Top Banner
River to Sea Transportation Planning Organization TIP COMPARISON REPORT Comparing the FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) to the FY 2015/16 - FY 2019/20 TIP (amended 5/25/16) June 22, 2016
180

TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

Sep 18, 2019

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea

Transportation Planning Organization

TIP COMPARISON REPORT

Comparing the

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

to the

FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

June 22, 2016

Page 2: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 1

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Locally Funded Projects - Information Only

3rd Avenue Gateway FPN: NSB-15-02FROM at SR A1A (3rd Av) & S Peninsula AvTO DESCRIPTION: HWY-ENHANCEMENTConstruct gateway feature on the northeastcorner of the intersection of SR A1A (3rd Av) andS. Peninsula Av.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF $150,440 0 0 0 0 0 0

$150,440 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 1 of 179

Page 3: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 2

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Locally Funded Projects - Information Only

5th Street Bridge FPN: NSB-15-01FROM Riverside DrTO Commodore DriveDESCRIPTION: BRIDGE REPLACEMENTReplace 5th Street Bridge to Yacht Club Island.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF $411,587 0 0 0 0 0 0

$411,587 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 2 of 179

Page 4: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 3

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Traffic Operations, ITS & Safety Projects

Big Tree Rd Railroad FPN: 4369121FROM at FEC RR Xing # 271950-RTO DESCRIPTION: RAIL SAFETY PROJECTSafety improvements to FEC RR Xing #271950-R over Big Tree Road including PE,flagging, labor, materials and other related costs.The TPO's support for traffic operations,intelligent transportation systems (ITS), andsafety projects is expressed on pgs 1, 44, 49, 92,and 96 of the 2035 Long Range TransportationPlan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

RRU RHP $176,960 0 0 0 0 0 0

$176,960 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 3 of 179

Page 5: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 4

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Traffic Operations, ITS & Safety Projects

CR 4028 / 6th Street FEC FPN: 4385551FROM 6th St at FEC Rail Xing #272929-KTO DESCRIPTION: RAIL SAFETY PROJECTRailroad crossing safety improvements at CR4028 (6th St) and the FEC Railroad (crossing#272929-K). The TPO's support for safetyprojects is expressed on page 64 of the 2040Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST RHP 0 $317,720 0 0 0 0 0

0 $317,720 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 4 of 179

Page 6: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 5

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Miscellaneous Projects

DeLand District FPN: 4180809FROM TO DESCRIPTION: FIXED CAPITAL OUTLAYMinor repairs/renovations to FDOT's District FiveAdministration Building on Woodland Boulevardin DeLand.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST FCO $230,000 0 0 0 0 0 0MNT D $150,000 0 0 0 0 0 0

$380,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 5 of 179

Page 7: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 6

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Traffic Operations, ITS & Safety Projects

Doyle Road Paved FPN: 4389901FROM Providence BlvdTO Saxon BlvdDESCRIPTION: PAVE SHOULDERSLap agreement with Volusia County to increaselane width to 12 ft. and add paved shoulders onDoyle Road between Providence Boulevard andSaxon Boulevard. Project length: 1.85 miles.TPO's support for traffic operations, intelligenttransportation system (ITS), and safety projectsis expressed on pgs 1, 44, 49, 92, and 96 of the2035 Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE LF $100,000 0 0 0 0 0 0CST ACSU $1,400,000 0 0 0 0 0 0CST SU $600,000 0 0 0 0 0 0CEI ACSU $5,000 0 0 0 0 0 0CEI LF $120,000 0 0 0 0 0 0

$2,225,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 6 of 179

Page 8: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 7

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Miscellaneous Projects

FDOT 5 District Office FPN: 4223462FROM at US 17-92 (Woodland Blvd)TO DESCRIPTION: FIXED CAPITAL OUTLAYPhase II construction for a major renovation ofthe Department of Transportation District 5offices in DeLand. The total project cost (PhaseII) is $309,000.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

DSB DIH $309,900 0 0 0 0 0 0

$309,900 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 7 of 179

Page 9: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 8

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Aviation Projects

Flagler County Airport FPN: 4350831FROM at Flagler County AirportTO DESCRIPTION: AVIATIONConstruct partial parallel taxiway to Runway 6-24.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $1,438,000 0 0 0 0 0 0CAP FAA 0 0 0 0 0 0 0CAP LF $359,500 0 0 0 0 0 0

$1,797,500 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 8 of 179

Page 10: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 9

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Transit & Transportation DisadvantagedProjects

Flagler County New FPN: 4377711FROM Flagler County-wideTO DESCRIPTION: OPERATING FOR FIXEDProjects to be determined for funding underSection 5317. (Reference 2035 Long RangeTransportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DU $149,999 0 0 0 0 0 0OPS LF $149,999 0 0 0 0 0 0

$299,998 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 9 of 179

Page 11: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 10

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Transit & Transportation DisadvantagedProjects

Flagler County Transit FTA FPN: 4387441FROM Flagler County-wideTO DESCRIPTION: COMMUTER TRANS.Flagler County will use these FTA Section 5316funds for capital, planning and operatingexpenses for projects that transport low incomeindividuals to and from jobs and activities relatedto employment, and for reverse commuteprojects. (Reference 2035 Long RangeTransportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DU $149,999 0 0 0 0 0 0OPS LF $149,999 0 0 0 0 0 0

$299,998 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 10 of 179

Page 12: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 11

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Aviation Projects

Flagler County Wildlife FPN: 4335181FROM at Flagler County AirportTO DESCRIPTION: AVIATION ENVIRONMENTALWildlife assessment at Flagler County Airport.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $5,000 0 0 0 0 0 0CAP FAA $90,000 0 0 0 0 0 0CAP LF $5,000 0 0 0 0 0 0

$100,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 11 of 179

Page 13: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 12

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Locally Funded Projects - Information Only

Ft Smith Boulevard - Add FPN: DLT-15-01FROM Howland BlvdTO SR 415DESCRIPTION: ADD LANES & RECONSTRUCTAdd a center lane to the existing two-lane facilityfrom Howland Boulevard to SR 415.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF $575,000 0 0 0 0 0 0

$575,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 12 of 179

Page 14: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 13

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Bicycle, Pedestrian & Enhancement Projects

Holsonback Drive FPN: 4393041FROM Volusia County Health Dept. DrivewayTO Bill France BlvdDESCRIPTION: SIDEWALKConstruct a five (5) ft. wide sidewalk on the southside of Holsonback Drive from a driveway leadingto the Volusia County Health Department to aVotran bus stop at the intersection of Bill FranceBoulevard and Holsonback Drive. Project length: 1,200 feet. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, and 64.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST SU $87,391 0 0 0 0 0 0CEI LF $6,319 0 0 0 0 0 0CEI SU $5,247 0 0 0 0 0 0

$98,957 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 13 of 179

Page 15: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 14

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Traffic Operations, ITS & Safety Projects

Hull Road Railroad FPN: 4369141FROM at FEC RR Xing # 273011-RTO DESCRIPTION: RAIL SAFETY PROJECTSafety improvements to FEC RR Xing #273011-R over Hull Road including PE, flagging,labor, materials and other related costs. TheTPO's support for traffic operations, intelligenttransportation systems (ITS), and safety projectsis expressed on pgs 1, 44, 49, 92, and 96 of the2035 Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

RRU RHP $60,560 0 0 0 0 0 0

$60,560 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 14 of 179

Page 16: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 15

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Bicycle, Pedestrian & Enhancement Projects

I-4 @ SR 44 Interchange FPN: 4354693FROM at SR 44TO DESCRIPTION: LANDSCAPINGLandscaping at the I-4/SR 44 interchange.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST DS $870,512 0 0 0 0 0 0CEI DIH $114,037 0 0 0 0 0 0

$984,549 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 15 of 179

Page 17: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 16

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Bicycle, Pedestrian & Enhancement Projects

I-4 @ Saxon Boulevard FPN: 4354692FROM at Saxon BlvdTO DESCRIPTION: LANDSCAPINGLandscaping at the I-4/Saxon Boulevardinterchange. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST DS $795,135 0 0 0 0 0 0CEI DIH $104,162 0 0 0 0 0 0

$899,297 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 16 of 179

Page 18: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 17

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Roadway Capacity Projects

I-4 Widening - SR 44 to FPN: 4084641FROM SR 44TO east of I-95DESCRIPTION: ADD LANES & RECONSTRUCTAdd lanes and reconstruct I-4 (widen from 4lanes to 6). Construction began in FY 2011/12 asa "design/build" project. Project length is 13.714miles. (Reference 2035 Long RangeTransportation Plan, Table 8.2, pg 122.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH 0 0 0 0 0 0 0PE NH 0 0 0 0 0 0 0PE NHAC 0 0 0 0 0 0 0PE NHPP 0 0 0 0 0 0 0

ROW BNIR 0 0 0 0 0 0 0ROW DI 0 0 0 0 0 0 0ROW DIH 0 0 0 0 0 0 0ROW NH 0 0 0 0 0 0 0ROW NHAC 0 0 0 0 0 0 0DSB ACNH 0 0 0 0 0 0 0DSB ACNP $398,762 0 0 0 0 0 0DSB DDR $1,072,376 0 0 0 0 0 0DSB DS 0 0 0 0 0 0 0DSB EB 0 0 0 0 0 0 0DSB NH 0 0 0 0 0 0 0DSB NHPP 0 0 0 0 0 0 0ENV DI 0 0 0 0 0 0 0ENV NHAC 0 0 0 0 0 0 0

$1,471,138 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 17 of 179

Page 19: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 18

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Bicycle, Pedestrian & Enhancement Projects

Lakeshore Shared-Use FPN: 4356711FROM Thornby ParkTO Green Springs ParkDESCRIPTION: BIKE PATH/TRAILThe project represents a 12-foot wide, 3,175 footlong bike/pedestrian trail spur that extends fromThornby Park to the lakeside entrance of GreenSprings Park. The proposed trail links severalpublic resources including Thornby Park, theDeltona Boat Ramp, the Deltona CommunityCenter and Green Springs Park with the St.Johns River to Sea Trail Loop. Project length:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF $66,745 0 0 0 0 0 0CST SU $17,127 0 0 0 0 0 0CST TALU $494,375 0 0 0 0 0 0

$578,247 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 18 of 179

Page 20: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 19

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Transit & Transportation DisadvantagedProjects

MPO Section 5303 FPN: 4224311FROM throughout R2CTPO planning areaTO DESCRIPTION: PTO STUDIESPlanning studies relating to public transitoperations (PTO studies). (Reference 2035 LongRange Transportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PLN DPTO $19,055 0 0 0 0 0 0PLN DU $152,443 0 0 0 0 0 0PLN LF $19,055 0 0 0 0 0 0

$190,553 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 19 of 179

Page 21: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 20

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Aviation Projects

New Smyrna Airport FPN: 4315761FROM at New Smyrna Beach Municipal AirportTO DESCRIPTION: AVIATION PRESERVATIONRunway 7-25 improvements. (Reference 2035Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $83,360 0 0 0 0 0 0CAP FAA $937,890 0 0 0 0 0 0CAP LF $20,840 0 0 0 0 0 0

$1,042,090 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 20 of 179

Page 22: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 21

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Traffic Operations, ITS & Safety Projects

New Smyrna Beach Traffic FPN: 4364721FROM At 19 intersection throughout the city TO DESCRIPTION: TRAFFIC CONTROLInstall Opticom traffic signal preemption devicesat nineteen (19)signalized intersectionsthroughout the city. This improvement will allowemergency responders to control the traffic signalsystems to navigate safely through intersections.The TPO's support for safety projects isexpressed on pages 11, 57, 65, and 66 of the2040 LRTP.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE LF $7,500 0 0 0 0 0 0CST LF $23,400 0 0 0 0 0 0CST SU $214,722 0 0 0 0 0 0CEI LF $9,490 0 0 0 0 0 0

$255,112 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 21 of 179

Page 23: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 22

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Aviation Projects

Ormond Beach Airpark - FPN: 4184811FROM at Ormond Beach AirportTO DESCRIPTION: AVIATION PRESERVATIONReplace Automated Weather ObservationSystem at the Ormond Beach Municipal Airport.(Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $14,000 0 0 0 0 0 0CAP FAA $157,500 0 0 0 0 0 0CAP LF $3,500 0 0 0 0 0 0

$175,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 22 of 179

Page 24: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 23

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Aviation Projects

Ormond Beach Airpark FPN: 4208621FROM at Ormond Beach Municipal AirportTO DESCRIPTION: AVIATION SAFETY PROJECTWildlife hazard assessment at Ormond BeachMunicipal Airport. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $8,800 0 0 0 0 0 0CAP FAA $99,900 0 0 0 0 0 0CAP LF $2,220 0 0 0 0 0 0

$110,920 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 23 of 179

Page 25: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 24

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Aviation Projects

Ormond Beach Airport FPN: 4335281FROM at Ormond Beach Municipal AirparkTO DESCRIPTION: AVIATION CAPACITYConstruct Taxiway "G" at Ormond BeachMunicipal Airpark. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $168,000 0 0 0 0 0 0CAP FAA $1,890,000 0 0 0 0 0 0CAP LF $42,000 0 0 0 0 0 0

$2,100,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 24 of 179

Page 26: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 25

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Traffic Operations, ITS & Safety Projects

Reed Canal Rd Railroad FPN: 4369131FROM at FEC RR Xing # 271954-TTO DESCRIPTION: RAIL SAFETY PROJECTSafety improvements to FEC RR Xing #271954-T over Reed Canal Road including PE,flagging, labor, materials and other related costs.The TPO's support for traffic operations,intelligent transportation systems (ITS), andsafety projects is expressed on pgs 1, 44, 49, 92,and 96 of the 2035 Long Range TransportationPlan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

RRU RHP $127,350 0 0 0 0 0 0

$127,350 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 25 of 179

Page 27: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 26

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Maintenance Projects

SR 15/600 (US17-92) from FPN: 4370541FROM E of Plymouth AvTO Mercers Fernery RdDESCRIPTION: LIGHTINGJPA for lighting with the City of DeLand.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST DS $250,000 0 0 0 0 0 0

$250,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 26 of 179

Page 28: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 27

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Traffic Operations, ITS & Safety Projects

SR 40 Railroad Crossing # FPN: 4369181FROM SR 40 at FEC Rail Xing # 621284-WTO DESCRIPTION: RAIL SAFETY PROJECTSafety improvements to FEC RR Xing #621284-W over SR 40 including PE, flagging,labor, materials and other related costs. TheTPO's support for traffic operations, intelligenttransportation systems (ITS), and safety projectsis expressed on pgs 1, 44, 49, 92, and 96 of the2035 Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

RRU RHP $396,904 0 0 0 0 0 0

$396,904 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 27 of 179

Page 29: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 28

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Maintenance Projects

SR 400 (Beville Rd) FPN: 4306771FROM W of Woodcrest DrTO W of US 1 (SR 5)DESCRIPTION: RESURFACINGMill and repave the existing asphalt pavement.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DDR 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0

CST DS $2,522,824 0 0 0 0 0 0CST SA $461,679 0 0 0 0 0 0RRU DS $12,000 0 0 0 0 0 0

$2,996,503 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 28 of 179

Page 30: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 29

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Roadway Capacity Projects

SR 415 Widening - Reed FPN: 4073554FROM Reed Ellis RoadTO 0.3 miles north of Acorn Lake RdDESCRIPTION: ADD LANES & RECONSTRUCTWiden SR 415 from 2 lanes to 4 from Reed EllisRoad to 0.3 miles north of Acorn Lake.Construction commenced in FY 2011/12. ProjectLength: 5.04 miles. (Reference 2035 Long RangeTransportation Plan, Table 7.1, pg 76.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE 0 0 0 0 0 0 0ROW 0 0 0 0 0 0 0CST 0 0 0 0 0 0 0RRU 0 0 0 0 0 0 0ENV 0 0 0 0 0 0 0

0 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 29 of 179

Page 31: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 30

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Roadway Capacity Projects

SR 415 Widening - St. FPN: 4073553FROM Seminole County lineTO Reed Ellis RdDESCRIPTION: ADD LANES & RECONSTRUCTWiden SR 415 from 2 lanes to 4 between theSeminole County Line and Reed Ellis Road.Construction commenced in FY 2011/12. Thiswork will include the addition of a two-lane bridgeto carry one direction of traffic. The existingtwo-lane bridge will be maintained to carry trafficin the opposite direction. Project Length: 2.406miles. (Reference 2035 Long Range

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH 0 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0

ROW DDR 0 0 0 0 0 0 0ROW DIH 0 0 0 0 0 0 0CST DDR 0 0 0 0 0 0 0CST DIH 0 0 0 0 0 0 0CST DS $64,898 0 0 0 0 0 0RRU DDR 0 0 0 0 0 0 0ENV DS 0 0 0 0 0 0 0

$64,898 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 30 of 179

Page 32: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 31

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Traffic Operations, ITS & Safety Projects

SR 421 (Dunlawton Av) FPN: 4344531FROM at FEC rail crossing #271958-VTO DESCRIPTION: RAIL SAFETY PROJECTRailroad crossing safety improvements at SR 421(Dunlawton Avenue) and the FEC Railroad(crossing # 271958-V). See related project FM#4349541. The TPO's support for trafficoperations, intelligent transportation systems(ITS), and safety projects is expressed on pgs 1,44, 49, 92, and 96 of the 2035 Long RangeTransportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST DIH $2,500 0 0 0 0 0 0

$2,500 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 31 of 179

Page 33: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 32

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Traffic Operations, ITS & Safety Projects

SR 44/Grand Avenue FPN: 4393921FROM SR 44 and Grand AvTO DESCRIPTION: ROUNDABOUTA design/build project to replace existingintersection with a roundabout, install signage,pavement markings, and lighting. Project length:0.1 mile. The TPO's support for safety projects isexpressed on pages 11, 57, 65, and 66 of the2040 LRTP.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST DDR $1,000,000 0 0 0 0 0 0CEI DIH $10,000 0 0 0 0 0 0CEI DS $100,000 0 0 0 0 0 0

$1,110,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 32 of 179

Page 34: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 33

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Maintenance Projects

SR 472 Resurfacing FPN: 4324412FROM East of MLK Jr BlvdTO West of Graves AvDESCRIPTION: RESURFACINGMill and resurface SR 472 from east of MartinLuther King Jr. Boulevard to west of GravesAvenue. Project length: 0.85 mile. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DDR 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0

CST DDR $1,478,522 0 0 0 0 0 0CST DS $384,731 0 0 0 0 0 0CEI DDR $10,270 0 0 0 0 0 0CEI DIH $137,568 0 0 0 0 0 0

$2,011,091 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 33 of 179

Page 35: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 34

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Maintenance Projects

SR 5 (US 1) Resurfacing FPN: 4306781FROM South StTO Magnolia/Shangrila DrDESCRIPTION: RESURFACINGMill and repave US 1 (SR 5) from South Street toMagnolia/Shangrila Dr. Project length: 8.1 miles.(The TPO's support for system preservation andmaintenance is expressed on page 65 of the2040 LRTP.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE n/a 0 0 0 0 0 0 0CST DS $6,769,699 0 0 0 0 0 0CST SA $5,992,205 0 0 0 0 0 0CEI DIH $67,269 0 0 0 0 0 0CEI DS $52,050 0 0 0 0 0 0

$12,881,223 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 34 of 179

Page 36: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 35

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Traffic Operations, ITS & Safety Projects

SR 5A (Nova Rd) Lighting FPN: 4217051FROM SR 430 (Mason Av)TO Flomich StDESCRIPTION: LIGHTINGJPAs with the City of Holly Hill and the City ofDaytona Beach for lighting along SR 5A (NovaRd) from SR 430 (Mason Avenue) to FlomichStreet. Lighting is to be done by Florida Power &Light Company on their poles. The R2CTPO’ssupport for traffic operations, intelligenttransportation systems (ITS), and safety projectsis expressed on pgs 1, 44, 49, 92, and 96 of the

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST DDR $200,000 0 0 0 0 0 0

$200,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 35 of 179

Page 37: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 36

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Maintenance Projects

SR 600 (US 92) FPN: 4324411FROM SR 15 (US 17)TO N Alabama StDESCRIPTION: RESURFACINGMill and resurface SR 600 (US 92 between SR15 (US 17) and North Alabama Avenue inDeLand. Project length: 0.147 mile. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DDR 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0

CST DS $175,310 0 0 0 0 0 0CST NHRE $509,805 0 0 0 0 0 0CEI DDR $10,270 0 0 0 0 0 0CEI SA $38,842 0 0 0 0 0 0

$734,227 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 36 of 179

Page 38: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 37

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Maintenance Projects

SR 600 (US 92) FPN: 4324421FROM SR 5A (Nova Rd)TO SR 5 (US 1)DESCRIPTION: RESURFACINGResurfacing SR 600 (US 92) between SR 5A(Nova Rd) and SR 5 (US 1) and sections on SR 5(US 1), except section from mile marker 20.086to 20.596, and resurfacing SR 5 (US 1)westbound lanes only between Magnolia and SR600 (US 92). (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH 0 0 0 0 0 0 0CST DS 0 0 0 0 0 0 0CST NHRE $875,807 0 0 0 0 0 0CEI SA $241,548 0 0 0 0 0 0

$1,117,355 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 37 of 179

Page 39: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 38

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Bicycle, Pedestrian & Enhancement Projects

SR A1A Landscaping FPN: 4354631FROM Harvard DrTO Granada BlvdDESCRIPTION: LANDSCAPINGJPA with the City of Ormond Beach forlandscaping along SR A1A from Harvard Drive toGranada Boulevard. (Reference 2035 LongRange Transportation Plan, Planning Factors, pg10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST DS $550,000 0 0 0 0 0 0

$550,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 38 of 179

Page 40: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 39

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Bicycle, Pedestrian & Enhancement Projects

Seminole Woods FPN: 4285361FROM SR 5 (US 1)TO Sesame BlvdDESCRIPTION: BIKE PATH/TRAILConstruct a 10-ft wide multi-use path alongSeminole Woods Boulevard connecting theSeminole Woods neighborhood to the City'sextensive multi-use path system. the proposedproject will address bicycle/pedestrian safety forthe southernmost 1.3 miles of Seminole WoodsBoulevard. The TPO's support for trafficoperations, intelligent transportation systems

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF $21,342 0 0 0 0 0 0CST SU $545,966 0 0 0 0 0 0CEI LF $2,135 0 0 0 0 0 0

$569,443 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 39 of 179

Page 41: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 40

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Major Bridge Projects

Turnbull Bay Road Bridge FPN: 4300401FROM over Turnbull CreekTO DESCRIPTION: BRIDGE REPLACEMENTReplace the existing two-lane bridge on TurnbullBay Road over Turnbull Creek. Design,right-of-way acquisition, and construction are tobe done by Volusia County. (Reference 2035Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE ACBR 0 0 0 0 0 0 0PE BRT 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0

ROW BRT 0 0 0 0 0 0 0CST ACSB $4,339,073 0 0 0 0 0 0

$4,339,073 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 40 of 179

Page 42: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 41

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Transit & Transportation DisadvantagedProjects

Volusia Park & Ride Lot FPN: 4302901FROM at DeBary SunRail Station in WestTO DESCRIPTION: PARK AND RIDE LOTSFDOT is expanding the DeBary SunRail Park &Ride Lot to accommodate 212 new parkingspaces including 8 ADA spaces, 10 wider spacesfor commuter vans, and one “flex space” forservice/maintenance vehicles. Parking lot lightingand landscaping are also included in the project.No changes are being made to the existingaccess to/from the parking lot. (Reference 2035

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH $4,460 0 0 0 0 0 0PE DPTO 0 0 0 0 0 0 0

CST DIH $50,429 0 0 0 0 0 0CST DPTO $242,135 0 0 0 0 0 0CST DS $653,164 0 0 0 0 0 0

$950,188 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 41 of 179

Page 43: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 42

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Transit & Transportation DisadvantagedProjects

Volusia Section 5339 Bus FPN: 4380121FROM Volusia County - Rural AreasTO DESCRIPTION: CAPITAL FOR FIXED ROUTEFunding for capital projects FY 16 for the fixedroute system in the rural area, including buses,equipment, computers and communicationexpenditures. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 63, 64, and 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DU $312,500 0 0 0 0 0 0CAP LF $78,125 0 0 0 0 0 0

$390,625 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 42 of 179

Page 44: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 43

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Transit & Transportation DisadvantagedProjects

Votran - Section 5307 FPN: 4193732FROM Volusia County-wideTO DESCRIPTION: CAPITAL FOR FIXED ROUTEVotran will receive FTA Section 5307 funds forfixed routes and paratransit service in FY2014/15 to replace five (5) 35' buses, one (1)paratransit 22' cutaway, planning and equipment(to be determined). The estimated total cost is$9,750,000. (Reference River to Sea TPO 2035Long Range Transportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP FTA $7,800,000 0 0 0 0 0 0CAP LF $1,950,000 0 0 0 0 0 0

$9,750,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 43 of 179

Page 45: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 44

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Transit & Transportation DisadvantagedProjects

Votran - Section 5317 New FPN: 4347591FROM Volusia County-wideTO DESCRIPTION: CAPITAL FOR FIXED ROUTEProjects to be determined for funding underSection 5317. (Reference 2035 Long RangeTransportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DU $985 0 0 0 0 0 0OPS LF $985 0 0 0 0 0 0

$1,970 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 44 of 179

Page 46: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 45

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Transit & Transportation DisadvantagedProjects

Votran Sec 5339 Small FPN: 4371861FROM Volusia County-wideTO DESCRIPTION: CAPITAL FOR FIXED ROUTEFunding for purchase of fixed-route buses andother equipment. (Reference River to Sea TPO2035 Long Range Transportation Plan, pgs49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DU $504,736 0 0 0 0 0 0CAP LF $126,184 0 0 0 0 0 0

$630,920 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 45 of 179

Page 47: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 46

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

Transit & Transportation DisadvantagedProjects

Votran Special Marketing FPN: 4369561FROM Volusia County-wideTO DESCRIPTION: TRANSIT SERVICE

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DPTO $40,000 0 0 0 0 0 0OPS LF $40,000 0 0 0 0 0 0

$80,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 46 of 179

Page 48: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 47

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

Bellevue Avenue FPN: 4315371FROM at Daytona Beach Int'l AirportTO DESCRIPTION: AVIATION CAPACITYRealign Bellevue Avenue to straighten the curvewest of SR 483 (Clyde Morris Boulevard). TheTPO's support for aviation is expressed in thevision statement, goals, and objectives of the2040 Long Range Transportation Plan (2040LRTP, pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP GMR 0 0 $2,500,000 0 0 0 0CAP LF 0 0 $2,500,000 0 0 0 0

0 0 $5,000,000 0 0 0 0

Aviation Projects

Bellevue Avenue FPN: 4315371FROM at Daytona Beach Int'l AirportTO DESCRIPTION: AVIATION CAPACITYRealign Bellevue Avenue to straighten the curvewest of SR 483 (Clyde Morris Boulevard). TheTPO's support for traffic operations, intelligenttransportation systems (ITS), and safety projectsis expressed on pgs 1, 44, 49, 92, and 96 of the2035 Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP GMR 0 0 $2,500,000 0 0 0 0CAP LF 0 0 $2,500,000 0 0 0 0

0 0 $5,000,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 47 of 179

Page 49: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 48

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

DBIA - Innovative FPN: 4315401FROM at Daytona Beach Int'l AirportTO DESCRIPTION: AVIATION CAPACITYRepayment of bonds. The TPO's support foraviation is expressed in the vision statement,goals, and objectives of the 2040 Long RangeTransportation Plan (2040 LRTP, pgs 9 through12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DDR $12,939 0 0 0 0 0 0CAP DPTO $115,282 $150,000 $150,000 0 0 0 0CAP FAA $2,307,984 $2,700,000 $2,700,000 0 0 0 0CAP LF $128,222 $150,000 $150,000 0 0 0 0

$2,564,427 $3,000,000 $3,000,000 0 0 0 0

Aviation Projects

DBIA - Innovative FPN: 4315401FROM at Daytona Beach Int'l AirportTO DESCRIPTION: AVIATION CAPACITYRepayment of bonds.(Reference 2035 LongRange Transportation Plan, Planning Factors, pg10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $115,000 $115,000 $115,000 0 0 0 0CAP FAA $2,070,000 $2,070,000 $2,070,000 0 0 0 0CAP LF $115,000 $115,000 $115,000 0 0 0 0

$2,300,000 $2,300,000 $2,300,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 48 of 179

Page 50: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 49

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

DBIA Taxiway FPN: 4315391FROM at Daytona Beach Int'l AirportTO DESCRIPTION: AVIATION PRESERVATIONTaxiway rehabilitation construction. The TPO'ssupport for aviation is expressed in the visionstatement, goals, and objectives of the 2040Long Range Transportation Plan (2040 LRTP,pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO $192,972 0 $875,000 0 0 0 0CAP FAA $3,279,996 0 $15,750,000 0 0 0 0CAP LF $192,972 0 $875,000 0 0 0 0

$3,665,940 0 $17,500,000 0 0 0 0

Aviation Projects

DBIA Taxiway FPN: 4315391FROM at Daytona Beach Int'l AirportTO DESCRIPTION: AVIATION PRESERVATIONTaxiway rehabilitation construction. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $510,000 0 0 0 0 0 0CAP FAA $9,180,000 0 0 0 0 0 0CAP LF $510,000 0 0 0 0 0 0

$10,200,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 49 of 179

Page 51: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 50

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

Daytona Bch Int'l Airport - FPN: 4332731FROM Midway AvenueTO Catalina DriveDESCRIPTION: AVIATION CAPACITYRealign airport entrance road. The TPO's supportfor aviation is expressed in the vision statement,goals, and objectives of the 2040 Long RangeTransportation Plan (2040 LRTP, pgs 9 through12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP GMR 0 0 $2,500,000 0 0 0 0CAP LF 0 0 $2,500,000 0 0 0 0

0 0 $5,000,000 0 0 0 0

Aviation Projects

Daytona Bch Int'l Airport - FPN: 4332731FROM Midway AvenueTO Catalina DriveDESCRIPTION: AVIATION CAPACITYRealign airport entrance road. (Reference 2035Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP GMR 0 0 $2,500,000 0 0 0 0CAP LF 0 0 $2,500,000 0 0 0 0

0 0 $5,000,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 50 of 179

Page 52: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 51

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

Daytona Bch Int'l Airport FPN: 4332701FROM at Daytona Beach Int'l AirportTO DESCRIPTION: AVIATION CAPACITYConstruct transportation loop road. The TPO'ssupport for aviation is expressed in the visionstatement, goals, and objectives of the 2040Long Range Transportation Plan (2040 LRTP,pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP GMR 0 0 $2,750,000 0 0 0 0CAP LF 0 0 $2,750,000 0 0 0 0

0 0 $5,500,000 0 0 0 0

Aviation Projects

Daytona Bch Int'l Airport FPN: 4332701FROM at Daytona Beach Int'l AirportTO DESCRIPTION: AVIATION CAPACITYConstruct transportation loop road. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP GMR 0 0 $2,750,000 0 0 0 0CAP LF 0 0 $2,750,000 0 0 0 0

0 0 $5,500,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 51 of 179

Page 53: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 52

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

Daytona Beach Int'l Airport FPN: 4370371FROM at Daytona Beach Int'l AirportTO DESCRIPTION: AVIATION PRESERVATIONDaytona Beach International Airport-Rehabilitation/reconstruction of Runway 7R-25L.The TPO's support for aviation is expressed inthe vision statement, goals, and objectives of the2040 Long Range Transportation Plan (2040LRTP, pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DDR $1,000,000 0 0 $2,000,000 $2,000,000 0 0CAP DPTO 0 $1,785,000 $1,885,000 0 0 0 0CAP LF $1,000,000 $1,785,000 $1,885,000 $2,000,000 $2,000,000 0 0

$2,000,000 $3,570,000 $3,770,000 $4,000,000 $4,000,000 0 0

Aviation Projects

Daytona Beach Int'l Airport FPN: 4370371FROM at Daytona Beach Int'l AirportTO DESCRIPTION: AVIATION PRESERVATION

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DDR $1,000,000 0 0 $2,000,000 $2,000,000 0 0CAP DPTO 0 $1,785,000 $1,885,000 0 0 0 0CAP LF $1,000,000 $1,785,000 $1,885,000 $2,000,000 $2,000,000 0 0

$2,000,000 $3,570,000 $3,770,000 $4,000,000 $4,000,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 52 of 179

Page 54: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 53

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

DeLand Municipal Airport - FPN: 4370341FROM at DeLand Municipal AirportTO DESCRIPTION: AVIATION PRESERVATIONResurfacing Taxiway “B” with new asphalt, fulllength. The TPO's support for aviation isexpressed in the vision statement, goals, andobjectives of the 2040 Long RangeTransportation Plan (2040 LRTP, pgs 9 through12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO 0 0 0 0 0 $71,112 0CAP FAA 0 0 0 0 0 $800,000 0CAP LF 0 0 0 0 0 $17,778 0

0 0 0 0 0 $888,890 0

Aviation Projects

DeLand Municipal Airport - FPN: 4370341FROM at DeLand Municipal AirportTO DESCRIPTION: AVIATION PRESERVATION

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO 0 $60,000 0 0 0 0 0CAP FAA 0 $675,000 0 0 0 0 0CAP LF 0 $15,000 0 0 0 0 0

0 $750,000 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 53 of 179

Page 55: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 54

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

DeLand Municipal Airport FPN: 4370381FROM at DeLand Municipal AirportTO DESCRIPTION: AVIATIONThe construction of new T-hangars and a few boxhangars. The TPO's support for aviation isexpressed in the vision statement, goals, andobjectives of the 2040 Long RangeTransportation Plan (2040 LRTP, pgs 9 through12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO 0 $248,927 $700,000 0 0 0 0CAP LF 0 $62,232 $175,000 0 0 0 0

0 $311,159 $875,000 0 0 0 0

Aviation Projects

DeLand Municipal Airport FPN: 4370381FROM at DeLand Municipal AirportTO DESCRIPTION: AVIATION

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO 0 $605,727 $572,000 $700,000 $700,000 0 0CAP LF 0 $605,727 $572,000 $700,000 $700,000 0 0

0 $1,211,454 $1,144,000 $1,400,000 $1,400,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 54 of 179

Page 56: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 55

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

DeLand Municipal Airport FPN: 4370351FROM TO DESCRIPTION: AVIATIONInstallation of a full service fuel farm. The TPO'ssupport for aviation is expressed in the visionstatement, goals, and objectives of the 2040Long Range Transportation Plan (2040 LRTP,pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO $296,800 0 0 $604,000 0 0 0CAP LF $155,420 0 0 $151,000 0 0 0

$452,220 0 0 $755,000 0 0 0

Aviation Projects

DeLand Municipal Airport FPN: 4370351FROM TO DESCRIPTION: AVIATION

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $660,000 0 0 0 0 0 0CAP LF $165,000 0 0 0 0 0 0

$825,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 55 of 179

Page 57: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 56

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

DeLand Municipal Airport FPN: 4315451FROM at DeLand Municipal AirportTO DESCRIPTION: AVIATION SAFETY PROJECTAirport improvement project. The TPO's supportfor aviation is expressed in the vision statement,goals, and objectives of the 2040 Long RangeTransportation Plan (2040 LRTP, pgs 9 through12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO $1,404,654 $356,800 0 0 0 0 0CAP LF $894,770 $89,200 0 0 0 0 0

$2,299,424 $446,000 0 0 0 0 0

Aviation Projects

DeLand Municipal Airport FPN: 4315451FROM at DeLand Municipal AirportTO DESCRIPTION: AVIATION SAFETY PROJECTAirport improvement project. (Reference 2035Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $760,000 0 0 0 0 0 0CAP LF $190,000 0 0 0 0 0 0

$950,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 56 of 179

Page 58: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 57

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

DeLand Municipal Airport FPN: 4370231FROM at DeLand Municipal AirportTO DESCRIPTION: AVIATION PRESERVATIONResurfacing runway 5-23 with new asphalt, fulllength. The TPO's support for aviation isexpressed in the vision statement, goals, andobjectives of the 2040 Long RangeTransportation Plan (2040 LRTP, pgs 9 through12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO 0 0 0 $96,000 0 0 0CAP FAA 0 0 0 $1,080,000 0 0 0CAP LF 0 0 0 $24,000 0 0 0

0 0 0 $1,200,000 0 0 0

Aviation Projects

DeLand Municipal Airport FPN: 4370231FROM at DeLand Municipal AirportTO DESCRIPTION: AVIATION PRESERVATION

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO 0 0 $128,000 0 0 0 0CAP FAA 0 0 $1,290,000 0 0 0 0CAP LF 0 0 $32,000 0 0 0 0

0 0 $1,450,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 57 of 179

Page 59: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 58

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

DeLand Municipal Airport FPN: 4315441FROM at DeLand Municipal AirportTO DESCRIPTION: AVIATION PRESERVATIONRehabilitate Runway 5-23. The TPO's support foraviation is expressed in the vision statement,goals, and objectives of the 2040 Long RangeTransportation Plan (2040 LRTP, pgs 9 through12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO $68,320 $60,000 0 0 0 0 0CAP FAA 0 $675,000 0 0 0 0 0CAP LF $17,080 $15,000 0 0 0 0 0

$85,400 $750,000 0 0 0 0 0

Aviation Projects

DeLand Municipal Airport FPN: 4315441FROM at DeLand Municipal AirportTO DESCRIPTION: AVIATION PRESERVATIONRehabilitate Runway 5-23. (Reference 2035 LongRange Transportation Plan, Planning Factors, pg10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $46,000 0 0 0 0 0 0CAP FAA $517,500 0 0 0 0 0 0CAP LF $11,500 0 0 0 0 0 0

$575,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 58 of 179

Page 60: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 59

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

Flagler Co Airport FPN: 4049211FROM at Flagler County AirportTO DESCRIPTION: AVIATION SAFETY PROJECTAirport improvement project- Construct a new GATerminal and Airport Administration Building. TheTPO's support for aviation is expressed in thevision statement, goals, and objectives of the2040 Long Range Transportation Plan (2040LRTP, pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DDR 0 0 0 $1,600,000 $1,000,000 0 0CAP DPTO 0 0 $600,000 0 0 0 0CAP LF 0 0 $150,000 $400,000 $250,000 0 0

0 0 $750,000 $2,000,000 $1,250,000 0 0

Aviation Projects

Flagler Co Airport FPN: 4049211FROM at Flagler County AirportTO DESCRIPTION: AVIATION SAFETY PROJECTAirport improvement project. (Reference 2035Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DDR 0 0 0 $1,600,000 $1,600,000 0 0CAP DPTO 0 0 $600,000 0 0 0 0CAP LF 0 0 $600,000 $1,600,000 $1,600,000 0 0

0 0 $1,200,000 $3,200,000 $3,200,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 59 of 179

Page 61: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 60

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

Flagler Co Design & FPN: 4208432FROM at Flagler County AirportTO DESCRIPTION: AVIATION CAPACITYDesign and construct runway 11-29 relocation atFlagler County Airport.The TPO's support for aviation is expressed inthe vision statement, goals, and objectives of the2040 Long Range Transportation Plan (2040LRTP, pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO $2,609,010 $1,206,400 $1,000,000 0 0 0 0CAP FAA $6,931,800 $3,650,000 0 0 0 0 0CAP LF $147,040 $80,000 $25,000 0 0 0 0

$9,687,850 $4,936,400 $1,025,000 0 0 0 0

Aviation Projects

Flagler Co Design & FPN: 4208432FROM at Flagler County AirportTO DESCRIPTION: AVIATION CAPACITYDesign and construct runway 11-29 relocation atFlagler County Airport. (Reference 2035 LongRange Transportation Plan, Planning Factors, pg10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $469,200 $206,400 0 0 0 0 0CAP FAA $5,278,500 $2,322,000 0 0 0 0 0CAP LF $117,300 $51,600 0 0 0 0 0

$5,865,000 $2,580,000 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 60 of 179

Page 62: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 61

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

Flagler County Airport FPN: 4370251FROM at Flagler County AirportTO DESCRIPTION: AVIATIONFlagler County Airport Terminal Building-Construct a new GA Terminal and AirportAdministration Building.The TPO's support foraviation is expressed in the vision statement,goals, and objectives of the 2040 Long RangeTransportation Plan (2040 LRTP, pgs 9 through12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO $300,000 $1,000,000 $1,000,000 0 0 0 0CAP LF $75,000 $1,000,000 $1,000,000 0 0 0 0

$375,000 $2,000,000 $2,000,000 0 0 0 0

Aviation Projects

Flagler County Airport FPN: 4370251FROM at Flagler County AirportTO DESCRIPTION: AVIATION

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $300,000 $1,000,000 $1,000,000 0 0 0 0CAP LF $75,000 $1,000,000 $1,000,000 0 0 0 0

$375,000 $2,000,000 $2,000,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 61 of 179

Page 63: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 62

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

New Smyrna Beach FPN: 4370161FROM at New Smyrna Beach Municipal AirportTO DESCRIPTION: AVIATION SAFETY PROJECTThe TPO's support for aviation is expressed inthe vision statement, goals, and objectives of the2040 Long Range Transportation Plan (2040LRTP, pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DDR 0 $400,000 0 0 0 0 0CAP LF 0 $100,000 0 0 0 0 0

0 $500,000 0 0 0 0 0

Aviation Projects

New Smyrna Beach FPN: 4370161FROM at New Smyrna Beach Municipal AirportTO DESCRIPTION: AVIATION SAFETY PROJECT

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DDR 0 $1,060,000 $1,100,000 $1,100,000 $1,100,000 0 0CAP LF 0 $1,060,000 $1,100,000 $1,100,000 $1,100,000 0 0

0 $2,120,000 $2,200,000 $2,200,000 $2,200,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 62 of 179

Page 64: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 63

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

New Smyrna Beach FPN: 4370301FROM at New Smyrna Beach Municipal AirportTO DESCRIPTION: AVIATIONThe TPO's support for aviation is expressed inthe vision statement, goals, and objectives of the2040 Long Range Transportation Plan (2040LRTP, pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DDR $550,000 0 0 0 0 0 0CAP DPTO 0 $250,000 0 0 0 0 0CAP LF $137,500 $62,500 0 0 0 0 0

$687,500 $312,500 0 0 0 0 0

Aviation Projects

New Smyrna Beach FPN: 4370301FROM at New Smyrna Beach Municipal AirportTO DESCRIPTION: AVIATION

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DDR $550,000 0 0 0 0 0 0CAP LF $137,500 0 0 0 0 0 0

$687,500 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 63 of 179

Page 65: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 64

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

Ormond Beach Municipal FPN: 4370331FROM at Ormond Beach Municipal AirportTO DESCRIPTION: AVIATIONThe TPO's support for aviation is expressed inthe vision statement, goals, and objectives of the2040 Long Range Transportation Plan (2040LRTP, pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO $117,427 $601,250 0 0 0 0 0CAP LF $343,750 $601,250 0 0 0 0 0

$461,177 $1,202,500 0 0 0 0 0

Aviation Projects

Ormond Beach Municipal FPN: 4370331FROM at Ormond Beach Municipal AirportTO DESCRIPTION: AVIATION

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DPTO $343,750 0 0 0 0 0 0CAP LF $343,750 0 0 0 0 0 0

$687,500 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 64 of 179

Page 66: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 65

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

Ormond Beach Municipal FPN: 4384901FROM at Ormond Beach Municipal AirportTO DESCRIPTION: AVIATION PRESERVATIONThe TPO's support for aviation is expressed inthe vision statement, goals, and objectives of the2040 Long Range Transportation Plan (2040LRTP, pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO 0 0 0 $12,000 $60,000 0 0CAP FAA 0 0 0 $135,000 $675,000 0 0CAP LF 0 0 0 $3,000 $15,000 0 0

0 0 0 $150,000 $750,000 0 0

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 65 of 179

Page 67: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 66

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

Ormond Beach Municipal FPN: 4384891FROM at Ormond Beach Municipal AirportTO DESCRIPTION: AVIATION SAFETY PROJECTThe TPO's support for aviation is expressed inthe vision statement, goals, and objectives of the2040 Long Range Transportation Plan (2040LRTP, pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DPTO 0 0 $14,000 0 0 0 0CAP FAA 0 0 $157,500 0 0 0 0CAP LF 0 0 $3,500 0 0 0 0

0 0 $175,000 0 0 0 0

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 66 of 179

Page 68: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 67

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Aviation Projects

Ormond Beach Municipal FPN: 4370201FROM at Ormond Beach Municipal AirportTO DESCRIPTION: AVIATIONThe TPO's support for aviation is expressed inthe vision statement, goals, and objectives of the2040 Long Range Transportation Plan (2040LRTP, pgs 9 through 12.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DDR 0 $71,346 0 0 0 0 0CAP LF 0 $17,837 0 0 0 0 0

0 $89,183 0 0 0 0 0

Aviation Projects

Ormond Beach Municipal FPN: 4370201FROM at Ormond Beach Municipal AirportTO DESCRIPTION: AVIATION

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DDR 0 $890,000 $1,100,000 $1,100,000 $1,100,000 0 0CAP LF 0 $890,000 $1,100,000 $1,100,000 $1,100,000 0 0

0 $1,780,000 $2,200,000 $2,200,000 $2,200,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 67 of 179

Page 69: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 68

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

Bicycle/Pedestrian FPN: 4217242FROM throughout R2CTPO planning areaTO DESCRIPTION: CORRIDOR/SUBAREAPlanning studies to determine the feasibility ofconstructing new bicycle and pedestrian facilitiesat various locations throughout the TPO'sPlanning Area. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 85, table 31 onpg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PLN SU $300,000 $100,000 $100,000 $100,000 $100,000 0 0

$300,000 $100,000 $100,000 $100,000 $100,000 0 0

Bicycle, Pedestrian & Enhancement Projects

JPA - Bicycle/Pedestrian FPN: 4217242FROM throughout R2CTPO planning areaTO DESCRIPTION: CORRIDOR/SUBAREAPlanning studies to determine the feasibility ofconstructing new bicycle and pedestrian facilitiesat various locations thoughout the TPO'sPlanning Area. (Reference 2035 Long RangeTransportation Plan, pgs 63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PLN SU $100,000 $100,000 $100,000 $100,000 $100,000 0 0

$100,000 $100,000 $100,000 $100,000 $100,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 68 of 179

Page 70: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 69

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

Big Tree Road Shared Use FPN: 4355321FROM James StreetTO SR 5A (Nova Road)DESCRIPTION: BIKE PATH/TRAILLAP agreement with the City of South Daytona toconstruct a 10' wide shared use path along BigTree Road from James Street to SR 5A (NovaRoad). (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 85, table 31 onpg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST LF 0 $100,000 0 0 0 0 0CST SU 0 $477,500 0 0 0 0 0

0 $577,500 0 0 0 0 0

Bicycle, Pedestrian & Enhancement Projects

Big Tree Road Shared Use FPN: 4355321FROM James StreetTO SR 5A (Nova Road)DESCRIPTION: BIKE PATH/TRAILLAP agreement with the City of South Daytona toconstruct a 10' wide shared use path along BigTree Road from James Street to SR 5A (NovaRoad). (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF 0 $100,000 0 0 0 0 0CST SU 0 $477,500 0 0 0 0 0

0 $577,500 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 69 of 179

Page 71: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 70

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

East Central Regional Rail FPN: 4154348FROM Guise RoadTO Gobbler's Lodge RoadDESCRIPTION: BIKE PATH/TRAILConstruct Segment 4A of the East CentralRegional Rail Trail along abandoned rail line fromGuise Road to Gobbler's Lodge Road. Projectlength: 3.51 miles. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 85, table 31 onpg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

ROW ACTU $4,000 0 0 0 0 0 0ROW LF $10,233 0 0 0 0 0 0ROW TALU $439,767 0 0 0 0 0 0CST SA 0 0 0 $4,432,301 0 0 0

$454,000 0 0 $4,432,301 0 0 0

Bicycle, Pedestrian & Enhancement Projects

East Central Regional Rail FPN: 4154348FROM Guise RoadTO Gobbler's Lodge RoadDESCRIPTION: BIKE PATH/TRAILConstruct Segment 4A of the East CentralRegional Rail Trail along abandoned rail line fromGuise Road to Gobbler's Lodge Road. Projectlength: 3.51 miles. (Reference 2035 Long RangeTransportation Plan, pgs. 63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

ROW ACTU 0 0 0 0 0 0 0ROW LF 0 0 0 0 0 0 0ROW TALU 0 0 0 0 0 0 0CST SA 0 0 0 $4,083,500 0 0 0

0 0 0 $4,083,500 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 70 of 179

Page 72: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 71

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

East Coast Regional Rail FPN: 4154349FROM Gobbler's Lodge RoadTO Maytown Spur RoadDESCRIPTION: BIKE PATH/TRAILLAP agreement with Volusia County to constructa multi-use trail on the abandoned rail linebetween Gobbler's Lodge Road and MaytownSpur Road. This is a design/build project.(Reference 2040 Long Range TransportationPlan, pgs 10, 11, 85, table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST ACSA 0 $725,838 0 0 0 0 0

0 $725,838 0 0 0 0 0

Bicycle, Pedestrian & Enhancement Projects

East Central Regional Rail FPN: 4154349FROM Gobbler's Lodge RoadTO Maytown Spur RoadDESCRIPTION: BIKE PATH/TRAILLAP agreement with Volusia County to constructa multi-use trail on the abandoned rail linebetween Gobbler's Lodge Road and MaytownSpur Road. This is a design/build project.(Reference 2040 Long Range TransportationPlan, pgs. 10, 11, 85, table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF $725,838 0 0 0 0 0 0

$725,838 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 71 of 179

Page 73: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 72

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

East Coast Regional Trail - FPN: 4154343FROM Cow CreekTO Brevard County lineDESCRIPTION: BIKE PATH/TRAILConstruct Section 3 of a multi-use trail alongabandoned rail line SR 415 from Cow Creek tothe Volusia-Brevard County line. Project length:13.55 miles. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 85, table 31 onpg. 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST ACSA 0 $2,207,414 0 0 0 0 0CST LF 0 $129,374 0 0 0 0 0CST SU 0 $653,016 0 0 0 0 0

0 $2,989,804 0 0 0 0 0

Bicycle, Pedestrian & Enhancement Projects

East Coast Regional Rail FPN: 4154343FROM Cow CreekTO Brevard County lineDESCRIPTION: BIKE PATH/TRAILConstruct Section 3 of a multi-use trail alongabandoned rail line SR 415 from Cow Creek tothe Volusia-Brevard County line. Project length13.55 miles. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 85, table 31 onpg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF $2,336,788 0 0 0 0 0 0CST SU $653,016 0 0 0 0 0 0

$2,989,804 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 72 of 179

Page 74: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 73

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

Forrest Hills Connector FPN: 4355351FROM Old Tomoka RdTO Scottsdale DrDESCRIPTION: BIKE PATH/TRAILLAP agreement with the City of Ormond Beach toconstruct a 10-ft wide mixed use trail to theTomoka Elementary School. (Reference 2040Long Range Transportation Plan, pgs 10, 11, 85,table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE ACSU $51,811 0 0 0 0 0 0PE LF $5,612 0 0 0 0 0 0PE SU $1,281 0 0 0 0 0 0

CST LF 0 0 $102,042 0 0 0 0CST SU 0 0 $487,246 0 0 0 0

$58,704 0 $589,288 0 0 0 0

Bicycle, Pedestrian & Enhancement Projects

Forrest Hills Connector FPN: 4355351FROM Old Tomoka RdTO Scottsdale DrDESCRIPTION: BIKE PATH/TRAILLAP agreement with the City of Ormond Beach toconstruct a 10-ft wide mixed use trail to theTomoka Elementary School. (Reference 2035Long Range Transportation Plan, pgs 63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE LF $5,612 0 0 0 0 0 0PE SU $50,792 0 0 0 0 0 0

CST LF 0 $102,042 0 0 0 0 0CST SU 0 $487,246 0 0 0 0 0

$56,404 $589,288 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 73 of 179

Page 75: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 74

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

French Avenue Trail FPN: 4355381FROM Spring-to-Spring TrailTO Valentine ParkDESCRIPTION: BIKE PATH/TRAILConstruct 2,940 ft of 8-ft wide pedestrian trailfrom the Spring-to-Spring Trail to Valentine Park.The Spring-to-Spring Trail is part of theCoast-to-Coast Trail. (Reference 2040 LongRange Transportation Plan, pgs 10, 11, 85, table31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE LF $42,154 0 0 0 0 0 0PE SU $400,454 0 0 0 0 0 0

$442,608 0 0 0 0 0 0

Bicycle, Pedestrian & Enhancement Projects

French Avenue Trail FPN: 4355381FROM Spring-to-Spring TrailTO Valentine ParkDESCRIPTION: BIKE PATH/TRAILConstruct 2,940 ft of 8-ft wide pedestrian trailfrom the Spring-to-Spring Trail to Valentine Park.The Spring-to-Spring Trail is part of theCoast-to-Coast Trail. (Reference 2035 LongRange Transportation Plan, pgs 63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE LF $42,154 0 0 0 0 0 0PE SU $400,454 0 0 0 0 0 0

ROW LF 0 $445 0 0 0 0 0ROW SU 0 $4,004 0 0 0 0 0

$442,608 $4,449 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 74 of 179

Page 76: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 75

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

Halifax River Greenway FPN: 4355331FROM Beville RdTO Wilder BlvdDESCRIPTION: BIKE PATH/TRAILLAP agreement with the City of Daytona Beachto construct 1,800 ft of 12-ft wide trail where thereare currently no pedestrian facilities. (Reference2035 Long Range Transportation Plan, pgs63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST LF 0 0 0 0 0 0 0CST SU 0 0 0 0 0 0 0CEI LF 0 0 0 0 0 0 0CEI SU 0 0 0 0 0 0 0

0 0 0 0 0 0 0

Bicycle, Pedestrian & Enhancement Projects

Halifax River Greenway FPN: 4355331FROM Beville RdTO Wilder BlvdDESCRIPTION: BIKE PATH/TRAILLAP agreement with the City of Daytona Beachto construct 1,800 ft of 12-ft wide trail where thereare currently no pedestrian facilities. (Reference2035 Long Range Transportation Plan, pgs63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF 0 0 0 0 0 0 0CST SU 0 0 0 0 0 0 0CEI LF 0 0 0 0 0 0 0CEI SU 0 0 0 0 0 0 0

0 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 75 of 179

Page 77: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 76

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

Halifax River Greenway FPN: 4355341FROM Beach StreetTO Riverfront ParkDESCRIPTION: BIKE PATH/TRAILLAP agreement with the City of Daytona Beachto construct 800 ft of 12-ft wide trail and 500 ft of12-ft wide elevated trail along the Halifax Riverfrom Beach Street to Riverfront Park. (Reference2035 Long Range Transportation Plan, pgs63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST LF 0 0 0 0 0 0 0CST SU 0 0 0 0 0 0 0CEI LF 0 0 0 0 0 0 0CEI SU 0 0 0 0 0 0 0

0 0 0 0 0 0 0

Bicycle, Pedestrian & Enhancement Projects

Halifax River Greenway FPN: 4355341FROM Beach StreetTO Riverfront ParkDESCRIPTION: BIKE PATH/TRAILLAP agreement with the City of Daytona Beachto construct 800 ft of 12-ft wide trail and 500 ft of12-ft wide elevated trail along the Halifax Riverfrom Beach Street to Riverfront Park. (Reference2035 Long Range Transportation Plan, pgs63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF 0 0 0 0 0 0 0CST SU 0 0 0 0 0 0 0CEI LF 0 0 0 0 0 0 0CEI SU 0 0 0 0 0 0 0

0 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 76 of 179

Page 78: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 77

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

I-95 from 0.5 mile N of SR FPN: 2427155FROM 0.5 mile north of SR 44TO 1.6 miles north of SR 600 (US 92)DESCRIPTION: LANDSCAPINGLandscaping along I-95 from 0.5 mile north of SR44 to 1.6 miles north of SR 600 (US 92).(Reference 2040 Long Range TransportationPlan, pgs 10, 11, 85, table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST DDR 0 0 0 $324,600 0 0 0CST DI 0 0 0 $3,295,755 0 0 0CST DIH 0 0 0 $321,457 0 0 0

0 0 0 $3,941,812 0 0 0

Bicycle, Pedestrian & Enhancement Projects

I-95 from 0.5 mile N of SR FPN: 2427155FROM 0.5 mile north of SR 44TO 1.6 miles north of SR 600 (US 92)DESCRIPTION: LANDSCAPINGLandscaping along I-95 from 0.5 mile north of SR44 to 1.6 miles north of SR 600 (US 92).(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST DI 0 0 0 $2,764,982 0 0 0CST DIH 0 0 0 $294,804 0 0 0CST DS 0 0 0 $276,518 0 0 0

0 0 0 $3,336,304 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 77 of 179

Page 79: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 78

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

Landscaping I-4/I-95 FPN: 4354691FROM at Saxon Blvd, SR 44, and US 1TO DESCRIPTION: LANDSCAPINGLandscaping at the I-4/SR 44 and I-4/Saxon Blvdinterchanges and at the I-95/US 1 interchange.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST 0 0 0 0 0 0 0

0 0 0 0 0 0 0

Bicycle, Pedestrian & Enhancement Projects

Landscaping I-4/I-95 FPN: 4354691FROM at Saxon Blvd, SR 44, and US 1TO DESCRIPTION: LANDSCAPINGLandscaping at the I-4/SR 44 and I-4/Saxon Blvdinterchanges and at the I-95/US 1 interchange.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST 0 0 0 0 0 0 0

0 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 78 of 179

Page 80: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 79

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

Magnolia Street Sidewalk FPN: 4355881FROM 6th StreetTO 10th StreetDESCRIPTION: SIDEWALKLAP agreement with the City of New SmyrnaBeach to construct a sidewalk along MagnoliaStreet from 6th Street to 10th Street. (Reference2040 Long Range Transportation Plan, pgs 10,11, 85, table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST LF 0 $5,431 0 0 0 0 0CST SU 0 $52,497 0 0 0 0 0

0 $57,928 0 0 0 0 0

Bicycle, Pedestrian & Enhancement Projects

Magnolia Street Sidewalk FPN: 4355881FROM 6th StreetTO 10th StreetDESCRIPTION: SIDEWALKLAP agreement with the City of New SmyrnaBeach to construct a sidewalk along MagnoliaStreet from 6th Street to 10th Street. (Reference2035 Long Range Transportation Plan, pgs63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF 0 $5,431 0 0 0 0 0CST SU 0 $52,497 0 0 0 0 0

0 $57,928 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 79 of 179

Page 81: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 80

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

North Spruce Creek Road FPN: 4355391FROM SR 5A (Nova Road)TO Angelina CourtDESCRIPTION: SIDEWALKLAP agreement with the City of Port Orange toconstruct 720 ft of 5-ft wide sidewalk and 1,500 ftof 8-ft wide sidewalk along Spruce Creek Roadfrom SR 5A (Nova Rd) to Angelina Court.(Reference 2040 Long Range TransportationPlan, pgs 10, 11, 85, table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE LF 0 $7,006 0 0 0 0 0PE SU 0 $66,557 0 0 0 0 0

CST LF 0 0 0 $35,030 0 0 0CST SU 0 0 0 $369,565 0 0 0

0 $73,563 0 $404,595 0 0 0

Bicycle, Pedestrian & Enhancement Projects

North Spruce Creek Road FPN: 4355391FROM SR 5A (Nova Road)TO Angelina CourtDESCRIPTION: SIDEWALKLAP agreement with the City of Port Orange toconstruct 720 ft of 5-ft wide sidewalk and 1,500 ftof 8-ft wide sidewalk along Spruce Creek Roadfrom SR 5A (Nova Rd) to Angelina Court.(Reference 2035 Long Range TransportationPlan, pgs 63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE LF 0 $7,006 0 0 0 0 0PE SU 0 $66,557 0 0 0 0 0

CST LF 0 0 $35,030 0 0 0 0CST SU 0 0 $369,565 0 0 0 0

0 $73,563 $404,595 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 80 of 179

Page 82: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 81

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

River to Sea TPO FPN: 4046181FROM Not yet determinedTO DESCRIPTION: BIKE PATH/TRAILThirty percent (30%) of XU funds received by theRiver to Sea TPO are set aside for bike andpedestrian improvements. (Reference 2040 LongRange Transportation Plan, pgs 10, 11, 85, table31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST SU $659,009 $1,383,717 $687,365 $1,025,285 $1,482,313 $1,519,800 0CST TALU $17,677 $435,388 $1,912 $442,700 $1,069 $442,684 0

$676,686 $1,819,105 $689,277 $1,467,985 $1,483,382 $1,962,484 0

Bicycle, Pedestrian & Enhancement Projects

River to Sea TPO FPN: 4046181FROM Not yet determinedTO DESCRIPTION: BIKE PATH/TRAILThirty percent (30%) of XU funds received by theRiver to Sea TPO are set aside for bike andpedestrian improvements. (Reference 2035 LongRange Transportation Plan, pgs 63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST SU $502,934 $275,941 $815,117 $1,210,584 $1,243,584 0 0CST TALU $446,020 $446,186 $446,166 $446,119 $446,080 0 0

$948,954 $722,127 $1,261,283 $1,656,703 $1,689,664 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 81 of 179

Page 83: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 82

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

SR 600 (US 92) Int'l FPN: 4348711FROM Williamson BlvdTO Midway AvDESCRIPTION: PEDESTRIAN SAFETYConstruct pedestrian safety improvements (I-95to SR A1A corridor, west phase), providing widersidewalk and addressing impacts to drainage,lighting, signs and utilities. Two new pedestrianbridges over SR 600 are included at MP 17.35and 18.00. Includes sidewalk improvements northof SR 600. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 85, table 31 on

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DDR $80,000 0 0 0 0 0 0PE DIH $185,933 0 0 0 0 0 0PE DS $85,138 0 0 0 0 0 0

ROW DDR $1,000 0 0 0 0 0 0DSB DDR $18,380,637 $48,670 0 0 0 0 0DSB DIH $206,244 0 0 0 0 0 0RRU DDR $233,200 0 0 0 0 0 0ENV DDR $43,700 0 0 0 0 0 0INC DDR $850,000 0 0 0 0 0 0

$20,065,852 $48,670 0 0 0 0 0

Bicycle, Pedestrian & Enhancement Projects

SR 600 (US 92) Int'l FPN: 4348711FROM Williamson BlvdTO Midway AvDESCRIPTION: PEDESTRIAN SAFETYConstruct pedestrian safety improvements (I-95to SR A1A corridor, west phase), providing widersidewalk and addressing impacts to drainage,lighting, signs and utilities. Two new pedestrianbridges over SR 600 are included at MP 17.35and 18.00. Includes sidewalk improvements northof SR 600. (Reference 2035 Long RangeTransportation Plan, pgs 63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DDR 0 0 0 0 0 0 0PE DIH $712 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0

ROW DDR $1,000 0 0 0 0 0 0DSB DDR $36,270 $50,000 0 0 0 0 0DSB DIH $180,133 0 0 0 0 0 0RRU DDR $233,200 0 0 0 0 0 0ENV DDR 0 0 0 0 0 0 0INC DDR $800,000 0 0 0 0 0 0

$1,251,315 $50,000 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 82 of 179

Page 84: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 83

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

Spring to Spring Trail US FPN: 4364341FROM Wayside Park (Seminole County)TO Lake Monroe Park (Volusia County)DESCRIPTION: BIKE PATH/TRAILConstruct a segment of the Coast to Coast Trailfrom Wayside Park in Seminole County, over theSt Johns River (US 17/92 Bridge), to LakeMonroe Park and the Spring-to-Spring Trail inVolusia County. Project length: 0.531 miles(0.113 miles in Volusia County). (Reference 2040Long Range Transportation Plan, pgs 10, 11, 85,table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DDR 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE DIOH 0 0 0 0 0 0 0

CST DDR 0 0 $1,186,900 0 0 0 0CST DIOH 0 0 $38,456 0 0 0 0CEI DDR 0 0 $134,713 0 0 0 0CEI DIH 0 0 $13,471 0 0 0 0CEI DIOH 0 0 $5,527 0 0 0 0

0 0 $1,379,067 0 0 0 0

Bicycle, Pedestrian & Enhancement Projects

Spring to Spring Trail US FPN: 4364341FROM Wayside Park (Seminole County)TO Lake Monroe Park (Volusia County)DESCRIPTION: BIKE PATH/TRAILConstruct a segment of the Coast to Coast Trailfrom Wayside Park in Seminole County, over theSt Johns River (US 17/92 Bridge), to LakeMonroe Park and the Spring-to-Spring Trail inVolusia County. Project length: 0.531 miles(0.113 miles in Volusia County). (Reference 2035Long Range Transportation Plan, pgs 63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DDR 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE DIOH 0 0 0 0 0 0 0

CST DDR 0 0 $1,186,900 0 0 0 0CST DIOH 0 0 $38,456 0 0 0 0CEI DDR 0 0 $134,713 0 0 0 0CEI DIH 0 0 $13,471 0 0 0 0CEI DIOH 0 0 $5,527 0 0 0 0

0 0 $1,379,067 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 83 of 179

Page 85: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 84

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Bicycle, Pedestrian & Enhancement Projects

Victoria Gardens FPN: 4355361FROM Clyde Morris BoulevardTO Appleview WayDESCRIPTION: SIDEWALKLAP agreement with the City of Port Orange toconstruct 1,600 ft of 5-ft wide sidewalk alongVictoria Gardens Boulevard from Clyde MorrisBoulevard to Appleview Way. (Reference 2040Long Range Transportation Plan, pgs 10, 11, 85,table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE LF $8,910 0 0 0 0 0 0PE SU $82,025 0 0 0 0 0 0

CST LF 0 0 0 $28,780 0 0 0CST SU 0 0 0 $125,063 0 0 0

$90,935 0 0 $153,843 0 0 0

Bicycle, Pedestrian & Enhancement Projects

Victoria Gardens FPN: 4355361FROM Clyde Morris BoulevardTO Appleview WayDESCRIPTION: SIDEWALKLAP agreement with the City of Port Orange toconstruct 1,600 ft of 5-ft wide sidewalk alongVictoria Gardens Boulevard from Clyde MorrisBoulevard to Appleview Way. (Reference 2035Long Range Transportation Plan, pgs 63-73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE LF $3,925 0 0 0 0 0 0PE SU $37,190 0 0 0 0 0 0

CST LF 0 $28,780 0 0 0 0 0CST SU 0 $125,063 0 0 0 0 0

$41,115 $153,843 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 84 of 179

Page 86: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 85

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Locally Funded Projects - Information Only

Beresford Ave Extension FPN: IFZ4-6FROM Blue Lake AveTO Kepler RoadDESCRIPTION: NEW ROAD CONSTRUCTIONThis project will extend a new 2-lane roadwayfrom Blue Lake Ave. to Kepler Road. This projectwill provide a new parallel facility to SR-44 andrelieve some of the congestion on SR-44.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE IFZ4 0 $100,000 0 0 0 0 0CST IFZ4 0 $3,500,000 0 0 0 0 0

0 $3,600,000 0 0 0 0 0

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 85 of 179

Page 87: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 86

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Locally Funded Projects - Information Only

Howland Blvd Widening FPN: IFZ3-1FROM Providence BlvdTO Elkcam BlvdDESCRIPTION: ADD LANES & RECONSTRUCTHowland Blvd. widening from 2 lanes to 4 lanesfrom Providence Blvd. to Elkcam Blvd.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE BOND 0 $886,000 0 0 0 0 0ROW BOND 0 0 $2,500,000 0 0 0 0

0 $886,000 $2,500,000 0 0 0 0

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 86 of 179

Page 88: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 87

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Locally Funded Projects - Information Only

Howland Boulevard/Ft FPN: DLT-15-02FROM at Howland Blvd/Ft Smith BlvdTO DESCRIPTION: INTERSECTIONImprovements to the intersection of HowlandBoulevard and Ft Smith Boulevard including newturn lanes, bicycle lanes and a five-foot sidewalk.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST LF 0 0 0 0 0 0 0

0 0 0 0 0 0 0

Locally Funded Projects - Information Only

Howland Boulevard/Ft FPN: DLT-15-02FROM at Howland Blvd/Ft Smith BlvdTO DESCRIPTION: INTERSECTIONImprovements to the intersection of HowlandBoulevard and Ft Smith Boulevard including newturn lanes, bicycle lanes and a five-foot sidewalk.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF 0 0 0 0 0 0 0

0 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 87 of 179

Page 89: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 88

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Locally Funded Projects - Information Only

Orange Camp FPN: IFZ4-5FROM I-4 Frontage RoadTO Martin Luther King BoulevardDESCRIPTION: ADD LANES & RECONSTRUCTVolusia County will widen Orange Camp Roadbetween the I-4 Frontage Road and Martin LutherKing Boulevard. Impact fee and bond revenueswill fund the construction in FY 2012/13. Theestimated total project cost is $5,559,000including $1,059,000 previously expended forengineering and right-of-way acquisition. Projectlength: 0.78 mile.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST BOND 0 $5,267,000 0 0 0 0 0CST IFZ4 0 $2,500,000 0 0 0 0 0CST LOGT 0 $700,000 0 0 0 0 0

0 $8,467,000 0 0 0 0 0

Locally Funded Projects - Information Only

Orange Camp FPN: IFZ4-5FROM I-4 Frontage RoadTO Martin Luther King BoulevardDESCRIPTION: ADD LANES & RECONSTRUCTVolusia County will widen Orange Camp Roadbetween the I-4 Frontage Road and Martin LutherKing Boulevard. Impact fee and bond revenueswill fund the construction in FY 2012/13. Theestimated total project cost is $5,559,000including $1,059,000 previously expended forengineering and right-of-way acquisition. Projectlength: 0.78 mile.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 88 of 179

Page 90: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 89

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Locally Funded Projects - Information Only

Palm Harbor Parkway FPN: PC-01FROM Palm Harbor ParkwayTO Matanzas Woods ParkwayDESCRIPTION: NEW ROAD CONSTRUCTIONConstruct new road from the current northernterminus of Palm Harbor Parkway to the easternterminus of Matanzas Woods Parkway. Thisproject is fully funded for construction in FY 2015.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST LF $15,000 $25,000 0 0 0 0 0

$15,000 $25,000 0 0 0 0 0

Locally Funded Projects - Information Only

Palm Harbor Parkway FPN: PC-01FROM Palm Harbor ParkwayTO Matanzas Woods ParkwayDESCRIPTION: NEW ROAD CONSTRUCTIONConstruct new road from the current northernterminus of Palm Harbor Parkway to the easternterminus of Matanzas Woods Parkway. Thisproject is fully funded for construction in FY 2015.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LF $15,000 $25,000 0 0 0 0 0

$15,000 $25,000 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 89 of 179

Page 91: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 90

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Locally Funded Projects - Information Only

Park Avenue Widening FPN: IFZ2-1FROM Old Mission RoadTO Massey Ranch BlvdDESCRIPTION: ADD LANES & RECONSTRUCTWest Park Ave. widening from 2 lanes to 3 lanesfrom Old Mission Road to Massey Ranch Road.The project will include a center left turning lane,wider through lanes, and paved shoulders.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST LOGT 0 $2,600,000 0 0 0 0 0

0 $2,600,000 0 0 0 0 0

FPN: FROM TO DESCRIPTION:

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 90 of 179

Page 92: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 91

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Asphalt Repair FPN: 4348471FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance. (Reference 2040 LongRange Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D 0 $846,746 0 0 0 0 0

0 $846,746 0 0 0 0 0

Maintenance Projects

Asphalt Repair FPN: 4348471FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance. (Reference 2035 LongRange Transportation Plan, Planning Factors, pg10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D 0 $846,746 0 0 0 0 0

0 $846,746 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 91 of 179

Page 93: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 92

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Asset Maintenance - FPN: 4290781FROM Flagler County-wideTO DESCRIPTION: ROUTINE MAINTENANCEContract with Flagler County for assetmaintenance. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $5,294,007 $1,076,000 $1,162,080 $1,200,000 $1,200,000 $1,200,000 0

$5,294,007 $1,076,000 $1,162,080 $1,200,000 $1,200,000 $1,200,000 0

Maintenance Projects

Asset Maintenance - FPN: 4290781FROM Flagler County-wideTO DESCRIPTION: ROUTINE MAINTENANCEContract with Flagler County for assetmaintenance. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $1,076,000 $1,076,000 $2,362,080 $1,200,000 $1,200,000 0 0

$1,076,000 $1,076,000 $2,362,080 $1,200,000 $1,200,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 92 of 179

Page 94: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 93

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of Bunnell FPN: 2441721FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCEMemorandum of agreement with the City ofBunnell for routine maintenance. (Reference2040 Long Range Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $878,239 $67,000 $67,000 $67,000 $67,000 $67,000 0

$878,239 $67,000 $67,000 $67,000 $67,000 $67,000 0

Maintenance Projects

City of Bunnell FPN: 2441721FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCEMemorandum of agreement with the City ofBunnell for routine maintenance. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg. 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $66,852 $67,000 $67,000 $67,000 $67,000 0 0

$66,852 $67,000 $67,000 $67,000 $67,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 93 of 179

Page 95: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 94

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of Daytona Beach - FPN: 2446071FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with City ofDaytona Beach. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $3,169,984 $146,619 $146,619 $146,619 $146,619 $146,619 0

$3,169,984 $146,619 $146,619 $146,619 $146,619 $146,619 0

Maintenance Projects

City of Daytona Beach - FPN: 2446071FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with City ofDaytona Beach. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $154,000 $154,000 $154,000 $154,000 $154,000 0 0

$154,000 $154,000 $154,000 $154,000 $154,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 94 of 179

Page 96: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 95

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of DeBary - FPN: 4033912FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofDeBary. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $528,783 $37,000 $37,000 $37,000 $37,000 $37,000 0

$528,783 $37,000 $37,000 $37,000 $37,000 $37,000 0

Maintenance Projects

City of DeBary - FPN: 4033912FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofDeBary. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $32,411 $37,000 $37,000 $37,000 $37,000 0 0

$32,411 $37,000 $37,000 $37,000 $37,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 95 of 179

Page 97: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 96

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of DeLand - FPN: 4173621FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofDeLand. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $155,277 $10,159 $10,159 $10,159 $10,159 $10,159 0

$155,277 $10,159 $10,159 $10,159 $10,159 $10,159 0

Maintenance Projects

City of DeLand - FPN: 4173621FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofDeLand. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $10,159 $10,159 $10,159 $10,159 $10,159 0 0

$10,159 $10,159 $10,159 $10,159 $10,159 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 96 of 179

Page 98: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 97

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of Edgewater - FPN: 2446211FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofEdgewater. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $553,084 $42,400 $42,400 $42,400 $42,400 $42,400 0

$553,084 $42,400 $42,400 $42,400 $42,400 $42,400 0

Maintenance Projects

City of Edgewater - FPN: 2446211FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofEdgewater. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $42,400 $42,400 $42,400 $42,400 $42,400 0 0

$42,400 $42,400 $42,400 $42,400 $42,400 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 97 of 179

Page 99: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 98

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of Flagler Beach - FPN: 4149791FROM throughout Flagler BeachTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with City of FlaglerBeach. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $257,462 $28,144 $28,144 $28,144 $28,144 $28,144 0

$257,462 $28,144 $28,144 $28,144 $28,144 $28,144 0

Maintenance Projects

City of Flagler Beach - FPN: 4149791FROM throughout Flagler BeachTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with City of FlaglerBeach. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $17,295 $17,295 $17,295 $17,295 $17,295 0 0

$17,295 $17,295 $17,295 $17,295 $17,295 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 98 of 179

Page 100: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 99

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of Holly Hill - FPN: 2449121FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofHolly Hill. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $536,184 $32,000 $32,000 $32,000 $32,000 $32,000 0

$536,184 $32,000 $32,000 $32,000 $32,000 $32,000 0

Maintenance Projects

City of Holly Hill - FPN: 2449121FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofHolly Hill. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $31,834 $32,000 $32,000 $32,000 $32,000 0 0

$31,834 $32,000 $32,000 $32,000 $32,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 99 of 179

Page 101: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 100

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of New Smyrna Bch - FPN: 4165921FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofNew Smyrna Beach. (Reference 2040 LongRange Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $617,013 $34,260 $34,260 $34,260 $34,260 $34,260 0

$617,013 $34,260 $34,260 $34,260 $34,260 $34,260 0

Maintenance Projects

City of New Smyrna Bch - FPN: 4165921FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofNew Smyrna Beach. (Reference 2035 LongRange Transportation Plan, Planning Factors, pg10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $34,260 $66,000 $66,000 $66,000 $34,260 0 0

$34,260 $66,000 $66,000 $66,000 $34,260 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 100 of 179

Page 102: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 101

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of Oak Hill - FPN: 4172601FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofOak Hill. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $411,931 $44,224 $44,224 $44,224 $44,224 $44,224 0

$411,931 $44,224 $44,224 $44,224 $44,224 $44,224 0

Maintenance Projects

City of Oak Hill - FPN: 4172601FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofOak Hill. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $44,224 $44,224 $44,224 $44,224 $44,224 0 0

$44,224 $44,224 $44,224 $44,224 $44,224 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 101 of 179

Page 103: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 102

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of Orange City - FPN: 4157491FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofOrange City. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $341,869 $35,149 $35,149 $35,149 $35,149 $35,149 0

$341,869 $35,149 $35,149 $35,149 $35,149 $35,149 0

Maintenance Projects

City of Orange City - FPN: 4157491FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofOrange City. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $35,149 $35,149 $35,149 $35,149 $35,149 0 0

$35,149 $35,149 $35,149 $35,149 $35,149 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 102 of 179

Page 104: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 103

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of Ormond Beach - FPN: 2445831FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with City ofOrmond Beach. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $3,008,294 $173,000 $173,000 $173,000 $173,000 $173,000 0

$3,008,294 $173,000 $173,000 $173,000 $173,000 $173,000 0

Maintenance Projects

City of Ormond Beach - FPN: 2445831FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with City ofOrmond Beach. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $172,996 $173,000 $173,000 $173,000 $173,000 0 0

$172,996 $173,000 $173,000 $173,000 $173,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 103 of 179

Page 105: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 104

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of Palm Coast FPN: 4173641FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCEMemorandum of agreement with the City of PalmCoast for routine maintenance. (Reference 2040LRTP, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $971,095 $95,000 $95,000 $95,000 $95,000 $95,000 0

$971,095 $95,000 $95,000 $95,000 $95,000 $95,000 0

Maintenance Projects

City of Palm Coast FPN: 4173641FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCEMemorandum of agreement with the City of PalmCoast for routine maintenance. (Reference 2035LRTP, Planning Factors, pg. 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $94,008 $95,000 $95,000 $95,000 $95,000 0 0

$94,008 $95,000 $95,000 $95,000 $95,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 104 of 179

Page 106: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 105

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of Port Orange - FPN: 2446081FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with City of PortOrange. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $742,804 $65,577 $65,577 $65,577 $65,577 $65,577 0

$742,804 $65,577 $65,577 $65,577 $65,577 $65,577 0

Maintenance Projects

City of Port Orange - FPN: 2446081FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with City of PortOrange. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $65,577 $40,610 $40,610 $40,610 $65,577 0 0

$65,577 $40,610 $40,610 $40,610 $65,577 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 105 of 179

Page 107: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 106

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

City of South Daytona - FPN: 2446451FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofSouth Daytona. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $338,167 $16,501 $16,501 $16,501 $16,501 $16,501 0

$338,167 $16,501 $16,501 $16,501 $16,501 $16,501 0

Maintenance Projects

City of South Daytona - FPN: 2446451FROM City-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with the City ofSouth Daytona. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $16,501 $17,000 $17,000 $17,000 $17,000 0 0

$16,501 $17,000 $17,000 $17,000 $17,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 106 of 179

Page 108: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 107

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Colbert Lane Resurfacing FPN: 4319261FROM SR 100 (Moody Blvd)TO Palm Coast PkwyDESCRIPTION: RESURFACINGResurface Colbert Lane from SR 100 (MoodyBoulevard) to Palm Coast Parkway. (Reference2040 Long Range Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST CIGP 0 $150,000 0 0 0 0 0CST SCRA 0 $1,562,500 0 0 0 0 0

0 $1,712,500 0 0 0 0 0

Maintenance Projects

Colbert Lane Resurfacing FPN: 4319261FROM SR 100 (Moody Blvd)TO Palm Coast PkwyDESCRIPTION: RESURFACINGResurface Colbert Lane from SR 100 (MoodyBoulevard) to Palm Coast Parkway. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST CIGP 0 $150,000 0 0 0 0 0CST SCRA 0 $1,562,500 0 0 0 0 0

0 $1,712,500 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 107 of 179

Page 109: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 108

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Drainage Maintenance and FPN: 4279861FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCEMaintenance projects including pipe and culverts,pipe lining (US 1), and drainage improvements (4locations in Volusia County). (Reference 2040Long Range Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST DS $64,150 0 0 0 0 0 0MNT D $13,929,451 $2,430,045 0 0 0 0 0

$13,993,601 $2,430,045 0 0 0 0 0

Maintenance Projects

Drainage Maintenance and FPN: 4279861FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCEMaintenance projects including pipe and culverts,pipe lining (US 1), and drainage improvements (4locations in Volusia County). (Reference 2035Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST DS 0 0 0 0 0 0 0MNT D $1,999,000 0 0 0 0 0 0

$1,999,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 108 of 179

Page 110: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 109

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Flagler County FPN: 4149792FROM Flagler County-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with FlaglerCounty for maintenance on non-intrastate statehighway facilities. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $106,575 $6,357 $6,357 $6,357 $6,357 $6,357 0

$106,575 $6,357 $6,357 $6,357 $6,357 $6,357 0

Maintenance Projects

Flagler County FPN: 4149792FROM Flagler County-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance contract with FlaglerCounty for maintenance on non-intrastate statehighway facilities. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg. 10.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $5,879 $5,879 $5,879 $5,879 $5,879 0 0

$5,879 $5,879 $5,879 $5,879 $5,879 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 109 of 179

Page 111: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 110

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Flagler Roadways Primary FPN: 4181051FROM Flagler County-wideTO DESCRIPTION: IN-HOUSE SYSTEMFDOT will conduct routine maintenance on stateroads throughout Flagler County. (Reference2040 Long Range Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $1,309,645 $181,881 $198,849 $193,245 $193,245 $168,565 0

$1,309,645 $181,881 $198,849 $193,245 $193,245 $168,565 0

Maintenance Projects

Flagler Roadways Primary FPN: 4181051FROM Flagler County-wideTO DESCRIPTION: IN-HOUSE SYSTEMFDOT will conduct routine maintenance on stateroads throughout Flagler County. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $163,761 $181,881 $198,849 $193,245 $193,245 0 0

$163,761 $181,881 $198,849 $193,245 $193,245 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 110 of 179

Page 112: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 111

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Flagler Traffic Engineering FPN: 4130192FROM Flagler County-wideTO DESCRIPTION: TRAFFIC SIGNALSReimbursement to Flagler County formaintenance of traffic signals county-wide.(Reference 2040 Long Range TransportationPlan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

OPS DDR $403,633 $48,149 $50,513 $47,605 $47,605 0 0OPS DITS $22,473 0 0 0 0 0 0

$426,106 $48,149 $50,513 $47,605 $47,605 0 0

Maintenance Projects

Flagler Traffic Engineering FPN: 4130192FROM Flagler County-wideTO DESCRIPTION: TRAFFIC SIGNALSReimbursement to Flagler County formaintenance of traffic signals county-wide.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DDR $48,149 $48,149 $50,513 $47,605 $47,605 0 0OPS DITS $22,473 0 0 0 0 0 0

$70,622 $48,149 $50,513 $47,605 $47,605 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 111 of 179

Page 113: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 112

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

I-4 (SR 400) Resurfacing FPN: 4324551FROM St Johns River BridgeTO East of Enterprise RdDESCRIPTION: RESURFACINGMill and resurface I-4 from the St. Johns RiverBridge to east of Enterprise Road. Project length: 4.98 miles. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE ACNP 0 0 0 0 0 0 0CST ACNP $8,095,076 0 0 0 0 0 0CEI ACNP $1,488,565 0 0 0 0 0 0CEI DS $5,135 0 0 0 0 0 0

$9,588,776 0 0 0 0 0 0

Maintenance Projects

I-4 (SR 400) Resurfacing FPN: 4324551FROM St Johns River BridgeTO East of Enterprise RdDESCRIPTION: RESURFACINGMill and resurface I-4 from the St. Johns RiverBridge to east of Enterprise Road. Project length: 4.98 miles. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE ACNP 0 0 0 0 0 0 0CST ACNP $8,095,076 0 0 0 0 0 0CEI ACNP $1,488,565 0 0 0 0 0 0CEI DS $5,135 0 0 0 0 0 0

$9,588,776 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 112 of 179

Page 114: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 113

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

I-4 (SR 400) Resurfacing FPN: 4380381FROM 0.9 mile south of Saxon BlvdTO 0.7 mile east of SR 472DESCRIPTION: MILL AND RESURFACEResurfacing to address deteriorating pavement.Project length: 4.95 miles. The TPO's support forsystem preservation and maintenance isexpressed on page 65 of the 2040 LRTP.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE ACNP $325,000 0 0 0 0 0 0PE DIH $5,000 0 0 0 0 0 0

$330,000 0 0 0 0 0 0

Maintenance Projects

I-4 (SR 400) Resurfacing FPN: 4380381FROM 0.9 mile south of Saxon BlvdTO 0.7 mile east of SR 472DESCRIPTION: RESURFACINGResurfacing to address deterioration ofpavement. The TPO's support for systempreservation and maintenance is expressed onpage 65 of the 2040 LRTP.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE ACNP $325,000 0 0 0 0 0 0PE DIH $5,000 0 0 0 0 0 0

$330,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 113 of 179

Page 115: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 114

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

I-95 From Volusia County FPN: 4380031FROM Volusia County LineTO north of Palm Coast ParkwayDESCRIPTION: RESURFACINGResurface SR 9/I-95 from Volusia County Line tonorth of Palm Coast Parkway. Project Length:11.29 miles. The TPO's support for transportationmaintenance projects it expressed on page 65 ofthe R2CTPO 2040 Long Range TransportationPlan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE ACNP 0 $685,000 0 0 0 0 0PE DIH $10,000 0 0 0 0 0 0

CST ACNP 0 0 0 $21,780,660 0 0 0CST DIH 0 0 0 $1,027,900 0 0 0

$10,000 $685,000 0 $22,808,560 0 0 0

Maintenance Projects

I-95 From Volusia County FPN: 4380031FROM Volusia County LineTO north of Palm Coast ParkwayDESCRIPTION: MILL AND RESURFACEResurface SR 9/I-95 from Volusia County Line tonorth of Palm Coast Parkway. Project Length: 11.29 miles. The TPO's support for transportationmaintenance projects it expressed on page 63 ofthe R2CTPO 2040 Long Range TransportationPlan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE ACNP 0 $685,000 0 0 0 0 0PE DIH $10,000 0 0 0 0 0 0

$10,000 $685,000 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 114 of 179

Page 116: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 115

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

I-95 from North of Palm FPN: 4380032FROM North of Palm Coast ParkwayTO Pellicer CreekDESCRIPTION: RESURFACINGResurface SR 9/I-95 from North of Palm CoastParkway to Pellicer Creek. Project length: 7.39.The TPO's support for transportationmaintenance projects it expressed on page 65 ofthe R2CTPO 2040 Long Range TransportationPlan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE ACNP 0 $685,000 0 0 0 0 0PE DIH $10,000 0 0 0 0 0 0

CST ACNP 0 0 0 $12,518,740 0 0 0CST DIH 0 0 0 $589,690 0 0 0

$10,000 $685,000 0 $13,108,430 0 0 0

Maintenance Projects

I-95 from North of Palm FPN: 4380032FROM North of Palm Coast ParkwayTO Pellicer CreekDESCRIPTION: MILL AND RESURFACEResurface SR 9/I-95 from North of Palm CoastParkway to Pellicer Creek. Project length: 7.39.The TPO's support for transportationmaintenance projects it expressed on page 63 ofthe R2CTPO 2040 Long Range TransportationPlan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE ACNP 0 $685,000 0 0 0 0 0PE DIH $10,000 0 0 0 0 0 0

$10,000 $685,000 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 115 of 179

Page 117: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 116

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Landscape Maintenance FPN: 4344851FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenace of landscaping. (Reference2040 Long Range Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $17,869 $7,308 0 0 0 0 0

$17,869 $7,308 0 0 0 0 0

Maintenance Projects

Landscape Maintenance FPN: 4344851FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenace of landscaping. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $17,869 $7,308 0 0 0 0 0

$17,869 $7,308 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 116 of 179

Page 118: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 117

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Lighting Agreements - FPN: 4136155FROM throughout Bunnell and Flagler BeachTO DESCRIPTION: LIGHTINGLighting agreements with Bunnell and FlaglerBeach. (Reference River to Sea TPO 2040LRTP, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D 0 $68,631 $70,690 $72,811 $74,996 $77,246 0MNT DDR $654,444 0 0 0 0 0 0

$654,444 $68,631 $70,690 $72,811 $74,996 $77,246 0

Maintenance Projects

Lighting Agreements - FPN: 4136155FROM throughout Bunnell and Flagler BeachTO DESCRIPTION: LIGHTINGLighting agreements with Bunnell and FlaglerBeach. (Reference River to Sea TPO 2035LRTP, Planning Factors, pg. 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT DDR $66,825 $79,200 $82,500 $73,800 $75,100 0 0

$66,825 $79,200 $82,500 $73,800 $75,100 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 117 of 179

Page 119: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 118

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Lighting Agreements - FPN: 4136158FROM throughout Volusia CountyTO DESCRIPTION: LIGHTINGAgreements for lighting at various locationsthroughout Volusia County. (Reference 2040Long Range Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D 0 $939,473 $967,660 $996,692 $1,026,608 $1,057,407 0MNT DDR $8,389,747 0 0 0 0 0 0

$8,389,747 $939,473 $967,660 $996,692 $1,026,608 $1,057,407 0

Maintenance Projects

Lighting Agreements - FPN: 4136158FROM throughout Volusia CountyTO DESCRIPTION: LIGHTINGAgreements for lighting at various locationsthroughout Volusia County. (Reference 2035Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT DDR $912,294 $1,013,000 $1,031,400 $997,500 $1,026,710 0 0

$912,294 $1,013,000 $1,031,400 $997,500 $1,026,710 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 118 of 179

Page 120: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 119

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Marineland Acres - FPN: 4356331FROM at Marineland AcresTO DESCRIPTION: RESURFACINGNew pavement, resurfacing and drainageimprovements for 8 local roads in MarinelandAcres. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST CIGP 0 0 0 0 $5,150,000 0 0CST GRSC 0 0 $540,000 0 0 0 0

0 0 $540,000 0 $5,150,000 0 0

Maintenance Projects

Marineland Acres - FPN: 4356331FROM at Marineland AcresTO DESCRIPTION: RESURFACINGNew pavement, resurfacing and drainageimprovements for 8 local roads in MarinelandAcres. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST CIGP 0 0 0 0 $5,150,000 0 0CST GRSC 0 0 $540,000 0 0 0 0

0 0 $540,000 0 $5,150,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 119 of 179

Page 121: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 120

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Nova Canal Maintenance FPN: 4291581FROM Reed Canal RdTO LPGA BlvdDESCRIPTION: ROUTINE MAINTENANCERoutine maintenance of the Nova Canal.(Reference 2040 Long Range TransportationPlan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $729,217 $160,000 $200,000 $200,000 $200,000 $200,000 0

$729,217 $160,000 $200,000 $200,000 $200,000 $200,000 0

Maintenance Projects

Nova Canal Maintenance FPN: 4291581FROM Reed Canal RdTO LPGA BlvdDESCRIPTION: ROUTINE MAINTENANCERoutine maintenance of the Nova Canal.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $200,000 $200,000 $200,000 $200,000 0 0 0

$200,000 $200,000 $200,000 $200,000 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 120 of 179

Page 122: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 121

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Old Dixie Highway FPN: 4337291FROM SR 5 (US 1)TO I-95DESCRIPTION: RESURFACINGJPA with Flagler County for resurfacing Old DixieHighway from SR 5 (US 1) to I-95. (Reference2040 Long Range Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST CIGP 0 0 $1,320,000 0 0 0 0CST SCED $250,000 0 0 0 0 0 0

$250,000 0 $1,320,000 0 0 0 0

Maintenance Projects

Old Dixie Highway FPN: 4337291FROM SR 5 (US 1)TO I-95DESCRIPTION: RESURFACINGJPA with Flagler County for resurfacing Old DixieHighway from SR 5 (US 1) to I-95. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST CIGP 0 0 $1,320,000 0 0 0 0CST SCED $250,000 0 0 0 0 0 0

$250,000 0 $1,320,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 121 of 179

Page 123: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 122

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Old Kings Rd Box Culverts FPN: 4372011FROM TO DESCRIPTION: REPLACE OR WIDEN BRReplace or widen bridge culverts. (Reference2040 Long Range Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST GRSC 0 0 0 0 0 $1,050,000 0CST SCRA 0 0 $235,000 0 0 0 0

0 0 $235,000 0 0 $1,050,000 0

Maintenance Projects

Old Kings Rd Box Culverts FPN: 4372011FROM TO DESCRIPTION: REPLACE OR WIDEN BRReplace or widen bridge culverts. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg. 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST SCRA 0 0 $235,000 0 0 0 0

0 0 $235,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 122 of 179

Page 124: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 123

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Pavement Markings FPN: 4278331FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCERenew pavement markings throughout VolusiaCounty. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $2,322,585 $386,675 $170,972 $170,972 0 0 0

$2,322,585 $386,675 $170,972 $170,972 0 0 0

Maintenance Projects

Pavement Markings FPN: 4278331FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCERenew pavement markings throughout VolusiaCounty. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $386,675 $386,675 $170,972 $170,972 0 0 0

$386,675 $386,675 $170,972 $170,972 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 123 of 179

Page 125: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 124

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Pipe, Desilt, and Video FPN: 4291791FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCEThis is a routine maintenance project to desiltand video drainage pipes county-wide.(Reference R2CTPO 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST DS $2,221 0 0 0 0 0 0MNT D $1,205,416 $931,640 0 0 0 0 0

$1,207,637 $931,640 0 0 0 0 0

Maintenance Projects

Pipe, Desilt, and Video FPN: 4291791FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCEThis is a routine maintenance project to desiltand video drainage pipes county-wide.(Reference R2CTPO 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST DS 0 0 0 0 0 0 0MNT D $221,707 0 0 0 0 0 0

$221,707 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 124 of 179

Page 126: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 125

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

SR 20/100 Resurfacing FPN: 4323461FROM W of Bunnell City LimitsTO SR 5 (US 1)DESCRIPTION: RESURFACINGResurface SR 20/100 from west of the BunnellCity Limits to SR 5 (US 1). (Reference River toSea TPO 2040 Long Range Transportation Plan,page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DIH $17,916 0 0 0 0 0 0PE DS $228,593 0 0 0 0 0 0

CST DDR 0 $5,125 0 0 0 0 0CST DIH 0 $73,474 0 0 0 0 0CST DS 0 $766,002 0 0 0 0 0

$246,509 $844,601 0 0 0 0 0

Maintenance Projects

SR 20/100 Resurfacing FPN: 4323461FROM W of Bunnell City LimitsTO SR 5 (US 1)DESCRIPTION: RESURFACINGResurface SR 20/100 from west of the BunnellCity Limits to SR 5 (US 1). (Reference River toSea TPO 2035 Long Range Transportation Plan,Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH 0 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0

CST DIH 0 $75,481 0 0 0 0 0CST DS 0 $583,389 0 0 0 0 0

0 $658,870 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 125 of 179

Page 127: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 126

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

SR 40 (Granada Blvd) FPN: 4369371FROM E of Halifax RiverTO W of Halifax RiverDESCRIPTION: BRIDGE-REPAIR/REHABRehabilitate/repair footer of pier 9. (Reference2040 Long Range Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE BRRP $55,363 0 0 0 0 0 0PE DIH $2,000 0 0 0 0 0 0

CST BRRP 0 $885,679 0 0 0 0 0CST DIH 0 $19,035 0 0 0 0 0

$57,363 $904,714 0 0 0 0 0

Maintenance Projects

SR 40 (Granada Blvd) FPN: 4369371FROM E of Halifax RiverTO W of Halifax RiverDESCRIPTION: BRIDGE-REPAIR/REHABRehabilitate/repair footer of pier 9. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH $2,000 0 0 0 0 0 0PE DS $15,000 0 0 0 0 0 0

$17,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 126 of 179

Page 128: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 127

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

SR 44 Audible Pavement FPN: 4362351FROM E of Prevatt AvTO E of Wild Orange DrDESCRIPTION: SIGNING/PAVEMENTFDOT will add audible edgeline pavementmarkings on SR 44 from east of Prevatt Avenueto east of Wild Orange Drive. Project length:16.204 miles. (Reference 2040 Long RangeTransportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DIH $7,000 0 0 0 0 0 0PE HSP $100,000 0 0 0 0 0 0

CST DDR 0 0 $26,325 0 0 0 0CST HSP 0 0 $705,494 0 0 0 0

$107,000 0 $731,819 0 0 0 0

Maintenance Projects

SR 44 Audible Pavement FPN: 4362351FROM E of Prevatt AvTO E of Wild Orange DrDESCRIPTION: SIGNING/PAVEMENTFDOT will add audible edgeline pavementmarkings on SR 44 from east of Prevatt Avenueto east of Wild Orange Drive. Project length:16.204 miles. (Reference 2035 Long RangeTransportation Plan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH $7,000 0 0 0 0 0 0PE HSP $100,000 0 0 0 0 0 0

CST HSP 0 0 $722,914 0 0 0 0

$107,000 0 $722,914 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 127 of 179

Page 129: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 128

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

SR 5 (US 1) Palm Coast - FPN: 4373031FROM On SR 5 (US 1) approx. 0.7 mile north ofTO DESCRIPTION: MCCO WEIGH STATIONRebuild the existing weigh station on SR 5A (US1) in Palm Coast. The TPO's support formaintenance and system preservation isexpressed on page 65 of the 2040 LRTP.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST DWS 0 $442,800 0 0 0 0 0

0 $442,800 0 0 0 0 0

Maintenance Projects

SR 5 (US 1) Palm Coast - FPN: 4373031FROM On SR 5 (US 1) approx. 0.7 mile north ofTO DESCRIPTION: MCCO WEIGH STATIONRebuild the existing weigh station on SR 5A (US1) in Palm Coast.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST DWS $432,000 0 0 0 0 0 0

$432,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 128 of 179

Page 130: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 129

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

SR 5A (Nova Rd) from SR FPN: 4324383FROM SR 400 (Beville Rd)TO SR 600 (W Int'l Speedway Blvd)DESCRIPTION: RESURFACINGResurface SR 5A (Nova Rd) from SR 400(Beville Rd) to SR 600/US 92 (InternationalSpeedway Blvd). Project length: 2.017 miles.(Reference 2040 Long Range TransportationPlan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DIH $100,135 0 0 0 0 0 0PE DS $8,272 0 0 0 0 0 0

CST DDR 0 $2,911,606 0 0 0 0 0CST DIH 0 $267,855 0 0 0 0 0CST DS $2,008,635 0 0 0 0 0 0

$2,117,042 $3,179,461 0 0 0 0 0

Maintenance Projects

SR 5A (Nova Rd) from SR FPN: 4324383FROM SR 400 (Beville Rd)TO SR 600 (W Int'l Speedway Blvd)DESCRIPTION: RESURFACINGResurface SR 5A (Nova Rd) from SR 400(Beville Rd) to SR 600/US 92 (InternationalSpeedway Blvd). Project length: 2.017 miles.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH 0 0 0 0 0 0 0CST DDR 0 $2,670,745 0 0 0 0 0CST DIH 0 $275,172 0 0 0 0 0CST DS 0 $5,265 0 0 0 0 0

0 $2,951,182 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 129 of 179

Page 131: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 130

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

SR 5A/Frontage Rd FPN: 4369151FROM Brentwood Dr/3rd/8th/10th St'sTO 8th St/Sunset LnDESCRIPTION: RESURFACINGResurface SR 5A from Brentwood Drive to 10thStreet and from 10th Street to Sunset Lane;resurface SR 5A frontage road from 3rd Street to8th Street and from 8th Street to SR 5A.(Reference 2040 Long Range TransportationPlan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DDR $111,293 0 0 0 0 0 0PE DIH $32,682 0 0 0 0 0 0PE DS $429,604 0 0 0 0 0 0

CST DDR 0 0 $329,589 0 0 0 0CST DIH 0 0 $275,171 0 0 0 0CST NHRE 0 0 $3,305,115 0 0 0 0CST SA 0 0 $10,530 0 0 0 0

$573,579 0 $3,920,405 0 0 0 0

Maintenance Projects

SR 5A/Frontage Rd FPN: 4369151FROM Brentwood Dr/3rd/8th/10th St'sTO 8th St/Sunset LnDESCRIPTION: RESURFACINGResurface SR 5A from Brentwood Drive to 10thStreet and from 10th Street to Sunset Lane;resurface SR 5A frontage road from 3rd Street to8th Street and from 8th Street to SR 5A.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH $20,000 0 0 0 0 0 0PE DS $400,000 0 0 0 0 0 0

CST DIH 0 0 $281,965 0 0 0 0CST NHRE 0 0 $2,732,232 0 0 0 0CST SA 0 0 $10,790 0 0 0 0

$420,000 0 $3,024,987 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 130 of 179

Page 132: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 131

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

SR 600 from Emmet St to N FPN: 4368551FROM Emmet StTO N Charles StDESCRIPTION: DRAINAGE IMPROVEMENTSDrainage improvements on SR 600/US 92(International Speedway Blvd) from EmmetStreet to N Charles St. Improvements will includereplacing existing storm drains and constructingadditional curb inlets. (Reference River to SeaTPO 2040 Long Range Transportation Plan,page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DIH $42,167 0 0 0 0 0 0PE DS $532,178 0 0 0 0 0 0

ROW DDR 0 $27,583 $70,747 0 0 0 0ROW DIH 0 $21,218 0 0 0 0 0CST DDR 0 0 $697,998 0 0 0 0CST DIH 0 0 $10,530 0 0 0 0

$574,345 $48,801 $779,275 0 0 0 0

Maintenance Projects

SR 600 from Emmet St to N FPN: 4368551FROM Emmet StTO N Charles StDESCRIPTION: DRAINAGE IMPROVEMENTSDrainage improvements on SR 600/US 92(International Speedway Blvd) from EmmetStreet to N Charles St. Improvements will includereplacing existing storm drains and constructingadditional curb inlets. (Reference River to SeaTPO 2035 Long Range Transportation Plan,Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DDR $500,000 0 0 0 0 0 0PE DIH $10,000 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0

ROW DDR 0 $82,000 $31,000 $23,000 0 0 0ROW DIH 0 $5,000 $10,000 $5,000 0 0 0CST DDR 0 0 $703,825 0 0 0 0CST DIH 0 0 $10,790 0 0 0 0

$510,000 $87,000 $755,615 $28,000 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 131 of 179

Page 133: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 132

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

SR A1A from South of S FPN: 4295731FROM South of S 23rd StreetTO N 21st StreetDESCRIPTION: ROAD/SLOPE PROTECTIONAdd 500 feet of sheet pile walls/slope protectionstabilization in areas of Flagler Beach where SRA1A is threatened by erosion. (Reference 2040Long Range Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DDR $1,000,000 0 0 0 0 0 0PE DIH $20,104 0 0 0 0 0 0

CST DDR 0 $3,642,000 0 0 0 0 0CST DIH 0 $188,169 0 0 0 0 0

$1,020,104 $3,830,169 0 0 0 0 0

Maintenance Projects

SR A1A from South of S FPN: 4295731FROM South of S 23rd StreetTO N 21st StreetDESCRIPTION: ROAD/SLOPE PROTECTIONAdd 500 feet of sheet pile walls/slope protectionstabilization in areas of Flagler Beach where SRA1A is threatened by erosion. (Reference 2035Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DDR $300,000 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0

CST DDR 0 $4,342,000 0 0 0 0 0CST DIH 0 $188,169 0 0 0 0 0

$300,000 $4,530,169 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 132 of 179

Page 134: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 133

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Volusia Performance FPN: 4280031FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance throughout Volusia County.(Reference 2040 Long Range TransportationPlan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $4,038,450 $569,049 $569,049 $853,572 $569,049 $569,049 0

$4,038,450 $569,049 $569,049 $853,572 $569,049 $569,049 0

Maintenance Projects

Volusia Performance FPN: 4280031FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine maintenance throughout Volusia County.(Reference 2035 Long Range TransportationPlan, Planning Factors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $569,049 $569,049 $569,049 $853,572 $569,049 0 0

$569,049 $569,049 $569,049 $853,572 $569,049 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 133 of 179

Page 135: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 134

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Volusia Primary In-House FPN: 4181131FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine in-house maintenance of state roadsthroughout the county. (Reference 2040 LongRange Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

MNT D $44,697,527 $2,819,152 $2,783,889 $2,748,375 $2,748,375 $2,889,686 0

$44,697,527 $2,819,152 $2,783,889 $2,748,375 $2,748,375 $2,889,686 0

Maintenance Projects

Volusia Primary In-House FPN: 4181131FROM Volusia County-wideTO DESCRIPTION: ROUTINE MAINTENANCERoutine in-house maintenance of state roadsthroughout the county. (Reference 2035 LongRange Transportation Plan, Planning Factors, pg10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

MNT D $2,807,329 $2,819,152 $2,783,889 $2,748,375 $2,748,375 0 0

$2,807,329 $2,819,152 $2,783,889 $2,748,375 $2,748,375 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 134 of 179

Page 136: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 135

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Maintenance Projects

Volusia Traffic Engineering FPN: 4130199FROM Volusia County-wideTO DESCRIPTION: TRAFFIC SIGNALSContracts with Volusia County TrafficEngineering relating to traffic signals. (Reference2040 Long Range Transportation Plan, page 65.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

OPS DDR $5,091,912 $629,518 $653,321 $629,857 $629,857 0 0OPS DITS $432,968 0 0 0 0 0 0

$5,524,880 $629,518 $653,321 $629,857 $629,857 0 0

Maintenance Projects

Volusia Traffic Engineering FPN: 4130199FROM Volusia County-wideTO DESCRIPTION: TRAFFIC SIGNALSContracts with Volusia County TrafficEngineering relating to traffic signals. (Reference2035 Long Range Transportation Plan, PlanningFactors, pg 10.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DDR $529,968 $629,518 $653,321 $629,857 $629,857 0 0OPS DITS $432,968 0 0 0 0 0 0

$962,936 $629,518 $653,321 $629,857 $629,857 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 135 of 179

Page 137: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 136

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Major Bridge Projects

SR 44 Over St Johns River FPN: 4295561FROM TO DESCRIPTION: REPLACE MOVABLE SPANReplace Whitehair Bridge #110063 on SR 44over the St. Johns River. This is a basculebridge. It will be replaced with a mid-rise,fixed-span bridge. The PD&E was funded underFM #4046461. This project is in Lake County.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PD&E ACSB 0 0 0 0 0 0 0PE ACSB $1,860,000 0 0 0 0 0 0

ROW ACSB 0 0 $2,168,000 0 0 0 0CST ACSB 0 0 0 0 $20,218,416 0 0

$1,860,000 0 $2,168,000 0 $20,218,416 0 0

Major Bridge Projects

SR 44 Over St Johns River FPN: 4295561FROM TO DESCRIPTION: REPLACE MOVABLE SPANReplace Whitehair Bridge #110063 on SR 44over the St. Johns River. This is a basculebridge. It will be replaced with a mid-rise,fixed-span bridge. The PD&E was funded underFM #4046461. This project is in Lake County.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PD&E ACSB 0 0 0 0 0 0 0PE ACSB $1,860,000 0 0 0 0 0 0

ROW ACSB 0 0 $2,168,000 0 0 0 0CST ACSB 0 0 0 0 $20,218,416 0 0

$1,860,000 0 $2,168,000 0 $20,218,416 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 136 of 179

Page 138: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 137

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Port, Rail & Freight Projects

Holly Hill FEC Rail Siding FPN: 4348701FROM South of LPGA BlvdTO DESCRIPTION: RAIL CAPACITY PROJECTExtend FEC Railroad siding. This project is partof a larger group of FEC projects aimed at bridgeupgrades and rail siding extensions. The railsiding extensions will allow more trains toeffectively pull into a siding to allow oncomingtrains to pass. These extensions will addsignificant capacity to the line. Projects will becontracted directly with FEC railroad. (Reference

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

RRU GMR 0 $2,804,517 0 0 0 0 0RRU LF 0 $2,804,517 0 0 0 0 0

0 $5,609,034 0 0 0 0 0

Port, Rail & Freight Projects

Holly Hill FEC Rail Siding FPN: 4348701FROM South of LPGA BlvdTO DESCRIPTION: RAIL CAPACITY PROJECTExtend FEC Railroad siding. This project is partof a larger group of FEC projects aimed at bridgeupgrades and rail siding extensions. The railsiding extensions will allow more trains toeffectively pull into a siding to allow oncomingtrains to pass. These extensions will addsignificant capacity to the line. Projects will becontracted directly with FEC railroad. Reference

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 137 of 179

Page 139: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 138

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Port, Rail & Freight Projects

New Smyrna FEC Rail FPN: 4348691FROM South of Canal StreetTO DESCRIPTION: RAIL CAPACITY PROJECTExtend FEC Railroad siding. This project is partof a larger group of FEC projects aimed at bridgeupgrades and rail siding extensions. The railsiding extensions will allow more trains toeffectively pull into a siding to allow oncomingtrains to pass. These extensions will addsignificant capacity to the line. Projects will becontracted directly with FEC railroad. (Reference

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST GMR 0 $2,833,592 0 0 0 0 0CST LF 0 $2,833,592 0 0 0 0 0

0 $5,667,184 0 0 0 0 0

Port, Rail & Freight Projects

New Smyrna FEC Rail FPN: 4348691FROM South of Canal StreetTO DESCRIPTION: RAIL CAPACITY PROJECTExtend FEC Railroad siding. This project is partof a larger group of FEC projects aimed at bridgeupgrades and rail siding extensions. The railsiding extensions will allow more trains toeffectively pull into a siding to allow oncomingtrains to pass. These extensions will addsignificant capacity to the line. Projects will becontracted directly with FEC railroad. Reference

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 138 of 179

Page 140: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 139

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Roadway Capacity Projects

I-4 (SR 400) Managed-Use FPN: 4084642FROM Volusia/Seminole County LineTO 1/2 mile east of SR 472DESCRIPTION: PRELIM ENG FOR FUTUREI-4 widening to ten (10) lanes from east of SR15/600 (US 17/92) in Orange County to 1/2 mileeast of SR 472 to accommodate four (4)managed-use (variable toll) lanes. Preliminaryengineering is partially funded from FY 2011/12through FY 2015/16. The anticipated time-framefor construction is 2021-2025. The estimated totalproject cost is $8,021,857 (year of expenditure).

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE ACNP $7,698,858 0 0 0 0 0 0PE DIH $172,729 0 0 0 0 0 0

ENV DDR 0 0 $150,270 0 0 0 0

$7,871,587 0 $150,270 0 0 0 0

Roadway Capacity Projects

I-4 (SR 400) Managed-Use FPN: 4084642FROM Volusia/Seminole County LineTO 1/2 mile east of SR 472DESCRIPTION: PRELIM ENG FOR FUTUREI-4 widening to ten (10) lanes from east of SR15/600 (US 17/92) in Orange County to 1/2 mileeast of SR 472 to accommodate four (4)managed-use (variable toll) lanes. Preliminaryengineering is partially funded from FY 2011/12through FY 2015/16. The anticipated time-framefor construction is 2021-2025. The estimated totalproject cost is $681,292,000 (year of

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE ACNP $6,410,549 0 0 0 0 0 0PE DIH $833,520 0 0 0 0 0 0

ENV DDR 0 0 $150,270 0 0 0 0ENV DIOH 0 0 $11,511 0 0 0 0

$7,244,069 0 $161,781 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 139 of 179

Page 141: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 140

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Roadway Capacity Projects

I-95 Widening - Brevard FPN: 4068694FROM Volusia/Brevard County lineTO 0.5 mile north of SR 44DESCRIPTION: ADD LANES & REHABILITATEAdd lanes and rehabilitate pavement on I-95 fromthe Brevard County line to 0.5 miles north of SR44. Environmental review was funded in FY2008/09; right-of-way acquisition was fundedfrom FY 2009/10 through FY 2013/14. Fundingfor construction was programmed in FY 2011/12under FM# 4068698. Project Length: 16.89 miles.(Reference 2040 Long Range Transportation

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DI $4,871,846 0 0 0 0 0 0PE DIH $163,931 0 0 0 0 0 0PE DS $381,955 0 0 0 0 0 0

ROW BNIR $35,506 0 0 0 0 0 0ROW DIH $47,888 0 0 0 0 0 0ROW NH $123,941 0 0 0 0 0 0CST ACNP 0 0 $556,000 0 0 0 0ENV DDR $5,763,753 0 0 0 0 0 0ENV DI $93,333 0 0 0 0 0 0ENV DS $1,314,415 0 0 0 0 0 0

$12,796,568 0 $556,000 0 0 0 0

Roadway Capacity Projects

I-95 Widening - Brevard FPN: 4068694FROM Volusia/Brevard County lineTO 0.5 mile north of SR 44DESCRIPTION: ADD LANES & REHABILITATEAdd lanes and rehabilitate pavement on I-95 fromthe Brevard County line to 0.5 miles north of SR44. Environmental review was funded in FY2008/09; right-of-way acquisition was fundedfrom FY 2009/10 through FY 2013/14. Fundingfor construction was programmed in FY 2011/12under FM# 4068698. Project Length: 16.89 miles.(Reference 2035 Long Range Transportation

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DI 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0

ROW BNIR 0 0 0 0 0 0 0ROW DIH 0 0 0 0 0 0 0ROW NH 0 0 0 0 0 0 0CST ACNP 0 0 $556,000 0 0 0 0ENV DDR 0 0 0 0 0 0 0ENV DI 0 0 0 0 0 0 0ENV DS 0 0 0 0 0 0 0

0 0 $556,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 140 of 179

Page 142: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 141

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Roadway Capacity Projects

I-95 Widening - SR 44 to I-4 FPN: 4068696FROM 0.5 miles north of SR 44TO south of I-4DESCRIPTION: ADD LANES & REHABILITATEAdd lanes and rehabilitate pavement on I-95 from0.5 miles north of SR 44 to south of I-4.Right-of-way acquisition was funded from FY2008/09 through FY 2012/13. All constructionfunds were transferred to FM# 2427152. Projectlength: 10.39 miles (Reference 2040 Long RangeTransportation Plan, table 28, pg 68.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DI $3,036,492 0 0 0 0 0 0PE DIH $162,600 0 0 0 0 0 0PE DS $1,300,000 0 0 0 0 0 0

ROW DDR $364,250 0 0 0 0 0 0ROW NHAC $62,671 0 0 0 0 0 0ROW NHPP $1,222,946 0 0 0 0 0 0DSB ACNP 0 0 $487,952 0 0 0 0ENV DI $7,371,406 0 0 0 0 0 0ENV DS $408,478 0 0 0 0 0 0

$13,928,843 0 $487,952 0 0 0 0

Roadway Capacity Projects

I-95 Widening - SR 44 to I-4 FPN: 4068696FROM 0.5 miles north of SR 44TO south of I-4DESCRIPTION: ADD LANES & REHABILITATEAdd lanes and rehabilitate pavement on I-95 from0.5 miles north of SR 44 to south of I-4.Right-of-way acquisition was funded from FY2008/09 through FY 2012/13. All constructionfunds were transferred to FM# 2427152. Projectlength: 10.39 miles (Reference 2035 Long RangeTransportation Plan, Table 8.2, pg 121.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DI 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0

ROW DDR 0 0 0 0 0 0 0ROW NHAC 0 0 0 0 0 0 0ROW NHPP 0 0 0 0 0 0 0DSB ACNP 0 0 $500,000 0 0 0 0ENV DI 0 0 0 0 0 0 0ENV DS 0 0 0 0 0 0 0

0 0 $500,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 141 of 179

Page 143: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 142

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Roadway Capacity Projects

I-95/I-4 Ultimate System FPN: 2427152FROM 0.5 mile north of SR 44TO 1.6 miles north of US 92DESCRIPTION: RECONST. INTERCH.; ADDConstruct the ultimate systems interchange atI-95/I-4/US 92 and widen I-95 from 0.5 mile northof SR 44 to 1.6 miles north of US 92 (SR 600).Construction was funded in prior years underFM# 2427152. The total project cost is estimatedto be $244,730,514 (year of expenditure)including $233,837,059 incurred in prior years.The environmental, design, and right-of-way

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PDE NHAC $1,286,935 0 0 0 0 0 0PE ACNP $1,100,000 0 0 0 0 0 0PE DIH $271,371 0 0 0 0 0 0PE NHAC $2,073,511 0 0 0 0 0 0PE NHPP $2,994,033 0 0 0 0 0 0

ROW ACNP 0 $228,963 0 0 0 0 0ROW BNIR $4,213,394 $6,430,106 0 0 0 0 0ROW DIH $101,414 0 0 0 0 0 0ROW NHPP $4,131,537 0 0 0 0 0 0DSB $30,399,899 0 0 0 0 0 0DSB ACNP $9,343,291 0 $146,386 0 0 0 0DSB DDR 0 0 $268,000 0 0 0 0DSB DI $95,388,037 0 0 0 0 0 0DSB DIH $62 0 0 0 0 0 0DSB GMR $35,687,763 0 0 0 0 0 0DSB NHPP $43,007,216 0 0 0 0 0 0ENV NHPP $1,658,596 0 0 0 0 0 0INC DDR $180,000 0 0 0 0 0 0INC DI $2,000,000 $3,820,000 0 0 0 0 0

$10,479,069 $414,386 0 0 0 0

Roadway Capacity Projects

I-95/I-4 Ultimate System FPN: 2427152FROM 0.5 mile north of SR 44TO 1.6 miles north of US 92DESCRIPTION: RECONST. INTERCH.; ADDConstruct the ultimate systems interchange atI-95/I-4/US 92 and widen I-95 from 0.5 mile northof SR 44 to 1.6 miles north of US 92 (SR 600).Construction was funded in prior years underFM# 2427152. The total project cost is estimatedto be $291,589,880 (year of expenditure)including $269,068,891 incurred in prior years.The environmental, design, and right-of-way

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PDE NHAC 0 0 0 0 0 0 0PE ACNP 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE NHAC 0 0 0 0 0 0 0PE NHPP 0 0 0 0 0 0 0

ROW ACNP 0 $100,000 $3,066,492 0 0 0 0ROW BNIR $8,200,000 $5,000,000 0 0 0 0 0ROW DIH $4,497 0 0 0 0 0 0ROW NHPP 0 0 0 0 0 0 0DSB ACNP 0 0 $150,000 0 0 0 0DSB DI 0 0 0 0 0 0 0DSB DIH 0 0 0 0 0 0 0DSB GMR 0 0 0 0 0 0 0RRU DI 0 0 0 0 0 0 0ENV NHPP 0 0 0 0 0 0 0INC DI $2,500,000 $3,500,000 0 0 0 0 0

$10,704,497 $8,600,000 $3,216,492 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 142 of 179

Page 144: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 143

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Roadway Capacity Projects

I-95/Matanzas Woods FPN: 4119592FROM at I-95 and Matanzas Woods PkwyTO DESCRIPTION: INTERCHANGE (NEW)New interchange on I-95 at Matanzas WoodsParkway. Funding for construction wasprogrammed in FY 2014/15. The total projectcost is $13,513,955 including $13,473,955expended in prior years. (Reference 2035 LRTP,Addendum #1.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PLN HPP $257,359 0 0 0 0 0 0PDE EB $9,285 0 0 0 0 0 0PDE HPP $440,121 0 0 0 0 0 0PDE SA $58,466 0 0 0 0 0 0PE DIH $45,142 0 0 0 0 0 0PE LF $600,000 0 0 0 0 0 0

CST CIGP $6,033,138 0 0 0 0 0 0CST DDR $1,465,862 0 $40,000 0 0 0 0CST DIH $14,477 0 0 0 0 0 0CST TRIP $2,463,582 0 0 0 0 0 0ENV DS $626,136 0 0 0 0 0 0ENV TRIP $137,890 0 0 0 0 0 0

$12,151,458 0 $40,000 0 0 0 0

Roadway Capacity Projects

I-95/Matanzas Woods FPN: 4119592FROM at I-95 and Matanzas Woods PkwyTO DESCRIPTION: INTERCHANGE (NEW)New interchange on I-95 at Matanzas WoodsParkway. Funding for construction wasprogrammed in FY 2014/15. The total projectcost is $13,513,955 including $13,473,955expended in prior years. (Reference 2035 LRTP,Addendum #1.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PLN HPP 0 0 0 0 0 0 0PDE EB 0 0 0 0 0 0 0PDE HPP 0 0 0 0 0 0 0PDE SA 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE LF 0 0 0 0 0 0 0

CST CIGP 0 0 0 0 0 0 0CST DDR 0 0 $40,000 0 0 0 0CST DIH 0 0 0 0 0 0 0CST TRIP 0 0 0 0 0 0 0ENV DS 0 0 0 0 0 0 0ENV TRIP 0 0 0 0 0 0 0

0 0 $40,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 143 of 179

Page 145: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 144

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Roadway Capacity Projects

Matanzas Woods Parkway FPN: 4336751FROM SR 5 (US 1)TO Southbound I-95 RampsDESCRIPTION: NEW ROAD CONSTRUCTIONRebuild existing roadway as a 4-lane facility fromSR 5 (US 1) to the southbound I-95 ramps.(Reference 2040 Long Range TransportationPlan, Table 29, pg. 69.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE SA 0 0 $1,903,000 0 0 0 0

0 0 $1,903,000 0 0 0 0

Roadway Capacity Projects

Matanzas Woods Parkway FPN: 4336751FROM SR 5 (US 1)TO Southbound I-95 RampsDESCRIPTION: NEW ROAD CONSTRUCTIONRebuild existing roadway as a 4-lane facility fromSR 5 (US 1) to the southbound I-95 ramps.(Reference 2035 Long Range TransportationPlan, Addendum #1, pg. 19.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE SA 0 0 $1,903,000 0 0 0 0

0 0 $1,903,000 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 144 of 179

Page 146: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 145

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Roadway Capacity Projects

Old Kings Road Extension FPN: 4355611FROM Matanzas Woods PkwyTO Old Kings RdDESCRIPTION: NEW ROAD CONSTRUCTION -Extend Old Kings Road northward fromMatanzas Woods Parkway to Old Kings Road.(Reference 2040 Long Range TransportationPlan, Table 29, pg. 69.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST GRSC $600,000 0 0 0 0 0 0CST TRIP 0 0 0 $1,742,525 0 0 0CST TRWR 0 0 0 $2,757,475 0 0 0

$600,000 0 0 $4,500,000 0 0 0

Roadway Capacity Projects

Old Kings Road Extension FPN: 4355611FROM Matanzas Woods PkwyTO Old Kings RdDESCRIPTION: NEW ROAD CONSTRUCTION -Extend Old Kings Road northward fromMatanzas Woods Parkway to Old Kings Road.(Reference 2035 Long Range TransportationPlan, Addendum #1, pg. 19.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

ROW GRSC $600,000 0 0 0 0 0 0

$600,000 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 145 of 179

Page 147: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 146

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Roadway Capacity Projects

SR 15 (US 17) Widening - FPN: 4102511FROM DeLeon Springs BoulevardTO SR 40DESCRIPTION: RIGHT OF WAY ACQUISITIONEnvironmental study and right-of-way acquisitionin preparation for widening US 17 (SR 15) from 2to 4 lanes between DeLeon Springs Blvd and SR40. Total project cost is estimated to beapproximately $76,355,885. Approximately$9,088,982 has been expended to date for PD&Estudy, environmental and engineering design.Project Length: 6.85 miles. (Reference 2040

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PDE DIH $68,905 0 0 0 0 0 0PDE SL $685,549 0 0 0 0 0 0PE DDR $4,878,572 0 0 0 0 0 0PE DIH $418,823 0 0 0 0 0 0

ROW DDR $968,344 $3,910,000 $677,550 $4,351,560 $3,831,506 0 0ROW DIH $192,724 $288,176 $271,000 0 0 0 0CST ACNP 0 0 0 0 0 0 $45,041,801CST DI 0 0 0 0 0 0 $4,895,310RRU ACNP 0 0 0 0 0 0 $3,000,000ENV ACSA $445,182 0 0 0 0 0 0ENV DDR $1,430,883 0 0 0 0 0 0INC ACNP 0 0 0 0 0 0 $1,000,000

$9,088,982 $4,198,176 $948,550 $4,351,560 $3,831,506 0 $53,937,111

Roadway Capacity Projects

SR 15 (US 17) Widening - FPN: 4102511FROM DeLeon Springs BoulevardTO SR 40DESCRIPTION: RIGHT OF WAY ACQUISITIONEnvironmental study and right-of-way acquisitionin preparation for widening US 17 (SR 15) from 2to 4 lanes between DeLeon Springs Blvd and SR40. Total project cost is estimated to beapproximately $70.5 million. Approximately $9million has been expended to date for PD&Estudy, environmental and engineering design.Project Length: 6.85 miles. (Reference 2035

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PDE DIH 0 0 0 0 0 0 0PDE SL 0 0 0 0 0 0 0PE DDR 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0

ROW DDR $1,327,450 $5,310,000 $3,100,000 $155,250 $1,418,755 0 0ROW DIH $150,000 $262,428 $271,000 0 0 0 0ROW DS 0 0 0 $1,912,851 0 0 0CST ACNP 0 0 0 0 0 $38,581,861 0CST DI 0 0 0 0 0 $5,000,000 0RRU ACNP 0 0 0 0 0 $3,000,000 0ENV DDR 0 0 0 0 0 0 0INC ACNP 0 0 0 0 0 $1,000,000 0

$1,477,450 $5,572,428 $3,371,000 $2,068,101 $1,418,755 $47,581,861 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 146 of 179

Page 148: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 147

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Roadway Capacity Projects

SR 40 FROM SR 15 US 17 FPN: 2408361FROM SR 15 (US 17)TO SR 11DESCRIPTION: ADD LANES & RECONSTRUCTWiden SR 40 from 2 lanes to 4 between SR 15(US 17) and SR 11. Preliminary engineering wasprogrammed in FY 2013/14; environmental studyis programmed in FY 2016/17. Project length is6.657 miles. (Reference River to Sea TPO 2040Long Range Transportation Plan, table 28, pg68.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE ACSA $1,026,704 0 0 0 0 0 0PE DIH $203,543 0 0 0 0 0 0PE DS $3,884 0 0 0 0 0 0PE SA $2,496,773 0 0 0 0 0 0

ROW 0 0 0 0 0 0 $5,046,000ROW DIH 0 0 0 0 0 0 $200,000ENV DDR 0 $4,500,000 0 0 0 0 0

$3,730,904 $4,500,000 0 0 0 0 $5,246,000

Roadway Capacity Projects

SR 40 FROM SR 15 US 17 FPN: 2408361FROM SR 15 (US 17)TO SR 11DESCRIPTION: ADD LANES & RECONSTRUCTWiden SR 40 from 2 lanes to 4 between SR 15(US 17) and SR 11. Preliminary engineering wasprogrammed in FY 2013/14; environmental studyis programmed in FY 2016/17. Project length is6.657 miles. (Reference River to Sea TPO LongRange Transportation Plan, Table 8.2, pg 122.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE ACSA 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0

ENV DDR 0 $1,500,000 0 0 0 0 0ENV DS 0 $3,000,000 0 0 0 0 0

0 $4,500,000 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 147 of 179

Page 149: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 148

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Roadway Capacity Projects

SR 483 (Clyde Morris Blvd) FPN: 4081781FROM SR 400 (Beville Rd)TO SR 600 (US 92, Int'l Speedway Blvd)DESCRIPTION: ADD LANES & REHABILITATEClyde Morris Boulevard is proposed to bewidened from 4 lanes to 6 between Beville Road(SR 400) and US 92 (SR 600, InternationalSpeedway Blvd), including sidewalks. Funding forright-of-way acquisition is programmed in FY2017/18 through FY 2019/20. Funding forconstruction has not yet been identified. ProjectLength: 2.2 miles. (Reference 2040 Long Range

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

ROW DDR 0 0 $1,150,000 $1,650,000 $8,038,160 $3,632,048 0ROW DIH 0 0 $175,000 $180,000 $175,000 $11,059 0

0 0 $1,325,000 $1,830,000 $8,213,160 $3,643,107 0

Roadway Capacity Projects

SR 483 (Clyde Morris Blvd) FPN: 4081781FROM SR 400 (Beville Rd)TO SR 600 (US 92, Int'l Speedway Blvd)DESCRIPTION: ADD LANES & REHABILITATEClyde Morris Boulevard is proposed to bewidened from 4 lanes to 6 between Beville Road(SR 400) and US 92 (SR 600, InternationalSpeedway Blvd), including sidewalks. Funding forright-of-way acquisition is programmed in FY2017/18 through FY 2019/20. Funding forconstruction has not yet been identified. ProjectLength: 2.2 miles. (Reference 2035 Long Range

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PDE DDR 0 0 0 0 0 0 0PDE DIH 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE EB 0 0 0 0 0 0 0PE SU 0 0 0 0 0 0 0

ROW DDR 0 0 $5,850,000 $7,597,693 $5,488,160 0 0ROW DIH 0 0 $175,000 $180,000 $175,000 0 0

0 0 $6,025,000 $7,777,693 $5,663,160 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 148 of 179

Page 150: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 149

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Roadway Capacity Projects

SR 600 (US 92) Widening - FPN: 4226271FROM I-4 Eastbound Ramp to SR 600 (US 92)TO CR 415 (Tomoka Farms Rd)DESCRIPTION: WIDEN ROADWidening SR 600 (US 92, InternationalSpeedway Blvd) from 4 lanes to 6 between theI-4 eastbound off-ramp to SR 600 and TomokaFarms Road. This facility provides direct accessto I-95 vicinity and into Daytona Beachattractions, and is a hurricane evacuation routefrom the coastal area. The estimated total projectcost is $12,847,766 including $4,389,261

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DC $210 0 0 0 0 0 0PE DDR $335,154 0 0 0 0 0 0PE DIH $428,116 0 0 0 0 0 0PE SA $199,260 0 0 0 0 0 0PE ST10 $599,897 0 0 0 0 0 0PE SU $1,326,624 0 0 0 0 0 0

ROW DDR 0 0 0 $650,000 $3,600,000 $4,088,305 0ROW DIH 0 0 0 $70,000 $50,200 0 0ENV ACSA $1,500,000 0 0 0 0 0 0

$4,389,261 0 0 $720,000 $3,650,200 $4,088,305 0

Roadway Capacity Projects

SR 600 (US 92) Widening - FPN: 4226271FROM I-4 Eastbound Ramp to SR 600 (US 92)TO CR 415 (Tomoka Farms Rd)DESCRIPTION: WIDEN ROADWidening SR 600 (US 92, InternationalSpeedway Blvd) from 4 lanes to 6 between theI-4 eastbound off-ramp to SR 600 and TomokaFarms Road. This facility provides direct accessto I-95 vicinity and into Daytona Beachattractions, and is a hurricane evacuation routefrom the coastal area. The estimated total projectcost is $18.6 million including $4,253,307

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DC 0 0 0 0 0 0 0PE DDR 0 0 0 0 0 0 0PE DIH $23,523 0 0 0 0 0 0PE SA 0 0 0 0 0 0 0PE ST10 0 0 0 0 0 0 0PE SU 0 0 0 0 0 0 0

ROW DDR 0 0 0 0 $3,600,000 0 0ROW DIH 0 0 0 $20,000 $15,020 0 0ROW DS 0 0 0 $2,550,000 0 0 0ENV ACSA $550,000 0 0 0 0 0 0ENV DDR $200,000 0 0 0 0 0 0ENV EB $750,000 0 0 0 0 0 0

$1,523,523 0 0 $2,570,000 $3,615,020 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 149 of 179

Page 151: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 150

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

Doyle Road Paved FPN: 4355951FROM Lush LaneTO Courtland BoulevardDESCRIPTION: PAVE SHOULDERSLAP agreement with Volusia County to addpaved shoulders on Doyle Road between LushLane and Courtland Boulevard. The TPO'ssupport for traffic operations, intelligenttransportation systems (ITS), and safety projectsis expressed on page 65, table 31 on page 73 ofthe 2040 Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE LF 0 $98,662 0 0 0 0 0CST LF 0 0 $101,562 0 0 0 0CST SU 0 0 $682,074 0 0 0 0

0 $98,662 $783,636 0 0 0 0

Traffic Operations, ITS & Safety Projects

Doyle Road Paved FPN: 4355951FROM Lush LaneTO Courtland BoulevardDESCRIPTION: PAVE SHOULDERSLAP agreement with Volusia County to addpaved shoulders on Doyle Road between LushLane and Courtland Boulevard. The TPO'ssupport for traffic operations, intelligenttransportation systems (ITS), and safety projectsis expressed on pgs 1, 44, 49, 92, and 96 of the2035 Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE LF 0 $98,662 0 0 0 0 0CST LF 0 0 $101,562 0 0 0 0CST SU 0 0 $682,074 0 0 0 0

0 $98,662 $783,636 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 150 of 179

Page 152: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 151

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

Lighting Impr'ts I-4 @ SR FPN: 4350561FROM I-4 @ SR 472, Orange Camp Rd, DirksenTO DESCRIPTION: LIGHTINGLighting improvements at I-4/SR 472, atI-4/Orange Camp Rd, at I-4/Dirksen Dr, at I-4/SR44 and at I-4/US 92. The TPO's support for safetyprojects is expressed on page 65, table 31 onpage 73 of the 2040 Long Range TransportationPlan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE ACNP $480,000 0 0 0 0 0 0PE DDR $403,671 0 0 0 0 0 0PE DIH $12,000 0 0 0 0 0 0

CST DDR 0 $2,587,389 $21,629 0 0 0 0CST DI 0 $4,724,726 0 0 0 0 0CST DIH 0 $82,164 0 0 0 0 0CST HSP 0 $1,338,363 0 0 0 0 0

$895,671 $8,732,642 $21,629 0 0 0 0

Traffic Operations, ITS & Safety Projects

Lighting Impr'ts I-4 @ SR FPN: 4350561FROM I-4 @ SR 472, Orange Camp Rd, DirksenTO DESCRIPTION: LIGHTINGLighting improvements at I-4/SR 472, atI-4/Orange Camp Rd, at I-4/Dirksen Dr, at I-4/SR44 and at I-4/US 92. The TPO's support for safetyprojects is expressed on pgs 1, 44, 49, 92, and96 of the 2035 Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE ACNP $480,000 0 0 0 0 0 0PE DDR $270,000 0 0 0 0 0 0PE DIH $12,000 0 0 0 0 0 0

CST DDR 0 $2,699,486 0 0 0 0 0CST DI 0 $4,677,495 0 0 0 0 0CST HSP 0 $1,286,218 0 0 0 0 0CEI DI 0 $51,976 0 0 0 0 0CEI DIH 0 $84,408 0 0 0 0 0CEI DS 0 $367,012 0 0 0 0 0CEI HSP 0 $88,705 0 0 0 0 0

$762,000 $9,255,300 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 151 of 179

Page 153: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 152

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

River to Sea TPO Traffic FPN: 4204331FROM throughout R2CTPO planning areaTO DESCRIPTION: TRAFFIC OPS IMPROVEMENTForty percent (40%) of SU funds received by theRiver to Sea TPO is set aside for trafficoperations, intelligent transportation systems(ITS), and safety improvements. The TPO'ssupport for such projects is expressed on pg 65and table 31 on pg 73 of the 2040 Long RangeTransportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST SU $297,428 $1,440,981 $359,410 0 $1,691,446 0 0

$297,428 $1,440,981 $359,410 0 $1,691,446 0 0

Traffic Operations, ITS & Safety Projects

River to Sea TPO Traffic FPN: 4204331FROM throughout R2CTPO planning areaTO DESCRIPTION: TRAFFIC OPS IMPROVEMENTForty percent (40%) of SU funds received by theRiver to Sea TPO is set aside for trafficoperations, intelligent transportation systems(ITS), and safety improvements. The TPO'ssupport for such projects is expressed on pgs 1,44, 49, 92, and 96 of the 2035 Long RangeTransportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST SU $1,531,809 $1,440,981 $979,268 $1,710,530 $1,691,446 0 0

$1,531,809 $1,440,981 $979,268 $1,710,530 $1,691,446 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 152 of 179

Page 154: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 153

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

SR 20/SR 100 Intersection FPN: 4361261FROM SR 100 at SR 20TO DESCRIPTION: ADD LEFT TURN LANE(S)Add left turn lane. (Reference 2040 Long RangeTransportation Plan, on page 65, table 31 on page 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DIH $19,500 0 0 0 0 0 0PE DS $350,000 0 0 0 0 0 0

CST DDR 0 0 $551,495 0 0 0 0CST DIH 0 0 $76,244 0 0 0 0

$369,500 0 $627,739 0 0 0 0

Traffic Operations, ITS & Safety Projects

SR 20/SR 100 Intersection FPN: 4361261FROM SR 100 at SR 20TO DESCRIPTION: ADD LEFT TURN LANE(S)Add left turn lane. (Reference 2035 Long RangeTransportation Plan, Table 8.2, pg 122.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH $7,000 0 0 0 0 0 0PE DS $350,000 0 0 0 0 0 0

CST DIH 0 0 $55,120 0 0 0 0CST DS 0 0 $356,070 0 0 0 0

$357,000 0 $411,190 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 153 of 179

Page 155: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 154

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

SR 40 from Interchange FPN: 4344551FROM Interchange BlvdTO Southbound I-95 RampsDESCRIPTION: ADD TURN LANE(S)Extend the turn lane from Interchange Boulevardto the southbound I-95 ramps. The TPO's supportfor traffic operations, intelligent transportationsystems (ITS), and safety projects is expressedon page 65, table 31 on page 73 of the 2040Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DIH $20,000 0 0 0 0 0 0PE DS $218,537 0 0 0 0 0 0

CST DDR 0 $546,691 0 0 0 0 0CST DIH 0 $36,729 0 0 0 0 0

$238,537 $583,420 0 0 0 0 0

Traffic Operations, ITS & Safety Projects

SR 40 from Interchange FPN: 4344551FROM Interchange BlvdTO Southbound I-95 RampsDESCRIPTION: ADD TURN LANE(S)Extend the turn lane from Interchange Boulevardto the southbound I-95 ramps. The TPO's supportfor traffic operations, intelligent transportationsystems (ITS), and safety projects is expressedon pgs 1, 44, 49, 92, and 96 of the 2035 LongRange Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH 0 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0

CST DDR 0 $369,587 0 0 0 0 0CST DIH 0 $37,732 0 0 0 0 0

0 $407,319 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 154 of 179

Page 156: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 155

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

SR 44 - Kepler Road FPN: 4319221FROM at SR 44 and Kepler RdTO DESCRIPTION: TRAFFIC OPS IMPROVEMENTExtend westbound right turn lane at SR 44/Kepler Road in order to provide additionalstorage and improve safety. The TPO's supportfor traffic operations, intelligent transportationsystems (ITS), and safety projects is expressedon page 65, table 31 on page 73 of the 2040Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE LF $500,000 0 0 0 0 0 0ROW LF $2,000,000 0 0 0 0 0 0CST DDR 0 $821,416 0 0 0 0 0CST LF 0 $3,000,000 0 0 0 0 0

$2,500,000 $3,821,416 0 0 0 0 0

Traffic Operations, ITS & Safety Projects

SR 44 - Kepler Road FPN: 4319221FROM at SR 44 and Kepler RdTO DESCRIPTION: TRAFFIC OPS IMPROVEMENTExtend westbound right turn lane at SR 44/Kepler Road in order to provide additonal storageand improve safety. The TPO's support for trafficoperations, intelligent transportation systems(ITS), and safety projects is expressed on pgs 1,44, 49, 92, and 96 of the 2035 Long RangeTransportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE LF 0 0 0 0 0 0 0ROW LF 0 0 0 0 0 0 0CST CIGP 0 $821,416 0 0 0 0 0CST LF 0 $3,000,000 0 0 0 0 0

0 $3,821,416 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 155 of 179

Page 157: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 156

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

SR 44 Corridor FPN: 4287791FROM West of SR 415TO East of Mission RdDESCRIPTION: TRAFFIC OPS IMPROVEMENTImprovements for SR 44 from west of SR 415 toeast of Mission Road based upon developmentneeds being approved by the City of NewSmyrna Beach. Improvements will consist ofaccess management, signalization and turnlanes. Project length: 7.83 miles. The TPO'ssupport for traffic operations, intelligenttransportation systems (ITS), and safety projects

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CST LFP 0 $70,108 0 0 0 0 0

0 $70,108 0 0 0 0 0

Traffic Operations, ITS & Safety Projects

SR 44 Corridor FPN: 4287791FROM West of SR 415TO East of Mission RdDESCRIPTION: TRAFFIC OPS IMPROVEMENTImprovements for SR 44 from west of SR 415 toeast of Mission Road based upon developmentneeds being approved by the City of NewSmyrna Beach. Improvements will consist ofaccess management, signalization and turnlanes. Project length: 7.83 miles. The TPO'ssupport for traffic operations, intelligenttransportation systems (ITS), and safety projects

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CST LFP 0 $70,108 0 0 0 0 0

0 $70,108 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 156 of 179

Page 158: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 157

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

SR 44 Traffic Signals FPN: 4363661FROM Palmetto StTO Live Oak StDESCRIPTION: TRAFFIC SIGNALSTraffic signal upgrades on SR 44 from PalmettoStreet to Live Oak Street. The TPO's support fortraffic operations, intelligent transportationsystems (ITS), and safety projects is expressedon page 65, table 31 on page 73 of the 2040Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DDR $355,000 0 0 0 0 0 0PE DIH $30,500 0 0 0 0 0 0

ROW DDR 0 0 $579,380 0 0 0 0ROW DIH 0 0 $43,709 0 0 0 0CST DDR 0 0 0 0 $210,917 0 0CST DIH 0 0 0 0 $28,526 0 0

$385,500 0 $623,089 0 $239,443 0 0

Traffic Operations, ITS & Safety Projects

SR 44 Traffic Signals FPN: 4363661FROM Palmetto StTO Live Oak StDESCRIPTION: TRAFFIC SIGNALS

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DDR $355,000 0 0 0 0 0 0ROW DIH 0 0 $5,000 0 0 0 0ROW DS 0 0 $522,000 0 0 0 0CST DIH 0 0 0 0 $39,797 0 0CST DS 0 0 0 0 $257,086 0 0

$355,000 0 $527,000 0 $296,883 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 157 of 179

Page 159: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 158

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

SR 5 (US 1) Intersection FPN: 2409928FROM at SR 5 (US 1) & Big Tree RdTO DESCRIPTION: INTERSECTIONIntersection improvement -- one of 15intersections identified for improvement in the US1 Arterial Investment Study. The design phasehas been completed. Funding for right-of-wayacquisition is funded in FY 2013/14. Constructionis funded in FY 2017/18. (Reference on page 65and reference table 31 on page 73 of the 2040Long Range Transportation Plan.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DDR $8,022 0 0 0 0 0 0PE DIH $57,838 0 0 0 0 0 0PE DS $49,181 0 0 0 0 0 0PE SA $305,321 0 0 0 0 0 0

ROW DDR $90,339 0 0 0 0 0 0ROW DIH $32,501 0 0 0 0 0 0CST DDR 0 0 $671,353 0 $39,153 0 0CST DIH 0 0 $100,539 0 0 0 0

$543,202 0 $771,892 0 $39,153 0 0

Traffic Operations, ITS & Safety Projects

SR 5 (US 1) Intersection FPN: 2409928FROM at SR 5 (US 1) & Big Tree RdTO DESCRIPTION: INTERSECTIONIntersection improvement -- one of 15intersections identified for improvement in the US1 Arterial Investment Study. The design phasehas been completed. Funding for right-of-wayacquisition is funded in FY 2013/14. Constructionis funded in FY 2017/18. (Reference 2035 LongRange Transportation Plan, Table 8.2, pg 122.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DDR 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0PE SA 0 0 0 0 0 0 0

ROW DDR $30,000 0 0 0 0 0 0ROW DIH $10,000 0 0 0 0 0 0CST DDR 0 0 $571,416 0 $40,000 0 0CST DIH 0 0 $103,022 0 0 0 0

$40,000 0 $674,438 0 $40,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 158 of 179

Page 160: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 159

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

SR 5 (US 1) Intersection FPN: 2409925FROM at SR 5 (US 1) & Canal StTO DESCRIPTION: INTERSECTION (MAJOR)Intersection improvement -- one of 15intersections identified for improvement in the US1 Arterial Investment Study. The design phasehas been completed. Right-of-way acquisitionwas funded in FY 2013/14. Construction isfunded in FY 2017/18. Project length: 0.59 mile.(Reference on page 65 and reference table 31 onpage 73 of the 2040 Long Range Transportation

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE CM $175,000 0 0 0 0 0 0PE DIH $71,937 0 0 0 0 0 0PE SA $943,983 0 0 0 0 0 0

ROW DDR $373,836 0 0 0 0 0 0ROW DIH $93,025 0 0 0 0 0 0CST DDR 0 0 0 $4,283,962 0 $40,141 0CST DIH 0 0 0 $347,931 0 0 0RRU DDR $89,736 $605,264 0 0 0 0 0

$1,747,517 $605,264 0 $4,631,893 0 $40,141 0

Traffic Operations, ITS & Safety Projects

SR 5 (US 1) Intersection FPN: 2409925FROM at SR 5 (US 1) & Canal StTO DESCRIPTION: INTERSECTION (MAJOR)Intersection improvement -- one of 15intersections identified for improvement in the US1 Arterial Investment Study. The design phasehas been completed. Right-of-way acquisitionwas funded in FY 2013/14. Construction isfunded in FY 2017/18. Project length: 0.59 mile.(Reference 2035 Long Range TransportationPlan, Table 8.2, pg 122.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE CM 0 0 0 0 0 0 0PE DIH 0 0 0 0 0 0 0PE SA 0 0 0 0 0 0 0

ROW DDR 0 0 0 0 0 0 0ROW DIH 0 0 0 0 0 0 0CST DDR 0 0 $3,538,372 0 $40,000 0 0CST DIH 0 0 $346,966 0 0 0 0RRU DDR 0 $605,264 0 0 0 0 0

0 $605,264 $3,885,338 0 $40,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 159 of 179

Page 161: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 160

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

SR 5 (US 1) Intersection FPN: 2409927FROM at Reed Canal RdTO DESCRIPTION: INTERSECTIONIntersection improvement -- one of 15intersections identified for improvement in the US1 Arterial Investment Study. The design phasehas been completed. Right-of-way acquisitionwas funded in FY 2013/14. Construction isfunded in FY 2017/18. Project length: 0.59 mile.(Reference on page 65 and reference table 31 onpage 73 of the 2040 Long Range Transportation

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DDR $91,929 0 0 0 0 0 0PE DIH $104,859 0 0 0 0 0 0PE DS $5,955 0 0 0 0 0 0PE SA $461,404 0 0 0 0 0 0

ROW DDR $238,375 $3,278 0 0 0 0 0ROW DIH $71,960 0 0 0 0 0 0ROW DS $32,050 0 0 0 0 0 0CST DDR 0 0 $1,110,468 0 $39,153 0 0CST DIH 0 0 $128,951 0 0 0 0

$1,006,532 $3,278 $1,239,419 0 $39,153 0 0

Traffic Operations, ITS & Safety Projects

SR 5 (US 1) Intersection FPN: 2409927FROM at Reed Canal RdTO DESCRIPTION: INTERSECTIONIntersection improvement -- one of 15intersections identified for improvement in the US1 Arterial Investment Study. The design phasehas been completed. Right-of-way acquisitionwas funded in FY 2013/14. Construction isfunded in FY 2017/18. Project length: 0.59 mile.(Reference 2035 Long Range TransportationPlan, Table 8.2, pg 122.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DIH 0 0 0 0 0 0 0PE DS 0 0 0 0 0 0 0PE SA 0 0 0 0 0 0 0

ROW DDR $90,000 0 0 0 0 0 0ROW DIH $5,000 0 0 0 0 0 0ROW DS 0 0 0 0 0 0 0CST DDR 0 0 $1,058,872 0 $40,000 0 0CST DIH 0 0 $132,135 0 0 0 0

$95,000 0 $1,191,007 0 $40,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 160 of 179

Page 162: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 161

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

SR A1A (Atlantic Av) Mast FPN: 4355961FROM at Cardinal DriveTO DESCRIPTION: TRAFFIC SIGNALSLAP agreement with the City of Ormond Beach toreplace the existing strain pole traffic signalsupport system with mast arms. The TPO'ssupport for traffic operations, intelligenttransportation systems (ITS), and safety projectsis expressed on page 65, table 31 on page 73 ofthe 2040 Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE SU 0 0 $27,445 0 0 0 0

0 0 $27,445 0 0 0 0

Traffic Operations, ITS & Safety Projects

SR A1A (Atlantic Av) Mast FPN: 4355961FROM at Cardinal DriveTO DESCRIPTION: TRAFFIC SIGNALSLAP agreement with the City of Ormond Beach toreplace the existing strain pole traffic signalsupport system with mast arms. The TPO'ssupport for traffic operations, intelligenttransportation systems (ITS), and safety projectsis expressed on pgs 1, 44, 49, 92, and 96 of the2035 Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE SU 0 0 $27,445 0 0 0 0

0 0 $27,445 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 161 of 179

Page 163: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 162

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

Traffic FPN: 4217253FROM throughout R2CTPO planning areaTO DESCRIPTION: CORRIDOR/SUBAREAThe TPO sets aside funding to conduct planningfeasibility studies for traffic operations, ITS(intelligent transportation systems), and safetyprojects located throughout the TPO's PlanningArea. The TPO's support for traffic operations,intelligent transportation systems (ITS), andsafety projects is expressed on page 65, table 31on page 73 of the 2040 Long Range

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PLN SU $26,328 $100,000 $100,000 $100,000 $100,000 0 0

$26,328 $100,000 $100,000 $100,000 $100,000 0 0

Traffic Operations, ITS & Safety Projects

JPA - Traffic FPN: 4217253FROM throughout R2CTPO planning areaTO DESCRIPTION: CORRIDOR/SUBAREAThe TPO sets aside funding to conduct planningfeasibility studies for traffic operations, ITS(intelligent transportation systems), and safetyprojects located throughout the TPO's PlanningArea. The TPO's support for traffic operations,intelligent transportation systems (ITS), andsafety projects is expressed on pgs 1, 44, 49, 92,and 96 of the 2035 Long Range Transportation

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PLN SU $100,000 $100,000 $100,000 $100,000 $100,000 0 0

$100,000 $100,000 $100,000 $100,000 $100,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 162 of 179

Page 164: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 163

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Traffic Operations, ITS & Safety Projects

US 1/Park Av from S of FPN: 4371211FROM S of Park AvTO N of Park AvDESCRIPTION: TRAFFIC SIGNALSReplace existing strain pole signal supportsystem with mast arms. The TPO's support fortraffic operations, intelligent transportationsystems (ITS), and safety projects is expressedon page 65, table 31 on page 73 of the 2040Long Range Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PE DDR 0 0 0 0 $370,000 0 0PE DIH 0 0 0 0 $2,000 0 0

0 0 0 0 $372,000 0 0

Traffic Operations, ITS & Safety Projects

US 1/Park Av from S of FPN: 4371211FROM S of Park AvTO N of Park AvDESCRIPTION: TRAFFIC SIGNALSReplace existing strain pole signal supportsystem with mast arms. The TPO's support fortraffic operations, intelligent transportationsystems (ITS), and safety projects is expressedon pgs 1, 44, 49, 92, and 96 of the 2035 LongRange Transportation Plan.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PE DDR 0 0 0 0 $200,000 0 0PE DIH 0 0 0 0 $2,000 0 0

0 0 0 0 $202,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 163 of 179

Page 165: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 164

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Flagler County Section FPN: 4226332FROM Flagler County-wideTO DESCRIPTION: OPERATING/ADMIN.Section 5311 non-urban transit operating andadministrative assistance. (Reference 2040 LongRange Transportation Plan, pgs 10, 11, 85, table31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

OPS DU $428,840 $70,242 $75,896 0 0 0 0OPS LF $428,840 $70,242 $75,896 0 0 0 0

$857,680 $140,484 $151,792 0 0 0 0

Transit & Transportation DisadvantagedProjects

Flagler County Section FPN: 4226332FROM Flagler County-wideTO DESCRIPTION: OPERATING/ADMIN.Section 5311 non-urban transit operating andadministrative assistance. (Reference 2035 LongRange Transportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DU $68,840 $72,285 $75,896 0 0 0 0OPS LF $68,840 $72,285 $75,896 0 0 0 0

$137,680 $144,570 $151,792 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 164 of 179

Page 166: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 165

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Flagler County Transit FTA FPN: 4353941FROM Flagler County-wideTO DESCRIPTION: OPERATING/ADMIN.FTA Section 5311 operating/administrativeassistance for public transit. (Reference 2040Long Range Transportation Plan, pgs 10, 11, 85,table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

OPS DU 0 0 0 $79,691 $83,677 $103,501 0OPS LF 0 0 0 $79,691 $83,677 $103,501 0

0 0 0 $159,382 $167,354 $207,002 0

Transit & Transportation DisadvantagedProjects

Flagler County Transit FTA FPN: 4353941FROM Flagler County-wideTO DESCRIPTION: OPERATING/ADMIN.FTA Section 5311 operating/administrativeassistance for public transit. (Reference 2035Long Range Transportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DU 0 0 0 $79,691 $83,677 0 0OPS LF 0 0 0 $79,691 $83,677 0 0

0 0 0 $159,382 $167,354 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 165 of 179

Page 167: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 166

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

River to Sea TPO - Sec. FPN: 4314031FROM throughout R2CTPO planning areaTO DESCRIPTION: PTO STUDIESPlanning studies relating to public transitoperations (PTO studies) throughout the River toSea TPO's planning area. (Reference 2040 LongRange Transportation Plan, pgs 10, 11, 85, table31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PLN DPTO 0 $25,614 $19,627 $19,627 $20,339 $21,073 0PLN DU 0 $204,914 $157,016 $157,016 $161,726 $167,594 0PLN LF 0 $25,614 $19,627 $19,627 $20,339 $21,073 0

0 $256,142 $196,270 $196,270 $202,404 $209,740 0

Transit & Transportation DisadvantagedProjects

River to Sea TPO - Sec. FPN: 4314031FROM throughout R2CTPO planning areaTO DESCRIPTION: PTO STUDIESPlanning studies relating to public transitoperations (PTO studies) throughout the River toSea TPO's planning area. (Reference 2035 LongRange Transportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PLN DPTO 0 $19,055 $19,627 $19,627 $20,339 0 0PLN DU 0 $152,443 $157,016 $157,016 $161,726 0 0PLN LF 0 $19,055 $19,627 $19,627 $20,339 0 0

0 $190,553 $196,270 $196,270 $202,404 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 166 of 179

Page 168: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 167

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Section 5311 Rural FPN: 4333111FROM Volusia County-wideTO DESCRIPTION: OPERATING/ADMIN.Votran receives Federal Transit Administration(FTA) Section 5311 funds for operating andadministrative assistance to providetransportation for small urban and ruralgeographical areas. This project includes fundingfor FY 2017/18 through FY 2019/20. See FM#4241221 for funding in FY 2015/16 and FY2016/17. (Reference 2040 Long Range

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

OPS DU 0 0 $374,979 $393,728 $413,414 $507,019 0OPS LF 0 0 $374,979 $393,728 $413,414 $507,019 0

0 0 $749,958 $787,456 $826,828 $1,014,038 0

Transit & Transportation DisadvantagedProjects

Section 5311 Rural FPN: 4333111FROM Volusia County-wideTO DESCRIPTION: OPERATING/ADMIN.Votran receives Federal Transit Administration(FTA) Section 5311 funds for operating andadministrative assistance to providetransportation for small urban and ruralgeographical areas. This project includes fundingfor FY 2017/18 through FY 2019/20. See FM#4241221 for funding in FY 2015/16 and FY2016/17. (Reference 2035 Long Range

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DU 0 0 $374,979 $393,728 $413,414 0 0OPS LF 0 0 $374,979 $393,728 $413,414 0 0

0 0 $749,958 $787,456 $826,828 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 167 of 179

Page 169: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 168

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

SunRail Feeder Bus FPN: 4331662FROM TO DESCRIPTION: OPERATING FOR FIXEDNew Votran bus service providing enhancedaccess to and from SunRail commuter railstations in DeBary and DeLand. (Reference 2040Long Range Transportation Plan, pgs 10, 11, 85,table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

OPS DIS $445,000 $291,000 $299,000 $308,000 $316,000 $327,000 0OPS DPTO $367,000 0 0 0 0 0 0

$812,000 $291,000 $299,000 $308,000 $316,000 $327,000 0

Transit & Transportation DisadvantagedProjects

SunRail Feeder Bus FPN: 4331662FROM TO DESCRIPTION: OPERATING FOR FIXEDNew Votran bus service providing enhancedaccess to and from SunRail commuter railstations in DeBary and DeLand. (Reference 2035Long Range Transportation Plan, Table 8.2, pg124.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DIS $284,000 $291,000 $299,000 $308,000 $316,000 $327,000 0OPS DPTO 0 0 0 0 0 0 0

$284,000 $291,000 $299,000 $308,000 $316,000 $327,000 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 168 of 179

Page 170: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 169

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Volusia FTA Section 5339 FPN: 4388681FROM Volusia County - Small Urban AreaTO DESCRIPTION: CAPITAL FOR FIXED ROUTEFunding for purchase of fixed-route buses andother equipment for the small urban area.(Reference River to Sea TPO 2040 Long RangeTransportation Plan, pgs 10, 11, 85, table 31 onpg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP DU $283,991 $264,603 0 0 0 0 0CAP LF $799,998 $66,151 0 0 0 0 0

$1,083,989 $330,754 0 0 0 0 0

Transit & Transportation DisadvantagedProjects

Volusia FTA Section 5339 FPN: 4388681FROM Volusia County - Small Urban AreaTO DESCRIPTION: CAPITAL FOR FIXED ROUTEFunding for capital projects FY 16 and FY 17 inthe fixed route system, including buses,equipment, computers and communicationexpenditures. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 63, 64, and 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP DU $283,991 $264,603 0 0 0 0 0CAP LF $70,998 $66,151 0 0 0 0 0

$354,989 $330,754 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 169 of 179

Page 171: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 170

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Votran - Section 5307 FPN: 4247821FROM Volusia County-wideTO DESCRIPTION: OPERATING FOR FIXEDVotran receives Federal Transit Administration(FTA) Section 5307 Block Grant and localfunding for operating assistance. This projectincludes funding for FY 2013/14 through FY2016/17. Funding for FY 2017/18 and FY2018/19 is included in FM# 4333071. (Reference2040 Long Range Transportation Plan, pgs 10,11, 85, table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

OPS DDR $1,142,194 $274,855 0 0 0 0 0OPS DPTO $6,816,071 $1,696,134 0 0 0 0 0OPS FTA $3,534,750 $900,000 0 0 0 0 0OPS LF $50,154,436 $12,538,609 0 0 0 0 0

$61,647,451 $15,409,598 0 0 0 0 0

Transit & Transportation DisadvantagedProjects

Votran - Section 5307 FPN: 4247821FROM Volusia County-wideTO DESCRIPTION: OPERATING FOR FIXEDVotran receives Federal Transit Administration(FTA) Section 5307 Block Grant and localfunding for operating assistance. This projectincludes funding for FY 2013/14 through FY2016/17. Funding for FY 2017/18 and FY2018/19 is included in FM# 4333071. (Reference2035 Long Range Transportation Plan, pgs49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DDR $289,742 $274,855 0 0 0 0 0OPS DPTO $1,712,371 $1,711,585 0 0 0 0 0OPS FTA $900,000 $900,000 0 0 0 0 0OPS LF $12,538,609 $12,538,609 0 0 0 0 0

$15,440,722 $15,425,049 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 170 of 179

Page 172: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 171

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Votran - Section 5311 FPN: 4241221FROM Volusia County-wideTO DESCRIPTION: OPERATING/ADMIN.Votran receives Federal Transit Administration(FTA) Section 5311 funds for operating andadministrative assistance to providetransportation for small urban and ruralgeographical areas. This project includes fundingfor FY 2013/14 through FY 2016/17. See FM#4333111 for funding in FY 2017/18. (Reference2040 Long Range Transportation Plan, pgs 10,

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

OPS DU $1,024,163 $340,681 0 0 0 0 0OPS LF $1,024,163 $340,681 0 0 0 0 0

$2,048,326 $681,362 0 0 0 0 0

Transit & Transportation DisadvantagedProjects

Votran - Section 5311 FPN: 4241221FROM Volusia County-wideTO DESCRIPTION: OPERATING/ADMIN.Votran receives Federal Transit Administration(FTA) Section 5311 funds for operating andadministrative assistance to providetransportation for small urban and ruralgeographical areas. This project includes fundingfor FY 2013/14 through FY 2016/17. See FM#4333111 for funding in FY 2017/18. (Reference2035 Long Range Transportation Plan, pgs

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DU $340,117 $357,123 0 0 0 0 0OPS LF $340,117 $357,123 0 0 0 0 0

$680,234 $714,246 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 171 of 179

Page 173: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 172

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Votran - Section 5339 Bus FPN: 4357131FROM Volusia County-wideTO DESCRIPTION: CAPITAL FOR FIXED ROUTEFunding for purchase of fixed-route buses andequipment. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 85, table 31 onpg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP FTA $1,469,329 $524,810 $540,555 $556,771 $573,474 0 0CAP LF $117,934 $131,203 $135,139 $139,193 $143,369 0 0

$1,587,263 $656,013 $675,694 $695,964 $716,843 0 0

Transit & Transportation DisadvantagedProjects

Votran - Section 5339 Bus FPN: 4357131FROM Volusia County-wideTO DESCRIPTION: CAPITAL FOR FIXED ROUTEFunding for purchase of fixed-route buses.(Reference 2035 Long Range TransportationPlan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP FTA $1,507,120 $524,810 $540,555 $556,771 $573,474 0 0CAP LF $127,381 $131,203 $135,139 $139,193 $143,369 0 0

$1,634,501 $656,013 $675,694 $695,964 $716,843 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 172 of 179

Page 174: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 173

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Votran - XU Set-Aside / FPN: 4254411FROM Volusia County-wideTO DESCRIPTION: CAPITAL FOR FIXED ROUTEVotran receives STP XU set-aside funding (30%of the River to Sea TPO's allocation) and FTASection 5307 funds to assist with capitalequipment (public transportation vehicles)purchases. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 85, table 31 onpg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP FTAT $3,915,633 $1,246,200 $1,341,591 0 0 0 0CAP LF $940,223 $311,550 $268,318 0 0 0 0CAP SU $3,915,633 $1,246,200 $1,341,591 0 0 0 0

$8,771,489 $2,803,950 $2,951,500 0 0 0 0

Transit & Transportation DisadvantagedProjects

Votran - XU Set-Aside / FPN: 4254411FROM Volusia County-wideTO DESCRIPTION: CAPITAL FOR FIXED ROUTEVotran receives STP XU set-aside funding (30%of the River to Sea TPO's allocation) and FTASection 5307 funds to assist with capitalequipment (public transportation vehicles)purchases. (Reference 2035 Long RangeTransportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP FTAT $1,313,700 $1,246,200 $1,341,591 0 0 0 0CAP LF $650,471 $311,550 $268,318 0 0 0 0CAP SU 0 0 0 0 0 0 0CAP XU (SU) $2,627,448 $1,246,200 $1,341,591 0 0 0 0

$4,591,619 $2,803,950 $2,951,500 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 173 of 179

Page 175: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 174

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Votran Express Routes FPN: 4346041FROM Volusia County-wideTO DeBary SunRail StationDESCRIPTION: OPERATING/ADMIN.Votran will provide express bus serviceconnecting SunRail at the DeBary Station.(Reference 2040 Long Range TransportationPlan, pgs 10, 11, 85, table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

OPS DDR 0 $347,040 $347,040 $347,040 $347,040 $347,040 0OPS DPTO $1,041,120 0 0 0 0 0 0

$1,041,120 $347,040 $347,040 $347,040 $347,040 $347,040 0

Transit & Transportation DisadvantagedProjects

Votran Express Routes FPN: 4346041FROM Volusia County-wideTO DeBary SunRail StationDESCRIPTION: OPERATING/ADMIN.Votran will provide express bus serviceconnecting SunRail at the DeBary Station.(Reference 2035 Long Range TransportationPlan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DPTO $347,040 0 0 0 0 0 0

$347,040 0 0 0 0 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 174 of 179

Page 176: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 175

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Votran Operating FPN: 4333071FROM Volusia County-wideTO DESCRIPTION: OPERATING FOR FIXEDVotran receives Federal Transit Administration(FTA) Section 5307 Block Grant and localfunding for operating assistance. This projectincludes funding for FY 2017/18 through FY2019/20. Funding for FY 2015/16 and FY2016/17 is included in FM# 4247821. (Reference2040 Long Range Transportation Plan, pgs 10,11, 85, table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

OPS DDR 0 0 $295,893 $299,490 $296,333 $293,612 0OPS DPTO 0 0 $1,755,833 $1,813,799 $1,904,489 $2,005,165 0OPS FTA 0 0 $900,000 $900,000 $900,000 $900,000 0OPS LF 0 0 $12,538,609 $12,538,609 $12,538,987 $12,538,987 0

0 0 $15,490,335 $15,551,898 $15,639,809 $15,737,764 0

Transit & Transportation DisadvantagedProjects

Votran Operating FPN: 4333071FROM Volusia County-wideTO DESCRIPTION: OPERATING FOR FIXEDVotran receives Federal Transit Administration(FTA) Section 5307 Block Grant and localfunding for operating assistance. This projectincludes funding for FY 2017/18 through FY2019/20. Funding for FY 2015/16 and FY2016/17 is included in FM# 4247821. (Reference2035 Long Range Transportation Plan, pgs49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DDR 0 0 $295,893 $299,490 $296,333 0 0OPS DPTO 0 0 $1,755,833 $1,813,799 $1,904,489 0 0OPS FTA 0 0 $900,000 $900,000 $900,000 0 0OPS LF 0 0 $12,538,609 $12,538,609 $12,538,987 0 0

0 0 $15,490,335 $15,551,898 $15,639,809 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 175 of 179

Page 177: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 176

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Votran Section 5307 Buses FPN: 4352491FROM Volusia County-wideTO DESCRIPTION: CAPITAL FOR FIXED ROUTEVotran will receive FTA Section 5307 funds forfixed routes and paratransit service in FY2018/19 and FY 2019/20 to replace buses andequipment (to be determined). (Reference 2040Long Range Transportation Plan, pgs 10, 11, 85,table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP FTAT 0 0 0 $1,357,898 $1,343,584 $1,331,249 0CAP LF 0 0 0 $339,475 $335,896 $332,813 0CAP SU 0 0 0 $1,357,898 $1,343,584 $1,331,249 0

0 0 0 $3,055,271 $3,023,064 $2,995,311 0

Transit & Transportation DisadvantagedProjects

Votran Section 5307 Buses FPN: 4352491FROM Volusia County-wideTO DESCRIPTION: CAPITAL FOR FIXED ROUTEVotran will receive FTA Section 5307 funds forfixed routes and paratransit service in FY2018/19 and FY 2019/20 to replace buses andequipment (to be determined). (Reference 2035Long Range Transportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP FTAT 0 0 0 $1,357,898 $1,343,584 0 0CAP LF 0 0 0 $339,475 $335,896 0 0CAP SU 0 0 0 $1,357,898 $1,343,584 0 0

0 0 0 $3,055,271 $3,023,064 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 176 of 179

Page 178: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 177

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Votran Section 5307 FPN: 4315331FROM Volusia County-wideTO DESCRIPTION: CAPITAL FOR FIXED ROUTEVotran receives FTA Section 5307 funds topurchase equipment for fixed-route transitservice. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 85, table 31 onpg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

CAP FTA $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,240,000 0CAP LF $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,060,000 0

$10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,300,000 0

Transit & Transportation DisadvantagedProjects

Votran Section 5307 FPN: 4315331FROM Volusia County-wideTO DESCRIPTION: CAPITAL FOR FIXED ROUTEVotran receives FTA Section 5307 funds topurchase equipment for fixed-route transitservice. (Reference 2035 Long RangeTransportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

CAP FTA $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000 0 0CAP LF $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 0 0

$10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 177 of 179

Page 179: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 178

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transit & Transportation DisadvantagedProjects

Votran Transit Service FPN: 4302851FROM US 1 corridor - Violusia CountyTO DESCRIPTION: TRANSIT SERVICEImprove bus service to 30 minute frequency inUS 1 corridor (routes 3 & 4). (Reference 2040Long Range Transportation Plan, pgs 10, 11, 85,table 31 on pg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

OPS DPTO $2,904,000 $726,000 $747,780 $780,492 $795,522 $810,667 0

$2,904,000 $726,000 $747,780 $780,492 $795,522 $810,667 0

Transit & Transportation DisadvantagedProjects

Votran Transit Service FPN: 4302851FROM US 1 corridor - Violusia CountyTO DESCRIPTION: TRANSIT SERVICEImprove bus service to 30 minute frequency inUS 1 corridor (routes 3 & 4). (Reference 2035Long Range Transportation Plan, pgs 49-63.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

OPS DPTO $726,000 $726,000 $747,780 $780,492 $795,522 0 0

$726,000 $726,000 $747,780 $780,492 $795,522 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 178 of 179

Page 180: TIP COMPARISON REPORT - River to Sea TPO · River to Sea . Transportation Planning Organization . TIP COMPARISON REPORT . Comparing the . FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16)

River to Sea TPOTransportation Improvement ProgramFY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016) versus FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (AdoptedJune 22, 2016)

Page 179

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive;ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Transportation Planning/Studies

Volusia/Flagler Urban Area FPN: 4179621FROM throughout R2CTPO planning areaTO DESCRIPTION: TRANSPORTATIONFunding allocations in FY 2015/16 through FY2019/20 for transportation planning for the Riverto Sea TPO. (Reference 2040 Long RangeTransportation Plan, pgs 10, 11, 85, table 31 onpg 73.)

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2016/17 - FY 2016/17 - FY 2020/21 TIP (Adopted June 22, 2016)

PLN PL $4,242,289 $650,395 $650,395 $650,395 $650,395 $650,395 0PLN SU $581,450 0 0 0 0 0 0PLN TALU $42,906 0 0 0 0 0 0

$4,866,645 $650,395 $650,395 $650,395 $650,395 $650,395 0

Transportation Planning/Studies

Volusia/Flagler Urban Area FPN: 4179621FROM throughout R2CTPO planning areaTO DESCRIPTION: TRANSPORTATIONFunding allocations in FY 2015/16 through FY2019/20 for transportation planning for the Riverto Sea TPO.

Facility Item No. Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22FY 2015/16 - FY 2015/16 - FY 2019/20 TIP (Amended May 25,2016)

PLN PL $654,290 $654,290 $654,290 $654,290 $654,290 0 0

$654,290 $654,290 $654,290 $654,290 $654,290 0 0

FY 2016/17 to FY 2020/21 TIP (adopted 6/22/16)

FY 2015/16 to FY 2019/20 TIP (amended 5/25/16)

FY 2016/17 - FY 2020/21 TIP (adopted 6/22/16) Compared To FY 2015/16 - FY 2019/20 TIP (amended 5/25/16)

Pg 179 of 179