1 Sustainable Site Design Case Study at Fort Baker Cavallo Point-The Lodge at the Golden Gate Sustainable Site Design Case Study at Fort Baker Cavallo Point-The Lodge at the Golden Gate Agenda Agenda Background History of Fort Baker Redevelopment Approach Challenges Sustainable Vision Low Impact Features Lessons Learned Background History of Fort Baker Redevelopment Approach Challenges Sustainable Vision Low Impact Features Lessons Learned
23

Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

Feb 03, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

1

Sustainable Site Design Case Study at Fort BakerCavallo Point-The Lodge at the Golden GateSustainable Site Design Case Study at Fort BakerCavallo Point-The Lodge at the Golden Gate

AgendaAgendaBackgroundHistory of Fort BakerRedevelopment ApproachChallengesSustainable VisionLow Impact FeaturesLessons Learned

BackgroundHistory of Fort BakerRedevelopment ApproachChallengesSustainable VisionLow Impact FeaturesLessons Learned

Page 2: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

2

Background – Developer SelectionBackground – Developer Selection

NPS Prepared GMP 1980, EIS 1999Developer RFP 20014 Teams Short-listedLocal Team SelectedSmallest “Footprint”Sustainable FeaturesPost Ranch ExampleSausalito Challenge

NPS Prepared GMP 1980, EIS 1999Developer RFP 20014 Teams Short-listedLocal Team SelectedSmallest “Footprint”Sustainable FeaturesPost Ranch ExampleSausalito Challenge

History of Fort BakerHistory of Fort BakerArmy Base Dates to late 1800’sBuilt Before the GG BridgeStrategic LocationSubmarine NetStand-Alone FacilityPrototypical Buildings

Army Base Dates to late 1800’sBuilt Before the GG BridgeStrategic LocationSubmarine NetStand-Alone FacilityPrototypical Buildings

Page 3: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

3

History of Fort BakerHistory of Fort Baker

History of Fort BakerHistory of Fort Baker

Page 4: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

4

History of Fort BakerHistory of Fort Baker

History of Fort BakerHistory of Fort Baker

Page 5: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

5

History of Fort BakerHistory of Fort Baker

History of Fort BakerHistory of Fort Baker

Page 6: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

6

Redevelopment ApproachRedevelopment Approach

Redevelopment Approach Just Kidding!Redevelopment Approach Just Kidding!

Page 7: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

7

Redevelopment ApproachRedevelopment Approach

Redevelopment ApproachRedevelopment Approach

Page 8: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

8

ChallengesChallengesAged Utility Systems

Wall drainsSS/Roof Leader Connections

Limited BudgetLow Room Count

NPS RequirementsHistoric FabricCultural Landscapes

Collaboration with NPSDesign FundingAdapting to ChangePhasing

Aged Utility SystemsWall drainsSS/Roof Leader Connections

Limited BudgetLow Room Count

NPS RequirementsHistoric FabricCultural Landscapes

Collaboration with NPSDesign FundingAdapting to ChangePhasing

Aged Utility SystemsAged Utility SystemsLimited InformationMost Piping 100 Years OldBasement Water IntrusionNew Occupied SpaceCross ConnectionsNew Pump Systems to SDSignificant Inflow & InfiltrationPrioritize Repairs to Fit Budget

Limited InformationMost Piping 100 Years OldBasement Water IntrusionNew Occupied SpaceCross ConnectionsNew Pump Systems to SDSignificant Inflow & InfiltrationPrioritize Repairs to Fit Budget

Page 9: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

9

NPS RequirementsNPS RequirementsSignificant Limitations

Historic BuildingsPeriod of SignificancePreservation of Site FeaturesCultural LandscapeLandscape Precedence

All New Features VettedInfiltration AreasPermeable Parking

Significant LimitationsHistoric BuildingsPeriod of SignificancePreservation of Site FeaturesCultural LandscapeLandscape Precedence

All New Features VettedInfiltration AreasPermeable Parking

Sustainable VisionSustainable VisionLimit Ground DisturbanceOptimize InfiltrationSite Features to “Fit”Limit PipingTrack Cost/BenefitLeverage Existing SystemsSW Master Plan

Limit Ground DisturbanceOptimize InfiltrationSite Features to “Fit”Limit PipingTrack Cost/BenefitLeverage Existing SystemsSW Master Plan

Page 10: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

10

Low Impact FeaturesLow Impact FeaturesPermeable Parking LotsShallow Infiltration AreasIntegrate with LandscapeDisconnected DownspoutsBubblers to Overland FlowDisconnect SD from SS

Permeable Parking LotsShallow Infiltration AreasIntegrate with LandscapeDisconnected DownspoutsBubblers to Overland FlowDisconnect SD from SS

Permeable Parking LotsPermeable Parking LotsPervious Concrete ConsideredCost ProhibitiveCaltrans Class 2 PermGeotechnical EvaluationGeogrid and FabricLimited Subbase PrepConstruction ParkingRun-on Control

Pervious Concrete ConsideredCost ProhibitiveCaltrans Class 2 PermGeotechnical EvaluationGeogrid and FabricLimited Subbase PrepConstruction ParkingRun-on Control

Page 11: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

11

Permeable Parking LotsPermeable Parking LotsParking Lot LocationsParking Lot Locations

Permeable Parking LotsPermeable Parking LotsGeogrid InstallationGeogrid Installation

Page 12: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

12

Permeable Parking LotsPermeable Parking LotsConstruction ApproachConstruction Approach

Permeable Parking LotsPermeable Parking LotsSheetflow into Shallow Infiltration AreaSheetflow into Shallow Infiltration Area

Page 13: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

13

Permeable Parking LotsPermeable Parking LotsEdge Details – Sheetflow OverflowEdge Details – Sheetflow Overflow

Permeable Parking LotsPermeable Parking LotsSheetflow into Shallow Infiltration AreaSheetflow into Shallow Infiltration Area

Page 14: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

14

Permeable Parking LotsPermeable Parking LotsSheetflow into Shallow Infiltration AreasSheetflow into Shallow Infiltration Areas

Permeable Parking LotsPermeable Parking LotsRun-on ControlRun-on Control

Page 15: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

15

Permeable Parking LotsPermeable Parking LotsRun-on ControlRun-on Control

Shallow Infiltration AreasShallow Infiltration AreasIntegrated with New LodgingShaped to Fit Topography“First-Flush” FocusLimited Inundation PeriodDual Purpose Piped InflowOverflow to BubblersCoordinated with LandscapingUnder-drain Backup

Integrated with New LodgingShaped to Fit Topography“First-Flush” FocusLimited Inundation PeriodDual Purpose Piped InflowOverflow to BubblersCoordinated with LandscapingUnder-drain Backup

Page 16: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

16

Shallow Infiltration AreasShallow Infiltration Areas

Shallow Infiltration AreasShallow Infiltration Areas

Page 17: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

17

Shallow Infiltration AreasShallow Infiltration AreasAdjacent to New LodgingAdjacent to New Lodging

Shallow Infiltration AreasShallow Infiltration AreasAdjacent to New LodgingAdjacent to New Lodging

Page 18: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

18

Shallow Infiltration AreasShallow Infiltration AreasAdjacent to New LodgingAdjacent to New Lodging

Shallow Infiltration AreasShallow Infiltration AreasAdjacent to New LodgingAdjacent to New Lodging

Page 19: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

19

Shallow Infiltration AreasShallow Infiltration Areas

Shallow Infiltration AreasShallow Infiltration AreasAdjacent to New LodgingAdjacent to New Lodging

Page 20: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

20

Shallow Infiltration AreasShallow Infiltration AreasAdjacent to New LodgingAdjacent to New Lodging

Shallow Infiltration AreasShallow Infiltration AreasWait to Grade!Wait to Grade!

Page 21: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

21

Shallow Infiltration AreasShallow Infiltration AreasWait to Grade!Wait to Grade!

Disconnected DownspoutsDisconnected DownspoutsExisting Tied to Underground Piping10-16 per Building300’ Collection Piping per Building Suspected SS ConnectionsReplace to Overland FlowIntegrate with Planned SurfacesNew Piping/Bubblers at Hardscape Areas

Existing Tied to Underground Piping10-16 per Building300’ Collection Piping per Building Suspected SS ConnectionsReplace to Overland FlowIntegrate with Planned SurfacesNew Piping/Bubblers at Hardscape Areas

Page 22: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

22

Disconnected DownspoutsDisconnected DownspoutsCollection Piping Around BuildingCollection Piping Around Building

Lessons LearnedLessons LearnedGive Yourself PermissionTake on Leadership RoleAdvocate EarlyHighlight Financial BenefitKeep Design FlexibleUnderstand All Site IssuesLeverage SuccessExpect and Welcome ChangeStay Solution Oriented

Give Yourself PermissionTake on Leadership RoleAdvocate EarlyHighlight Financial BenefitKeep Design FlexibleUnderstand All Site IssuesLeverage SuccessExpect and Welcome ChangeStay Solution Oriented

Page 23: Tom-Sweet PGE WS - URS Cavallo Point Presentation Slides ...

23

Q&AQ&ATom Sweet, PE, LEED AP®