004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take one ALUMINIUM PROFILE of 500 mm (19.7") out of the box.
28

Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Aug 11, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME

Take one ALUMINIUM PROFILE of 500 mm (19.7") out of the box.

Page 2: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Slide two ANGULAR MOUNTS (from the box) in the end of the ALUMINIUM PROFILE of 500 mm (19.7").

Slide this assembly in the left profile of the BASE FRAME.

Page 3: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Slide it further down the profile until its centre is at 16 cm (6.3") from the edge of the base frame.

Page 4: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Tighten the bolts on the ANGULAR MOUNTS.

Take all the parts out of the bag labelled with 21.

Page 5: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Now take 4 pieces as shown in the picture below out of the bag containing the plastic parts (ROD CLAMP Z BIG).

Notice how the round hole must be 10 mm (0.39") in diameter.

Page 6: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Take two rods out of the bag labelled with 7. These rods should have a diameter of 10 mm (0.39") and a length of

345 mm (13.6").

Page 7: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Use 4 square M5 nuts to assemble the following:

Page 8: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Slide 2 of these down the left upright ALUMINIUM PROFILE as shown in the pictures below:

Page 9: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Now slide two ROD CLAMP Z BIG pieces over the bolts as shown in the pictures below.

Page 10: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Make sure that the ROD CLAMP Z BIG pieces are as far down as possible and then tighten the bolt. Do not over

tighten this bolt.

Page 11: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Put the two rods in the ROD CLAMP Z BIG pieces.

Page 12: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Take all the parts out of the bag labelled with 19.

Page 13: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Now take 4 pieces as shown in the picture below out of the bag containing the plastic parts (BEARING CLAMP Z BIG).

Page 14: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Slide 4 linear bearings into the 4 BEARING CLAMP Z BIG pieces.

Page 15: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Use the circlip pliers to carefully fit the circlips around the both sides of the 4 LM10UU LINEAR BEARINGS.

Page 16: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take
Page 17: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Take all the parts out of the bag labelled with 20.

Page 18: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Use the 2 M4 countersunk screws to attach the small ALUMINIUM PROFILE to the Z CARRIAGE FRONT piece.

Page 19: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Note the red markings. Make sure the orientation is correct.

Use the M4 nuts and M4 toothed washers as shown in the picture below:

Page 20: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Slide an M4 washer over the long M4 bolt. Repeat this 8 times.

Page 21: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Slide the bolt with washer through then Z CARRIAGE FRONT piece and the Z CARRIAGE back piece. Make sure that

the orientation of the pieces is exactly as in the picture (watch the red arrows carefully).

Put the remaining bolts in place and use an M4 washer and an M4 locking nut on each bolt. Do not tighten the bolts.

Page 22: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Slide the 4 BEARING CLAMP Z BIG pieces between the 2 aluminium plates and over the bolts.

Page 23: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Slightly tighten the bolts. We will fully tighten these bolts at a later step in the building process.

Page 24: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Slide this assembly over the upright 2 rods. Pay attention to the orientation.

Page 25: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Now slide the two remaining ROD CLAMP Z BIG pieces over the rods.

Page 26: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Take two of these bolts you assembled earlier:

Slide these bolts in the upright profile so they fit in the ROD CLAMP Z BIG pieces.

Page 27: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Tighten these bolts. Do not over tighten.

Page 28: Tmp en 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAMEprojektit.biz/kuvat/3D_tulostin/manual/en_004 ASSEMBLING THE LEF… · 004 – ASSEMBLING THE LEFT UPRIGHT OF THE FRAME Take

Making sure that this Z CARRIAGE can move freely up and down, you can firmly tighten all the bolts that were