Top Banner
T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington, DC Road Rail Intermodalism Workshop held at AASHTO Building
24

T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Dec 17, 2015

Download

Documents

Brianne Stevens
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

T.R. Lakshmanan

Road-Rail Intermodalism: Opportunities and Barriers

Center for Transportation Studies Boston University

September 22-23, 2005Washington, DC

Road Rail Intermodalism Workshopheld at AASHTO Building

Page 2: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Presentation Outline

1. Road Rail Intermodalism: Definition & Scope

2. The Emergence of Short haul Rail as a Public/Private Policy Issue

3. The Evolving Decision Contexts in Short haul Rail

4. Experience with Short Rail Corridors

5. Towards New Modals of Intermodal of Transport Service

Page 3: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Intermodalism represents the use of at least two modes of transport in an integrated manner, in a door-todoor transport chain.

Integrated implies: coordinated, seamless, flexible, and continuous flow

Road Rail intermodalism is used in the sense of short haul rail freight movement along a corridor or a geographically bandedarea. Freight movement is a directional flow linking major freight nodes (terminals) and has a mainline rail elementwith connecting roadways.

e.g. Alameda Corridor FAST Corridor in Washington State Mid Atlantic Rail Corridor.

Page 4: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

- Increasing Congestion in Major Metros & Cargo Hubs

- Potential for Degradation of Transport Service Quality

- Threats to U.S. Trade Performance and Industry competitiveness

Such Corridor Projects offered as Solutions to Major Problems in the U.S. Transport System:

- New Decision Contexts for New Corridor Projects * Sustainable Transport Criteria * Financing Mosaics * Stakeholder Partnerships

Page 5: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Factors Underlying Transport Problems

Demand Side Factors volume expansion locations of demand quality of transport services that add production value

Supply Side Constraints slow expansion of road & related infrastructure rising congestion and degrading service

Support for Future Economic Development centers of innovation in global economy heavily weighted towards major metros and cargo hubs

Page 6: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

US Freight Shipments

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

1998 2010 2020

International

Domestic

Total

-

5,000

10,000

15,000

20,000

25,000

30,000

1998 2010 2020

International

Domestic

Totalby tons (millions)

by value (billions $)

Page 7: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Industry Direct Total

Foundry products .017 .368

Forgings and stampings .026 .346

Pulp, paper and paperboard .131 .301

Non Metallic minerals .048 .362

Other fabricated metal products .075 .378

Basic chemicals 0.182 0.565

Direct and Total Export Proportions for Selected Industries

Page 8: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Top 10 US International Freight Gateways Ranked by Value of Shipments 2003 ($ Billion)

2003 Rank

2002 Rank Port Name Total Exports Imports

1 2 Port of Los Angeles, CA (water) 122 17 105

2 1 JFK International Airport, NY (air) 112 47 65

3 3 Port of Detroit, MI (land) 102 55 47

4 4 Port of New York and New Jersey (water)

101 24 77

5 5 Port of Long Beach, CA (water) 96 17 79

6 6 Port of Laredo, TX (land) 79 32 46

7 7 Los Angeles International Airport, CA (air)

64 33 31

8 8 Port Huron, MI (land) 62 23 40

9 9 Port of Buffalo-Niagara Falls, NY (land) 59 27 32

10 11 Chicago, IL (air) 54 21 34

Top 10 gateways 851 296 556

Page 9: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Quality of Transport Services (beyond reliability & speed)

- Transport Process Innovations

* Improved vehicle utilization

* JIT, quick response systems

- Transport Service Innovations

* New Supply Chains (Global sourcing, Changing markets)* Refashioning Supply Chains (Spatial concentration of inventories)

These processes and service innovations add production value and confer strategic advantage to U.S. firms

Page 10: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Supply Side Constraints

Over Two Decades

1. U.S: VMT has doubled, while highway mileage is up by 1%

2. Railroads Value of freight up by 50%, while available track

mileage down by 35%

3. 42 of 75 major urban areas with “undesirable congestion”

4. Congestion is concentrated at our largest ports and rail hubs, which are co-located in major urban areas

Page 11: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Evolving Transport Services and Regional Economic Development

Freight Operations &Regional, Global Supply

Chain Management

Warehousing &Distribution

Airfreight&

ParcelExpress

Commercial Trucking

RailroadIntermodal

Transportation

Manufacturing

Containerized OceanShipping

Page 12: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Knowledge &

Competence

Endowments

Communication

Infrastructure

TransportInfrastructure

Regulatory &

Policy Environment

Industry Competitiveness

& Economic Clustering

Transport Infrastructure, Competitiveness & Economic Growth

Page 13: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Two Major Games in the Global Economy

•Urban areas in economic competitionin the global economy competing globally.

•Centers of innovation in a knowledge-intensive global economy concentrated in a few large creative urban areas.

Implications

Page 14: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Short haul rail corridors are being considered as responses - e.g. a 200 FEU train per hour in each direction for a 10 hour daily window is equivalent of about 1.5 million truck moves per year by rail.

• Major investments• Tough issues of assembly of land and physical capital at desired locations• Principle beneficiaries scattered beyond urban areas• Difficulties in arriving at a consensus on solutions and• Financing among diverse affected communities.

Page 15: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

New Decisions Contexts for Corridor Projects

1. E/E/S Context for Sustainable Transportation

2. Innovative Financial Framework

3. New Stakeholder Processes

Page 16: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Economic Assessment

Page 17: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Railroads a Volume Business

A very cheap line haul cost/mile to offset very expensive terminal & dryage costs incurred in container movement)

- 55,000 main track miles abandoned (replacement at $2-5 million/track mile. major intermodal terminals - $50-75 million)

- Bring rail costs to a level to promote traffic shift from highway to short haul corridors

- Public benefits and costs

Page 18: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

A. Highway Marginal Trucking Cost

Highway user revenues Net highway corridor costs/mile and over time

B. Other External Costs - accidents - pollutions costs - energy costs - congestion costs

Page 19: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Fatalities per billion ton miles.

BTU’s per ton miles.

Page 20: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Pounds of pollutant per ton mile

Page 21: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Cost Component Road/Highway Rail

Air Pollution 7.9 3.8

Congestion 5.5 0.2

Accidents 5.4 1.5

Infrastructure 2.5 2.9

Other 2.9 4.0

Total 24.2 12.4

Source: European Commission, 2002

Marginal External Cost for Road & RailEuros per 1000 tkm)

Page 22: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Cargo Hub Project Types

Types of Benefit Beneficiaries Selected Potential Funding Sources

Possible Funding Partners

Highways and rail access improvements to cargo hubs of national significance and international services

• Increased transportation industry productivity

• Increased reliability

• Reduced inventory cots and logistics

•National, state, and local economy

•Shippers

•Carriers

•Consumers

• Tolls and user feeds

• State/local grants or loans

• Boarders and corridor programs

•Special-purpose authority

•State and local government

•FHWA Section 1118

Rail access improvements to domestic rail cargo hubs

• Increased rail freight traffic

• Increased rail capacity and efficiency

•Rail carrier

•Port operators/owners

• Tolls

• Wharfage fees

• Railroads

•Special-purpose authority

•railroads

Cargo hub access improvements that add cargo hub expansion options and capacity and also benefit local commuters and reduce congestion in metro-politan areas

• Increased transportation capacity with diversified modal options

• Improved shipping reliability

• Reduced congestion

• Reduced delays

• Reduced vehicle emissions

•Shippers

•Commercial vehicle operators

•Auto users

•Regional economy

•Surrounding community, other highway users, and railroads

• Tolls

• Railroads

• Intermodal demonstration project

• TIFIA

• Surface transportation programs

• CMAQ

• State transportation funds

• Special-purpose authority

• FHWA

• FHWA (state and MPO)

• State government

Benefit, Beneficiaries and Potential Funding Sources For Short Haul Rail Projects

Derived from TRB, 1 NCHRP Report 497. 2003

Page 23: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,

Type of Assistance Examples Repayment Requirements/Match

Requirements

Implication of Level/ Type of Public Private Sector Commitment

Other Considerations

Private sector rant or donation Cash contribution, ROW contribution, and or in kind support (planning , design or operations commitment).

No repayment required Cash contribution implies most significant private sector commitment to project initiation and ongoing success

Level of private sector contribution is major factor in indicating importance of project to private sector firms directly involved & is an essential element in public/private partnership. Reponses to private sector needs for projects that are not part of long term area plans.

Bond financing through public credit market- specifically floated for project or TIFIA or other gov’t/public authority loans to be repaid by users

Special bond issues (e.g. Alameda Corridor)

Repayment guaranteed by private sector generally through user fees charged to user of facilities being implemented (Project finances).

Implies commitment from primary direct user groups that will pay user fees through the life of the project an significant private sector interest in ongoing operation.

Government may act as guarantor of bonds or offer tax incentives/tax free status to reduce interest rates below market level.

Local, state, and/or federal loans or bond issues

Federal loans (TIFIA), FSTED program; State Infrastructure Bank Loans, or state DOT, airport, or port authority bond issues

Repayment guaranteed by taxes: fees and/or general revenue not specifically tied to the project (I some cases may be repaid partially through user charges or tolls)

Implies significant public interest in project initiation, ongoing public sector interest restricted to financial viability; significant private sector interest in ongoing operation

Generally provides financing at lower interest rate than project specific bonds financing: repayment may be tied to certain future tax revenues or user fees (similar to revenue bonds).

Local, state and federal grants CMAQ, STP, state and local grant funding – part of most projects, different levels of national, state or local significance

No repayment required Implies significant public interest in project initiation, significant pubic interest in ongoing operation, CMAQ directly related to environment/congestion benefit

Implies significant, on-going public benefit; grant assistance especially federal , may trigger environmental review, other requirements.

Categories of Funding Assitance Related to public/Private Sector Benefits

Page 24: T.R. Lakshmanan Road-Rail Intermodalism: Opportunities and Barriers Center for Transportation Studies Boston University September 22-23, 2005 Washington,