8.330 239.28

3.710 7.500 8.330 231.78

3.510 7.500 8.330 219.29

3.650 0.600 8.330 18.24

3.650 0.600 8.330 18.24

3.520 0.630 8.330 18.47

3.650 7.500 8.330 228.03

3.750 7.500 8.330 234.28

3.750 7.500 8.330 234.28

3.610 7.250 8.330 218.02

3.830 7.500 8.330 239.28

3.710 7.500 8.330 231.78

3.510 7.500 8.330 219.29

3.650 0.600 8.330 18.24

3.650 0.600 8.330 18.24

3.520 0.630 8.330 18.47

3.650 7.500 8.330 228.03

3.750 7.500 8.330 234.28

3.750 7.500 8.330 234.28

3.610 7.250 8.330 218.02

3.830 7.500 8.330 239.28

3.710 7.500 8.330 231.78

3.510 7.500 8.330 219.29

3.650 0.600 8.330 18.24

3.650 0.600 8.330 18.24

3.520 0.630 8.330 18.47

3.650 7.500 8.300 227.21

3.750 7.500 8.300 233.44

3.750 7.500 8.300 233.44

3.610 7.250 8.300 217.23

3.830 7.500 8.300 238.42

3.710 7.500 8.300 230.95

3.510 7.500 8.300 218.50

3.650 0.600 8.300 18.18

3.650 0.600 8.300 18.18

3.520 0.630 8.300 18.41

Page 116: Trabajo Clase - Lab Estructuras Civil Gantt

3.650 7.500 8.330 228.03

3.750 7.500 8.330 234.28

3.750 7.500 8.330 234.28

3.610 7.250 8.330 218.02

3.830 7.500 8.330 239.28

3.710 7.500 8.330 231.78

3.510 7.500 8.330 219.29

3.650 0.600 8.330 18.24

3.650 0.600 8.330 18.24

3.520 0.630 8.330 18.47

3.650 7.500 8.330 228.03

3.750 7.500 8.330 234.28

3.750 7.500 8.330 234.28

3.610 7.250 8.330 218.02

3.830 7.500 8.330 239.28

3.710 7.500 8.330 231.78

3.510 7.500 8.330 219.29

3.650 0.600 8.330 18.24

3.650 0.600 8.330 18.24

3.520 0.630 8.330 18.47

9.64 M3

Area cad

32.400 0.200 6.48

2.500 2.650 0.200 1.33

Area cad

1.530 0.200 0.31

Area cad

1.530 0.200 0.31

Area cad

1.530 0.200 0.31

Area cad

1.530 0.200 0.31

Area cad

1.530 0.200 0.31

Page 117: Trabajo Clase - Lab Estructuras Civil Gantt

Area cad

1.530 0.200 0.31

48.21 M2

Area cad

32.400 32.40

2.500 2.650 6.63

Area cad

1.530 1.53

Area cad

1.530 1.53

Area cad

1.530 1.53

Area cad

1.530 1.53

Area cad

1.530 1.53

Area cad

1.530 1.53

0.00 Kg

24.42 M3

17.670 0.120 0.450 0.95

17.670 0.420 0.150 1.11

2.410 0.150 0.700 0.25

2.410 0.450 0.150 0.16

0.780 0.250 0.700 0.27

0.780 0.550 0.150 0.13

19.030 0.120 0.510 2.33

19.030 0.420 0.150 2.40

10.340 0.120 0.680 1.69

Page 118: Trabajo Clase - Lab Estructuras Civil Gantt

10.340 0.420 0.150 1.30

57.850 0.120 0.470 6.53

57.850 0.420 0.150 7.29

ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES REFORZADO 197.17 M2

17.670 0.900 15.90

2.410 1.400 3.37

0.780 1.400 2.18

19.030 1.020 38.82

10.340 1.360 28.12

57.850 0.940 108.76

0.00 KG

15.53 M3

3.150 0.200 2.200 2.77

5.150 0.200 2.200 4.53

3.550 5.150 0.300 5.48

3.550 5.150 0.150 2.74

90.61 M2

Perimetro

17.400 2.350 40.89

15.800 2.200 34.76

3.150 4.750 14.96

1,059.32 KG