Top Banner
Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012
41

Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Apr 02, 2015

Download

Documents

Kari Sergent
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Towards a regular assessment & reporting process based on SEIS

UNECE/WGEMA meeting 1-2 November 2012

Page 2: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Ministerial Declaration

14. ….’To keep the pan-European environment under review, we decide to establish a regular process of environmental assessment and to develop the SEIS across the region. These will serve multiple policy processes, including MEAs, and include capacity-building of countries in Eastern Europe, the Caucasus, Central Asia and South-Eastern Europe to monitor and assess their environment. We invite EEA and its partners to develop an outline for how these actions could be performed and to present it to the ECE Committee on Environmental Policy.’ … http://www.unece.org/fileadmin/DAM/env/documents/2011/ece/ece.astana.conf.2011.2.add.1.e.pdf

Page 3: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

The mandate

• Keep the pan-European environment under review• Establish a regular process of environment

assessment• Develop a Shared Environmental Information

System

So that SEIS gradually develops to underpin future environment assessment and review activities

Page 4: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

TWO time perspectives

• Short-term: 2012-2013• Medium/Long-term: 2014-2020and:• Regular monitoring & assessment of the

implementation process

Page 5: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

SEIS and related EU policy instruments

a) SEIS communication 1/2008

c) SEIS staff working paper 6/2012 (EU internal) b) Communication on better implementation

3/2012

Page 6: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

SEIS implementation in practiceStakeholders Why? What ?

(content)How? (infrastructure)

Who?(networks)

EU Better policies Env compliance INSPIREGMES

MS

EEA Improveassessments

Reporting activ. IndicatorsSENSE2

EIONET

Member States Streamline Rep. oblig. Data flows, CDR National and local authorities

ENP Harmonise Water, air, waste AoA, REPORTNET Env. & statistics

CA Trust cooperation

Water, air rep. oblig., MEAs

AoA, indicators Env. & statistics water bodies

Pan-European Monitor envCapacity building

Regular report CSI, AoA UNECE, MEAs, Int. org

Global Interoperability Monitoring status UNEP/Live, EoEData policyStandards

ISO, GEOSS, OGC,

Page 7: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

SEIS implementation short-termStakeholders

Time frame What (content)

How (infrastructure)

Who(networks)

EEA 2012-2013 WISE, BISE, CLIMA-ADAPT, Air quality E-reporting

SENSE (indicators)SERIS (reports)INSPIRE (Geo spatial data services)EoE (web services) GEMET, SOER LiveData policy

EionetW BalkansGMES-in situ

ENP 2014 IndicatorsData flowsRegular Assessments

IT working group Env. & statistic networks

CA 2014 IndicatorsData flowsSOE

Env. & statistic networks

Global 2015 UNEP Live SOE Live GEOSS, GNON

Page 8: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Steps in the process so far

• Sept. 2011 –Astana Declaration• Oct. 2011 – WGEMA – first ideas on implementing the Astana

mandate • March 2012 – EEA MB – Discussing draft outline prepared for

CEP• April 2012 – EU WPIEI – Discussing Astana follow up actions and

EU position to CEP meeting • April-Sept. 2012 - Comments and proposals to the draft outline • July- onwards – Dialogue with key partners (MEAs, EU, OECD,

UNEP, RECs) • October 2012 - Revised draft outline available for UNECE/CEP

and WGEMA

Page 9: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Other SEIS related activitiesCapacity building• ENP/SEIS - Workshops on SEIS/infrastructure and indicators

for both East and South (*)• Caspian sea- Env information system (together with

UNEP/Grid) Sept.2012• Central Asia - Aware project including SEIS national events

New SEIS projects• Central Asia – tendering closed on 1 Oct. for FLERMONECA

project (including SEIS extension); expected start 2013• Caspian – new SEIS related project for consideration for EU

funding

Page 10: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Relevant SEIS events

• SEIS dedicated side event in Rio –June 2012 (attended by UNECE, UNEP, CAREC and EEA members)

• Central Asia – EU panel on environment and climate change (Sept. 2012) – SEIS development endorsed as priority for cooperation in new fin. perspective 2014-2020;

• ENP/Steering Committee (21-22 Nov. Copenhagen)• Central Asia- EU –high level meeting on env. issues (to

endorse the proposed priorities 10-11 Dec. Bishkek, tbc.)• The first Eye on Earth user conference (4-6 March 2013,

Dublin)

Page 11: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

SEIS Action Plan

• Develop the next SOER cycle in a consistent way across region, using the indicators developed with associated assessments , following DPSIR framework

• Underpin the indicators used in the next SOER by regular data flows

• Streamline the activity of existing networks towards creating building blocks in the MDIAR(K) process for regular reporting

Page 12: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Points for discussion

• Role of WGEMA and JTF in the process• Coordination of networks at national level• Planned deliverables and timetable• Contributions to mid term review (2013)

Page 13: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

SEIS in action

Snapshot of EEA/SEIS activities

Page 15: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

FLIS IMS / CSI SENSE

A B C

11 GMT fiches 20-30 thematic fiches 39 country fiches

11 to 44 indicators 37 to 200 indicators 8 to 37 indicators

SYN

Synthesis report

3 indicator reports & stakeholder workshops

2012

2013

2014

Synthesis &

Derivatives

Global Megatrends

Thematic SOE summaries

Country-levelSOE summaries

Signals 2015 and other derivatives

? ?Reportnet

(incl. PDF, ...)Eionet

(incl. SERIS)FLIS

Dyn

am

ic in

form

ati

on

SOER2015

SOE Live

Page 16: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

IMS relation with other parts of the information system

Indicator = Specification + assessment Data sources(with metadata)

Data visualization (with metadata)

Graphs

Maps

Daviz

Eye on Earth

Map viewers

Page 17: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

AQ e-Reporting ?

• A new system for reporting air quality information

• A single system for all regulatory & informative reporting

• Modernised and standards based, to make full use of computers and the internet to deliver

Automation

Reliability / consistency

Medium to long-term savings

Enhanced information sharing

• All existing systems replaced as of 1 January 2014

Page 18: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Overview of the transition to air quality e-Reporting

VALIDATED AQ DATA

•Compliance data•Additional exchanged data

AQ Questionnaire Reporting•Attainment info•Exposure info•Area info•AQ management zones

PROVISIONAL

DATA•Up to date data•Summer ozone•Comparison with Alert & Info thresholds

AQ plans•Exceedance info•Source apportionment

•Projections•Measures

XML

New XML-based transmission(all AQ dataflows)

Currently reported and exchange information:

Page 19: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

XML-based air quality data reporting and exchange under the current mechanism

Nationalor

regional

database

EEAdatabase

InitialQA/QC

Up-to-date datatransmission34 countries +

Russia, US

Public

EEA’s web pages

Eye on Earth

National/regional public

O3 summer exceedances calculations

Other European projects

AQ stations

Provisional data

Consistency between national/regional and EEA

databases!!!

Re-transmission Corrected data

Current XML reporting

Page 20: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Shared Infrastructures and Tools

Informationproducts

Contentregistry

Datadictionary

Reportingobligations

EEAdata

services

Dataexchangemodules

Networkdirectory

Datarepository

Data handling

Data reporting Data dissemination

Page 21: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

UNEP Live components Relevant EEA existing infratructure components SEIS

1. Integrated Search

2. Reports

3. Maps and Graphics

4. Data and Indicators

5. My Country

6. Near Real-Time Alerts

7. Crowd Sourcing

8. SOE-Live

Synergies UNEP Live – EEA SOE Live

Page 23: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Multi-lingual Thesaurus GEMET

Page 24: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Reportnet Central Data Repository

Page 25: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Reporting Obligations Database

Page 26: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Data Centre Services

Page 27: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Semantic Data Service

Page 28: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

State of the Environment Reporting Information System SERIS

Page 29: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Europe's Environment Assessment of Assessments EE-AoA

Page 30: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Indicator Management System

Page 31: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Sharing European and National State of the Environment - SENSE

Page 32: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Forward-Looking Information and Services (FLIS)

Page 33: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

EUNIS - Linked env. data and information

Page 34: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

EIONET-Forum - infrastructure

Interest groupInterest

group

ZOPEApplication server

NaayaContent management system

EIONET Forum

Interest group

EnviroWindows

CHMBiodiv

BISE

Portal/websiteCustomise

Toolkits Customise/developNew features

CMSDevelopment/use

Application serveruse

Page 35: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

EEA Multimedia Services

Page 36: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Eye on Earth

Page 37: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Open government – Open data

Portal ready by end of 2012Member State portal to be launched in 2013EEA will share all its environmental data

Page 38: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

SEIS ENPI - Cookbook

• A set of case studies collected from EEA Member and Cooperating countries and ENPI partner countries.

• A SEIS Checklist comprising a set of questions designed to assess the status of SEIS development and identify possible gaps and areas for further enhancement.

• Steps to be taken into account when planning SEIS implementation.

• Useful links.

http://www.seiscookbook.net

Page 39: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

A Case study:

• Gives light on how to translate SEIS principles into practice

• Addresses real examples of implementation (currently 25 case studies)

• Identifies a series of services/tools that can be (re)used to meet the SEIS principles in a range of contexts

• Provides a SEIS barometer to benchmark your system / process

List of case studies

Page 40: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

SEIS implementation plan – DG ENV

• Inter-service consultation of a EC staff working paper SEIS implementation plan

• Publication end 2012 (tbc.)• Introducing SIIFs (Structured

implementation and information frameworks)• EEA is supporting pilot SIIFs on:

• Air quality• Urban waste water treatment

Page 41: Towards a regular assessment & reporting process based on SEIS UNECE/WGEMA meeting 1-2 November 2012.

Thank you !

http://www.eea.europa.eu/