Page 1: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Quality Control / Production supervision

2006-2015

Tomasz Durań

Page 2: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

NDT Visual Testing during manufacturer audit

Page 3: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Joint measurement during manufacturer audit

Page 4: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Joint measurement during manufacturer audit

Page 5: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

NDT Visual Testing

Page 6: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Preparation for welding – checking preheating

Page 7: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

NDT Liquid Penetrant Test

Page 8: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

NDT Visual Testing during manufacturer audit

Page 9: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Manufacturer audit

Page 10: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Examples of projects I was involved in:manufacturing audit of Kalmar Ship to Shore crane, destination: port

Finnsteve

Page 11: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Examples of projects I was involved in:manufacturing audit of Kalmar Ship to Shore crane, destination: port

Finnsteve

Page 12: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Examples of projects I was involved in:manufacturing audit of Kalmar Automatic Stacking Crane,

destination: port CTB Hamburg

Page 13: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Steel structure measurements

Page 14: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Alingment: Motor / gearbox / clutch / rope drum

Page 15: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Top flange levelling

Page 16: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Measurements of machining

Page 17: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Measurements of shafts delivered by subcontractor

Page 18: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Measurements of parts delivered by

subcontractor

Page 19: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Material hardness test

Page 20: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Anticorrosive preservation made by subcontractor –quality control

Page 21: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Anticorrosive preservation made by subcontractor – Dry Film Thickness measuring

Page 22: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Zinc coating made by subcontractor – quality control

Page 23: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Bolted Joints – tightening torque testing

Page 24: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Bolted Joints – tightening torque testing

Page 25: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Bolted Joints – tightening torque testing

Page 26: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Bolted Joints – tightening torque testing

Page 27: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Bolted Joints – tightening torque testing

Page 28: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Bolted Joints – tightening torque testing

Page 29: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Manual torque wrench – tightening torque testing

Page 30: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Manual torque wrench – tightening torque testing

Page 31: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Quantity and Quality audit at subcontractor

workshop

Page 32: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

Surveying

Page 33: Tomasz Duran Quality Control Production Supervision 2006 - 2015 [tryb zgodności]

• Reports from audits: progress and quality• Various methods of Measurement,

leveling, horizontal positioning…• Alingment by clock or laser gauge• NDT, mesurement reports• And many more…