Top Banner
TPCB WORK IN GREECE Presented by E. Fokitis at the Pierre Auger Meeting , Malargue April 2003 The GERBER Files + Schematics were given to Firm SLS located in Athens Six pairs of printed circuits (6 TPCB_A’s and 6 TPCB_B’s) have been produced A commercial firm is importing components to assemble on above printed circuits . First assembled cards should be ready within 2 weeks provided all components have arrived. SLS Firm plans to use as sub-contractor, for doing the Environmental Stress Screening, Intracom SA, located 25 Km from Athens
5

TPCB WORK IN GREECE Presented by E. Fokitis at the Pierre Auger Meeting, Malargue April 2003 The GERBER Files + Schematics were given to Firm SLS located.

Dec 22, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TPCB WORK IN GREECE Presented by E. Fokitis at the Pierre Auger Meeting, Malargue April 2003 The GERBER Files + Schematics were given to Firm SLS located.

TPCB WORK IN GREECEPresented by E. Fokitis at the Pierre Auger Meeting , Malargue April

2003

• The GERBER Files + Schematics were given to Firm SLS located in Athens

• Six pairs of printed circuits (6 TPCB_A’s and 6 TPCB_B’s) have been produced

• A commercial firm is importing components to assemble on above printed circuits . First assembled cards should be ready within 2 weeks provided all components have arrived.

• SLS Firm plans to use as sub-contractor, for doing the Environmental Stress Screening, Intracom SA, located 25 Km from Athens

Page 2: TPCB WORK IN GREECE Presented by E. Fokitis at the Pierre Auger Meeting, Malargue April 2003 The GERBER Files + Schematics were given to Firm SLS located.

Printed Circuit TPCB_A Greece

Page 3: TPCB WORK IN GREECE Presented by E. Fokitis at the Pierre Auger Meeting, Malargue April 2003 The GERBER Files + Schematics were given to Firm SLS located.

Printed Circuit TPCB_B

Page 4: TPCB WORK IN GREECE Presented by E. Fokitis at the Pierre Auger Meeting, Malargue April 2003 The GERBER Files + Schematics were given to Firm SLS located.

Expected production plan

• We plan to construct and test for 2003 approximately 30 pairs of TPCB’s

Page 5: TPCB WORK IN GREECE Presented by E. Fokitis at the Pierre Auger Meeting, Malargue April 2003 The GERBER Files + Schematics were given to Firm SLS located.

Plans for Operational Performance Tests

• We need to have from AUGER’s SDE group a suggested facility for testing the performance of TPCB’s after passing tests concerning Environmental Stress Screening .

• Such a facility will be installed at NTUA and/or UOA as soon as possible