Top Banner
Project Overview Grand Rapids Public Schools and the Kent Intermediate School District expanded their special education learning environment, Pine Grove Learning Center. The expansion includes eight classrooms, a new cafeteria, and a playground. This addition was designed to meet the students’ needs and offer them more opportunities for inclusion. The building was constructed with input from special education staff to earn certification set by the U.S. Green Building Council. The Pine Grove Learning Center provides a safe, positive, learning environment where each student is given the opportunity and tools to communicate and participate in academics. Indiana | Michigan | Ohio www.stonecreek.cc Project Statistics Project Location: Wyoming, MI Project Participants Ø Architect: Progressive AE Ø Construction Manager: Owen Ames Kimball ©2017 Stonecreek Interior Systems Total Solution Provider Ø Project Size: 29,600 square foot addition Ø Total Construction Cost: $9 million Ø Stonecreek Contract: $55,850 Project Name: KISD Pine Grove Learning Center Ø Case Systems Plastic Laminate Casework Ø Formica Wild Cherry Casework Color Ø Wilsonart Twilight Zephyr Countertops
1

Total Solution Provider€¦ · Total Solution Provider Ø Project Size: 29,600 square foot addition Ø Total Construction Cost: $9 million Ø Stonecreek Contract: $55,850 Project

Jul 22, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Total Solution Provider€¦ · Total Solution Provider Ø Project Size: 29,600 square foot addition Ø Total Construction Cost: $9 million Ø Stonecreek Contract: $55,850 Project

Project Overview

Grand Rapids Public Schools and the Kent Intermediate School District expanded their special education learning environment, Pine Grove Learning Center. The expansion includes eight classrooms, a new cafeteria, and a playground. This addition was designed to meet the students’ needs and offer them more opportunities for inclusion. The building was constructed with input from special education staff to earn certification set by the U.S. Green Building Council. The Pine Grove Learning Center provides a safe, positive, learning environment where each student is given the opportunity and tools to communicate and participate in academics.

Indiana | Michigan | Ohiowww.stonecreek.cc

Project Statistics

Project Location: Wyoming, MI

Project Participants Ø Architect: Progressive AE

Ø Construction Manager: Owen Ames Kimball

©2017 Stonecreek Interior Systems

Total Solution Provider

Ø Project Size: 29,600 square foot addition

Ø Total Construction Cost: $9 million

Ø Stonecreek Contract: $55,850

Project Name: KISD Pine Grove Learning Center

Ø Case Systems Plastic Laminate Casework

Ø Formica Wild Cherry Casework Color

Ø Wilsonart Twilight Zephyr Countertops