Top Banner
TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission on Environmental Quality Stormwater & Pretreatment Team Water Quality Division (512) 239 4671
50

TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Dec 28, 2015

Download

Documents

Noah Powell
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

TPDES PermittingMunicipal Separate Storm Sewer

Systems (MS4s) Updates

Trade Fair

May 5 - 6, 2015

Hanne Lehman Nielsen and Rebecca Villalba

Texas Commission on Environmental QualityStormwater & Pretreatment Team

Water Quality Division(512) 239 4671

Page 2: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Outline of Presentation

Municipal Stormwater Permitting

• Phase I versus Phase II

Requirements of Regulated MS4s

Developing a Stormwater Management Program

Annual Reports

Status of Application Review Process

Page 3: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

What is an MS4?

An MS4 is a publicly-owned or operated stormwater drainage system• Designed to collect or convey stormwater• Includes storm drains, pipes, ditches, gutters, etc.

Page 4: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase I MS4s Medium and Large

• Municipal population 100,000+ (1990 Census)• Includes public entities within jurisdictional

boundaries of the city• TxDOT, universities, some others

• Universe: 26 TPDES permits• Some include coalitions (about 50 permittees)

• First renewals submitted summer of 2010• Last renewals submitted spring of 2014

Page 5: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Requirements of Phase I MS4s Develop a Stormwater Management Program to

address Minimum Control Measures

• Public Education and Outreach/Public Involvement and Participation

• Pollution Prevention/Good Housekeeping for Municipal Operations

• MS4 Maintenance Activities• Illicit Discharge Detection and Elimination• Construction Site Runoff• Post-Construction Control Measures• Industrial & High Risk Runoff

Page 6: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Requirements of Phase I MS4s Perform Monitoring – Three Options:

1. Representative storm events,

2. Representative rapid bioassessment, or

3. Watershed monitoring - regional wet weather characterization program (Dallas-Fort Worth area)• Coordinated by North Central Texas Council

of Governments• Program reviewed and approved by TCEQ

Page 7: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Requirements of Phase I MS4s

In addition to Water Quality Monitoring:

Monitoring of Floatables• Often required in two locations at a

frequency two times per year• Report collected amount

Submit Annual Reports• TCEQ reviews and provides feedback

Page 8: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase I MS4s Permit RenewalsEPA Review

• Requesting similar requirements as Phase II GP• Priority areas• List of construction sites• Procedures for inspection of industrial sources• Mapping requirements• Impaired waterbodies with and without TMDLs

• Requesting to see inspection or audit reports completed by TCEQ

Page 9: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase I MS4sCity of Abilene*

City of Amarillo

City of Arlington*

City of Austin

TxDOT Austin

UT Austin

City of Beaumont*

TxDOT Beaumont

City of Corpus Christi*

City of Dallas

TxDOT Dallas

City of El Paso*

City of Fort Worth*

* Denotes co-permittees

City of Garland

City of Houston*

TxDOT Houston

City of Irving*

City of Laredo*

City of Lubbock*

City of Mesquite

North TX Tollway Authority

City of Pasadena

City of Plano

Port of Houston Authority

City of San Antonio*

City of Waco*

Page 10: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

TxDOT MS4 Statewide Individual PermitWQ0005011000

Page 11: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

TxDOT MS4 Statewide Individual PermitWQ0005011000

Application received March 18, 2013• EPA and TCEQ agreed with concept• Delays due to complexity of permit and legal

implications• Draft permit is currently going through internal

reviews

Coverage will replace• 15 Phase I individual permits• 19 Phase II authorizations under the Phase II GP

Coverage will include New MS4 areas

Page 12: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

TxDOT MS4 Statewide Individual PermitWQ0005011000

Permit Requirements• Level 2 MS4 provisions from Phase II GP• Phase I provisions from TxDOT Phase I

individual permits

Page 13: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

TxDOT MS4 Statewide Individual PermitWQ0005011000

Transition Period• Previous Phase I co-permittees reapply

without TxDOT• All requirements in Phase I permits need

to be met• TxDOT Phase I responsibilities will be

transferred to statewide individual permit

Page 14: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit

Notification letters sent to

new and existing MS4s

Permit documents on

website:• General permit• Fact sheet• ED response to comments

Page 15: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit

Phase II General Permit TXR040000• Regulates small MS4s located in a UA• Issued December 13, 2013 – 5 year term

First General Permit issued in 2007• 406 approved notices of intent • 66 waivers

Page 16: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General PermitRenewal

Applications Received• 507 Notices of Intents (not all will be issued)• 72 waivers

Summary of Renewals Received• Universe increased by almost 100 MS4s• 200 new MS4 entities applied• 80 previously regulated MS4s did not apply

Page 17: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Urbanized Area (UA)

UAs represent densely developed territory

A densely settled core of census tracts and/or census blocks meeting minimum population density requirements:• A combined residential population of at least

50,000 people• Overall population density of at least 1,000 people

per square mile

Page 18: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Urbanized Area (UA)

• US Census Bureau develops the UAs• UA maps illustrate defined boundaries of UAs in the

form of a map• EPA website regarding UA maps:

http://water.epa.gov/polwaste/npdes/stormwater/Urbanized-Area-Maps-for-NPDES-MS4-Phase-II-Stormwater-Permits.cfm

• TCEQ website regarding UA maps:

http://www.tceq.texas.gov/assistance/water/sw-ms4.html

Page 19: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.
Page 20: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit

Tiered Permitting Approach (based on population in the UA)• Level 1: Up to 10,000• Level 2: 10,000 to 40,000

• includes non-traditional MS4s• Level 3: 40,000 to 100,000• Level 4: More than 100,000

Page 21: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Waiver Option from Permitting Requirements

Option 1• Serves a population less than 1,000 in an UA and

• Discharge not contributing substantially to interconnected regulated MS4

• No TMDL or WLA for an impaired waterbody that requires the MS4 to have additional controls

Option 2• Serves a population under 10,000 and

• Receiving water has been evaluated• No TMDL or WLA for an impaired waterbody

that requires the MS4 to have additional controls• Future discharge will not impair water body

Page 22: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit

Minimum Control Measures (MCMs)1. Public Education, Outreach, and Involvement2. Illicit Discharge Detection and Elimination3. Construction Site Stormwater Runoff Control4. Post-Construction Stormwater Management in

New Development and Redevelopment5. Pollution Prevention and Good Housekeeping for

Municipal Operations6. Industrial Stormwater Sources7. Optional MCM for Construction done by the

Permittee (MS4) as the Site Operator

Page 23: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit

Required Elements in Each MCM• All levels – requirements in 40 CFR §122.34 and expired

general permit

Program Examples under the MCMsMCM1 - Public Education, Outreach, and Involvement

• E.g. Brochures, utility bills stuffers, billboard advertisements, websites, Public Notice Requirements

Page 24: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit

MCM 2 - Illicit Discharge Detection and Elimination• E.g. Ordinance, MS4 map, detection techniques

(screening etc.), enforcement procedures, illegal dumping hotlines, response procedures, etc.

MCM 3 – Construction Site Stormwater Runoff Control

E.g. Ordinance, site inspection, site plan review, construction site waste disposal requirements, hot lines, MS4 staff training, etc

Page 25: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit

MCM 4 – Post Construction Stormwater Management in New Development and Redevelopment

• E.g. Ordinance, long term operation and maintenance of permanent BMPs, list of structural and non-structural BMPs, etc.

MCM 5 – Pollution Prevention and Good Housekeeping for Municipal Operations

• E.g. Housekeeping procedures and BMPs at MS4 operations and maintenance sites, employee training, maintenance of structural controls, street sweeping, disposal of waste, etc.

Page 26: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit

MCM 6 – Industrial Stormwater Sources • E.g. control pollutants from landfills, municipal waste

facilities, hazardous waste facilities and other industrial facilities. Only required for Level 4 MS4s

Optional 7th MCM – Municipal Construction • May cover all municipal construction activities where

the MS4 is the construction site operator• No NOI required under the CGP TXR150000

Page 27: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit

Develop and implement a comprehensive Stormwater Management Program (SWMP)

Submit: • Notice of Intent (NOI), Form TCEQ – 20368• SWMP• Fee - $100• Paper only

TCEQ performs technical review of SWMP

Publish public notice in newspaper• Opportunity for the public to view and submit

comments on the NOI and SWMP

Applying for Coverage

Page 28: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 GP Renewal

Existing Permittees• Assess previous program elements and goals

• Determine effectiveness• Modify as necessary• Develop and implement new elements

New Permittees• Develop and implement new elements

Developing a SWMP

Page 29: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Stormwater Management Program

Implementation of SWMP• Develop a schedule• Implemented in yearly intervals over the 5 year

permit term• Must be fully implemented at the end of the 5 year

permit term

Possibility for Coalitions• Usually share a boundary or watershed• Each MS4 is responsible for own compliance• Enter into agreements with clear delineation of

responsibilities

Page 30: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit Lists of Impaired Waterbodies

• CWA 303(d) List includes waterbodies with no TMDL (category 5)

• Index of Water Quality Impairments in the Integrated Report of Surface Water includes:• impaired waterbodies with a TMDL (category 4)• impaired waterbodies with no TMDL (category 5)

http://www.tceq.texas.gov/waterquality/assessment/305_303.html

Page 31: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit Discharges into Impaired Water Bodies without

an Approved TMDL• Determine if MS4 is source of the POC• Include focused BMPs to reduce to the Maximum

Extent Practicable (MEP) the POC• Identify sources• Modify program as necessary• Include progress in annual report

Page 32: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Discharges to Impaired Waterbodies without a TMDL

Page 33: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit

Discharges into Impaired Water Bodies with an Approved TMDL• MS4 contributes to the impairment

• Describe targeted controls (BMPs) in SWMP and report progress in annual report

• Each BMP to include a measurable goal • Identify a benchmark

• If pollutant of concern (POC) is bacteria• Refer to I-Plan or use alternative BMPs

Page 34: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit Discharges into Impaired Water Bodies with an

Approved TMDL• Assess progress towards benchmark

• Use available data or collect monitoring data (instream or outfall)

• If no progress towards benchmark shown • Identify alternative focused BMPs

Page 35: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Discharges to Impaired Waterbodies with a TMDL

Page 36: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 and Annual Reports

Annual Report • Must be submitted even though application might not

have been approved• Due 90 days after reporting year• Flexibility selecting reporting year

• Fiscal year, calendar year, or permit year• Reporting year can not change during the permit

term

Page 37: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II Annual Reports Submit the original report to the TCEQ

Stormwater & Pretreatment Team (MC 148) Submit a copy of the report to the appropriate

TCEQ regional office• Specify in the report cover letter that the TCEQ

Regional Office has been sent a copy of the report

Retain a copy of the report on site Annual Report template (Form 20561) available:

http://www.tceq.texas.gov/assistance/water/sw-ms4.html

Template was updated to match new permit

Page 38: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II Annual Reports Shared Programs

• Annual report for shared SWMPs to be system-wide (inclusive of all MS4s that share the plan)

• MS4s who share a SWMP must submit a (one) combined annual report

Signature Requirements• Each operator must sign the report per

30 TAC § 305.128

Page 39: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Sample of a Measurable Goal Table

Page 40: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II Annual ReportsPermit Year Option Fiscal Year (example) Option

Date Action Date Action

Dec. 2013 Permit effective date Dec. 2013 Permit effective date

June 2014 (180 days)

NOI + SWMP June 2014 (180 days)

NOI + SWMP

Dec. 2014 End of permit year Sept. 2014 Start of MS4 fiscal year

March 2015 Year 1 Annual Report due(90 days from permit year)

Sept. 2015 End of MS4 fiscal year

Dec. 2015 Year 1 Annual Report due (90 days from fiscal year)

• New MS4s: The first annual report needs to include all months since the permit effective date

• Existing MS4s: The first annual report needs to include all months since the end of last reporting period

Page 41: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Application Review Process

Administrative Review Water Quality Standards Review Review of SWMPs Public Notice

• Approval of public notice by MS4

Note: All MS4 entities gets contacted by TCEQ – quick responses facilitate issuance of authorizations

Page 42: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Application Review Process

Lessons Learned by Review of SWMPs • Many activities are being continued• Some have no requirements for impaired waterbodies• Some have vague implementation schedule• General and qualitative measurable goals

MCMs• Various requirements are missing

Seeing more coalitions formed

Page 43: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Application Review Process

Deficiencies Noted• Segments missing or incorrect• TMDL requirements not included• Impairment requirements not included• Not clear that Non-traditional MS4s only have Level 2

requirements• Direct vs. indirect discharge

Page 44: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Application Review Process

TCEQs Goal for Review Process• All applications reviewed by end of 2014

Current Status (March 2015)• Applications received: 507 NOIs and 72 Waivers• Tech complete: 465• Issued: 423 NOIs and 38 waivers

Page 45: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Application Review Process

Innovations in SWMPs• Bumper stickers on municipal vehicles to promote

SWMP• MUDs using Rate Orders for regulating and enforcing

SWMP• Phone Apps for reporting

Page 46: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 General Permit

Current Permitting Activities• Finishing up issuing authorizations• Following up with notices not published• Identifying MS4s that did not apply

Additional Information• Developed template ordinances• Currently developing template SWMP

Q&A document on TCEQ MS4 website Processing Notices of Changes

Page 47: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Phase II MS4 Notice of Change

Notice of change (NOC)• Changes to SWMP• Updated form TCEQ – 20392

NOC is needed for • Replace an infeasible BMP with an alternative BMP• All other changes

NOC is not needed for• Adding BMPs or replacing a BMP with a similar BMP• Non-substantive changes• Annexing or de-annexing land

Page 48: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

TCEQ Web Links

Stormwater Home Page• http://www.tceq.texas.gov/permitting/stormwater

/sw_permits.html

Small Business and Local Government Assistance• http://www.tceq.texas.gov/assistance

Page 49: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

TPDES Stormwater Program Contacts

Water Quality Division

• Rebecca L. Villalba, Stormwater & Pretreatment team leader

• Stormwater permit writers• Hal Bailey• Hanne Lehman Nielsen• Dan Siebeneicher• Lindsay Garza• Kent Trede• Lana D’Souza• Ryan Bucek

Page 50: TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 5 - 6, 2015 Hanne Lehman Nielsen and Rebecca Villalba Texas Commission.

Contact Information

Small Business and Local Government Assistance (SBLGA)(800) 447-2827www.texasenvirohelp.org

Stormwater NOI/NEC/NOT Status (512) 245-0130

[email protected]

Permitting Information (Technical)(512) [email protected]