David Greeno Passenger Focus Whittles House 14 Pentonville Road London, N1 9HF Tel: 0300 123 0837 Email: [email protected]David Chilvers Continental Research 132-140 Goswell Road London EC1V 7DY Tel: 020 7490 9111 Email: [email protected]Contacts NATIONAL PASSENGER SURVEY - WAVE 20 – Spring 2009 TOC REPORT FOR WREXHAM and SHROPSHIRE Note: Wrexham and Shropshire data is unweighted, whilst the long distance sector data is weighted
26
Embed
TOC Report W20 Wrexham and Shropshired3cez36w5wymxj.cloudfront.net/migrated/toc_report... · TOC REPORT FOR WREXHAM and SHROPSHIRE Note: Wrexham and Shropshire data is unweighted,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
David GreenoPassenger FocusWhittles House14 Pentonville RoadLondon, N1 9HF
TOC REPORT FOR WREXHAM and SHROPSHIRENote: Wrexham and Shropshire data is unweighted,
whilst the long distance sector data is weighted
Page 1
Contents Page No
Overall Satisfaction and Station Factors for TOC 2Train Factors for TOC 3-4Overall Satisfaction and Station Factors for TOC type 5Train Factors for TOC type 6-7Trends in all 32 Satisfaction Factors for TOC 8-15Methodology 16Issues affecting fieldwork 17-20Sample profile for TOC and TOC type 21-22Stations sampled - unweighted and weighted data 23Sample profile for all TOCs - weighted 24Sample profile for all TOCs - unweighted 25
NATIONAL PASSENGER SURVEY - WAVE 20 – Spring 2009
TOC REPORT FOR WREXHAM and SHROPSHIRE
Page 2NATIONAL PASSENGER SURVEY - WAVE 20 – Spring 2009
WREXHAM and SHROPSHIRE
9
2
2
12
1
1
8
1
10
3
12
12
6
3
7
4
2
12
9
15
14
14
15
10
9
15
24
15
1
35
43
36
40
44
38
40
42
30
47
38
43
34
62
39
49
37
34
29
39
34
37
32
34
27
59
0
2
1
2
2
1
5
5
7
5
O V ER A LL SA T ISF A C T IO N ( 3 0 1)
ST A T IO N - T IC KET B U Y IN GF A C ILIT IES ( 111)
ST A T IO N - PR O V IS IO N O FIN F O R M A T IO N A B O U T T R A IN T IM E S/
PLA T F O R M S ( 2 6 8 )
ST A T IO N - T HE U PKEEP / R EPA IR O FT HE ST A T IO N B U ILD IN G S/
PLA T F O R M S ( 2 6 2 )
ST A T IO N - C LEA N LIN ESS ( 2 77)
ST A T IO N - T HE F A C ILIT IES A N DSER V IC ES ( 2 4 2 )
ST A T IO N - T HE A T T IT U D ES A N DHELPF U LN ESS O F T HE ST A F F ( 2 2 0 )
ST A T IO N - C O N N EC T IO N S W IT HO T HER F O R M S O F PU B LIC
T R A N SPO R T ( 2 0 4 )
ST A T IO N - F A C ILIT IES F O R C A RPA R KIN G ( 12 4 )
T HE O V ER A LL ST A T IO NEN V IR O N M EN T ( 2 8 9 )
ST A T IO N - Y O U R PE R SO N A LSEC U R IT Y W HILS T U SIN G ( 2 4 1)
ST A T IO N - T HE A V A ILA B ILIT Y O FST A F F ( 2 4 7)
ST A T IO N - HO W R EQ U EST T OST A T IO N ST A F F W A S HA N D LED ( 71)
Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied
Page 8NATIONAL PASSENGER SURVEY - WAVE 20 – Spring 2009
WREXHAM and SHROPSHIRE
N.B. BENCHMARKS AND TARGETS ARE ONLY SHOWN FOR APPLICABLE FACTORS
97
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
OVERALL SATISFACTION (301)
82
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION – TICKET BUYING FACILITIES (111)
85
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION – PROVISION OF INFORMATION ABOUT TRAIN TIMES/ PLATFORMS (268)
77
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION – THE UPKEEP/ REPAIR OF THE STATION BUILDING/ PLATFORMS (262)
Page 9NATIONAL PASSENGER SURVEY - WAVE 20 – Spring 2009
WREXHAM and SHROPSHIRE
N.B. BENCHMARKS AND TARGETS ARE ONLY SHOWN FOR APPLICABLE FACTORS
78
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION - CLEANLINESS (277)
67
10
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION – THE FACILITIES AND SERVICES (242)
80
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION – THE ATTITUDES AND HELPFULNESS OF THE STAFF (220)
76
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION – CONNECTIONS WITH OTHER FORMS OF PUBLIC TRANSPORT (204)
Page 10NATIONAL PASSENGER SURVEY - WAVE 20 – Spring 2009
WREXHAM and SHROPSHIRE
N.B. BENCHMARKS AND TARGETS ARE ONLY SHOWN FOR APPLICABLE FACTORS
67
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION – FACILITIES FOR CAR PARKING (124)
79
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION – OVERALL ENVIRONMENT (289)
72
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION – YOUR PERSONAL SECURITYWHILST USING (241)
70
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION – THE AVAILABILITY OF STAFF (247)
Page 11NATIONAL PASSENGER SURVEY - WAVE 20 – Spring 2009
WREXHAM and SHROPSHIRE
N.B. BENCHMARKS AND TARGETS ARE ONLY SHOWN FOR APPLICABLE FACTORS
93
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
STATION – HOW REQUEST TO STATION STAFFWAS HANDLED (71)
73
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE FREQUENCY OF THE TRAINS ON THAT ROUTE (277)
92
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – PUNCTUALITY/ RELIABILITY (I.E. THE TRAIN ARRIVING/ DEPARTING ON TIME) (282)
81
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE LENGTH OF TIME THE JOURNEY WAS SCHEDULED TO TAKE (SPEED) (274)
Page 12NATIONAL PASSENGER SURVEY - WAVE 20 – Spring 2009
WREXHAM and SHROPSHIRE
N.B. BENCHMARKS AND TARGETS ARE ONLY SHOWN FOR APPLICABLE FACTORS
66
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – CONNECTIONS WITH OTHER TRAIN SERVICES (139)
84
10
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE VALUE FOR MONEY FOR THE PRICE OF YOUR TICKET (284)
96
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – CLEANLINESS OF THE TRAIN (304)
87
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – UP KEEP AND REPAIR OF THE TRAIN (301)
Page 13NATIONAL PASSENGER SURVEY - WAVE 20 – Spring 2009
WREXHAM and SHROPSHIRE
N.B. BENCHMARKS AND TARGETS ARE ONLY SHOWN FOR APPLICABLE FACTORS
91
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE PROVISION OF INFORMATION DURING THE JOURNEY (277)
98
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE HELPFULNESS AND ATTITUDE OF STAFF ON TRAIN (288)
91
10
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE SPACE FOR LUGGAGE (269)
65
10
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE TOILET FACILITIES (223)
Page 14NATIONAL PASSENGER SURVEY - WAVE 20 – Spring 2009
WREXHAM and SHROPSHIRE
N.B. BENCHMARKS AND TARGETS ARE ONLY SHOWN FOR APPLICABLE FACTORS
95
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – SUFFICIENT ROOM FOR ALL THE PASSENGERSTO SIT/ STAND (296)
93
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE COMFORT OF THE SEATING AREA (300)
88
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE EASE OF BEING ABLE TO GET ON AND OFF (295)
94
10
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – YOUR PERSONAL SECURITY WHILST ON BOARD (280)
Page 15NATIONAL PASSENGER SURVEY - WAVE 20 – Spring 2009
WREXHAM and SHROPSHIRE
N.B. BENCHMARKS AND TARGETS ARE ONLY SHOWN FOR APPLICABLE FACTORS
96
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE CLEANLINESS OF THE INSIDE (304)
91
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE CLEANLINESS OF THE OUTSIDE (275)
95
10
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – THE AVAILABILITY OF STAFF (291)
82
10
20
30
40
50
60
70
80
90
100
Autumn
2004
Spring
2005
Autumn
2005
Spring
2006
Autumn
2006
Spring
2007
Autumn
2007
Spring
2008
Autumn
2008
Spring
2009
% SATIS
FIED
WREXHAM and SHROPSHIRE LONG DISTANCE Benchmark
TRAIN – HOW WELL TRAIN COMPANY DEALT WITH DELAYS (39)
Page 16METHODOLOGYQuestionnaires are handed out at stations to customers about to board a train.
A reply paid envelope is provided for returning questionnaires.
Each Train Operating Company (TOC) is sampled separately. Interviewers are given a number of questionnaires to hand out at a station.At Gatwick and Heathrow Airports and for some shifts at certain London termini, questionnaires are handed out to passengers of aspecific TOC.From Autumn 2003 onwards, at all other stations, questionnaires are handed out to passengers of any TOC (in the past, these werealso targeted).The number of questionnaires handed out will depend on:
•the size of station•time of day•length of shift
TOC data is compiled to provide a national sample.Fieldwork is carried out each Spring (February/March) and Autumn (September/October). Up to Wave 8, fieldwork took place over 3weeks. In Wave 9, the fieldwork was extended to an 11 week period, from 26 August to 9 November, to provide a better representation of journeys.
Quotas for returned questionnaires are set overall and by weekday/weekend, journey purpose and station size. All data for a TOC in this Report is weighted up to the number of passenger journeys annually on the TOC and the profile of those journeys by:
The data for number of journeys and profiles by these variables was generated from ORR data (2007).The stations for each TOC were stratified by number of passengers and a number of stations in each size stratum is sampled. This sample design and weighting ensures that data is representative of all passenger journeys made on each TOC. National results are constructed by combining data for all TOCs together, weighting by number of journeys.
For more details of NPS methodology, visit www.passengerfocus.org.uk
Page 17ISSUES AFFECTING WAVE 20
Wave 20 fieldwork was undertaken between 31 January 2009 and 27 March 2009. Top up shifts were run between 28 March and 9 April 2009. The main fieldwork period was similar to previous years, but the top-up period was slightly extended because of problems encountered earlier in the fieldwork period.
Extreme weather - in particular, heavy snow during the 1st week of February - caused a lot of disruption to the fieldwork schedule. Over 50% of all shifts originally scheduled for 2-6 February had to be postponed until later in the fieldwork period.
As always, planned engineering works meant that some shifts were rescheduled. As usual, shifts were only rescheduled if the engineering work caused a station or line closure. Whenever possible the shifts went ahead as planned if there were still trainservices running.
Over-running engineering work meant that further shifts had to be rescheduled during the course of the fieldwork, but this was not a great problem.
A few shifts were rescheduled to avoid clashing with Six Nations rugby matches, but sporting events did not cause much disruption to the original schedule.
Page 18ISSUES AFFECTING WAVE 19
Wave 19 fieldwork was undertaken between 1 September 2008 and 2 November 2008. Top up shifts were run between 3 November and 15 November 2008. The total fieldwork period was very similar to the corresponding waves in other years (other than 2007).
As usual, line closures due to planned engineering work required us to reschedule many shifts at stations where no trains were running. Some shifts were aborted if a station only had a replacement bus service.
In 3 areas, shifts were rescheduled because of strike action, or planned strike action.
Fatalities on the line once again led to some shifts having to be rescheduled.
Extreme weather caused some disruption to the schedule, either because trains couldn't run on flooded tracks, or because fieldworkers couldn't reach rural stations because of snowfall.
Page 19ISSUES AFFECTING WAVE 18
Wave 18 fieldwork was undertaken between 19 January and 7 March 2008. Top up shifts were run between 8 March and 17 March 2008. The fieldwork period was shorter, and started earlier than the corresponding wave in 2007 because Easter was unusually early.
Fieldwork ran smoothly, with just a small number of problems affecting specific TOCs.
Planned engineering work required us to reschedule a lot of shifts. As usual, we only re-scheduled shifts if there were no trains running from the station. Some shifts were aborted if a station only had a replacement bus service.
Over-running engineering works led to some weekend disruption.
6 Nations Rugby matches caused a couple of alterations to the initial schedule.
Two shifts had to be aborted because the police had closed the station.
"Passenger action" disrupted train services to such an extent that 3 shifts (Paddington and Heathrow) had to be aborted and rescheduled.
Page 20ISSUES AFFECTING WAVE 17
Wave 17 fieldwork was undertaken between 1 September and 9 November 2007. Top up shifts were run between 10 November and 1 December 2007. The fieldwork period was extended compared to the corresponding wave in 2006 because of the need to achieve targets for individual TOCs.
Fieldwork ran smoothly, with just a small number of problems affecting specific TOCs,
Planned engineering work required us to reschedule a handful of shifts. As usual, we only re-scheduled shifts if there were no trains running from the station. Some shifts were aborted if a station only had a replacement bus service. One shift was aborted because police had closed the station after an incident.
One shift at Cardiff was re-scheduled because an international rugby match was likely to lead to overcrowding at the station.