    S/N DESCRIPTION

    1 BASEMENT-2

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X

    X

    X X

    X X X X

    2 BASEMENT-1

    X X X X X X X X X X X X

    X X X X X X X X X X X XX X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X

    X

    X X

    X X X X

    3 LOWER GROUND FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X XX X X X X X X X X X X

    X X X X

    X

    X X

    X X X X

    4 GROUND FLOOR

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X

    X X X X

    5 1st FLOOR TO 9th FLOOR

    X X X X X X X X X X X

    X X X X X X X X X X

    X X X X X X X X X X

    X X X X X

    X X X X

    APARTMENT A

    RecallElevatortoGroundFloor

    EvacuationMessagesthroughVASystemin

    FlatUnits&LiftCorridors.

    ActivationOfFIREALARMS

    ounder/Bell

    IndicationinMainMIMICPanelInFire

    CommandCentreInTower-2

    TroubleIndication&BuzzerinFACP-AIn

    GroundFloorReceptionLob

    by

    SupervisoryIndication&Buz

    zerinFACP-AIn

    GroundFloorReceptionLob

    by

    AlarmIndicationinFACP-AInGroundFloor

    ReceptionLobby

    IndicationinMIMICPanelGroundFloor

    ReceptionLobby

    Activation of Manual Call Point

    2nd Alarm Signal of FM200

    First/Trouble Alarm Signal of FM200

    TroubleIndication&BuzzerinMFACPInFire

    CommandCentreInTower-2

    Activation of Smoke Detector

    EFFECTS

    DESCRIPTION

    Activation Of Water - FLOW SWITCH

    Activation of Heat Detector (CP Ventilation)

    Activation of Heat Detector

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    Activation of Smoke Detector

    Activation of Smoke Detector

    Activation of Heat DetectorActivation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    StopFreshAirFan-ROOF

    CAUSE DESCRIPTION

    AlarmIndicationinMFACPInFireCommand

    CentreInTower-2

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    Activation of Tamper Switch (Valve)

    Activation of Heat Detector

    Activation of Manual Call Point

    SIGNALtoFireBrigadeViaAutoDialer

    AlarmsandTroubleMonitoringinBMSin

    MainControlRoom

    ATSChangeover&GeneratorStart-UP

    ActivationOfFIREPUMP-EXHAUSTFANS.

    SupervisoryIndication&Buz

    zerinMFACPIn

    FireCommandCentreInTower-2

    ActivationOfCarParkVentilationSystem

    (MFAF,MEF,JF)

    StaircasePressurizationFan

    s(ASPF-01,02)

    ToOpenallAccessDoorsandGateBarrier

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Heat Detector (CP Ventilation)

    Activation of Heat Detector (CP Ventilation)

    Activation of Tamper Switch (Valve)

    Activation Of Water - FLOW SWITCH

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    2/22

    6 10th FLOOR

    X X X X X X X X X X X

    X X X X X X X X X X

    X X X X X X X X X X

    X X X X X

    X X X X

    7 ROOF FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X XX X X X

    8 COMMON

    X X X X

    X X X X

    X X X X X

    X X X X

    X X X X

    X X X X

    Devices Trouble

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Battery Failure

    Power Failure

    Network Failure

    Short / Open Circuit

    Grounding Fault

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    3/22

    S/N DESCRIPTION

    1 BASEMENT-2

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X

    X

    X X

    X X X X

    2 BASEMENT-1

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X

    X

    X X

    X X X X

    3 LOWER GROUND FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X

    X

    X X

    X X X X

    4 GROUND FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X

    X X X X

    5 1st FLOOR TO 9th FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X

    X X X X

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Heat DetectorActivation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    ToOpenallAccessDoorsandGateBarrier

    StopFreshAirFan-ROOF

    ActivationOfFIREPUMP-EXHAUSTFANS.

    ATSChangeover&GeneratorStart-UP

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    SIGNALtoFireBrigadeViaAutoDialer

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    TroubleIndication&BuzzerinM

    FACPIn

    FireCommandCentreInTower-2

    TroubleIndication&BuzzerinF

    ACP-AIn

    GroundFloorReceptionLobby

    SupervisoryIndication&BuzzerinMFACP

    InFireCommandCentreInTow

    er-2

    Activation of Heat Detector (CP Ventilation)

    SupervisoryIndication&BuzzerinFACP-A

    InGroundFloorReceptionLobby

    RecallElevatortoGroundFloor

    EvacuationMessagesthroughVASystemin

    FlatUnits&LiftCorridors.

    ActivationOfFIREALARMSou

    nder/Bell

    ActivationOfCarParkVentilationSystem

    (MFAF,MEF,JF)

    StaircasePressurizationFans(ASPF-01,02)

    Activation of Heat Detector (CP Ventilation)

    Activation of Heat Detector (CP Ventilation)

    CAUSE DESCRIPTION

    APARTMENT B

    EFFECTS

    DESCRIP

    TION

    AlarmIndicationinMFACPInF

    ireCommand

    CentreInTower-2

    IndicationinMainMIMICPanel

    InFire

    CommandCentreInTower-2

    AlarmIndicationinFACP-BInG

    roundFloor

    ReceptionLobby

    IndicationinMIMICPanelGroundFloor

    ReceptionLobby

    AlarmsandTroubleMonitoring

    inBMSin

    MainControlRoom

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    4/22

    6 10th FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X

    X X X X

    7 ROOF FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X

    X X X X

    8 COMMON

    X X X X

    X X X X

    X X X X X

    X X X XX X X X

    X X X X

    Devices Trouble

    Battery Failure

    Power Failure

    Network FailureShort / Open Circuit

    Grounding Fault

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    5/22

    S/N DESCRIPTION

    1 BASEMENT-2

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X

    X

    X X

    X X X X

    2 BASEMENT-1

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X

    X

    X X

    X X X X

    3 LOWER GROUND FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X

    X

    X X

    X X X X

    4 GROUND FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X

    5 1st FLOOR TO 9th FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    ToOpenallAccessDoorsandGateBarrier

    StopFreshAirFan-ROOF

    ActivationOfFIREPUMP-EXHAUSTFANS.

    ATSChangeover&Generator

    Start-UP

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    SIGNALtoFireBrigadeViaAutoDialer

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    TroubleIndication&BuzzerinMFACPIn

    FireCommandCentreInTower-2

    TroubleIndication&BuzzerinFACP-AIn

    GroundFloorReceptionLobby

    SupervisoryIndication&BuzzerinMFACP

    InFireCommandCentreInTow

    er-2

    Activation of Heat Detector (CP Ventilation)

    SupervisoryIndication&BuzzerinFACP-A

    InGroundFloorReceptionLobby

    RecallElevatortoGroundFloor

    EvacuationMessagesthroughVASystemin

    FlatUnits&LiftCorridors.

    ActivationOfFIREALARMSou

    nder/Bell

    ActivationOfCarParkVentilationSystem

    (MFAF,MEF,JF)

    StaircasePressurizationFans(

    ASPF-01,02)

    Activation of Heat Detector (CP Ventilation)

    Activation of Heat Detector (CP Ventilation)

    CAUSE DESCRIPTION

    APARTMENT C

    EFFECTS

    DESCRIP

    TION

    AlarmIndicationinMFACPInF

    ireCommand

    CentreInTower-2

    IndicationinMainMIMICPanelInFire

    CommandCentreInTower-2

    AlarmIndicationinFACP-CInG

    roundFloor

    ReceptionLobby

    IndicationinMIMICPanelGrou

    ndFloor

    ReceptionLobby

    AlarmsandTroubleMonitoring

    inBMSin

    MainControlRoom

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    6/22

    6 10th FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X

    7 ROOF FLOOR

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X

    8 COMMON

    X X X X

    X X X X

    X X X X X

    X X X XX X X X

    X X X X

    Devices Trouble

    Battery Failure

    Power Failure

    Network FailureShort / Open Circuit

    Grounding Fault

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    7/22

    S/N DESCRIPTION

    1

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X

    X X

    X X X X

    2

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X

    X X

    X X X X

    3

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X

    X X X X

    X X X

    4

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    5

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    BASEMENT-2

    1ST & 2ND FLOOR

    BASEMENT-1

    Activation of Smoke Detector

    Activation of Manual Call Point

    GROUND FLOOR

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    Activation of Manual Call Point

    Activation of Heat Detector

    3RD FLOOR

    Failure Of Openable Window Panel

    AlarmsandTroubleMonitoring

    inBMSin

    MainControlRoom

    SupervisoryIndication&Buzze

    rinMFACP

    InFireCommandCentreInTower-2

    RecallElevatortoGroundFloor

    Activation of Heat Detector (CP Ventlation)

    CAUSE DESCRIPTION

    TOWER-1

    AirHandlingUnitOfAffectedFloor

    TreatedFreshAirHandlingUnit

    ATSChangeover&Generator

    Start-UP

    ROOFFreshAirFan(FAF)Sto

    p

    ActivationOfFirePumpExhaustFans

    SIGNALtoFireBrigadeViaAutoDialer

    TroubleIndication&BuzzerinMFACPIn

    FireCommandCentreInTower-2

    ActivationOfCarParkVentilationSystem

    (MFAF,MEF,JF)

    StaircasePressurizationFans(ASPF-01,02)

    ToOpenallAccessDoorsand

    GateBarrier

    AlarmIndicationinMFACPInF

    ireCommand

    CentreInTower-2

    IndicationinMainMIMICPanelInFire

    CommandCentreInTower-2

    Activation of Smoke Detector

    EFFECTS

    DESCRIP

    TION

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Manual Call Point

    EvacuationMessagesthroughVASystemin

    Offices&LiftCorridors.

    ActivateOpenableWindowate

    veryoffice

    floor

    IndicationinMIMICPanel1stB

    asement

    ControlRoom

    LiftLobbyPressurizationFan(LPF-01,02)

    LiftShaftPressurizationFan(LSPF-01,02)

    ActivationOfFIREALARMSOUNDER/

    ALARMBell

    Activation of Smoke Detector

    Activation Of Water - FLOW SWITCH

    Failure Of Openable Window Panel

    Activation of Tamper Switch (Valve)

    Activation of Heat Detector

    Activation of Heat Detector (CP Ventlation)

    Activation of Manual Call Point

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    Activation of Heat Detector

    Activation Of Water - FLOW SWITCH

    Activation of Heat Detector

    Activation Of Water - FLOW SWITCH

    Activation of Smoke Detector

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    8/22

    S/N DESCRIPTION AlarmsandTroubleMonitoring

    inBMSin

    MainControlRoom

    SupervisoryIndication&Buzze

    rinMFACP

    InFireCommandCentreInTower-2

    RecallElevatortoGroundFloor

    CAUSE DESCRIPTION

    TOWER-1

    AirHandlingUnitOfAffectedFloor

    TreatedFreshAirHandlingUnit

    ATSChangeover&Generator

    Start-UP

    ROOFFreshAirFan(FAF)Sto

    p

    ActivationOfFirePumpExhaustFans

    SIGNALtoFireBrigadeViaAutoDialer

    TroubleIndication&BuzzerinMFACPIn

    FireCommandCentreInTower-2

    ActivationOfCarParkVentilationSystem

    (MFAF,MEF,JF)

    StaircasePressurizationFans(ASPF-01,02)

    ToOpenallAccessDoorsand

    GateBarrier

    AlarmIndicationinMFACPInF

    ireCommand

    CentreInTower-2

    IndicationinMainMIMICPanelInFire

    CommandCentreInTower-2

    EFFECTS

    DESCRIP

    TION

    EvacuationMessagesthroughVASystemin

    Offices&LiftCorridors.

    ActivateOpenableWindowate

    veryoffice

    floor

    IndicationinMIMICPanel1stB

    asement

    ControlRoom

    LiftLobbyPressurizationFan(LPF-01,02)

    LiftShaftPressurizationFan(LSPF-01,02)

    ActivationOfFIREALARMSOUNDER/

    ALARMBell

    6

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    7

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    8

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    9

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    10

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X

    11

    X X

    X X

    X X X

    X X

    X X

    Devices Trouble

    Activation of Smoke Detector

    4th FLOOR

    ROOF & UPPER ROOF

    17th FLOOR

    5th to 16th FLOOR

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    Failure Of Openable Window Panel

    Activation of Manual Call Point

    Activation of Heat Detector

    Activation of Tamper Switch (Valve)

    Activation Of Water - FLOW SWITCH

    18th FLOOR

    Activation of Smoke Detector

    Short / Open Circuit

    COMMON

    Activation of Heat Detector

    Failure Of Openable Window Panel

    Failure Of Openable Window Panel

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Battery Failure

    Power Failure

    Network Failure

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation of Smoke Detector

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    9/22

    S/N DESCRIPTION

    1

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X

    X

    X X X X

    2

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X

    X

    X X X X

    3

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X

    X X X X

    X X X

    4

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    5

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    Activation Of Water - FLOW SWITCH

    3RD FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    Failure Of Openable Window Panel

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    1ST & 2ND FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    GROUND FLOOR

    Activation of Smoke DetectorActivation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    Activation of Heat Detector (CP Ventlation)

    CAUSE DESCRIPTION

    TOWER-2

    Activation of Tamper Switch (Valve)

    BASEMENT-1

    ROOFFreshAirFan(FAF)Stop

    AirHandlingUnitOfAffectedFlo

    or

    ActivationOfFIREALARMSOU

    NDER/

    ALARMBell

    ActivationOfCarParkVentilatio

    nSystem

    (MFAF,MEF,JF)

    StaircasePressurizationFans(A

    SPF-01,02)

    LiftLobbyPressurizationFan(LPF-01,02)

    ATSChangeover&GeneratorStart-UP

    AlarmsandTroubleMonitoringinBMSin

    MainControlRoom

    TreatedFreshAirHandlingUnit

    SIGNALtoFireBrigadeViaAutoDialer

    LiftShaftPressurizationFan(LS

    PF-01,02)

    ToOpenallAccessDoorsandG

    ateBarrier

    ActivateOpenableWindowateveryoffice

    floor

    ActivationOfFirePumpExhaustFans

    BASEMENT-2

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Heat Detector (CP Ventlation)

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    RecallElevatortoGroundFloor

    EvacuationMessagesthroughV

    ASystemin

    Offices&LiftCorridors.

    EFFECTS

    DESCRIPTION

    AlarmIndicationinMFACPInFire

    CommandCentreInTower-2

    IndicationinMainMIMICPanelInFire

    CommandCentreInTower-2

    IndicationinMIMICPanel1stBasement

    ControlRoom

    TroubleIndication&BuzzerinM

    FACPIn

    FireCommandCentreInTower-2

    SupervisoryIndication&Buzzer

    inMFACP

    InFireCommandCentreInTow

    er-2

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    10/22

    S/N DESCRIPTION

    CAUSE DESCRIPTION

    TOWER-2

    ROOFFreshAirFan(FAF)Stop

    AirHandlingUnitOfAffectedFlo

    or

    ActivationOfFIREALARMSOU

    NDER/

    ALARMBell

    ActivationOfCarParkVentilatio

    nSystem

    (MFAF,MEF,JF)

    StaircasePressurizationFans(A

    SPF-01,02)

    LiftLobbyPressurizationFan(LPF-01,02)

    ATSChangeover&GeneratorStart-UP

    AlarmsandTroubleMonitoringinBMSin

    MainControlRoom

    TreatedFreshAirHandlingUnit

    SIGNALtoFireBrigadeViaAutoDialer

    LiftShaftPressurizationFan(LS

    PF-01,02)

    ToOpenallAccessDoorsandG

    ateBarrier

    ActivateOpenableWindowateveryoffice

    floor

    ActivationOfFirePumpExhaustFans

    RecallElevatortoGroundFloor

    EvacuationMessagesthroughV

    ASystemin

    Offices&LiftCorridors.

    EFFECTSDESCRIPTION

    AlarmIndicationinMFACPInFire

    CommandCentreInTower-2

    IndicationinMainMIMICPanelInFire

    CommandCentreInTower-2

    IndicationinMIMICPanel1stBasement

    ControlRoom

    TroubleIndication&BuzzerinM

    FACPIn

    FireCommandCentreInTower-2

    SupervisoryIndication&Buzzer

    inMFACP

    InFireCommandCentreInTow

    er-2

    7

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    8

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X

    X X X X X X X X

    X X X

    9

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    10

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    11

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    12

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    ROOF & UPPER ROOF

    21st FLOOR

    Activation of Smoke Detector

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water FLOW SWITCH

    Activation of Heat DetectorActivation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    Activation of Heat Detector

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    20th FLOOR

    Activation of Manual Call Point

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Activation of Smoke Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    Failure Of Openable Window Panel

    Activation Of Water - FLOW SWITCH

    19th FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    6th to 18th FLOOR

    Activation of Smoke Detector

    5th FLOOR

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation of Smoke Detector

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    11/22

    S/N DESCRIPTION

    1

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X

    X

    X X

    X X X X

    2X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X

    X

    X X

    X X X X

    3

    X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X

    X X X X

    X X X

    4

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    5

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    1ST & 2ND FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCHActivation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    3RD FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    BASEMENT-1Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    Activation of Heat Detector (CP Ventlation)

    GROUND FLOOR

    Activation of Smoke DetectorActivation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    CAUSE DESCRIPTION

    TOWER-3

    EFFECTS

    DESCRIPT

    ION

    ActivationOfCarParkVentilation

    System

    (M

    FAF,MEF,JF)

    StaircasePressurizationFans(AS

    PF-01,02)

    LiftLobbyPressurizationFan(LPF

    -01,02)

    LiftShaftPressurizationFan(LSP

    F-01,02)

    SIGNALtoFireBrigadeViaAutoDialer

    ActivateOpenableWindowateveryoffice

    floor

    EvacuationMessagesthroughVA

    Systemin

    O

    ffices&LiftCorridors.

    BASEMENT-2

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    Activation of Heat Detector (CP Ventlation)

    TreatedFreshAirHandlingUnit

    ActivationOfFirePumpExhaustF

    ans

    A

    TSChangeover&GeneratorStart-UP

    AlarmsandTroubleMonitoringinBMSin

    M

    ainControlRoom

    ROOFFreshAirFan(FAF)Stop

    AirHandlingUnitOfAffectedFloor

    ActivationOfFIREALARMSOUN

    DER/

    ALARMBell

    ToOpenallAccessDoorsandGa

    teBarrier

    AlarmIndicationinMFACPInFire

    Command

    CentreInTower-2

    In

    dicationinMainMIMICPanelIn

    Fire

    CommandCentreInTower-2

    In

    dicationinMIMICPanel1stBasement

    ControlRoom

    TroubleIndication&BuzzerinMF

    ACPInFire

    CommandCentreInTower-2

    SupervisoryIndication&Buzzerin

    MFACPIn

    FireCommandCentreInTower-2

    RecallElevatortoGroundFloor

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    12/22

    S/N DESCRIPTION

    CAUSE DESCRIPTION

    TOWER-3

    EFFECTS

    DESCRIPTION

    Ac

    tivationOfCarParkVentilationSystem

    (M

    FAF,MEF,JF)

    StaircasePressurizationFans(AS

    PF-01,02)

    LiftLobbyPressurizationFan(LPF

    -01,02)

    LiftShaftPressurizationFan(LSPF-01,02)

    SIGNALtoFireBrigadeViaAutoD

    ialer

    Ac

    tivateOpenableWindowateveryoffice

    flo

    or

    Ev

    acuationMessagesthroughVA

    Systemin

    Offices&LiftCorridors.

    TreatedFreshAirHandlingUnit

    Ac

    tivationOfFirePumpExhaustF

    ans

    ATSChangeover&GeneratorStart-UP

    AlarmsandTroubleMonitoringinBMSin

    MainControlRoom

    ROOFFreshAirFan(FAF)Stop

    AirHandlingUnitOfAffectedFloor

    Ac

    tivationOfFIREALARMSOUN

    DER/

    AL

    ARMBell

    To

    OpenallAccessDoorsandGa

    teBarrier

    AlarmIndicationinMFACPInFire

    Command

    CentreInTower-2

    IndicationinMainMIMICPanelIn

    Fire

    CommandCentreInTower-2

    IndicationinMIMICPanel1stBasement

    ControlRoom

    TroubleIndication&BuzzerinMFACPInFire

    CommandCentreInTower-2

    Su

    pervisoryIndication&Buzzerin

    MFACPIn

    FireCommandCentreInTower-2

    RecallElevatortoGroundFloor

    8

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    9

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    10

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X XX X X

    11

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X X X X X

    X X X

    12

    X X X X X X X X X X X XX X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X X X X X X X X

    X X X X

    13

    X X

    X X

    X X X

    X X

    ROOF & UPPER ROOF

    Activation of Smoke DetectorActivation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    COMMON

    Devices Trouble

    Battery Failure

    Power Failure

    Network Failure

    20th FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)Failure Of Openable Window Panel

    21st FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    6th to 18th FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    19th FLOOR

    Activation of Smoke Detector

    Activation of Heat DetectorActivation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    13/22

    S/N DESCRIPTION

    1

    X X X X X X X X X

    X X X X X X X X X

    X X X X X X X X

    X X X X

    X

    X

    X X X X

    2

    X X X X X X X X X

    X X X X X X X X X

    X X X X X X X X X

    X X X X

    X

    X

    X X X X

    3

    X X X X X X X X

    X X X X X X X X

    X X X X X X X X

    X X X X X

    X X X X

    X X

    4

    X X X X X X X X

    X X X X X X X X

    X X X X X X X X

    X X X X

    X X X X

    5

    X X

    X X

    X X X

    X X

    X X

    X X

    COMMON

    Devices TroubleBattery Failure

    Power Failure

    Network Failure

    Short / Open Circuit

    Grounding Fault

    ROOF & UPPER ROOF

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    GROUND FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCHActivation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    Activation of Smoke Detector

    Activation of Heat DetectorActivation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    SIGNALtoFireBrigadeViaAu

    toDialer

    Activation of Tamper Switch (Valve)

    BASEMENT-1

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    EFFECTSDESCRIPTION

    AlarmIndicationinMFACPInFireCommand

    CentreInTower-2

    IndicationinMainMIMICPane

    lInFire

    CommandCentreInTower-2

    IndicationinMIMICPanelGroundFloor

    Office

    ATSChangeover&GeneratorStart-UP

    AlarmsandTroubleMonitoring

    inBMSin

    MainControlRoom

    ActivationOfFIREALARMSO

    UNDER/

    ALARMBell

    CAUSE DESCRIPTION

    BASEMENT-2

    ActivationOfCarParkVentilationSystem

    (MFAF,MEF,JF)

    ToOpenallAccessDoorsand

    GateBarrier

    UTILITY

    TroubleIndication&Buzzerin

    MFACPIn

    FireCommandCentreInTowe

    r-2

    SupervisoryIndication&BuzzerinMFACP

    InFireCommandCentreInTo

    wer-2

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    2nd Alarm Signal of FM200

    ActivationOfFirePumpExhau

    stFans

    EvacuationMessagesthrough

    VASystem

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    14/22

    S/N DESCRIPTION1

    X X X X X X X X X

    X X X X X X X X X

    X X X X X X X X X

    X X X X X

    X X X X

    X X

    2

    X X X X X X X X X

    X X X X X XX X X X X X

    X X X X X

    X X X X X

    X X X

    5

    X X X X X X X X X

    X X X X X X X X X

    X X X X X X X X X

    X X X X X

    X X X X X

    X X X

    6

    X X X X X X X X X

    X X X X X X X X X

    X X X X X X X X X

    X X X X X

    X X X X X

    X X X

    7

    X X X X X X X X X

    X X X X X X X X X

    X X X X X X X X X

    X X X X X

    X X X X X

    X X X

    8

    X X X X X X X X X

    X X X X X X X X X

    X X X X X X X X X

    X X X X X

    5th FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water FLOW SWITCH

    4th FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    3rd FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    2nd FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    1st FLOOR

    Activation of Smoke Detector

    Activation of Heat DetectorActivation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    GROUND FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    CAUSE DESCRIPTION

    CARPARK

    EFFECTSDESCRIPT

    ION

    A

    larmIndicationinMFACPInFire

    Command

    C

    entreInTower-2

    IndicationinMainMIMICPanelIn

    Fire

    C

    ommandCentreInTower-2

    IndicationinMIMICPanelGround

    Floor

    C

    ontrolRoom

    A

    ctivationOfFIREALARMSOUN

    DER/

    A

    LARMBell

    T

    oOpenallAccessDoorsandGa

    teBarrier

    T

    roubleIndication&BuzzerinMF

    ACPInFire

    C

    ommandCentreInTower-2

    S

    upervisoryIndication&BuzzerinMFACPIn

    F

    ireCommandCentreInTower-2

    R

    ecallElevatortoGroundFloor

    E

    vacuationMessagesthroughVA

    Systemin

    O

    ffices&LiftCorridors.

    S

    IGNALtoFireBrigadeViaAutoDialer

    A

    ctivationOfFirePumpExhaustFans

    ATSChangeover&GeneratorSt

    art-UP

    A

    larmsandTroubleMonitoringin

    BMSin

    M

    ainControlRoom

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    15/22

    S/N DESCRIPTION

    1

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X

    X X X X

    X

    X

    X X X X

    2

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X X X X X X X X X

    X X X X

    X

    X

    X X X X

    3

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X XX X X X

    X X

    4

    X X X X X X X X X X X

    X X X X X X X X

    X X X X X X X X

    X X X X X X X

    X X X X X X X

    X X X

    5

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X

    X X X X X X X

    X X X

    6

    X X X X X X X X X X X

    X X X X X X X X X X X

    4th FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    1ST & 2ND FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    3RD FLOOR FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    BASEMENT-1

    Activation of Smoke Detector

    Activation of Heat DetectorActivation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    GROUND FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCHActivation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    CAUSE DESCRIPTION

    RECREATION BUILDING

    EFFECTS

    DESCRIPTION

    AlarmIndicationinMFACPInFireCommand

    CentreInTower-2

    IndicationinMainMIMICPane

    lInFire

    CommandCentreInTower-2

    IndicationinMIMICPanelLow

    erGround

    ControlRoom

    TroubleIndication&Buzzerin

    MFACPIn

    FireCommandCentreInTowe

    r-2

    SupervisoryIndication&BuzzerinMFACP

    InFireCommandCentreInTo

    wer-2

    RecallElevatortoGroundFloo

    r

    EvacuationMessagesthrough

    VASystemin

    Offices&LiftCorridors.

    BASEMENT-2

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    First/Trouble Alarm Signal of FM200

    2nd Alarm Signal of FM200

    Activation of Tamper Switch (Valve)

    SIGNALtoFireBrigadeViaAu

    toDialer

    ActivationOfFirePumpExhau

    stFans

    ATSChangeover&GeneratorStart-UP

    AlarmsandTroubleMonitoring

    inBMSin

    MainControlRoom

    AirHandlingUnitOfAffectedF

    loor

    ActivationOfFIREALARMSO

    UNDER/

    ALARMBell

    ActivationOfCarParkVentilationSystem

    (MFAF,MEF,JF)

    ToOpenallAccessDoorsand

    GateBarrier

    TreatedFreshAirHandlingUn

    it

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    16/22

    X X X X X X X

    X X X

    7

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X XX X X X X X X

    X X X

    8

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X

    X X X X X X X

    X X X

    9

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X

    X X X X X X X

    X X X

    10

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X

    X X X X X X X

    X X X

    11

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X X X X X

    X X X X X X X

    X X X X X X X

    X X X

    12

    X X X X X X X X X

    X X X X X X X X X

    X X X X X X X X X

    X X X X

    X X X X

    13

    X X

    X X

    X X X

    X X

    X X

    X X

    ROOF & UPPER ROOF

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    COMMON

    Devices Trouble

    Battery Failure

    Power Failure

    Network Failure

    Short / Open CircuitGrounding Fault

    20th FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCHActivation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    21st FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    6th to 18th FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    19th FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCH

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    Activation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

    5th FLOOR

    Activation of Smoke Detector

    Activation of Heat Detector

    Activation of Manual Call Point

    Activation Of Water - FLOW SWITCHActivation of Tamper Switch (Valve)

    Failure Of Openable Window Panel

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    17/22

    Updated : 22 November 2011

    Item Deficiencies/Deviations/Directions AEB Supervising Consultant Response/Remarks Midmac & Samko/Fire Specialists

    1 Submit the complete sheets of CDD approved plans of Tower 1 ( Architectural, Fire Alarm, Fire Fightingand ACMV ) CD copy.

    Refer to Soft Copy of Architectural and Fire Alarm

    Drawings. ( HVAC No CDD approved drawing). FireFighting Drawing /Justification submitted to CDD for

    Approval.

    2No designated Fire Engine Hard standing. of 6m x 15m ( minimum ), with longer side parallel to the

    faade of the building provided ( Tower 1 ).Done - See Attached Photo

    3

    Fireman's access panel shall be provided with either a red or orange triangle of equal sides ( minimum

    150mm on each side), which can b upright or inverted, on the external side of the building wall and

    wordings "Fire Fighting Access - Do not Obstruct" of at least 25mm height on the internal side ( Tower 1

    ).

    Done See Attached Photo

    * Fire department access panel shall be tempered glass ( NFPA 5000, Chapter 39, Section 46.5.31 ).

    4 Justify the rating of double swing glass doors at the lift lobby of Basement levels 1 & 2.AEB actions to justify fire rating of double swing glass

    doors in lift lobby.Done - See Attached Documents

    5Justify the installation of non fire rated sliding glass window in aluminum frames within the exit staircase

    enclosure at the roof top level of Tower 1.

    AEB confirmed the CDD requirements to be executed by

    MidmacDone - See Attached Photo

    6 Justify un-enclosed electrical equipments inside the exit staircase at the top most level of Tower 1.As per IFC design layouts - the MCC Panels must be

    totally enclosed on staircase landing.

    Refer to Attached Sketch Proposal & CDD approved Architectural

    Layout; AEB design layout with MCC Panel.

    7

    All vertical and horizontal penetrations or openings on the fire rate walls / slabs particularly exit access

    corridor, fire fighting / smoke - stop lobby, electrical room, shall be sealed with approved CDD fire

    stopping materials.

    This is similar to CDD comments at Apartments; AEB request

    Midmac to provide letter of confirmation for the works

    performed in accordance to CDD approved methodology and

    approved materials.

    Done - See Attached Photo

    8 No testing of fire fighting system at the time inspection.

    * Justify reducing the capacity of fire pumps serving basement 1 and basement 2 as indicated in the CDD

    approved plan 528-MP-M-FF-004 ( 8 of 9 ) dated April 10, 2011 should be 1900 GPM. During inspection it

    was found out the pump capacity is 1000 GPM. "As Built" drawings including justification shall be

    submitted in the CDD Planning Section for evaluation and approval.

    AEB uploaded the justification of using 3-numbers Fire

    Pumps to CDD Planning Section . Awaiting Approvalfrom CDD.

    9 Provide automatic suppression system in the storages at basement level.

    AEB to check and verify CDD approved plans for storage

    rooms are equipped with automated suppression

    system at basement areas.

    Store provided with Sprinkler System - Refer to Attached Photo

    10 Justify non provision of sprinkler system in the Ground Floor and 1stFloor Offices of Tower 1.

    As per CDD approved plans for General Towers at

    Ground & 1st floor provision of fire sprinklered

    system; however the CDD requirements will be carried

    out by ID Fit-out tenancy works.

    11Provide proper directional arrows and identification of each zone control valve, riser and piping which

    are serving.Done - See Attached Photo

    12 Some sprinkler heads were still provided with protected seal at the time of inspection. Done - See Attached Photo

    5-Oct-11

    Reference FPD INSP - 782/11 CDD FILE NUMBER 22580

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    18/22

    13

    It was noted that there were a lot of Common & Supervisory Fault / Trouble at FACP. Rectify the system

    and restore to normal operating condition. Submit Record of Completion duly acknowledged, signed /

    stamped by the supervising consultant.

    Supervisory fault still experienced at the Apartment Buildings are

    operational and at many occasions valves are being closed by the

    Facility maintenance team/tenants which is causing common

    faults.

    14 Justify non provision of evacuation message through PS System in Offices and Lift Corridors in Tower 1. Done - Refer to attached T & C Report

    15 Justify non provision of detection system in the Ground Floor and 1st Floor Offices of Tower 1.Similar comment as Item-10 to be carried out by ID Fit-

    out tenancy works.

    16Provide Duct Smoke Detector in the air supply to the pressurized stairwell. On detection of smoke in the

    air supply, the supply fan (s) shall be stopped ( as per NFPA 92A).AEB verified the CDD requirements to provide Done - See Attached Photo

    17

    Submit the update Cause and Effect Matrix showing the sequence of operation of all the system related

    to LIFE, SAFETY & FIRE PROTECTION indicating what will occur during fire alarm activation / simulation.

    Shall be acknowledged, signed / stamped by supervising consultant.

    AEB will update the Cause and Effect Matrix for

    Midmac & Samko with all fire specialists to perform

    the sequence of operation of the Smoke Management

    System

    > Submit fire strategy report detailing the sequence of operation of the smoke management system

    18

    A/C units for all FM 200 protected areas shall be interfaced or associated with the Control Panel. Split

    type A/C units at Qtel room did not shut down upon activation of alarm for FM 200 System at the time of

    inspection.

    AEB requested for a dialogue session with NAFFCO

    specialist for technical clarification and justify CDD

    requirement for implementation inside all FM-200

    system rooms.

    Works in Progress to be Completed by 15 December 2011.

    19Local fire alarm bells installed inside the enclosed rooms protected by FM 200 system shall be relocated

    outside and it will activated.Similar to Item-18 Works in Progress.

    20Justify the resume normal operation of all elevators / lifts after resetting the FACP. It should be at lift

    machine room.

    AEB requested Midmac & ETA to justify CDD comments

    necessary to provide.Done - See Attached Photo

    21Smoke management system testing at Basement Level 1 & 2 was not satisfactory at the time of

    inspection.

    * Some supply and exhaust fans not interfaced at FACP working during testing at fire mode.System tested and inspected on 21.11.2011 , However one Fan

    found not working; Rectifications work in progress.

    * Justify non provision of manual override for the smoke management system at FCC.

    Midmac & Samko to provide the basement smoke management

    schematic diagram operating as individual system; and provide

    justification overall manual over-ride at Main Fire Command

    Centre. Works in progress and expected to complete by

    30.11.2011.

    * Justify the efficiency of jet fans of basement ventilation system since there are a lot of obstructions.Done - Guide Vanes provided on Jet Fans by the Specialist

    (Systemair) - refer to attached Letter.

    22

    Submit CFD analysis and calculation for Basement Ventilation System ( Sufficient make up air should be

    provided to satisfy the exhaust requirements and attain a 10 ACH at fire mode and 4 to 6 ACH at normal

    mode).

    AEB requested Specialist - Systemair to examine the

    CFD Analysis as per CDD requirements for confirmation

    reply to CDD

    Done - Refer to attached CFD Analysis and Calculations in Soft

    Copy.( CD)

    23 Interfacing of escalator to FACP was not yet demonstrated at the time of inspection.

    AEB to review CDD requirements for the installed

    outdoor escalators (ground level) to be interfaced with

    FACP.

    Interfacing control cables for CDD requirements of Escalators

    linked with main FACP- Escalator panel in progress. Work schedule

    to be completed on 30.11.2011.

    Done - Refer to Updated |Cause and Effect Matrix

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    19/22

    24Data tabulation for pressurization system ( Staircase Pressure Differential ) of staircases and f ire lift lobby

    per floor shall be acknowledged, signed / stamped by supervising consultant ( for Tower 1 ).

    AEB confirmed receipt of test report conducted with

    Staircase Pressurization System; but the Fire Lift Lobby

    test reports for Tower-1/2/3 still outstanding.

    Data Tabulation for Staircase Pressurization - Refer to attach

    Report. Fire Lift Lobby Pressurization System for Tower -1/2/3 by

    30.11.2011.

    25 The independent ventilation system at FCC shall be connected to Emergency Power Supply System.

    AEB request for submission of Emergency Power Single

    Line Diagram related to installed Split Air-ConditioningUnits in the FCC room complete with room layout

    defining the indoor fan coil units locations.

    Done - Refer to attached Diagram.

    26Some identification markings for mechanical equipment rooms, shafts ( exhaust & fresh air ) and other

    important building services / rooms shall be provided.Done - Refer to attached Photos.

    27 FM 200 System shall comply to the requirements as follows: Done - See Attached Photo

    * Caution signs shall be provided outside the protected areas of FM 200 System "This room is protectedwith FM 200 System ; Do Not Enter In Case of Alarm".

    As per CDD requirements, the caution signs must be

    visible, 100mm height and installed outside protected

    rooms of FM-200 System

    Done - See Attached Photo

    * Manual Pull Station shall be provided with proper label " Manual Gas Release Station" and should

    have protective cover for accidental release of agent and tampering.

    As per CDD requirements, the caution sign must be

    provided with proper label wordings complete with

    protective cover against accidental release of agent

    and tampering/vandalism act.

    Midmac to provide CDD requirements accordingly with the correct

    identification words; however NAFFCO confirmed not required.

    * A manual mechanical means of discharging the required agent shall be provided on the storage

    container.Done - See Attached Photo and Material Brochure.

    * The Control Panel shall be connected to the Buildings Main Fire Alarm Panel and shall provide Alarm,

    Gas Discharged and Fault indications on the Main Panel.Only one alarm is provided - Print Out Attached.

    * The activation of Abort Button during second alarm will stop the countdown t imer and as soon abort

    button is released, the discharged delay countdown will restart at the preset duration.Done- refer to attached drawing.

    28

    Functional test of ATS for power change-over of Kahramaa to Emergency Power Supply System /

    Generator Set ( EPSS ) and vice versa initiating an alarm ( Life Safety & Fire Protection ) with essential

    loads connected shall be witnessed by QCDD.

    This CDD comment is related to the basement

    ventilation system under fire scenario activation and

    local Kahramaa electricity supply failure shall require

    the auto-transfer power to the emergency generator

    system serving all fire fighting systems.

    Done - Refer to attached T & C Report

    29

    Submit testing, commissioning and acceptance data report of Fire Alarm and Detection System, Fire

    Fighting System, Smoke Control and Ventilation System and lift operations done by the contractors duly

    acknowledged by the supervising consultants for Tower 1, Basement 1 & 2.

    Similar Item-28 but to include Lifts System integration

    report under fire scenario activation.

    Refer to attached T & C Report for Smoke Control and Ventilation

    System ; Lift Load Test Report.

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    20/22

    July 16 2011

    CDD REQUIREMENTS FOR SUBMISSION-INSPECTION

    S/N

    AEB SUBMISSION

    REQUIRED

    MIDMAC SUBMISSION

    REQUIRED

    AEB HEAD OFFICE

    SUBMISSION REQUIRED

    1

    CDD approved plans are

    included in application; refer

    to attached material

    certificates for FM 200 & Fire

    extinguisher

    2

    Midmac to submit all

    reports and include

    test/commissioning for fire

    protection, fire alarm &

    voice evacuation, fire

    pumps, FM-200, lifts,

    smoke control & ventilation

    systems

    3See attached scan approved

    CDD drawings.

    4

    Midmac to submit all

    battery calculations for fire

    alarm system, FM 200,

    voice evacuation system.

    5Midmac to submit all test

    reports for fire sprinkler

    system

    6Test in progress - Midmac

    to compile and submit all

    tests

    7

    Complete Hydarulic Flow

    calculations of FM-200System.

    8 Midmac submitted .

    9

    Fault signal correctly registered at control panel/sub-main fire alarm panel

    a) Audible fault alarm and fault indicator functioning

    b) FM200 must be integrated also with main fire alarm. All ventilation must automatically shut down during the alarm.

    10Midmac to submit all T & C

    reports

    Submit the complete sheets of CDD approved plans and CDD approved product certificate for Automatic Dry Powder Fire

    Extinguisher System, FM 200 system and other gaseous system (if any)

    Submit testing, commissioning, acceptance report (w/procedure/methodology), sequence of operation of fire protection

    system, fire detection and alarm system including the communication and voice evacuation system, fire pumps including its

    control, FM-200 Automatic Dry Powder Fire Suppression system, lifts and smoke control and ventilation system done by

    the contractor duly approved, acknowledged by supervising consultant.

    Submit detailed lift sections and lay-out plan on how to ccess the fire lift and its accessibility on all floors.

    Provide calculations for battery stand-by power supply taking into consideration the power requirements of all alarms,

    initiating devices and auxiliary components under full load conditions for Fire Detection & Alarm System, FM 200 System

    and other systems.

    Note that all rooms with FM-

    200 are not provided with

    ventilation, instead split a/c

    units installed.

    Midmac to perform the test

    required and submit the

    test report with

    endorsement.

    Submit hydrostatic pressure testing and flushing report for the sprinkler system done by the contractor and witnessed,

    acknowledged, signed/stamped by the supervising consultant.

    Submit tabulation of pressurization system (Staircase Pressure Differential, fire lift lobby, smoke stop lobby) per floor.

    Submit complete hydraulic flow calculations of FM-200 automatic fire suppression system. The individual sections of pipe

    and each fitting to be uised, as shown on the isometrics, must be identified and included in the calculation. Total agent

    discharge time must be shown and detailed by zone and calculations for battery stand-by power supply taking intoconsideration the power requirements of all alarms, initiating devices and auxiliary components under full load conditions of

    FM-200 system.

    Submit enclosure integrioty test report for FM 200 system. The test shall be conducted by a qualified tester acceptable to

    the QCD.

    Submit FM 200 Testing and alarms report - Simualtion test for the 1st mode and 2nd mode and test on electrical

    supervision system (simulate fault by disconnecting any detector/devioce connected to the f iring circuit). Following shall be

    satisfied:

    Submit the fire pumps sequence of operation, test report to evaluate its performed through the flow meter on its rated/peak

    flow and pressure.

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    21/22

    11

    Midmac to submit omplete

    Fire Pump test reports

    including performance

    curve and hydraulic

    calcualtions.

    12 Calculations are provided &available.

    13

    14

    15Midmac to provide

    certificate for glass

    composite

    16

    17

    18

    mac o su m

    test/commissioning report

    of generator running at full

    19

    Midmac to submit

    test/commissioning report

    of ATS change-over & vice

    versa with generatorconnected with essential

    loads

    20 See attached documents

    21 See attached documents

    22 See attached documentsCDD format for AEB

    endorsement - structural

    declaration

    23 See attached documents

    24

    a) Flush bolts for doors (auto per 7.2.1.5.10) locks shall not require use of key (7.2.1.5.2)a) Access Control

    schematic

    b) Location of latches (7.2.1.5.9.1)

    c) Physical barrier fr. BFL to GFL discharge See attached documents

    See attached documents

    25 Complied; see attached liftdetails.

    26 Staircase pressurization/smoke purging system.

    a) Fire rated cables per NFPA 70. a) See attached documents.

    b) Motorized pressure relief dampers w/ DPS (measure change pressure across doors). b) Midmac to provide.

    Submit proof of certification that smoke exhaust duct thickness have an appropriate fire resistance rating to withstand

    temperature of smoke to ensure reliability at the design temperature and length of exposure.

    Submit the Fire Strategy Report for the Smoke Prging System / Management Systems.

    Submit the Cause and Effect Matrix showing the sequence of operation of all the system related to LIFE SAFETY & FIRE

    PROTECTION indicating what will occur during f ire alarm activation/simulation.

    Submit the Single Line Diagram of EPSS (Emergency Power Supply System) and test/commissioning report of generator

    running on its full load with essential load connected.

    Submit functional test of ATS for power change-over of Kahramaa to emergency power supply system (EPSS) and vice

    versa initiating an alarm (Life Safety & Fire Protection) with essential loads connected and test shall be witnessed by

    QCDD.

    Fireman lifts - protected against H2 0 per 101 7.2.13.6

    Submit fire pumps test performance curve on which the system curve and duty point (100% & 150% data) together with

    hudraulic calculations of the sprinkler system.

    Exit Discharge - panic hardware (no locks)

    Submit letter of confirmation from the supervising consultant stating that approved fire stopping materials were used in all

    penetrations for protected areas (attached product catalogue/brochure) with accredited applicators.

    Submit calculation for the duration of fire water storage tank (excluding freeboard) in relation with the fire pump capacity.

    Submit Test Report for the composite glass panels used in the curtain wall/faade (shall not have plastic

    materials/combustible core)

    Submit site development plan showing the access way of fire apparatus, various provisions of breeching inlets and fire

    hydrants.

    Fire engine hardstanding access roads shall be kept clear of obstructions with vertical clearance of 4.5 meters and clear

    width of 4.0 meters.

    Provide fire engine hardstanding certificate showing the ground floor slab is capable of carrying an imposed stationary load

    of 45 Tons.

    Site Access - Fire Engine Hardstanding.

    d) handrails (760 mm ) of all portions of required egress width of stairs - the egress width shall be provided along the

    natural path of travel (7.2.2.4.2 - handrails)

  • 7/30/2019 Tower 1 and B1&B2 - 29 Comments

    22/22

    c) Manual override system @ FCC c) Midmac to provide

    d) Smoke vents (listed, visual insp., fail safe, auto open, override etc. - NFPA 704 - 5.1, 5.2.4/5.3 d) Refer to matrix table.

    27 FCC room.

    a) Fire resistance rating (ext.) a) See attached documents

    b) Manual override for energy fans

    c) EPSS annunciators/indicator

    c) refer to genset control

    panel signal to FACPd) Etc.

    28 AEB HO to provide

    29 Fire pump room

    a) Ventilation

    b) Fire telephone b) Complied

    c) Fuel tank for diesel pump c) Complied

    d) Ventilcation for tank d) Complied

    NOTE : Midmac to submit allcalibrated certificates for

    actual test of systems.

    Midmac to submit fire

    pump room layout c/w all

    items required by CDD

    Midmac to submit fire

    command center layout c/w

    all items required by CDD

    Fire strategy report (evacuation plan)

    All calibrated equipments/tools necessary for the actual test of the system such as manometer, anemometer, cold smoke

    generator, techometer, volt-meter/multi-tester, etc. shall be available on site.