Topik1 Penjanaan

Nov 22, 2014

Download

Education

Muhammad Arkam

Penjanaan Elektrik
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Topik1 Penjanaan

EEE603 EEE603 Selected Topic Selected Topic Group: EB82A Group: EB82A (Power)(Power)Power SystemPower SystemB. Electrical Engineering, UiTM B. Electrical Engineering, UiTM Seberang Perai, Pulau Pinang.Seberang Perai, Pulau Pinang.

Page 2: Topik1 Penjanaan

Ir. Muhammad Arkam B. Che Munaaim, P.Eng, IntPE

B. Elec. Eng (Hons), UTM, Dip. Elec. Eng. (Power), UTMElectrical Professional Engineer, MIEM, MIEEE, MIET, ASEAN Eng, APEC Eng.E-Mail: [email protected]/P Number: +6016-335 7727

Director (Electrical), Jurutera Perunding AZFA Sdn. Bhd, Shah Alam, Selangor.

Resident Engineer (Mechanical & Electrical), Mega Jati Consult Sdn. Bhd. for Project Design & Build of Advanced Technology Centre (ADTEC) Taiping, Perak.

Technical Advisory Committee (TAC), Electronic Industries, Institute Kemahiran Belia Negara (IKBN) Bukit Mertajam, Seberang Perai, Penang.

Lecturer, Power System, University Of Technology MARA, Seberang Perai, Penang.

Page 3: Topik1 Penjanaan

Durations Projects Client/Company Designation

6/4/99 5/5/99 Shah Alam (E) 132/33/11kV substation Tenaga Nasional BerhadMulti Discovery Sdn. Bhd.

Trainee Technician

10/5/99 7/6/99

Lumut Extension 132/11kV substation Tenaga Nasional Berhad Trainee Technician

28/10/99 29/11/9

9

Tanjung Kupang 132/11kV substation, Johor.

Tenaga Nasional Berhad Technician

July 2000 Paroi 275/132 kV substation, Negeri Sembilan.

Tenaga Nasional Berhad/ANSALDO

Testing Engineer

Aug. 2000 14/9/20

00

Kulim Hi-Tech Park (132kV Power Plant & Substation) Kedah.

Northern Utility Resources ELIN Commissioning Engineer

8/10/00 16/11/0

0

Seelong 132/11 kV substation, Johor. Tenaga Nasional BerhadMahkota Technologies S/B

Testing Engineer

19/11/00 Matrix Power Sdn. Bhd. (Factory Test), Selangor.

Multi Discovery Sdn. Bhd. Testing Engineer

December 2000

Kg. Subang 132/33/11kV substation, Selangor.

Tenaga Nasional BerhadMulti Discovery Sdn. Bhd.

Testing Engineer

January 2001 Merck 33 kV substation (Factory-KHTP), Kedah.

Tenaga Nasional Berhad Testing Engineer

February 2001

Gurun HVDC 110kV Substation, Kedah. Tenaga Nasional Berhad Testing Engineer

Page 4: Topik1 Penjanaan

Mar 2001 May 2001

IKBN Pagoh, Johor, Electrical contractor.

Min. Youths & Sports.Usrahlite Engineering S/B

Electrical Engineer

May 2001May 2003

IKBN seberang Prai, Penang, M & E contractor.

Min. Youths & Sports.Mega Nine Sdn. Bhd.

Project Engineer

June 2003Mar 2004

TUDM Western Hill, Penang. Full-package main contractor.

Min. Defense MalaysiaRasma Corporation S/B

Project Engineer

April 2004 – January

2005

Tendering, Controlling, Evaluating, Supervising, Claim, Reporting & Meeting.

Rasma Corporation Sdn. Bhd.& Mega Nine Sdn. Bhd.

Senior Project Engineer

January 2005-

31 March 2006

Tendering, Controlling, Evaluating, Supervising, Reporting & Meeting for Tabung Haji Switchgear Project & TUDM Sukhoi.

Rasma Corporation Sdn. Bhd.& Mega Nine Sdn. Bhd.

Senior Project Engineer

1st January 2007-

Present

Membina dan menyiapkan Sekolah Menengah Bertam Kepala Batas & Cadangan Pembangunan Kompleks Sukan For University Islam Antarabangsa Kuantan.

The Ministry Of Education University Islam Antarabangsa

Engineer

1st October 2007-

Present

Cadangan Merekabentuk, Membina & Menyiapkan Pusat Latihan Teknologi Tinggi (ADTEC) Di Atas PT 15643 Kamunting Raya, Mukim Asam Kubang, Daerah Larut Matang, Perak D.R.

The Ministry Of Human Resources, Malaysia

Resident Engineer (Mechanical &

Electrical)

Page 5: Topik1 Penjanaan
Page 6: Topik1 Penjanaan

Sistem PemarkahanSistem Pemarkahan

TugasanTugasan 50%50% UjianUjian 25%25% KuizKuiz 25%25%

Page 7: Topik1 Penjanaan

COURSE OUTLINE: SELECTED TOPIC COURSE OUTLINE: SELECTED TOPIC EEE603 POWER SYSTEMEEE603 POWER SYSTEM

WEEKWEEK CHAPTERCHAPTER SUB-CHAPTERSUB-CHAPTER

1 & 21 & 2

(8 hrs)(8 hrs)

-Introduction To Introduction To Power System Power System

EngineeringEngineering-GenerationGeneration

-Sejarah Industri Sejarah Industri Kuasa Di MalaysiaKuasa Di Malaysia

-Keperluan Asas Sistem KuasaKeperluan Asas Sistem Kuasa-Perkakasan Dalam Sistem KuasaPerkakasan Dalam Sistem Kuasa-Penjanaan, penukaran tenaga.Penjanaan, penukaran tenaga.-Penjanaan Kuasa ElektrikPenjanaan Kuasa Elektrik-Punca-Punca Tenaga Punca-Punca Tenaga -Asas Penghasilan ElektrikAsas Penghasilan Elektrik-Magnet, pengalir, penebat, fluks.Magnet, pengalir, penebat, fluks.

-Stesen Penjana Terma, Nuklear, -Stesen Penjana Terma, Nuklear, Minyak, Arang Batu, Diesel, Turbin Minyak, Arang Batu, Diesel, Turbin Gas, Hidro, Kitar Padu, SolarGas, Hidro, Kitar Padu, Solar-Peristiwa Penting Industri Kuasa Di Peristiwa Penting Industri Kuasa Di Malaysia.Malaysia.

Page 8: Topik1 Penjanaan

COURSE OUTLINE: SELECTED TOPIC COURSE OUTLINE: SELECTED TOPIC EEE603 POWER SYSTEMEEE603 POWER SYSTEM

WEEKWEEK CHAPTERCHAPTER SUB-CHAPTERSUB-CHAPTER

3 & 43 & 4

(8 hrs)(8 hrs)

-TransmissionTransmission-HVDC TransmissionHVDC Transmission

-KabelKabel-Talian PenghantaranTalian Penghantaran-Voltan Dalam Sistem Voltan Dalam Sistem PenghantaranPenghantaran-Jenis-Jenis TalianJenis-Jenis Talian-Perkakas Talian PenghantaranPerkakas Talian Penghantaran-Sistem Grid NasionalSistem Grid Nasional-Talian Penghantaran DCTalian Penghantaran DC-Jenis-Jenis PerlindunganJenis-Jenis Perlindungan-Kebaikan dan Keburukan Sistem Kebaikan dan Keburukan Sistem Grid NasionalGrid Nasional

Page 9: Topik1 Penjanaan

COURSE OUTLINE: SELECTED TOPIC COURSE OUTLINE: SELECTED TOPIC EEE603 POWER SYSTEMEEE603 POWER SYSTEM

WEEKWEEK CHAPTERCHAPTER SUB-CHAPTERSUB-CHAPTER

55

(8 hrs)(8 hrs)

-DistributionDistribution-High Voltage High Voltage

DistributionDistribution-Medium Voltage Medium Voltage

DistributionDistribution-Low Voltage Low Voltage DistributionDistribution

-Lighting Protection & Lighting Protection & Earthing SystemEarthing System

- Perlindungan & PembumianPerlindungan & Pembumian- Switchgear: Air Circuit Breaker, Switchgear: Air Circuit Breaker, Vacuum Circuit Breaker, Gas Circuit Vacuum Circuit Breaker, Gas Circuit Breaker (Gas Insulation Breaker (Gas Insulation Switchgear), Oil Circuit BreakerSwitchgear), Oil Circuit Breaker- Transformers: Oil Transformer, Transformers: Oil Transformer, Cast Resin Transformer.Cast Resin Transformer.- Protection Relays: Over current, Protection Relays: Over current, Earth Fault, Differential Relay, REF Earth Fault, Differential Relay, REF & Standby Earth Fault Relay.& Standby Earth Fault Relay.- Capacitor BankCapacitor Bank

- Lightning Protection Systems- Lightning Protection Systems

Page 10: Topik1 Penjanaan

RujukanRujukan::

Pemasangan & Penyenggaraan Elektrik, Edisi Kedua: Pemasangan & Penyenggaraan Elektrik, Edisi Kedua: Abd Samad Hanif 1994Abd Samad Hanif 1994

Panduan Peraturan IEE Edisi 15, A. Parameswaran & Panduan Peraturan IEE Edisi 15, A. Parameswaran & Yahya Emat 1992Yahya Emat 1992

Pemasangan Elektrik, Soal Jawab Berdasarkan Pemasangan Elektrik, Soal Jawab Berdasarkan Peraturan IEE, Abd Samad Hanif 1996Peraturan IEE, Abd Samad Hanif 1996

Laporan Latihan Jurutera Elektrik Kompeten Laporan Latihan Jurutera Elektrik Kompeten Suruhanjaya Tenaga Malaysia, Ir Muhammad Arkam, Suruhanjaya Tenaga Malaysia, Ir Muhammad Arkam, 20062006

Peraturan-Peraturan Bagi Pemasangan Elektrik, IEE Peraturan-Peraturan Bagi Pemasangan Elektrik, IEE Edisi-16, 1998Edisi-16, 1998

Protective Relays: Application Guide, GEC Protective Relays: Application Guide, GEC Measurement, 1990Measurement, 1990

Power System Protection & Switchgear, John Wiley & Power System Protection & Switchgear, John Wiley & Sons, 1987Sons, 1987

Page 11: Topik1 Penjanaan

RujukanRujukan::

Electrical Machines, Drives & Power System, Electrical Machines, Drives & Power System, Prentice HallPrentice Hall

Electrical Installation Works, TG FrancisElectrical Installation Works, TG Francis High Voltage Engineering, Kuffel & AbdullahHigh Voltage Engineering, Kuffel & Abdullah High Voltage Technology, AlstonHigh Voltage Technology, Alston Introduction To Power Electronics, Daniel W Introduction To Power Electronics, Daniel W

Hart, 1997Hart, 1997 Electric Energy System Theory, An Electric Energy System Theory, An

Introduction, 2Introduction, 2ndnd Ed, McGraw-Hill Book Co, NY, Ed, McGraw-Hill Book Co, NY, 19821982

Electric Power System, 3Electric Power System, 3rdrd Ed, John Wiley & Ed, John Wiley & Sons, 1988Sons, 1988

Page 12: Topik1 Penjanaan

RujukanRujukan::

Panduan Pendawaian Elektrik Domestik, Md Panduan Pendawaian Elektrik Domestik, Md Nasir Abd Manan, 2005Nasir Abd Manan, 2005

BM Weedy, Electric Power System, 3BM Weedy, Electric Power System, 3rdrd Ed John Ed John & Wiley, 1979& Wiley, 1979

WD Stevenson, Elements Of Power System WD Stevenson, Elements Of Power System Analysis, 3Analysis, 3rdrd Ed, McGraw Hill, 1975 Ed, McGraw Hill, 1975

SA Nasar, Electric Energy System, Prentice SA Nasar, Electric Energy System, Prentice Hall International, 1996Hall International, 1996

T.Tamsir, Pengenalan Sistem Kuasa, Unit T.Tamsir, Pengenalan Sistem Kuasa, Unit Penerbitan Akademik, UTM, 1990Penerbitan Akademik, UTM, 1990

William D Stevenson Jr. Elements Of Power William D Stevenson Jr. Elements Of Power System Analysis, Fourth Ed, McGraw Hill Book System Analysis, Fourth Ed, McGraw Hill Book Co, New York, 1982Co, New York, 1982

Page 13: Topik1 Penjanaan

RujukanRujukan::

Vincent Del Toro, Electric Power Systems, Vincent Del Toro, Electric Power Systems, Prentice Hall International Ed, New Jersey, Prentice Hall International Ed, New Jersey, 19921992

JD Glover & M Sharma, Power System JD Glover & M Sharma, Power System Analysis And Design (With Personal Computer Analysis And Design (With Personal Computer Applications) 2Applications) 2ndnd Ed, PWS Publishing Co., Ed, PWS Publishing Co., Boston, 1994Boston, 1994

OI Elgerd, Electric Energy System Theory, An OI Elgerd, Electric Energy System Theory, An Introduction, 2Introduction, 2ndnd Ed, McGraw Hill Book Co, Ed, McGraw Hill Book Co, New York, 1982New York, 1982

Page 14: Topik1 Penjanaan

Renungan…Renungan…Al Hadiid, Surah 57, Juzuk 27, Ayat 25:Al Hadiid, Surah 57, Juzuk 27, Ayat 25:

… … Dan Kami ciptakan Dan Kami ciptakan besi besi yang padanya yang padanya terdapat kekuatan yang hebat dan pelbagai terdapat kekuatan yang hebat dan pelbagai manafaat bagi manusia, (supaya mereka manafaat bagi manusia, (supaya mereka mempergunakan besi itu) dan supaya Allah mempergunakan besi itu) dan supaya Allah mengetahui siapa yang menolong (agama)Nya mengetahui siapa yang menolong (agama)Nya dan rasul-rasulnya padahal Allah tidak dan rasul-rasulnya padahal Allah tidak dilihatnya. Sesungguhnya Allah Maha Kuat lagi dilihatnya. Sesungguhnya Allah Maha Kuat lagi Maha Perkasa”Maha Perkasa”

Page 15: Topik1 Penjanaan

PendahuluanPendahuluan……

Penemuan lampu pijar (incandescent light Penemuan lampu pijar (incandescent light bulb) oleh Thomas Alva Edison pada tahun bulb) oleh Thomas Alva Edison pada tahun 1879 adalah pemangkin bagi perkembangan 1879 adalah pemangkin bagi perkembangan industri sistem kuasa di dunia.industri sistem kuasa di dunia.

Pembekalan elektrik swasta yang pertama ke Pembekalan elektrik swasta yang pertama ke Rawang oleh Loke Yew dan Thamboosamy Rawang oleh Loke Yew dan Thamboosamy Pillai pada 1894 adalah pemula industri kuasa Pillai pada 1894 adalah pemula industri kuasa di Malaysia.di Malaysia.

Page 16: Topik1 Penjanaan

KEPERLUAN ASAS SISTEM KEPERLUAN ASAS SISTEM KUASAKUASA

PENJANAAN (GENERATION)PENJANAAN (GENERATION) PENGHANTARAN (TRANSMISSION)PENGHANTARAN (TRANSMISSION) PENGAGIHAN (DISTRIBUTION)PENGAGIHAN (DISTRIBUTION)

Keperluan Lain:Keperluan Lain:Sistem PerlindunganSistem PerlindunganSistem PembumianSistem PembumianPengujian & PentauliahanPengujian & Pentauliahan

Page 17: Topik1 Penjanaan

PERKAKASAN DALAM SISTEM PERKAKASAN DALAM SISTEM KUASAKUASA Penjana (Generator)Penjana (Generator) Pengubah (Step Up Transformer)Pengubah (Step Up Transformer) Talian Penghantaran (Transmission Line)Talian Penghantaran (Transmission Line) Alat Suis (Switchgear)Alat Suis (Switchgear) Pemutus Litar (Circuit Breaker)Pemutus Litar (Circuit Breaker) Pengubah (Step Down Transformer)Pengubah (Step Down Transformer) Papan Suis (Switch Board)Papan Suis (Switch Board) Relay Perlindungan (Protection Relay)Relay Perlindungan (Protection Relay) Kabel (Cables)Kabel (Cables) Pembumian (Earthing)Pembumian (Earthing) Perlindungan Kilat (Lightning Protection)Perlindungan Kilat (Lightning Protection)

Page 18: Topik1 Penjanaan

TOPIK 1: PENJANAANTOPIK 1: PENJANAAN PenjanaanPenjanaan ialah proses pengeluaran tenaga elektrik ialah proses pengeluaran tenaga elektrik

dengan jumlah yang besar untuk kegunaan umum. dengan jumlah yang besar untuk kegunaan umum. Kebiasaannya, tenaga yang dihasilkan pada voltan 10-Kebiasaannya, tenaga yang dihasilkan pada voltan 10-20kV bagi mengurangkan kos penebatan.20kV bagi mengurangkan kos penebatan.

Asas-asas penukaran tenaga: Tenaga tidak boleh Asas-asas penukaran tenaga: Tenaga tidak boleh dicipta atau di musnahkan tetapi boleh di tukarkan dari dicipta atau di musnahkan tetapi boleh di tukarkan dari satu bentuk ke bentuk yang lain.satu bentuk ke bentuk yang lain.

Tenaga Cahaya – Tenaga HabaTenaga Cahaya – Tenaga Haba Tenaga Keupayaan – Tenaga MekanikTenaga Keupayaan – Tenaga Mekanik Tenaga Mekanik – Tenaga ElektrikTenaga Mekanik – Tenaga Elektrik

Page 19: Topik1 Penjanaan

PENJANAAN KUASA ELEKTRIKPENJANAAN KUASA ELEKTRIK

Dalam takrif lain, Penjanaan ialah penghasilan Dalam takrif lain, Penjanaan ialah penghasilan kuasa elektrik di stesen kuasa pusat untuk kuasa elektrik di stesen kuasa pusat untuk penghantaran ke beban atau kawasan penghantaran ke beban atau kawasan keperluan dan seterusnya pengagihan ke keperluan dan seterusnya pengagihan ke pengguna-pengguna. pengguna-pengguna.

3 elemen utama:3 elemen utama:

1) Punca-punca tenaga utama1) Punca-punca tenaga utama

2) Kaedah perubahan tenaga utama ke 2) Kaedah perubahan tenaga utama ke tenaga putaran.tenaga putaran.

3) Penjanaan untuk mengubahkan tenaga 3) Penjanaan untuk mengubahkan tenaga putaran ke tenaga elektrik.putaran ke tenaga elektrik.

Page 20: Topik1 Penjanaan

PENJANAAN KUASA ELEKTRIKPENJANAAN KUASA ELEKTRIK Punca-punca tenaga ialah arang batu, Punca-punca tenaga ialah arang batu,

gas, minyak atau lain-lain unsur yang gas, minyak atau lain-lain unsur yang berkerja untuk menggerakkan enjin wap. berkerja untuk menggerakkan enjin wap.

Penjana elektrik ialah peranti untuk Penjana elektrik ialah peranti untuk mengubah bentuk tenaga yang lain ke mengubah bentuk tenaga yang lain ke tenaga elektrik.tenaga elektrik.

Putaran selalunya di hasilkan dalam turbin Putaran selalunya di hasilkan dalam turbin yang di pacu oleh wap, kuasa air, gas-gas yang di pacu oleh wap, kuasa air, gas-gas pembakaran panas, angin dan pembakaran panas, angin dan sebagainya.sebagainya.

Page 21: Topik1 Penjanaan
Page 22: Topik1 Penjanaan

ASAS ELEKTRIKASAS ELEKTRIK Semua bahan pepejal, cecair dan gas terdiri daripada Semua bahan pepejal, cecair dan gas terdiri daripada

zarah bernama molekul.zarah bernama molekul. Molekul terdiri daripada atom.Molekul terdiri daripada atom. Molekul berlainan = Sebatian Molekul berlainan = Sebatian Molekul sama = unsurMolekul sama = unsur Nucleus = proton + neutronNucleus = proton + neutron Proton = PositiveProton = Positive Neutron = NeutralNeutron = Neutral Electron = NegativeElectron = Negative Elektron valen = elektron yang berada di orbit paling Elektron valen = elektron yang berada di orbit paling

luarluar Bilangan elektron valen 1-3: Pengalir, 5-8 Penebat Bilangan elektron valen 1-3: Pengalir, 5-8 Penebat

4: Semikonduktor.4: Semikonduktor.

-

Neukleus (Proton Neukleus (Proton + Neutron)+ Neutron)

ElektronElektron

Page 23: Topik1 Penjanaan

Pengalir:Pengalir: Bahan yang boleh mengalirkan Bahan yang boleh mengalirkan arus elektrik dengan baik.arus elektrik dengan baik.

Penebat:Penebat: Bahan yang tidak boleh Bahan yang tidak boleh mengalirkan arus elektrik.mengalirkan arus elektrik.

Separuh pengalir:Separuh pengalir: Bahan yang berada di Bahan yang berada di antara pengalir dan penebat. Pada satu antara pengalir dan penebat. Pada satu keadaan, boleh menjadi pengalir dan boleh keadaan, boleh menjadi pengalir dan boleh menjadi penebat pada keadaan yang lain.menjadi penebat pada keadaan yang lain.

Page 24: Topik1 Penjanaan

Arus:Arus: Pengaliran elektron bebas dari satu titik ke Pengaliran elektron bebas dari satu titik ke titik yang lain, unit: Ampere.titik yang lain, unit: Ampere.

Daya Gerak Elektrik:Daya Gerak Elektrik: Keupayaan yang diperlukan Keupayaan yang diperlukan untuk menggerakkan elektron. Unit: Volts.untuk menggerakkan elektron. Unit: Volts.

Kuasa:Kuasa: Kadar penukaran tenaga elektrik. Unit: Kadar penukaran tenaga elektrik. Unit: Watts.Watts.

Frekuensi:Frekuensi: Bilangan kitar dalam satu saat. Satu Bilangan kitar dalam satu saat. Satu kitar dalam masa satu saat bersamaan dengan 1 kitar dalam masa satu saat bersamaan dengan 1 Hertz.Hertz.

Page 25: Topik1 Penjanaan
Page 26: Topik1 Penjanaan
Page 27: Topik1 Penjanaan

ASAS PENGHASILAN TENAGA ASAS PENGHASILAN TENAGA ELEKTRIKELEKTRIK

Page 28: Topik1 Penjanaan

Magnet Terbahagi kepada 2:Magnet Terbahagi kepada 2:

- Magnet KekalMagnet Kekal- Magnet Sementara (Elektromagnet)Magnet Sementara (Elektromagnet)

Pemotongan urat daya (fluks) magnet oleh Pemotongan urat daya (fluks) magnet oleh sesuatu pengalir (conductor) akan sesuatu pengalir (conductor) akan menghasilkan arus elektrik di dalam pengalir menghasilkan arus elektrik di dalam pengalir tersebut.tersebut.

Dan sebaliknya, pengaliran arus elektrik dalam Dan sebaliknya, pengaliran arus elektrik dalam sesuatu pengalir akan menghasilkan fluks sesuatu pengalir akan menghasilkan fluks magnet di sekeliling pengalir tersebut.magnet di sekeliling pengalir tersebut.

Page 29: Topik1 Penjanaan
Page 30: Topik1 Penjanaan

Inilah konsep asas PENJANAAN TENAGA Inilah konsep asas PENJANAAN TENAGA elektrik dan diperluaskan serta di modenkan elektrik dan diperluaskan serta di modenkan dengan kaedah-kaedah berikut:dengan kaedah-kaedah berikut:

1) Stesen Penjana Terma1) Stesen Penjana Terma 2) Stesen Penjana Nuklear2) Stesen Penjana Nuklear 3) Stesen Penjana Minyak3) Stesen Penjana Minyak 4) Stesen Penjana Arang Batu4) Stesen Penjana Arang Batu 5) Stesen Penjana Diesel5) Stesen Penjana Diesel 6) Stesen Penjana Turbin Gas6) Stesen Penjana Turbin Gas 7) Stesen Penjana Hidro7) Stesen Penjana Hidro 8) Stesen Penjana Kitar Padu8) Stesen Penjana Kitar Padu 9) Stesen Penjana Solar9) Stesen Penjana Solar 10) Lain-Lain…. Kincir angin, biodiesel, tenaga 10) Lain-Lain…. Kincir angin, biodiesel, tenaga

dari bahan buangan dan sebagainya…dari bahan buangan dan sebagainya…

Page 31: Topik1 Penjanaan
Page 32: Topik1 Penjanaan

Stesen Penjana TermaStesen Penjana Terma Terma=Thermal=Haba bermaksud penglibatan tenaga haba Terma=Thermal=Haba bermaksud penglibatan tenaga haba

dalam menghasilkan tenaga elektrik.dalam menghasilkan tenaga elektrik. Contoh penjana kategori ini: Stim, arang batu, minyak, nuklear, Contoh penjana kategori ini: Stim, arang batu, minyak, nuklear,

dsb…dsb…

Gambarajah blok menunjukkan stesen penjana terma.

Page 33: Topik1 Penjanaan
Page 34: Topik1 Penjanaan
Page 35: Topik1 Penjanaan
Page 36: Topik1 Penjanaan

Stesen Penjana NuklearStesen Penjana Nuklear Logi nuklear masih menggunakan haba sebagai penggerak turbin Logi nuklear masih menggunakan haba sebagai penggerak turbin

tetapi oleh kerana bahaya dari sisa radioaktif dan kesukaran tetapi oleh kerana bahaya dari sisa radioaktif dan kesukaran mendapatkan bahan-bahan ini dari pasaran dunia, teknologi ini mendapatkan bahan-bahan ini dari pasaran dunia, teknologi ini tidak menjadi pilihan untuk dilaksanakan di negara kurang maju.tidak menjadi pilihan untuk dilaksanakan di negara kurang maju.

Gambarajah blok menunjukkan stesen penjana nuklear.

Page 37: Topik1 Penjanaan
Page 38: Topik1 Penjanaan
Page 39: Topik1 Penjanaan
Page 40: Topik1 Penjanaan
Page 41: Topik1 Penjanaan
Page 42: Topik1 Penjanaan
Page 43: Topik1 Penjanaan
Page 44: Topik1 Penjanaan
Page 45: Topik1 Penjanaan
Page 46: Topik1 Penjanaan
Page 47: Topik1 Penjanaan
Page 48: Topik1 Penjanaan

Stesen Penjana MinyakStesen Penjana Minyak Tidak banyak digunakan berbanding jenis arang batu kerana Tidak banyak digunakan berbanding jenis arang batu kerana

memerlukan tempat yang mempunyai sumber minyak berdekatan memerlukan tempat yang mempunyai sumber minyak berdekatan dan perlu hampir dengan air untuk sistem penyejukkan.dan perlu hampir dengan air untuk sistem penyejukkan.

Contoh di Malaysia: Perai, Port Dickson dan Pelabuhan Kelang.Contoh di Malaysia: Perai, Port Dickson dan Pelabuhan Kelang. Mempunyai konsep yang sama dalam penghasilan tenaga elektrik Mempunyai konsep yang sama dalam penghasilan tenaga elektrik

seperti Penjana Terma. Minyak yang digunakan ialah minyak asli seperti Penjana Terma. Minyak yang digunakan ialah minyak asli atau saki baki minyak selepas proses penapisan minyak dilakukan.atau saki baki minyak selepas proses penapisan minyak dilakukan.

Stesen Penjana DieselStesen Penjana Diesel Enjin diesel digunakan untuk memacu penjana. Aci (shaft) enjin Enjin diesel digunakan untuk memacu penjana. Aci (shaft) enjin

diesel dihubungkan terus dengan aci penjana untuk menghasilkan diesel dihubungkan terus dengan aci penjana untuk menghasilkan tenaga elektrik sebaik sahaja enjin diesel dihidupkan.tenaga elektrik sebaik sahaja enjin diesel dihidupkan.

Keupayaan enjin yang terhad menghadkan penghasilan tenaga.Keupayaan enjin yang terhad menghadkan penghasilan tenaga. Banyak digunakan di kawasan terpencil, tapak pembinaan, Banyak digunakan di kawasan terpencil, tapak pembinaan,

lombong-lombong dan pulau-pulau kecil untuk penjimatkan kos.lombong-lombong dan pulau-pulau kecil untuk penjimatkan kos.

Page 49: Topik1 Penjanaan
Page 50: Topik1 Penjanaan
Page 51: Topik1 Penjanaan
Page 52: Topik1 Penjanaan
Page 53: Topik1 Penjanaan
Page 54: Topik1 Penjanaan

Kuiz 1Kuiz 11)1) Two girls caught 25 frogs. Lisa caught four times as Two girls caught 25 frogs. Lisa caught four times as

many Jen did. How many frogs did Jen catch?many Jen did. How many frogs did Jen catch?2)2) A car traveled 28miles in 30minutes. How many A car traveled 28miles in 30minutes. How many

miles per hour was it traveling?miles per hour was it traveling?3)3) Ten people can paint 60 houses in 120 days, so five Ten people can paint 60 houses in 120 days, so five

people can paint 30 houses in… days…?people can paint 30 houses in… days…?4)4) What number is one half of one quarter of one tenth What number is one half of one quarter of one tenth

of 800?of 800?5)5) Two cars start off at the same point on a straight Two cars start off at the same point on a straight

highway facing opposite directions. Each car drives highway facing opposite directions. Each car drives for 6 miles, take a left turn, and drives for 8 miles. for 6 miles, take a left turn, and drives for 8 miles. How far apart are the two cars?How far apart are the two cars?

Page 55: Topik1 Penjanaan

Stesen Penjana Turbin GasStesen Penjana Turbin Gas Bahan api masih digunakan seperti stesen penjana terma.Bahan api masih digunakan seperti stesen penjana terma. Perbezaannya: Udara pada suhu biasa (+-30 oC) disedut menggunakan Perbezaannya: Udara pada suhu biasa (+-30 oC) disedut menggunakan

kipas untuk menghasilkan putaran turbin.kipas untuk menghasilkan putaran turbin. Udara dihala ke tempat pembakaran atau pemampat. Bahan api seperti gas Udara dihala ke tempat pembakaran atau pemampat. Bahan api seperti gas

dan arang batu digunakan untuk memanaskan udara tersebut.dan arang batu digunakan untuk memanaskan udara tersebut. Suhu udara dipanaskan hingga 1080 oC, 30 bar tekanan dan di lalukan Suhu udara dipanaskan hingga 1080 oC, 30 bar tekanan dan di lalukan

melalui turbin untuk menghasilkan tenaga elektrik.melalui turbin untuk menghasilkan tenaga elektrik.

Page 56: Topik1 Penjanaan
Page 57: Topik1 Penjanaan
Page 58: Topik1 Penjanaan
Page 59: Topik1 Penjanaan
Page 60: Topik1 Penjanaan
Page 61: Topik1 Penjanaan

Stesen Penjana HidroElektrikStesen Penjana HidroElektrik Diperoleh daripada takungan air di empangan yang merentasi sungai Diperoleh daripada takungan air di empangan yang merentasi sungai

atau tasik yang lebih tinggi daripada aras laut.atau tasik yang lebih tinggi daripada aras laut. Stesen di bina di kaki empangan pada 30-300 meter dari empangan.Stesen di bina di kaki empangan pada 30-300 meter dari empangan. Satu saluran dibuat antara empangan dan dewan turbin pada stesen Satu saluran dibuat antara empangan dan dewan turbin pada stesen

penjana.penjana. Air menjunam ke bawah dengan deras memacu turbin dan menghasilkan Air menjunam ke bawah dengan deras memacu turbin dan menghasilkan

elektrik di bahagian penjana.elektrik di bahagian penjana.

Page 62: Topik1 Penjanaan
Page 63: Topik1 Penjanaan

Penjana Hidro ElektrikPenjana Hidro Elektrik Tenaga elektrik yang terhasil pada penjana seterusnya Tenaga elektrik yang terhasil pada penjana seterusnya

di naikkan ke paras GRID nasional yang bersesuaian di naikkan ke paras GRID nasional yang bersesuaian sebelum di hantar ke talian penghantaran.sebelum di hantar ke talian penghantaran.

Stesen hidro bergantung kepada hujan untuk Stesen hidro bergantung kepada hujan untuk mendapatkan bekalan air. Pada musim kemarau, ketika mendapatkan bekalan air. Pada musim kemarau, ketika stesen tidak dapat berkendali, satu stesen pam di stesen tidak dapat berkendali, satu stesen pam di pasang di hilir empangan. Pam ini akan menghantar air pasang di hilir empangan. Pam ini akan menghantar air semula ke takungan sebaik dilepaskan melalui turbin semula ke takungan sebaik dilepaskan melalui turbin bagi memastikan sentiasa ada takungan yang bagi memastikan sentiasa ada takungan yang mencukupi untuk beroperasi.mencukupi untuk beroperasi.

Antara kelebihan stesen hidro ialah bebas pencemaran, Antara kelebihan stesen hidro ialah bebas pencemaran, kos operasi yang rendah, dapat mengeluarkan tenaga kos operasi yang rendah, dapat mengeluarkan tenaga yang besar dalam tempoh yang lama dan tetap.yang besar dalam tempoh yang lama dan tetap.

Kekurangannya pula ialah teknologinya mahal dan kos Kekurangannya pula ialah teknologinya mahal dan kos pembinaannya besar serta perlu kuat menghadapi pembinaannya besar serta perlu kuat menghadapi tekanan air pada masa akan datang.tekanan air pada masa akan datang.

Page 64: Topik1 Penjanaan
Page 65: Topik1 Penjanaan
Page 66: Topik1 Penjanaan
Page 67: Topik1 Penjanaan
Page 68: Topik1 Penjanaan
Page 69: Topik1 Penjanaan
Page 70: Topik1 Penjanaan
Page 71: Topik1 Penjanaan
Page 72: Topik1 Penjanaan
Page 73: Topik1 Penjanaan
Page 74: Topik1 Penjanaan
Page 75: Topik1 Penjanaan

Stesen Penjana Kitar PaduStesen Penjana Kitar Padu

Menggunakan kaedah stesen kuasa turbin gas, Menggunakan kaedah stesen kuasa turbin gas, tetapi lebihan haba yang tidak digunakan akan tetapi lebihan haba yang tidak digunakan akan disalurkan semula ke dandang bagi menghasilkan disalurkan semula ke dandang bagi menghasilkan tenaga elektrik secara terma.tenaga elektrik secara terma.

Ini bererti tiada tenaga yang terbuang begitu sahaja Ini bererti tiada tenaga yang terbuang begitu sahaja seperti yang berlaku pada stesen penjana lain.seperti yang berlaku pada stesen penjana lain.

Air laut biasanya digunakan untuk tujuan penyejukan Air laut biasanya digunakan untuk tujuan penyejukan stim setelah digunakan dalam kitar tertutup sistem stim setelah digunakan dalam kitar tertutup sistem penjana terma.penjana terma.

Sistem ini terdapat di Paka, Terengganu.Sistem ini terdapat di Paka, Terengganu.

Page 76: Topik1 Penjanaan

Dalam logi kitar padu, kuasa elektrik di janakan oleh Dalam logi kitar padu, kuasa elektrik di janakan oleh gabungan antara turbin gas, pemanas haba buangan gabungan antara turbin gas, pemanas haba buangan dan turbin stim.dan turbin stim.

Di dalam turbin gas, udara atmosfera di sedut masuk Di dalam turbin gas, udara atmosfera di sedut masuk dan diberi tekanan tinggi.dan diberi tekanan tinggi.

Udara tertekan dicampur dengan minyak dan dibakar Udara tertekan dicampur dengan minyak dan dibakar dalam combustion chamber.dalam combustion chamber.

Hasilnya, combustion chamber melalukan udara Hasilnya, combustion chamber melalukan udara panas dengan halaju tinggi yang berkembang panas dengan halaju tinggi yang berkembang melalui kepingan-kepingan turbin.melalui kepingan-kepingan turbin.

Turbin yang berputar itu memacu generator untuk Turbin yang berputar itu memacu generator untuk menghasilkan elektrik.menghasilkan elektrik.

Page 77: Topik1 Penjanaan

Pada operasi kitar terbuka, turbin gas akan mengeluarkan Pada operasi kitar terbuka, turbin gas akan mengeluarkan gas buangan ke udara melalui liang (blast stack) yang akan gas buangan ke udara melalui liang (blast stack) yang akan membazirkan tenaga haba di dalamnya.membazirkan tenaga haba di dalamnya.

Pada operasi kitar padu, turbin gas akan di salurkan oleh Pada operasi kitar padu, turbin gas akan di salurkan oleh sistem damper ke pemanas haba buangan.sistem damper ke pemanas haba buangan.

Haba buangan dilalukan pada air dalam litar pemanas untuk Haba buangan dilalukan pada air dalam litar pemanas untuk menghasilkan stim. Pemanas di reka bentuk untuk menghasilkan stim. Pemanas di reka bentuk untuk menghasilkan stim melalui 2 tekanan berbeza iaitu stim haba menghasilkan stim melalui 2 tekanan berbeza iaitu stim haba tekanan dan stim haba tekanan menurun.tekanan dan stim haba tekanan menurun.

Hasil daripada stim haba akan di bawa ke panghantaran stim Hasil daripada stim haba akan di bawa ke panghantaran stim biasa pada tekanan tinggi sebelum di masukkan ke turbin biasa pada tekanan tinggi sebelum di masukkan ke turbin stim.stim.

Page 78: Topik1 Penjanaan

Dalam turbin stim, stim akan dikembangkan Dalam turbin stim, stim akan dikembangkan melalui kepingan turbin dan susunan nozel. melalui kepingan turbin dan susunan nozel. Perkembangan stim akan menghasilkan kesan Perkembangan stim akan menghasilkan kesan putaran pada turbin yang digabungkan dengan putaran pada turbin yang digabungkan dengan generator untuk menghasilkan tenaga elektrik.generator untuk menghasilkan tenaga elektrik.

Stim yang telah digunakan akan Stim yang telah digunakan akan dikondensasikan menggunakan air laut.dikondensasikan menggunakan air laut.

Air yang telah dikondensasi di hantar semula Air yang telah dikondensasi di hantar semula ke punca asal untuk pemprosesan semula.ke punca asal untuk pemprosesan semula.

Page 79: Topik1 Penjanaan
Page 80: Topik1 Penjanaan
Page 81: Topik1 Penjanaan
Page 82: Topik1 Penjanaan
Page 83: Topik1 Penjanaan
Page 84: Topik1 Penjanaan
Page 85: Topik1 Penjanaan
Page 86: Topik1 Penjanaan
Page 87: Topik1 Penjanaan
Page 88: Topik1 Penjanaan
Page 89: Topik1 Penjanaan
Page 90: Topik1 Penjanaan
Page 91: Topik1 Penjanaan

Perbandingan Antara Stesen PenjanaPerbandingan Antara Stesen Penjana

Di Malaysia hanya terdapat 5 jenis stesen Di Malaysia hanya terdapat 5 jenis stesen penjanaan:penjanaan:

1)1) Penjana TermaPenjana Terma2)2) Penjana Turbin GasPenjana Turbin Gas3)3) Penjana Kitar PaduPenjana Kitar Padu4)4) Penjana HidroPenjana Hidro5)5) Penjana Diesel & Solar (Skala Kecil)Penjana Diesel & Solar (Skala Kecil)

Penjana solar dan diesel ada dipasang secara Penjana solar dan diesel ada dipasang secara kecil-kecilan di kawasan pedalaman yang sukar kecil-kecilan di kawasan pedalaman yang sukar diberikan bekalan elektrik secara talian diberikan bekalan elektrik secara talian penghantaran atau berkepadatan penduduk penghantaran atau berkepadatan penduduk rendah dan sistem perumahan tidak teratur.rendah dan sistem perumahan tidak teratur.

Page 92: Topik1 Penjanaan
Page 93: Topik1 Penjanaan
Page 94: Topik1 Penjanaan
Page 95: Topik1 Penjanaan
Page 96: Topik1 Penjanaan
Page 97: Topik1 Penjanaan
Page 98: Topik1 Penjanaan
Page 99: Topik1 Penjanaan
Page 100: Topik1 Penjanaan
Page 101: Topik1 Penjanaan
Page 102: Topik1 Penjanaan
Page 103: Topik1 Penjanaan
Page 104: Topik1 Penjanaan
Page 105: Topik1 Penjanaan
Page 106: Topik1 Penjanaan
Page 107: Topik1 Penjanaan
Page 108: Topik1 Penjanaan
Page 109: Topik1 Penjanaan
Page 110: Topik1 Penjanaan
Page 111: Topik1 Penjanaan
Page 112: Topik1 Penjanaan
Page 113: Topik1 Penjanaan
Page 114: Topik1 Penjanaan

Penjana SolarPenjana SolarSISTEM PHOTOVOLTAICSISTEM PHOTOVOLTAIC

Tenaga photovoltaic ialah penukaran Tenaga photovoltaic ialah penukaran tenaga dari cahaya matahari kepada tenaga dari cahaya matahari kepada bekalan elektrik melalui sel photovoltaic bekalan elektrik melalui sel photovoltaic (PVs), kebiasaannya dipanggil sebagai (PVs), kebiasaannya dipanggil sebagai sel suria. Sel photovoltaic ialah peranti sel suria. Sel photovoltaic ialah peranti bukan mekanikal yang selalunya bukan mekanikal yang selalunya diperbuat daripada silikon aloi. diperbuat daripada silikon aloi.

Page 115: Topik1 Penjanaan
Page 116: Topik1 Penjanaan
Page 117: Topik1 Penjanaan

Cahaya matahari akan membentuk Cahaya matahari akan membentuk photon-photon atau cebisan-cebisan photon-photon atau cebisan-cebisan kecil dari tenaga solar. Apabila photon-kecil dari tenaga solar. Apabila photon-photon ini menghentam sel photovoltaic, photon ini menghentam sel photovoltaic, ia mungkin akan memantul atau ia mungkin akan memantul atau menyerap. Hanya photon-photon yang menyerap. Hanya photon-photon yang menyerap boleh membekalkan tenaga menyerap boleh membekalkan tenaga untuk menghasilkan bekalan elektrik.untuk menghasilkan bekalan elektrik.

Page 118: Topik1 Penjanaan
Page 119: Topik1 Penjanaan

Apabila cahaya matahari atau tenaga dari matahari Apabila cahaya matahari atau tenaga dari matahari diserap oleh bahan (semikonduktor), elektron dipaksa diserap oleh bahan (semikonduktor), elektron dipaksa keluar dari atom bahan tersebut. keluar dari atom bahan tersebut.

Apabila elektron keluar dari tempatnya, hole akan Apabila elektron keluar dari tempatnya, hole akan terbentuk. Apabila terdapat elektron yang banyak di terbentuk. Apabila terdapat elektron yang banyak di mana setiap elektron akan membawa cas negatif, mana setiap elektron akan membawa cas negatif, elektron akan pergi menghala ke bahagian depan sel elektron akan pergi menghala ke bahagian depan sel photovoltaic. Hasil daripada kekurangan imbangan cas photovoltaic. Hasil daripada kekurangan imbangan cas di antara bahagian depan sel dengan bahagian di antara bahagian depan sel dengan bahagian belakang sel dan ini akan membentuk keupayaan belakang sel dan ini akan membentuk keupayaan voltan seperti terminal negatif dan positif bateri. voltan seperti terminal negatif dan positif bateri. Apabila dua bahagian disambungkan melalui beban Apabila dua bahagian disambungkan melalui beban luar, bekalan elektrik akan mengalir.luar, bekalan elektrik akan mengalir.

Page 120: Topik1 Penjanaan

Photons in in sunlight hit the solar panel and are hit the solar panel and are absorbed by semiconducting materials, such as absorbed by semiconducting materials, such as silicon. .

Electrons (negatively charged) are knocked loose from (negatively charged) are knocked loose from their atoms, allowing them to flow through the material their atoms, allowing them to flow through the material to produce to produce electricity. The complementary positive . The complementary positive charges that are also created (like bubbles) are called charges that are also created (like bubbles) are called holes and flow in the direction opposite of the electrons and flow in the direction opposite of the electrons in a silicon solar panel. in a silicon solar panel.

An array of solar panels converts solar energy into a An array of solar panels converts solar energy into a usable amount of usable amount of direct current (DC) electricity. (DC) electricity.

Page 121: Topik1 Penjanaan

When a When a photon hits a piece of silicon, one of three hits a piece of silicon, one of three things can happen:things can happen:

1) The photon can pass straight through the silicon — 1) The photon can pass straight through the silicon — this (generally) happens for lower energy photons, this (generally) happens for lower energy photons,

2) The photon can reflect off the surface, 2) The photon can reflect off the surface,

3) The photon can be absorbed by the silicon, if the 3) The photon can be absorbed by the silicon, if the photon energy is higher than the silicon photon energy is higher than the silicon band gap value. This generates an electron-hole pair and value. This generates an electron-hole pair and sometimes heat, depending on the band structure. sometimes heat, depending on the band structure.

Page 122: Topik1 Penjanaan
Page 123: Topik1 Penjanaan

Sistem Photovoltaic (PV) Sambungan Sistem Photovoltaic (PV) Sambungan GridGrid

Sistem ini menggunakan cahaya matahari Sistem ini menggunakan cahaya matahari sebagai sumber tenaga. Ianya senyap dan tidak sebagai sumber tenaga. Ianya senyap dan tidak mempunyai bahagian yang bergerak dan hampir mempunyai bahagian yang bergerak dan hampir tidak memerlukan pemantauan. Kekurangan tidak memerlukan pemantauan. Kekurangan dalam sistem ini ialah kadar efisiensi PV yang dalam sistem ini ialah kadar efisiensi PV yang rendah di sesetengah keadaan alam dan kos rendah di sesetengah keadaan alam dan kos sistem PV yang tinggi. Walaubagaimanapun, sistem PV yang tinggi. Walaubagaimanapun, sistem ini semakin popular kerana nilai arkitektur sistem ini semakin popular kerana nilai arkitektur yang tinggi.yang tinggi.

Page 124: Topik1 Penjanaan

Konsep: Konsep:

Panel PV menukarkan cahaya kepada elektrik Panel PV menukarkan cahaya kepada elektrik melalui bentuk aliran arus. Ia lebih dilihat sebagai melalui bentuk aliran arus. Ia lebih dilihat sebagai sumber arus elektrik kerana jumlah penghasilan sumber arus elektrik kerana jumlah penghasilan arus adalah berdasarkan jumlah cahaya. arus adalah berdasarkan jumlah cahaya. Regulator diperlukan untuk mengawal jumlah Regulator diperlukan untuk mengawal jumlah kuasa yang perlu dialirkan semula ke sistem grid kuasa yang perlu dialirkan semula ke sistem grid dan jumlah kuasa yang perlu dialirkan ke luar. dan jumlah kuasa yang perlu dialirkan ke luar. Jika arus keluar yang diperlukan adalah tinggi, Jika arus keluar yang diperlukan adalah tinggi, regulator akan mengalirkan semua tenaga dari regulator akan mengalirkan semua tenaga dari panel PV ke luar dan jika sebaliknya, kuasa panel PV ke luar dan jika sebaliknya, kuasa berlebihan akan dialirkan ke sistem grid.berlebihan akan dialirkan ke sistem grid.

Page 125: Topik1 Penjanaan

Bergantung kepada output yang diperlukan, Bergantung kepada output yang diperlukan, output DC (arus terus) memerlukan output DC (arus terus) memerlukan kelengkapan DC disambung terus ke kelengkapan DC disambung terus ke sistem PV ini manakala output AC (arus sistem PV ini manakala output AC (arus ulangalik) memerlukan penukar DC-AC ulangalik) memerlukan penukar DC-AC untuk menghasilkan output AC.untuk menghasilkan output AC.

Kapasiti kuasa bagi sistem PV ini Kapasiti kuasa bagi sistem PV ini bergantung kepada saiz panel yang bergantung kepada saiz panel yang digunakan. Maka kapasiti kuasa yang besar digunakan. Maka kapasiti kuasa yang besar akan dihasilkan jika terdapat panel PV yang akan dihasilkan jika terdapat panel PV yang besar atau banyak.besar atau banyak.

Page 126: Topik1 Penjanaan

PV in buildingsPV in buildings

Building-integrated photovoltaics (BIPV) are increasingly Building-integrated photovoltaics (BIPV) are increasingly incorporated into new domestic and industrial buildings as a incorporated into new domestic and industrial buildings as a principal or ancillary source of electrical power,principal or ancillary source of electrical power, and are one of and are one of the fastest growing segments of the photovoltaic industry.the fastest growing segments of the photovoltaic industry.

Typically, an array is incorporated into the roof or walls of a Typically, an array is incorporated into the roof or walls of a building, and roof tiles with integrated PV cells can now be building, and roof tiles with integrated PV cells can now be purchased. Arrays can also be purchased. Arrays can also be retrofitted into existing buildings; into existing buildings; in this case they are usually fitted on top of the existing roof in this case they are usually fitted on top of the existing roof structure. Alternatively, an array can be located separately from structure. Alternatively, an array can be located separately from the building but connected by cable to supply power for the the building but connected by cable to supply power for the building.building.

Where a building is at a considerable distance from the public Where a building is at a considerable distance from the public electricity supply (or electricity supply (or grid) - in remote or mountainous areas – ) - in remote or mountainous areas – PV may be the preferred possibility for generating electricity, or PV may be the preferred possibility for generating electricity, or PV may be used together with wind, diesel generators and/or PV may be used together with wind, diesel generators and/or hydroelectric power. In such hydroelectric power. In such off-grid circumstances batteries circumstances batteries are usually used to store the electric power.are usually used to store the electric power.

Page 127: Topik1 Penjanaan

PV in transportPV in transport

PV has traditionally been used for auxiliary PV has traditionally been used for auxiliary power in space. PV is rarely used to provide power in space. PV is rarely used to provide motive power in transport applications, but is motive power in transport applications, but is being used increasingly to provide auxiliary being used increasingly to provide auxiliary power in boats and cars. Recent advances in power in boats and cars. Recent advances in solar cell technology, however, have shown the solar cell technology, however, have shown the cell's ability to administer significant hydrogen cell's ability to administer significant hydrogen production, making it one of the top prospects production, making it one of the top prospects for alternative energy for automobiles.for alternative energy for automobiles.

Page 128: Topik1 Penjanaan

PV in standalone devicesPV in standalone devices

PV has been used for many years to power PV has been used for many years to power calculators and novelty devices. Improvements in calculators and novelty devices. Improvements in integrated circuits and low power LCD displays make integrated circuits and low power LCD displays make it possible to power a calculator for several years it possible to power a calculator for several years between battery changes, making solar calculators between battery changes, making solar calculators less common. In contrast, solar powered remote fixed less common. In contrast, solar powered remote fixed devices have seen increasing use recently, due to devices have seen increasing use recently, due to increasing cost of labour for connection of mains increasing cost of labour for connection of mains electricity or a regular maintenance programme. In electricity or a regular maintenance programme. In particular, parking meters,particular, parking meters, emergency telephones, and emergency telephones, and temporary traffic signs.temporary traffic signs.

Page 129: Topik1 Penjanaan
Page 130: Topik1 Penjanaan

Worldwide installed Worldwide installed photovoltaic totalsphotovoltaic totals

World solar photovoltaic (PV) market installations World solar photovoltaic (PV) market installations reached a record high of 2.8 gigawatts peak reached a record high of 2.8 gigawatts peak (GWp) in 2007.(GWp) in 2007.

The three leading countries (Germany, Japan and The three leading countries (Germany, Japan and the USA) represent nearly 89% of the total the USA) represent nearly 89% of the total worldwide PV installed capacity. On Wed worldwide PV installed capacity. On Wed 1 August 2007, word was published of construction of a , word was published of construction of a production facility in China, which is projected to production facility in China, which is projected to be one of the largest wafer factories in the world, be one of the largest wafer factories in the world, with a peak capacity of around 1,500MW.with a peak capacity of around 1,500MW.

Page 131: Topik1 Penjanaan
Page 132: Topik1 Penjanaan
Page 133: Topik1 Penjanaan

STESEN STESEN PENJANAPENJANA

KEBAIKANKEBAIKAN KEBURUKANKEBURUKAN

STIMSTIM MurahMurah Penjagaan lebih, pencemaran Penjagaan lebih, pencemaran udara, bekalan tenaga tidak udara, bekalan tenaga tidak terkawalterkawal

HIDROHIDRO Kos operasi murah, tiada pencemaran, Kos operasi murah, tiada pencemaran, kurang penjagaankurang penjagaan

Tempat tertentu, belanja awal Tempat tertentu, belanja awal mahal, masalah alam sekitar jika mahal, masalah alam sekitar jika tidak dirancang dengan tidak dirancang dengan sempurnasempurna

NUKLEARNUKLEAR Voltan tinggi boleh diperoleh dengan Voltan tinggi boleh diperoleh dengan bahan bakar kecil, tenaga maksimum bahan bakar kecil, tenaga maksimum walaupun saiz kecil.walaupun saiz kecil.

Bahaya radioaktif, bahan Bahaya radioaktif, bahan buangan perlukan penelitian, buangan perlukan penelitian, penjagaan lebih, penglibatan penjagaan lebih, penglibatan kuasa besar dunia dalam kuasa besar dunia dalam pembelian bahan radioaktif.pembelian bahan radioaktif.

DIESELDIESEL Ringkas, mudah alih.Ringkas, mudah alih. Voltan kecil, tenaga terhad.Voltan kecil, tenaga terhad.

SOLARSOLAR Kos operasi murah, tiada pencemaran, Kos operasi murah, tiada pencemaran, kurang penjagaankurang penjagaan

Tempat tertentu, belanja awal Tempat tertentu, belanja awal mahal, kuasa terhad.mahal, kuasa terhad.

KITAR KITAR PADUPADU

Bekalan tenaga yang lebih, pencemaran Bekalan tenaga yang lebih, pencemaran yang kurang, tiada pembaziran sumber yang kurang, tiada pembaziran sumber tenaga, kurang penjagaantenaga, kurang penjagaan

Kos pembaikan dan Kos pembaikan dan penyenggaraan yang tinggi.penyenggaraan yang tinggi.

Page 134: Topik1 Penjanaan

Kalendar Peristiwa Penting Kalendar Peristiwa Penting Industri Kuasa Di Malaysia.Industri Kuasa Di Malaysia. 1894:1894: Pembekalan Elektrik swista pertama ke Rawang oleh Loke Pembekalan Elektrik swista pertama ke Rawang oleh Loke

Yew dan Thamboosamy PillaiYew dan Thamboosamy Pillai 1896:1896: Pemasangan Lampu elektrik di Stesen Keretapi Kuala Pemasangan Lampu elektrik di Stesen Keretapi Kuala

Lumpur-Yang pertama di Kuala LumpurLumpur-Yang pertama di Kuala Lumpur 1900:1900: Stesen Janakuasa Pertama Negara, Hidro, Sempan, Raub. Stesen Janakuasa Pertama Negara, Hidro, Sempan, Raub. 1904:1904: Bekalan elektrik awam yang pertama di mulakan di Pulau Bekalan elektrik awam yang pertama di mulakan di Pulau

Pinang.Pinang. 1905:1905: Bekalan elektrik awam yang pertama ke Kuala Lumpur Bekalan elektrik awam yang pertama ke Kuala Lumpur

dengan pelancaran Stesen Janaelektrik Hidro Ulu Gombak.dengan pelancaran Stesen Janaelektrik Hidro Ulu Gombak. 1919:1919: Perlancaran Stesen Diesel Jalan Gombak yang berhadapan Perlancaran Stesen Diesel Jalan Gombak yang berhadapan

dengan Dewan Bandaraya Kuala Lumpur untuk memenuhi dengan Dewan Bandaraya Kuala Lumpur untuk memenuhi permintaan elektrik yang meningkat.permintaan elektrik yang meningkat.

1926:1926: Perak River Hidro Electric Company Ltd ditubuhkan. Perak River Hidro Electric Company Ltd ditubuhkan. 1927:1927: Penubuhan Jabatan Letrik Negeri-Negeri Melayu Bersekutu & Penubuhan Jabatan Letrik Negeri-Negeri Melayu Bersekutu &

Pelancaran Stesen Janaelektrik Bangsar di Kuala Lumpur. Pelancaran Stesen Janaelektrik Bangsar di Kuala Lumpur. Pelancaran Stesen Janaelektrik Hidro Ulu Langat.Pelancaran Stesen Janaelektrik Hidro Ulu Langat.

Page 135: Topik1 Penjanaan

1928:1928: Pelancaran Stesen Janaelektrik Malim Nawar 18MW oleh Pelancaran Stesen Janaelektrik Malim Nawar 18MW oleh PRHEP. Kinta Electrical Distribution Co Ltd (KED) ditubuhkan PRHEP. Kinta Electrical Distribution Co Ltd (KED) ditubuhkan sebagai anak syarikat PRHEP. 1929: Pelancaran talian 66kV yang sebagai anak syarikat PRHEP. 1929: Pelancaran talian 66kV yang pertama di antara Chenderoh dan Sungai Siput. Pelancaran Stesen pertama di antara Chenderoh dan Sungai Siput. Pelancaran Stesen Janaelektrik Hidro Chenderoh 27MW oleh PRHEP.Janaelektrik Hidro Chenderoh 27MW oleh PRHEP.

1933:1933: Jabatan Letrik membeli stesen Janaelektrik Hidro Ulu Langat Jabatan Letrik membeli stesen Janaelektrik Hidro Ulu Langat daripada lombing Sungai Besi. Pelancaran stesen Janaelektrik Batu daripada lombing Sungai Besi. Pelancaran stesen Janaelektrik Batu Gajah 9MW oleh PRHEP.Gajah 9MW oleh PRHEP.

1937:1937: Jumlah keupayaan penjanaan di stesen-stesen melebihi Jumlah keupayaan penjanaan di stesen-stesen melebihi 100MW, 85% dimiliki oleh PRHEP dan syarikat-syarikat 100MW, 85% dimiliki oleh PRHEP dan syarikat-syarikat perlombongan.perlombongan.

1942:1942: Tanah Melayu diserang Jepun menyebabkan logi-logi elektrik Tanah Melayu diserang Jepun menyebabkan logi-logi elektrik dimusnahkan oleh tentera British yang berundur. Penubuhan Nippon dimusnahkan oleh tentera British yang berundur. Penubuhan Nippon Hassoden Kabushiki Kaisha atau Syarikat Perdagangan Elektrik Hassoden Kabushiki Kaisha atau Syarikat Perdagangan Elektrik Jepun yang setara dengan Jabatan Lektrik.Jepun yang setara dengan Jabatan Lektrik.

1946:1946: Jabatan Letrik Neger-Negeri Melayu Bersekutu (Kemudiannya Jabatan Letrik Neger-Negeri Melayu Bersekutu (Kemudiannya Persekutuan Tanah Melayu) ditubuhkan semula dan memulakan Persekutuan Tanah Melayu) ditubuhkan semula dan memulakan pemulihan logi elektrik.pemulihan logi elektrik.

1948:1948: Jabatan Letrik mengambil alih Syarikat Elektrik Melaka. Jabatan Letrik mengambil alih Syarikat Elektrik Melaka.

Page 136: Topik1 Penjanaan

1949:1949: Penubuhan Lembaga Letrik Pusat dengan perlulusan Penubuhan Lembaga Letrik Pusat dengan perlulusan Ordinan Letrik, 1949 oleh Suruhanjaya Perundangan Ordinan Letrik, 1949 oleh Suruhanjaya Perundangan Persekutuan.Persekutuan.

1951:1951: Jawatan Pengurus Besar Lembaga Letrik Pusat diwujudkan Jawatan Pengurus Besar Lembaga Letrik Pusat diwujudkan pada 31 Disember.pada 31 Disember.

1952:1952: Perlancaran talian 66kV yang pertama dalam sistem LLP, Perlancaran talian 66kV yang pertama dalam sistem LLP, SJJC Bangsar, SJJC Bangi-Seremban-Melaka.SJJC Bangsar, SJJC Bangi-Seremban-Melaka.

1953:1953: Peringkat pertama Stesen Janaelektrik Jambatan Peringkat pertama Stesen Janaelektrik Jambatan Connaught dilancarkan.Connaught dilancarkan.

1956:1956: Stesen Janaelektrik Jambatan Connought 80MW siap Stesen Janaelektrik Jambatan Connought 80MW siap dengan pelancaran fasa kedua 40MW. Permulaan pemasangan dengan pelancaran fasa kedua 40MW. Permulaan pemasangan elektrik luar bandar dengan peruntukan RM 4.6juta di bawah elektrik luar bandar dengan peruntukan RM 4.6juta di bawah Rancangan Persekutuan Tanah Melayu Pertama 1956-1960.Rancangan Persekutuan Tanah Melayu Pertama 1956-1960.

1958:1958: Sistem 66kV di sambug ke Johor (Melaka-Keluang) Sistem 66kV di sambug ke Johor (Melaka-Keluang) 1959:1959: Fasa pertama Stesen Janaelektrik Melaka dilancarkan. Fasa pertama Stesen Janaelektrik Melaka dilancarkan. 1963:1963: Stesen Janaelektrik Sultan Yussof 100MW dilancarkan Stesen Janaelektrik Sultan Yussof 100MW dilancarkan

serentak dengan pelancaran talian penghantaran 132kV yang serentak dengan pelancaran talian penghantaran 132kV yang pertama menghubungkan Skim Elektrik-Hidro, Cameron Highland pertama menghubungkan Skim Elektrik-Hidro, Cameron Highland dengan Stesen Janaelektrik Jambatan Connought.dengan Stesen Janaelektrik Jambatan Connought.

1964:1964: J. Sharples bersara dari jawatan Pengurus Besar LLP dan J. Sharples bersara dari jawatan Pengurus Besar LLP dan diganti oleh Raja Zainal Raja Sulaiman. Anak Melayu pertama.diganti oleh Raja Zainal Raja Sulaiman. Anak Melayu pertama.

Page 137: Topik1 Penjanaan

1965:1965: Lembaga Letrik Pusat Persekutuan di beri nama baru, Lembaga Letrik Pusat Persekutuan di beri nama baru, Lembaga Letrik Negara Tanah Melayu.Lembaga Letrik Negara Tanah Melayu.

1966:1966: Bangunan ibu pejabat yang terletak di Jalan Bangsar dibuka Bangunan ibu pejabat yang terletak di Jalan Bangsar dibuka dengan rasminya oleh Tunku Abdul Rahman Putra, Perdana dengan rasminya oleh Tunku Abdul Rahman Putra, Perdana Menteri yang pertama.Menteri yang pertama.

Komputer pertama di negara ini ditempatkan di ibu pejabat LLTM Komputer pertama di negara ini ditempatkan di ibu pejabat LLTM ini.ini.

1967:1967: Pelancaran Stesen Janaelektrik Perai, dengan muatan 60MW Pelancaran Stesen Janaelektrik Perai, dengan muatan 60MW dan penghantaran 132kV diperluaskan ke Perai dari Cameron dan penghantaran 132kV diperluaskan ke Perai dari Cameron Highland/Ipoh, Grid kebangsaan diwujudkan. Pegawai asing tamat Highland/Ipoh, Grid kebangsaan diwujudkan. Pegawai asing tamat perkhidmatan dengan lembaga selepas Rancangan perkhidmatan dengan lembaga selepas Rancangan Pewarganegaraan disempurnakan.Pewarganegaraan disempurnakan.

1969:1969: Stesen Janaelektrik Hidro Sultan Idris 150MW di Batang Stesen Janaelektrik Hidro Sultan Idris 150MW di Batang Padang dilancarkan. Pelancaran Peringkat Pertama Stesen Padang dilancarkan. Pelancaran Peringkat Pertama Stesen Janaelektrik Tuanku Jaafar (120MW) di Port Dickson. Pelancaran Janaelektrik Tuanku Jaafar (120MW) di Port Dickson. Pelancaran talian 275kV yang pertama: Port Dickson-Kuala Lumpur.talian 275kV yang pertama: Port Dickson-Kuala Lumpur.

1974:1974: Tan Sri Raja Zainal Raja Sulaiman bersara dari perkhidmatan Tan Sri Raja Zainal Raja Sulaiman bersara dari perkhidmatan dan digantikan oleh Abu Zarim Hj Omar (Tan Sri Dato’). Bekalan dan digantikan oleh Abu Zarim Hj Omar (Tan Sri Dato’). Bekalan grid mula disambung ke Pantai Timur 132kV ke Kuantan.grid mula disambung ke Pantai Timur 132kV ke Kuantan.

1976:1976: Jabatan Bekalan Letrik Majlis Bandaran Pulau Pinang Jabatan Bekalan Letrik Majlis Bandaran Pulau Pinang diambilalih oleh LLN. Perlancaran peringkat akhir Stesen diambilalih oleh LLN. Perlancaran peringkat akhir Stesen Janaelektrik Tuanku Jaafar.Janaelektrik Tuanku Jaafar.

Page 138: Topik1 Penjanaan

1978:1978: Stesen Janaelektrik Hidro Temenggor 348MW dilancarkan Stesen Janaelektrik Hidro Temenggor 348MW dilancarkan dengan grid 275kV disambung dari Kuala Lumpur ke Temenggor.dengan grid 275kV disambung dari Kuala Lumpur ke Temenggor.

1979:1979: Pusat Kawalan Muatankuasa Nasional dibuka dengan Pusat Kawalan Muatankuasa Nasional dibuka dengan rasminya oleh Tun Hussein Onn. Kabel bawah laut 132kV yang rasminya oleh Tun Hussein Onn. Kabel bawah laut 132kV yang pertama dilancarkan.pertama dilancarkan.

1980:1980: Sambungan akhir 360MW ke Stesen Janaelektrik Perai Sambungan akhir 360MW ke Stesen Janaelektrik Perai dilancarkan. Grid 275kV diperluaskan dari Temenggor ke Perai.dilancarkan. Grid 275kV diperluaskan dari Temenggor ke Perai.

1981:1981: Pelancaran saling hubungan 100MW EGAT-LLN (Sadao ke Pelancaran saling hubungan 100MW EGAT-LLN (Sadao ke Bukit Keteri)Bukit Keteri)

1982:1982: Pengambilalihan PRHEP dan KED oleh Lembaga Letrik Pengambilalihan PRHEP dan KED oleh Lembaga Letrik Negara, Stesen Janaelektrik Sultan Iskandar 240MW di Pasir Negara, Stesen Janaelektrik Sultan Iskandar 240MW di Pasir Gudang.Gudang.

1983:1983: Stesen Janaelektrik Hidro Sultan Azlan Shah (Bersia) 72MW Stesen Janaelektrik Hidro Sultan Azlan Shah (Bersia) 72MW dilancarkan. Grid 275kV disambung ke Kelantan.dilancarkan. Grid 275kV disambung ke Kelantan.

1984:1984: Tan Sri Dato Abu Zarim bersara dan diganti oleh Mohd Tan Sri Dato Abu Zarim bersara dan diganti oleh Mohd Jalaluddin sebagai Pengurus Besar. Bahagian Pemeriksaan Elektrik Jalaluddin sebagai Pengurus Besar. Bahagian Pemeriksaan Elektrik di asingkan dari LLN dan diletakkan di bawah K Tenaga, Telekom & di asingkan dari LLN dan diletakkan di bawah K Tenaga, Telekom & Pos. Stesen Janaelektrik Hidro Sultan Azlan Shah 120MW dan Pos. Stesen Janaelektrik Hidro Sultan Azlan Shah 120MW dan sambungan turbin gas 180MW Jambatan Connought dilancarkan.sambungan turbin gas 180MW Jambatan Connought dilancarkan.

1985:1985: Bekalan elektrik sampai ke 65% kawasan luar bandar. Bekalan elektrik sampai ke 65% kawasan luar bandar. 1986:1986: Lingkaran 275kV menyambungkan semua stesen ke grid. Lingkaran 275kV menyambungkan semua stesen ke grid.

Page 139: Topik1 Penjanaan

19901990 -Tenaga Nasional Berhad, sebuah syarikat awam yang disenaraikan -Tenaga Nasional Berhad, sebuah syarikat awam yang disenaraikan

di BSKL, telah ditubuhkan penswastaan Lembaga Letrik Negara (di BSKL, telah ditubuhkan penswastaan Lembaga Letrik Negara (www.tnb.com.my).).

19961996 -TNB telah menjalankan penstrukturan dalaman secara besar--TNB telah menjalankan penstrukturan dalaman secara besar-

besaran dengan penubuhan pelbagai anak syarikat, setiap satu besaran dengan penubuhan pelbagai anak syarikat, setiap satu diberikan tanggungjawab dalam bidang tertentu:diberikan tanggungjawab dalam bidang tertentu:

TNB Generation Sdn. Bhd. (TNB Generation Sdn. Bhd. (www.tnb.com.my/tnbg/) ) TNB Transmission Sdn. Bhd. (TNB Transmission Sdn. Bhd. (www.tnb.com.my/) ) TNB Distribution Sdn. Bhd. (TNB Distribution Sdn. Bhd. (www.tnbubf.com.my/esd/) ) TNB Research Sdn. Bhd. (TNB Research Sdn. Bhd. (www.tnrd.com.my/) ) TNB Engineers Sdn. Bhd. (TNB Engineers Sdn. Bhd. (www.tnrd.com.my/tnbe/) /) University Tenaga Nasional (University Tenaga Nasional (www.uniten.edu.my/) ) TNB Engineering and Consultancy Sdn. Bhd. (TNB Engineering and Consultancy Sdn. Bhd. (

www.tnec.com.my/remaco) ) TNB Repair and Maintenance Sdn. Bhd. (TNB Repair and Maintenance Sdn. Bhd. (www.tnb.com.my/remaco/) )

Page 140: Topik1 Penjanaan

19981998 -Sabah Electricity Sdn. Bhd telah ditubuhkan pada 1 September -Sabah Electricity Sdn. Bhd telah ditubuhkan pada 1 September

1998 untuk mengambil alih urusan pembekalan elektrik di negeri 1998 untuk mengambil alih urusan pembekalan elektrik di negeri Sabah daripada Lembaga Letrik Sabah, sebuah badan berkanun Sabah daripada Lembaga Letrik Sabah, sebuah badan berkanun Kerajaan Persekutuan yang telah membekalkan elektrik di Sabah Kerajaan Persekutuan yang telah membekalkan elektrik di Sabah dan Labuan. dan Labuan.

-SESB dimiliki oleh TNB dan Kerajaan Negeri Sabah. Ia menjual -SESB dimiliki oleh TNB dan Kerajaan Negeri Sabah. Ia menjual 1,912 GWh elektrik.1,912 GWh elektrik.

20002000 - Jumlah kakitangan TNB seramai 24,334 orang. Sebanyak 52,576 - Jumlah kakitangan TNB seramai 24,334 orang. Sebanyak 52,576

GWh elektrik telah dijual kepada pengguna GWh elektrik telah dijual kepada pengguna - SESB menjual 1,912 GWh elektrik pada tahun 2000.- SESB menjual 1,912 GWh elektrik pada tahun 2000. - SESCo merupakan sebuah badan berkanun yang ditubuhkan - SESCo merupakan sebuah badan berkanun yang ditubuhkan

Kerajaan Negeri Sarawak. Kerajaan Negeri Sarawak memegang Kerajaan Negeri Sarawak. Kerajaan Negeri Sarawak memegang sebanyak 55% sementara Sarawak Enterprise Corporation Bhd sebanyak 55% sementara Sarawak Enterprise Corporation Bhd (SECB) pula memiliki 45% saham. Ia merupakan sebuah utiliti (SECB) pula memiliki 45% saham. Ia merupakan sebuah utiliti bersepadu dan telah menjual 2,537,036,803 kWh elektrik pada bersepadu dan telah menjual 2,537,036,803 kWh elektrik pada tahun 2000. tahun 2000.

Page 141: Topik1 Penjanaan

Industri Pembekalan ElektrikIndustri Pembekalan Elektrik Sub-sektor elektrik dikuasai oleh tiga utiliti bersepadu iaitu Tenaga Sub-sektor elektrik dikuasai oleh tiga utiliti bersepadu iaitu Tenaga

Nasional Berhad (TNB) untuk perkhidmatan di Semenanjung Nasional Berhad (TNB) untuk perkhidmatan di Semenanjung Malaysia, Sabah Electricity Sdn. Bhd. (SESB) dan Sarawak Malaysia, Sabah Electricity Sdn. Bhd. (SESB) dan Sarawak Electricity Supply Corporation (SESCo). Sub-sektor ini juga turut Electricity Supply Corporation (SESCo). Sub-sektor ini juga turut disokong oleh pelbagai penjana tenaga bebas (independent power disokong oleh pelbagai penjana tenaga bebas (independent power producers - IPPs), pengeluar tenaga juga co-generators.producers - IPPs), pengeluar tenaga juga co-generators.

TENAGA NASIONAL BERHADTENAGA NASIONAL BERHAD Tenaga Nasional Berhad, sebuah syarikat awam yang disenaraikan Tenaga Nasional Berhad, sebuah syarikat awam yang disenaraikan

di BSKL, telah ditubuhkan pada tahun 1990 melalui penswastaan di BSKL, telah ditubuhkan pada tahun 1990 melalui penswastaan Lembaga Letrik Negara (Lembaga Letrik Negara (www.tnb.com.my). TNB merupakan utiliti ). TNB merupakan utiliti elektrik yang terbesar di Malaysia dengan aset yang melebihi elektrik yang terbesar di Malaysia dengan aset yang melebihi RM54.0 bilion. Ia juga mempunyai kapasiti penjanaan tertinggi yang RM54.0 bilion. Ia juga mempunyai kapasiti penjanaan tertinggi yang melebihi 7100 MW yakni merupakan lebih daripada 61% jumlah melebihi 7100 MW yakni merupakan lebih daripada 61% jumlah keseluruhan tenaga yang dijana di Semenanjung Malaysia. Jumlah keseluruhan tenaga yang dijana di Semenanjung Malaysia. Jumlah kakitangannya pula sehingga 31 Ogos 2000 ialah seramai 24,334 kakitangannya pula sehingga 31 Ogos 2000 ialah seramai 24,334 orang. Sebanyak 52,576 GWh elektrik telah dijual kepada pengguna orang. Sebanyak 52,576 GWh elektrik telah dijual kepada pengguna pada tahun 2000. pada tahun 2000.

Page 142: Topik1 Penjanaan

SABAH ELECTRICITY SDN. BHD. (SESB)SABAH ELECTRICITY SDN. BHD. (SESB) Sabah Electricity Sdn. Bhd telah ditubuhkan pada 1 September Sabah Electricity Sdn. Bhd telah ditubuhkan pada 1 September

1998 untuk mengambil alih urusan pembekalan elektrik di negeri 1998 untuk mengambil alih urusan pembekalan elektrik di negeri Sabah daripada Lembaga Letrik Sabah, sebuah badan berkanun Sabah daripada Lembaga Letrik Sabah, sebuah badan berkanun Kerajaan Persekutuan yang telah membekalkan elektrik di Sabah Kerajaan Persekutuan yang telah membekalkan elektrik di Sabah dan Labuan. SESB dimiliki oleh TNB dan Kerajaan Negeri Sabah. Ia dan Labuan. SESB dimiliki oleh TNB dan Kerajaan Negeri Sabah. Ia menjual 1,912 GWh elektrik pada tahun 2000. menjual 1,912 GWh elektrik pada tahun 2000.

SARAWAK ELECTRICITY SUPPLY CORP. (SESCo)SARAWAK ELECTRICITY SUPPLY CORP. (SESCo) SESCo merupakan sebuah badan berkanun yang ditubuhkan SESCo merupakan sebuah badan berkanun yang ditubuhkan

Kerajaan Negeri Sarawak. Kerajaan Negeri Sarawak memegang Kerajaan Negeri Sarawak. Kerajaan Negeri Sarawak memegang sebanyak 55% sementara Sarawak Enterprise Corporation Bhd sebanyak 55% sementara Sarawak Enterprise Corporation Bhd (SECB) pula memiliki 45% saham. Ia merupakan sebuah utiliti (SECB) pula memiliki 45% saham. Ia merupakan sebuah utiliti bersepadu dan telah menjual 2,537,036,803 kWh elektrik pada bersepadu dan telah menjual 2,537,036,803 kWh elektrik pada tahun 2000. tahun 2000.

Page 143: Topik1 Penjanaan

Power Purchase AgreementPower Purchase Agreement A Power Purchase Agreement, or PPA, is a long-term agreement to A Power Purchase Agreement, or PPA, is a long-term agreement to

buy power from a company that produces electricity. Solar Power buy power from a company that produces electricity. Solar Power Partners (SPP™), using its own source of funds, builds a solar Partners (SPP™), using its own source of funds, builds a solar energy facility on our customer's site and maintains and operates energy facility on our customer's site and maintains and operates the facility for 15 years or longer. This facility generates reliable, the facility for 15 years or longer. This facility generates reliable, long-term clean energy for use by our customer. Under the terms of long-term clean energy for use by our customer. Under the terms of a PPA, SPP™ assumes the risks and responsibilities of ownership a PPA, SPP™ assumes the risks and responsibilities of ownership when it purchases, operates, and maintains the turn-key facility. We when it purchases, operates, and maintains the turn-key facility. We clean the solar panels regularly, provide preventative maintenance clean the solar panels regularly, provide preventative maintenance services, repair any faults, monitor the energy production and the services, repair any faults, monitor the energy production and the system's health and well-being. Our customers just run their system's health and well-being. Our customers just run their businesses as usual, without any of the headaches of owning a businesses as usual, without any of the headaches of owning a power plant. At the end of the PPA term, the facility can be power plant. At the end of the PPA term, the facility can be purchased by our customers at fair maket value or the PPA can be purchased by our customers at fair maket value or the PPA can be renewed on favorable terms. The PPA enables our customers (and renewed on favorable terms. The PPA enables our customers (and our world) to benefit from the use of "green" energy, while still our world) to benefit from the use of "green" energy, while still receiving some of the benefits of ownership (lower and/or "hedged" receiving some of the benefits of ownership (lower and/or "hedged" electricity costs, positive public image, etc. ) and allows them to electricity costs, positive public image, etc. ) and allows them to spend their capital budget on their core businesses. spend their capital budget on their core businesses. 

Page 144: Topik1 Penjanaan

PENJANA TENAGA BEBAS (IPPs)PENJANA TENAGA BEBAS (IPPs) IPPs di Malaysia menjana dan menjual elektrik secara pukal kepada IPPs di Malaysia menjana dan menjual elektrik secara pukal kepada

3 utiliti dominan. IPPs, yang sedang beroperasi adalah seperti 3 utiliti dominan. IPPs, yang sedang beroperasi adalah seperti berikut : berikut :

Semenanjung MalaysiaSemenanjung Malaysia

IPP LOKASI KAPASITI (MW) TARIKH LESEN DIISU

YTL Power Generation Paka, Terengganu & Pasir Gudang, Johor

808 404

7 April 1993

Segari Energy Ventures Sdn. Bhd. Lumut, Perak 1,303 15 Julai 1993

Powertek Sdn Bhd. Alor Gajah, Melaka 440 1 Disember 1993

Port Dickson Sdn. Bhd. Tanjung Gemuk, Port Dickson 440 1 Disember 1993

Pahlawan Power Sdn. Bhd Tanjung Keling, Melaka 334 26 Mei 1999

Genting Sanyen Power Sdn Bhd Kuala Langat, Selangor 720 1 Julai 1993

Page 145: Topik1 Penjanaan

IPP LOKASI KAPASITI (MW) TARIKH LESEN DIISU

ARL Tenaga Sdn. Bhd. Melawa 50 14 June 1994

Serudong Power Sdn. Bhd. Tawau 36 31 Mac 1995

Powertron Resources Sdn. Bhd. Karambunai 120 6 Februari 1997

Stratavest Sdn. Bhd. Sandakan 64.4 1 Oktober 1996

Sandakan Power corporation Sdn. Bhd. Sandakan 34 29 November 1997

Page 146: Topik1 Penjanaan

SarawakSarawak Tidak terdapat sebarang IPPs di Sarawak tetapi terdapat sebuah Tidak terdapat sebarang IPPs di Sarawak tetapi terdapat sebuah

penjana tenaga bersekutu dikenali sebagai Sejingkat Power Sdn. penjana tenaga bersekutu dikenali sebagai Sejingkat Power Sdn. Bhd, syarikat penjanaan yang dimiliki bersama oleh SESCo Bhd, syarikat penjanaan yang dimiliki bersama oleh SESCo sebanyak 49% dan Sarawak Enterprise Corporation Berhad (SECB) sebanyak 49% dan Sarawak Enterprise Corporation Berhad (SECB) sebanyak 51%. Ia terletak di Sejingkat, Sarawak dan mempunyai sebanyak 51%. Ia terletak di Sejingkat, Sarawak dan mempunyai kapasiti 50 MW sebanyak 2 unit yang mana setiap satunya kapasiti 50 MW sebanyak 2 unit yang mana setiap satunya digerakkan menggunakan arang batu dari Global Minerals digerakkan menggunakan arang batu dari Global Minerals berhampiran Kapit, Sarawak.berhampiran Kapit, Sarawak.

Co GeneratorsCo Generators Co-generators adalah pengeluaran elektrik dan tenaga haba Co-generators adalah pengeluaran elektrik dan tenaga haba

daripada satu sumber bahanapi sahaja. Kecekapan termal sehingga daripada satu sumber bahanapi sahaja. Kecekapan termal sehingga 90% adalah mungkin berbanding 40% sahaja dengan penjanaan 90% adalah mungkin berbanding 40% sahaja dengan penjanaan termal secara konvensional manakala kira-kira 60% di loji termal secara konvensional manakala kira-kira 60% di loji penjanaan gabungan kitaran. Sehingga kini, terdapat kira-kira 30 penjanaan gabungan kitaran. Sehingga kini, terdapat kira-kira 30 co-generators yang telah mendapat lesen daripada Suruhanjaya co-generators yang telah mendapat lesen daripada Suruhanjaya Tenaga. Berikut adalah antara co-generators yang utama :Tenaga. Berikut adalah antara co-generators yang utama :

Page 147: Topik1 Penjanaan

SYARIKAT LOKASI KAPASITI (MW) JENIS PENJANAAN

Sabah Forest Industries Sdn. Bhd. Sipitang, Sabah 57.7 Awam

Perwaja Steel Sdn. Bhd.Tanjung Berhala, Kemaman, Terengganu

9.5 Persendirian

Titan Petrochemicals (M) Sdn. Bhd. Pasir Gudang Industrial Estate, Johor 56 Persendirian

Lembaga Padi dan Beras Negara Sekinchan, Selangor 0.2 Persendirian

Gas District Cooling (KLIA) Sepang, Selangor 60 Awam

Gas District Cooling (KLCC) Kuala Lumpur City Centre 12 Persendirian

Page 148: Topik1 Penjanaan
Page 149: Topik1 Penjanaan
Page 150: Topik1 Penjanaan
Page 151: Topik1 Penjanaan
Page 152: Topik1 Penjanaan
Page 153: Topik1 Penjanaan
Page 154: Topik1 Penjanaan
Page 155: Topik1 Penjanaan
Page 156: Topik1 Penjanaan
Page 157: Topik1 Penjanaan
Page 158: Topik1 Penjanaan

ISTILAH ASAS SISTEM KUASA

Power supply

Power supply is a reference to a source of electrical power. A device or system that supplies electrical or other types of energy to an output load or group of loads is called a power supply unit or PSU. The term is most commonly applied to electrical energy supplies, less often to mechanical ones, and rarely to others.

Page 159: Topik1 Penjanaan

ISTILAH ASAS SISTEM KUASA

Electric power is defined as the rate at which electrical energy is transferred by an electric circuit. The SI unit of power is the watt.

When electric current flows in a circuit with resistance, it does work. Devices convert this work into many useful forms, such as heat (electric heaters), light (light bulbs), motion (electric motors) and sound (loudspeaker).

Page 160: Topik1 Penjanaan

In circuits, Electric power, like mechanical power, is

represented by the letter P in electrical equations. The term wattage is used colloquially to mean "electric power in watts."

In direct current resistive circuits, instantaneous electrical power is calculated using Joule's Law, which is named after the British physicist James Joule, who first showed that heat and mechanical energy were interchangeable.

where P is the power (watt or W) V is the potential difference (volt or V) I is the current (ampere or A)

Page 161: Topik1 Penjanaan

Joule's law can be combined with Ohm's law to produce two more equations:

P= I2R = V2/R

Page 162: Topik1 Penjanaan

In alternating current circuits, energy storage elements such as inductance and capacitance may result in periodic reversals of the direction of energy flow.

The portion of power flow that, averaged over a complete cycle of the AC waveform, results in net transfer of energy in one direction is known as real power (also referred to as active power). That portion of power flow due to stored energy, that returns to the source in each cycle, is known as reactive power.

Page 163: Topik1 Penjanaan

The relationship between real power, reactive power and apparent power can be expressed by representing the quantities as vectors.

Real power is represented as a horizontal vector and reactive power is represented as a vertical vector. The apparent power vector is the hypotenuse of a right triangle formed by connecting the real and reactive power vectors. This representation is often called the power triangle. Using the Pythagorean Theorem, the relationship among real, reactive and apparent power is:

(apparent power)2 = (real power)2 + (reactive power)2

VA2 = W2 + VAR2

(real power) = (apparent power) * cos θ

(reactive power) = (apparent power) * sin θ

The ratio of real power to apparent power is called power factor and is number always between 0 and 1.

VA

W

VAR

θ

Page 164: Topik1 Penjanaan

Sekian…..Sekian…..Akan Datang…Akan Datang…TALIAN PENGHANTARANTALIAN PENGHANTARAN