PETROVIETNAM Energy for National Sustainable Development Presented by: Ngo Anh Hien Deputy General Manager Gas Division of PetroVienam
PETROVIETNAMEnergy for National Sustainable Development
Presented by: Ngo Anh Hien
Deputy General Manager
Gas Division of PetroVienam
Content
OVERVIEW OF PIPELINE SYSTEM
CURRENT GAS PIPELINE SYSTEMS
DIRECTION TO DEVELOPMENT
ON-GOING GAS PIPELINE PROJECTS
UP-COMING GAS PIPELINE PROJECTS
PETROVIETNAMEnergy for National Sustainable Development
Overview of Gas Pipeline System
In 1981, the first developed gas field from Tien Hai – Song
Hong basin with flowrate of 20 – 23 MMCM/year supplied
to local industry.
In 1995, the first associated gas from Bach Ho field – Cuu
Long basin – with flowrate 1 MMCM/day supplied to Ba
Ria Power Plant.
In 2003, a first natural gas from Lan Tay field – Nam Con
Son basin with flowrate of 2 MMCM/day supplied to Phu
My Power Complex. By October 2008, the flowrate was
increased to 20 MMCM/day.
In 2007, a first associated gas from PM3-CAA overlapping
area supplied to Ca Mau Power Complex.
PETROVIETNAMEnergy for National Sustainable Development
Current Gas Pipeline Systems
• Northern area – Thai Binh Pipeline
• Rang Dong – Bach Ho – Phu My Pipeline
• Nam Con Son Pipeline
• PM3 – Ca Mau Pipeline
• Low Pressure Pipeline
PETROVIETNAMEnergy for National Sustainable Development
Current Gas Pipeline Systems
PETROVIETNAMEnergy for National Sustainable Development
Northern area – Thai Binh
Fields: Tien Hai C (07/1981)D14_STL (5/2004)Dong Quan D (2005)
Specification: Length: ~20 kmDiameter: Small (~6”)
Description: Limited gas resources
Supply gas to Tien Haiindustrial zone, ThaiBinh.
CAMBODIA
Ca Mau Complex
PM3-CAA
O Mon
Hiep Phuoc
Dinh Co GPP
Phu My Complex
Cuu Long Basin
Nam Con Son Basin
Ma Lay Tho Chu Basin
Bach Ho –Phu My PL:•Capacity: 2 bcmpa•Length: 117 km•Diameter: 16”
Nam Con Son 1 PL:•Capacity: 7 bcmpa•Length: 400 km•Diameter: 26”
PM3-Ca Mau PL:•Capacity: 2 bcmpa•Length: 330 km•Diameter: 18”
Block B, 48 &52
Current Gas Pipeline Systems
PETROVIETNAMEnergy for National Sustainable Development
Current Gas Pipeline SystemsSoutheast Region
PETROVIETNAMEnergy for National Sustainable Development
LOÂ 06.1
LAÂ NTAÂ Y-
LANÑ OÛ
LOÂ 11.2
MOÛ
NHAØ MAÙ Y
XÖ Û LYÙ KHÍ NAM COÂ N SÔ N
NHAØ MAÙ YXÖ Û LYÙ KHÍ
DINH COÁ
TRUNG TAÂ M
PHUÙ MYÕ
GDC
BLOCK 06.1
LAN TAY
& LAN DO
BLOCK 11.2
BACH HO
DINH CO TERMINAL
NAM CON SON
DINH CO GPP
BACH HO
BA RIA POWER PLANT
BACH HO
GAS
DISTRIBUTION
CENTER
PHU MY GDS
PHU MY 2.1
PHU MY 2.1 EXT.
PHU MY 1
PHU MY 3NAM CON SON
GAS DISTRIBUTIONCENTER
PHU MY GDCPHU MY 2.2
PHU MY FERTILIZER
LOW PRESSURE
PM – MX - GD
PHU MY INDUSTRIAL ZONE
PHU MY - HCM
OFFSHORE
DINH CO AREA
BA RIA AREA
Max. capacity: 2.0 BCM/y
Max. capacity: 7 BCM/y
PHU MY 4
PHUONG DONG RANG DONG
PHU MY 3
NHON TRACH 1
HIEP PHUOC
CA NGU VANG
NHON TRACH 2
STD/STV
Rong Doi Moi
Current Gas Pipeline Systems
PETROVIETNAMEnergy for National Sustainable Development
Rang Dong – Bach Ho – Phu My Pipeline
Ba Ria
GDS
Ba Ria
Power Plant
1.5 Bcm/y, 125 bar
LBV-804
SDV-805
LBV
547 MMCM/y22.5 - 24 bar
Bach Ho
Thi Vai Terminal
Phu My
GDS
Dinh Co GPP
Rang Dong
PM1
PM 2.2
PM 2.1
PM 3
UREA
PM 4
Phu My
GDC
STD/STV
Ca Ngu Vang
Rong Doi Moi
Current Gas Pipeline Systems
Nam Con Son Pipeline
LBV
Dinh Co
GPP
LBV
Lan Tay
Thi Vai Terminal
Dinh Co
Terminal
Hai Thach
Rong Doi
PM 2.2
PM 4
PM 3Phu My
GDS
Phu My
GDC
PETROVIETNAMEnergy for National Sustainable Development
PM 2.1
PM 1
Current Gas Pipeline SystemsLow Pressure Gas Pipeline
PETROVIETNAMEnergy for National Sustainable Development
Design Capacity:
1 BCMY
Specification: Length: 15 km
Description: Supply gas to theindustrial zonesalong the trunk-pipeline to Ba Ria,Phu My area.
Direction to Development
PETROVIETNAMEnergy for National Sustainable Development
• Maximize the utilization of existing pipeline system.
• Expand gas pipeline system in Southeast and Southwest
region.
• Utilize gas reserves in the Central and Northern of
Vietnam.
• Interconnect regional/national gas pipeline systems.
• Expand gas usage in other sectors such as resident,
transportation, industry etc through low pressure and city
gas pipeline system.
PETROVIETNAMEnergy for National Sustainable Development
Master Plan For Pipeline System
On-going Gas Pipeline Projects
PETROVIETNAMEnergy for National Sustainable Development
Rong-Doi Moi – Bach Ho Pipeline
Design Capacity: 6.4 BCMY
Location: Southeast region
Description: To gather gas and then compress associated gas in Rong – Doi Moi gas fields through Bach Ho –Dinh Co pipeline.
Specification: RC1-RP2: 9,5km, 10”RP3-RP2: 8.5km, 12”RP3-RC4: 16km, 10”RC4-RC5: 5.5km, 8”RC4-RCDM: 3.5km, 8”
First gas: 12/2010
On-going Gas Pipeline Projects
PETROVIETNAMEnergy for National Sustainable Development
On-going Gas Pipeline Projects
PETROVIETNAMEnergy for National Sustainable Development
Block B – O Mon Pipeline
06-2
PETR
O
CARIGA
LI
CARI
G
O MON
PHU My Design Capacity: 6.4 BCMY
Location: Southwest region
Specification: Length: 406 kmOnshore: 160 km, 30”Offshore: 246 km, 28”
First gas: 2014
Customers: - O Mon Power Complex(O Mon Power Plant2,3,4,5)
- Gas-Power-FertilizerIndustry Zone in Ca MauProvince.
Up-coming Gas Pipeline Projects
PETROVIETNAMEnergy for National Sustainable Development
Nam Con Son II Gas Pipeline
Design Capacity: 7 BCMY
Location: Southeast region
Description: The 400 km line will be built in parallelwith the 1st pipeline to transport gasfrom Block 05-2, 05-3 and 04-3 withconsideration of re-serving for otherpotential gas fields in Nam Con Sonbasin and importing gas later.
First gas: 2014
Up-coming Gas Pipeline Projects
PETROVIETNAMEnergy for National Sustainable Development
Block 102/106 & 103/107 – Thai Binh Pipeline
Distances
Hong Long - Landfall: ~55km
Hac Long - Hong Long: 10,3km
Bach Long - Hong Long: 17,4km
Dia Long - Hong Long: ~20km
Hong Long - Thai Binh: ~40km
Thai Binh – Landfall: 19,54km
THANK YOU!