Top Banner
Towards a neutron target and Measuring (n,ɣ) cross sections of the r- process Lothar Buchmann TRIUMF
13

Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

Mar 27, 2015

Download

Documents

Madeline Dawson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

Towards a neutron targetand

Measuring (n,ɣ) cross sections of the r-process

Lothar Buchmann

TRIUMF

Page 2: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

Physics of a neutron target

1. Precision scattering of neutrons on light nuclei, p…7Li (scattering lengths, potentials, polarization data).

2. n-p precicision radiative capture data.3. 7Li+n analog of 7Be+p.4. Some n-captures in s-process or

supernova neutronization (60Fe).5. The r-process: radiative capture.

A neutron target does not slow down the beam, or change its charge state, and is thus ideal for a storage ring.

Workshop

Page 3: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

TRIUMF plans

TRIUMF plans call for producing large quantities of cold uranium fission products by electro fission. That makes measurements in this region of the r-process something to be considered.

Page 4: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

Observed Solar-System Heavy-Element abundances

log = log10 (Yel/YH)+12

Solar s-process

p-process

r-process

Different processes contribute to the observed Heavy-Element abundancesr ≈ “leftovers” ( Solar – s )

Page 5: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

The r-process

Page 6: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

Some simple numbersEnergy: For the r-process, typically temperatures of 1-5 GK are encountered.As there is no Coulomb barrier, the average energy is simply kT, i.e.an energy range of the accelerator of 50-600 keV/u is desirable.

Example: 132Sn, double magic nucleus, T1/2~40 s, τ=57 s.Simplest assumption, everything is more or less in equilibrium,Isobars are immediately removed from the ring.

Next assumption: one gets 108 s-1 from the source into the ring. With the mean lifetime τ about 5x109 ions are in the ring in equilibrium.

The ring be 5 m in circumference, the energy be 100 keV/u. Then in 57 seconds 5x108 revolutions are made corresponding to a particle current of I=5x1017 s-1.

Page 7: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

More simple numbersNow, let the neutron density be 1000/cm3. For 1 m of sampling, one ends up with 105/cm2. Then the luminosity L is L=5x1022/cm2s-1.

With σ=100 mb Y=10-3 s-1=2.8 h-1, Dragon rates or better.

What are cross the sections?

Page 8: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

Neutron capture cross sections

13C+n p wave resonance σ(res)=8 mb

n capture on 238U

Interesting region

Page 9: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

Possible topology

UCN

Possible tunnel

Accelerator

Storage ring

Recoil separator

Page 10: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

Accelerator questions

1. Energy range: The energy range corresponds to lower ISACI energies except for the very lowest energies (decalerator?)

2. Mass range is pretty incompatible with ISACI, unless one is willing to throw 95% of the ions away.

3. Topography: At the moment, it looks as if ISACI and UNC go opposite directions.

4. How much would a dedicated accelerator cost? No principle problem in constructing a mass A=150, q=1 accelerator.

Page 11: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

Storage Ring questionsSize: can be in principle rather small, However, determined by charge state (2+, 3+) and energies.

Cooling: Is ion beam cooling advantageous?

Injection: Continuous injection with little losses? Stripping or phasespace and cooling?

Energy sweep: To find resonances that are at best known to a few keV in the cm, it will be necessary to sweep the beam continuously over an energy range of 10 to 20 keV/u. This feature needs to be incorporated into the ring, either for the interaction and separator region only or for the entire ring. The reason is, of course, that the neutron target does not produce any stopping throughout the target.

Detection: What detectors can be mounted at the neutron target (particle detectors)? How will a mass separator be included?

Isobar removal: The radioactive beam will decay to the an isobar. Mostly the charge state will change and that will remove most of the isobars. However, as ions are not fully stripped, some may stay behind.

Page 12: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

Recoil separatorAs by neutron capture the mass of the particle increases by one a recoil mass separator seems to be the appropriate tool to detect a signal.

The momentum is conserved (besides gamma-emission) in the collision, soan electric field needs to be part of the ring behind the neutron target. A Wien filter that directs the recoils out of the ring may work.

The energies are rather low for a recoil separator.

Is isobaric separation necessary (i.e., if there is isobaric beam)?How to achieve Z identification? Reacceleration? Will the separator follow the energy sweep?

Page 13: Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.

CostsWikipedia: The term handwaving is used in mathematics and physics to describe arguments that are not mathematically rigorous.

Beamline and accelerator: 5 M

Storage Ring: 10 M

Recoil separator: 3 M

Civil construction: 3 M

Proposal engineering estimates needed!