Top Banner
TOD Illustrated: Transit-Oriented Development at RTD Stations as of December 2019
22

TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

May 27, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

TOD Illustrated:Transit-Oriented Development at RTD Stations

as of December 2019

Page 2: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

The following pages depict the high density development that has occurred within a half-mile walk of rail and Flatiron Flyer stations, both shortly before and following the opening of the transit lines.

2

Overview

P. 3 Central

P. 4 L Line

P. 6 Southwest

P. 7 Central Platte Valley

P. 8 Southeast

P. 11 W Line

P. 13 Flatiron Flyer

P. 14 CU A Line

P. 16 B Line

P. 17 G Line

P. 18 R Line

P. 19 N Line

P. 20 Denver Union Station

P. 21 Summary

Page 3: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

Central

Downtown Development

CoLab Apartments253 units – 2019

Tapiz100 affordable units – 2013

Arches93 affordable units – 2014

Mariposa87 affordable units – 2014

The Zephyr77 affordable units – 2014

The Aerie94 affordable units

– 2014

DHA HQ172k SF office & retail

– 2019

Mason at Alameda338 units – 2014

The Denizen275 units, 2k SF retail – 2015

PDG Design District354 units – Planned 2020

Alta SOBO Station187 units – 2019

Broadway Junction60 affordable units – 2008

Windsor at Broadway Station419 units – 2009

1000 S. Broadway Apts260 units – 2014

The Henry403 units – 2019

D

F

H

E

C

3

Platt Park Townhomes30 townhomes – 2015

Hanover Platt Park303 units – 2018

North Lincoln Mid-Rise75 affordable units – 1996

Atlantis Apartments60 affordable units

– TBD

All Copy Products HQ81k SF office

– 2019

Gates DistrictPhase I – 290 units – Planned 2022

Phase II+ – Office, residential, retail – TBD

Santa Fe YardsResidential, retail

– TBD

L

Page 4: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

L Line, Part I

Uptown Square696 units – 2003

Tower on the Park168 condos

– 2004

One Lincoln Park184 units – 2007

AMLI Park Ave193 units – 2009

2020 Lawrence231 units – 2012

One City Park302 units – 2014

Point 21212 units – 2014

Renaissance Stout St78 affordable units

– 2014

Radius Uptown372 units – 2016

SkyHouse364 units – 2016

Radiant329 units – 2019

SOVA211 units – 2019

Alexan 20th St Station354 units – 2019

Renaissance Off Broadway Lofts

81 affordable units – 2001

L

4

Portofino Tower54 units – 2003

Beldame Apartments28 affordable units

– 1998

Grant Park112 condos, 3k SF retail – 2008

Renaissance Downtown Lofts

101 affordable units – 2018

Drehmoor Apartments75 affordable units

– 2007

Kenect434 units

– TBD

X Denver 3410 units

– TBD

Page 5: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

5

L

L Line, Part II

Park Ave West122 units – 2003

Benedict Park Place396 affordable units

– 2008

Mile High United Way63k SF – 2014

The Lydian130 units, 25k SF

– 2018

Welton Park223 affordable units

– 2016

Alexan ArapahoeSquare

353 units – 2018

600 Park Ave238 units

– TBD

The Point35 affordable units, 33 condos, 13k SF – 2003

The Brownstones at King Stroud Court

26 townhomes – 2015

The Rossonian41 keys, 7k SF retail

– TBD

Downing Sq Apts50 units – 1998

Fourth Quarter36 affordable units

– 2010

29th & Welton50 condos, 13 affordable

– TBD

The Wheatley82 affordable units, 14

townhomes – 2016

Blair Caldwell Library

40k SF – 2003

Cornerstone Residences

51 units– 2009

Villages at Curtis Park155 affordable units, 168 market rate units – 2001

Lofts at Downing St Station

33 condos, 8.5k SF – 1998

Posner Center25k SF– 2013

Champa Square50 units, 30 affordable

– 2003

Wise Harris Arms22 affordable units– renovated 2017

The Hooper101 units

– TBD

California Park East70 affordable units – renovated 2017

3030 Welton Hostel80 beds– TBD

Charity House36 affordable units – TBD

Page 6: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

Southwest

Evans Station Lofts50 affordable units – 2013

Encore Evans Station224 units – 2018

Cherokee Flats139 units, 5k SF retail – Planned 2020

Englewood Civic Center140k SF office – 2000

ArtWalk CityCenter445 units – 2001

Liv Apartments30 units – 2016

Broadway Acoma Lofts111 affordable units – 2018

Oxford Station Apartments238 units – 2016

Vita160 senior units – 2017

C

D

6

Berkshire Aspen Grove280 units – 2011

Littleton Station37 condos, 10k SF office – 2008

Nevada Place31 condos – 2011

Page 7: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

Central Platte Valley

River MileMixed use redevelopment

Planning ongoing

Campus Village at Auraria119 units, 695 beds

– 2005

SpringHill Suites150 keys – 2012

W

E

C

7

Meow Wolf90k SF entertainment space

– Planned 2021

Page 8: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

Southeast, Part I

University Station Apartments

60 senior units – 2014

Colorado Center Tower 3220k SF office, 12k SF retail

– 2017

Deco350 units – Planned 2020

Yale Station50 senior affordable units – 2011

Garden Court at Yale Station64 affordable units – 2016

Yale 25 Station112 units – 2018

The District276 units, retail – 2004

Camden Belleview Station270 units – 2009

Cielo201 units – 2009

Milehouse353 units, retail – 2014

Pearl DTC408 units – 2015

The DEN325 units, retail – 2016

Carillon Belleview163 senior units – 2018

One Belleview Station315K SF office – 2018

Denver Tech Center900 acres

25M SF of development150k jobs

Landmark271 condos/apartments,

168k SF retail – 2008

R

F

H

E

8

Monaco Row204 units – 2013

One DTC West75K SF office – 2018

Wash Park Station32 units – 2015

Louisiana StationLofts

29 condos – 2007

6900 Layton385K SF office, 7k retail

– Planned 2020

Observatory Heights70 townhomes – 2018

DTC Union392 units

– Planned 2020

StonebridgeOffice, hotel

– TBD

The Cameron361 units – TBD

The Georgetown25 townhomes – 2013

Parc Apartments248 units – 2014

Page 9: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

Southeast, Part II

Wingate by Wyndham

86 keys – 2004

Palazzo Verdi300k SF office, 100k

SF event space – 2008

Village Center Station 234k SF office, retail – 2009

CoBank274k SF office – 2015

Granite Place 300k SF office – 2017

Village Ctr Station II324k SF office – 2018

Panorama Corporate Ctr143k SF office

– 2008

The Rail at Inverness220 units – 2008

AMLI at Inverness 308 units – 2009

Capstone at Vallagio272 units – 2013

AMLI Dry Creek256 units – 2017

169 Inverness 120k SF office

– 2017

The Glenn 306 units – 2018

Elevation 265 units – 2014

R

F

E

9

9151 E Panorama220k SF office – 2017

Bambino Terzo250k SF office – TBD

Vallagio North90 condos – 2008

Vallagio at Inverness277 condos

– 2008

Dry Creek Crossing249 condos – 2009

The Jones District3+ million SF office &

residential – TBD

SpringHill Suites88 rooms – 2019

Palazzo Verdi II400k SF office

– TBD

Peakview PlaceOffice– TBD

Fiddler’s View40k SF office

– TBD

Caley Townhomes58 townhomes – 2017

Page 10: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

10

Westview431 units – 2005

Lincoln Square Lofts140 condos

– 2005

One Lincoln Station197k SF office, 10k SF

retail – 2008

Aspect230 units – 2015

Lofts at Lincoln Station101 units – 2015

Camden267 units – 2016

Arcos236 units – 2018

AMLI RidgeGate281 units – 2013

Charles Schwab800k SF office, 45k SF retail

– 2014-2019

IMT RidgeGate219 units – 2018

Lone Tree City Center and East Villages

2,200 acres, 50k jobs, 10k units – TBD

Southeast, Part III

Waterford Lone Tree400 units – 2003

Marriott Denver South279 keys – 2003

Regency at RidgeGate281 units – 2013

Hampton Inn106 keys – 2013

The Marq at RidgeGate244 units, 5k SF retail – 2013

Ovation190 units, 6k SF retail

– 2015

R

F

E

Prescient Apts240 units

– TBD

Kiewit Regional HQPhase I – 250k SF office – Planned 2020

Phase II - 130k SF office - TBD

Page 11: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

W Line, Part I

West Line Village175 townhomes – 2018

Sheridan Sta. Apts133 affordable units

– Planned 2020

Brandon Flats104 affordable units

– Planned 2020

Regatta Sloan’s374 units – 2015

Perry Row32 townhomes – 2018

Arroyo Village130 affordable units – 2018

Decatur Place106 affordable units

– 2014

Avalon Apts.80 affordable units

– 2014

Corky Gonzales Public Library

25,000 SF – 2015

CDOT HQ175k SF – 2018

Luxe at Mile High382 units – 2019

Stadium District Master Plan

Mixed use redevelopment

– Planning ongoing

W

11

1315 Sheridan15 units – 2011

Renaissance West End128 units – 2012

Mulroy Apartments50 affordable units – 2008

Villas at Sloan’s Lake63 affordable units – 2007

Julian Heights63 units

– Planned 2020

Benton St Flats22 townhomes – TBD

West Side Lofts10 condos – TBD

Page 12: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

W Line, Part II

Outlook Golden Ridge172 units– 2015

Beacon 85343 units – 2017

WestLink244 units– 2015

Avenida Senior Living229 units – 2019

Oak Street Townhomes81 townhomes

– 2018

Oak Street Station291 units

– 2019

Indy Street Flats115 affordable units

– Planned 2020

Pearson Grove82 townhomes

– TBD

Zephyr Line95 affordable units

– 2015

Lamar Sta. Crossing138 affordable units

– 2014

West Line Flats155 units– 2017

40-West Residences60 affordable units

– 2017

Flats at Two Creeks78 affordable units

– Planned 2020

W

12

Fairfield Inn128 keys– 2019

Lamar Sta. Crossing II 65 affordable units

– TBD

Brickhouse293 units

– Planned 2021

Miller Street Townhomes20 townhomes

– TBD

Page 13: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

Flatiron Flyer

Ascent Westminster255 affordable units, 22k

SF retail – 2019

Eaton St Apts118 affordable units, 22K

SF retail – 2019

Alamo Draft House40k SF retail

– 2019

Origin Hotel125 keys, 15k SF retail

– Planned 2020

GRID / Solera80k SF office, 30k SF retail

– TBD

Sherman Apts226 units, 34k SF

Retail – Planned 2020

AMLI Arista524 units – 2008

1st Bank Center60k SF expo – 2010

Arista Uptown272 units – 2013

Harvest Station297 units – 2014

8000 Uptown360 units – 2015

Atria Arista240 units – 2016

Two Nine North238 units – 2010

3060 Pearl Condos113 condos, 3k SF retail – 2012

Griffis 3100 Pearl319 units – 2014

Depot Square71 affordable units – 2015

Boulder Commons100k SF office

– 2017

Google 200k SF office

– 2018

30 + Pearl Phase I – 120 aff. units – Planned 2021

Phase II – Office, residential – TBD Sync36

392 units – 2018

FF

13

Hyatt Place Boulder150 keys – 2015

S’park286 units, 140k SF

commercial – Planned 2020

Nickel Flats100k SF office

– 2017

The Steelyards90 units, 140k SF – 2004

aLoft Hotel at Arista139 keys – 2010

Flatiron Marketplace Phase I

300 units – TBD

Reve Boulder242 units, 145k SF

commercial – Planned 2021

Page 14: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

University of Colorado A Line, Part I

Larimer Row28 townhomes – 2015

Link 3566 units, 10k SF retail – 2015

Great Divide Brewery65k SF retail – 2016

Zeppelin Station100k SF retail/office

– 2018

Ride at RiNo84 units – 2018

HUB South225k SF office, 25k SF retail

– 2019

World Trade Center250k SF office, 30k SF retail,

200 keys – Planned 2020

Catalyst180k SF office – 2018

Revolution 3600130k SF office, 20k SF retail

– Planned 2020

Camden RiNo233 units, 3,500 SF retail

– Planned 2020

Denver Rock Drill180 units, 318k SF office, 65k

retail, 175 keys – Planned 2021

A

14

Factory Flats24 condos – 2018

Dry Ice Factory20k SF office – 2009

3463 Walnut382 units, 18 affordable

– TBD

The Mission Ballroom64k SF event space

– 2019

4180 Wynkoop64k SF event space

– 2019

T3 RiNo250k SF office,

20k SF retail – TBD

Walnut Street Lofts66 affordable units

– Planned 2020

1420 38th

347 units, 5k SF office, 11k SF retail – TBD

HUB North95k SF office, 10k SF retail

– Planned 2020

North WynkoopUp to 1M SF office, 500 units

– TBD

Novel RiNo475 units, 10k SF retail

– Planned 2020

35th and Blake Offices26k SF office, 5k SF retail

– Planned 2020

Train DenverOffice, residential

– TBD

Best Western Vib140 keys

– Planned 2020

The Current RiNo200k SF office

– TBD

Watershed167k SF office, 13k SF retail

– Planned 2021

Sage Hospitality Hotel165 keys

– Planned 2021

Page 15: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

University of Colorado A Line, Part II

A

15

Village at Central Park Station

120 condos, 12 townhomes, 54k SF retail

– TBD

FBI Office220k SF office

– 2010

Panasonic100k SF office, expo

– 2014

Elevate at Peña Station 219 units – 2019

Peña Station Hyatt225 keys – 2019

Panasonic NEXT382 acres – TBD

Central Park Station One220k SF office – Planned 2021

Renaissance at N. Colorado Station

103 affordable units – 2016

Park Hill Station Apartments

156 affordable units – 2016

Park Hill 4000192 units – 2014

Park Hill Town Center Condos28 condos – 2015

Page 16: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

B Line

Alto Apts70 affordable units – 2018

Zia343 units, 91 condos, 8.5k SF retail – Planned 2020

Denver Post RedevelopmentResidential, office, retail – TBD

B

G

16

Westminster TOD147 units, retail – Planned 2021

Page 17: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

G Line

Arvada Station Apartments378 units – 2013

Gateway at Arvada Ridge296 units – 2019

Water Tower Flats327 units – 2007

Park Place153 units – 2015

Solana352 units – 2017

Hilton Garden Inn136 keys – 2017

Olde Town Residences (P. I)252 units – TBD

Olde Town Retail (P. II)Retail – TBD

G

17

Hance Ranch280 units – Planned 2020

Remington Home Townhomes75 units – TBD

Toll Brothers Townhomes200 units – TBD

Grandview Station14 units – Planned 2021

Page 18: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

R Line

21 Fitzsimons 600 units – 2008

Comfort Suites90 keys – 2016

Forum Fitzsimons409 units, 29k SF retail

– 2018

Holiday Inn Express & Suites126 keys – 2019

Alta Fitzsimons294 units

– TBD

Legacy at Fitzsimons Village

364 units – TBD

Citadel on Colfax100 units, 150 condos, 100k

SF retail – TBD

Fitzsimons South288 units – 2008

Parkside at City Center 250 units, 25k SF retail

– Planned 2021

Parq at Iliff424 units

– 2018

Spur at Iliff Station316 units, 12k SF retail

– 2019

The Point at Nine Mile Station500+ units, 100k SF retail, 250k SF

commercial – TBD

Village at Hampden Town Ctr.

132 units – 2005

R

H

18

Courtyard by Marriott139 keys – TBD

The Savoy at Dayton Station372 units – 2012

Town CenterTerrace

169 units – 2005

SpringHill Suites153 keys– 2011

Hyatt Regency249 keys – 2016

Solana Stapleton280 units – TBD

Fitzsimons 100151k SF office, 15k SF retail

– 2011

Fairfield Inn and Suites

82 keys – 2010

Extended Stay America

82 keys – 2010

Fitzsimons Innovation Village

Office & residential – TBD

21 Fitzsimons – Phase II253 units

– Planned 2020

Page 19: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

N Line

N

19

South Platte Crossing 80k SF office – 2019

70 affordable units – TBD

48 Race Phase I – 150 aff. units – Planned 2021Phase II+ – affordable housing – TBD

Eastlake Station North143 townhomes

– TBD

The Ridge at Thornton Station280 units

– 2017

Crossing Pointe North64 senior units

– 2019

Page 20: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

DUS Real Estate Development1900 16th STREET

(2009)17 Story Office,

Retail & Living Space

DAVITA WORLD HEADQUARTERS

(2012)14 Story Office

N. WING BUILDING(2013)

5 Story Office, Retail, Restaurants & Parking

S. WING BUILDINGONE UNION STATION

(2014)5 Story Office, Retail

CADENCE APARTMENTS(2013)

13 Story, 219 Apartments, Retail & Parking

DUS HISTORIC BUILDING(2014)

112 Room Crawford Hotel & Retail

ALTA CITY HOUSE(2015)

5 Story, 281 Apartments

PLATFORM(2015)

21 Story, 287 Apartments

1601 WEWATTA(2015)

10 Story Office Building, Retail, Parking

ALARA(2015)

313 Apartments, King Soopers Grocer

TRIANGLE BUILDING(2015)

11 Story Office, Retail

UNION TOWER WEST(2017)

203 keys, 100K Office, 10K Retail

ASHLEY UNION STATION(2017)

4 Story, 107 Apartments (Affordable)

HOTEL BORN & 1881 OFFICE

(2017)200 keys, 5 Story

Office & Retail

UNION DENVER(2017)

579 Apartments, Whole Foods Market

16 CHESTNUT(2018)

19 Story Office, Retail

HILTON GARDEN INN

(2019) 233 keys

THE GRAND(2018)

12 & 24 stories, 508 Apartments, Retail

COLORADAN(2019)

334 Condos, 28K Retail

THE PULLMAN(2020)

14 Stories, 3K Retail, 164 Apartments

9 10

11 12

1 2 8543 6 7

19 20

14

15 16 17 18

13

• 3,000 residential units • 1.9 million SF office • 250,000 SF retail• 750 hotel rooms

12

8

16

9

11

43 5

10

6

15

7

12

14

17 18

19 20

13

COMPLETED

PROPOSEDDUS MET

District

DDA District21

PANDO APARTMENTS(Proposed)

12 Story, 222 Apartments

21

Page 21: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

TOD Summary

RTD’s transit investment has had a significant impact on development in the region.

Transit-oriented development within a half-mile walk of a high frequency station*:• 48,000 Residential Units• 11,500,000 Square Feet Office• 1,600,000 Square Feet Retail• 4,000 Hotel Rooms

*Denver and Boulder downtowns excluded

21

Lines TOD Status Resi Units Office S.F. Retail S.F. Hotel KeysExisting 70

Planned 3,581 661,000 93,486 -

Existing 3,059 253,000 18,000 -

Planned 704 170,000 51,000 -

Existing 119 - - 150

Planned - - - -

Existing 900 820,000 100,000 225

Planned 2,207 1,631,800 266,800 680

Existing 2,628 1,885,994 254,675 748

Planned 386 2,918

Existing 3,306 440,000 99,700 289

Planned 1,174 300,000 143,500 125

Existing 1,506 - - 136

Planned 821 - 4,000 -

Existing 6,437 166,192 107,300 - Planned 1,269 58,000 6,100 41

Existing 344 80,000

Planned 363 7,000

Existing 2,710 151,700 73,500 837

Planned 2,157 250,000 125,000 139

Existing 8,297 2,730,587 250,950 559

Planned 1,343 1,576,992 53,408 -

Existing 1,599 150,000 - -

Planned 139 5,000 - -

Existing 3,325 175,000 - 128

Planned 985 - - -

Overall Total 48,444 11,505,265 1,657,337 4,057 Existing 14,144 4,652,792 753,212 985

Planned 34,300 6,852,473 904,125 3,072

Total

Flatiron Flyer

B Line

Central

Central Platte Valley

CU A Line

Denver Union Station

W Line

G Line

L Line

N Line

R Line

Southeast

Southwest

Page 22: TOD Illustrated: Transit-Oriented Development at RTD Stations Senior Living 229 units –2019 Oak Street Townhomes 81 townhomes –2018 Oak Street Station 291 units –2019 Indy Street

22

RTD Rail and BRT Opening Years

2006

2016

2016

2016

2019

2020

2013

2000

2002 1994

2019

• 1994 – Central

• 2000 – Southwest

• 2002 – Central Platte Valley

• 2006 – Southeast

• 2013 – W Line

• 2016 – FF, U of C A, B, R Lines

• 2019 – SERE, G Line

• 2020 – N Line