Top Banner
GE Oil & Gas Time-Saving Wellheads RSH-2-N 13-5/8” 5M Riser Speedhead System The RSH-2-N Riser Speedhead is an all-purpose speedhead system that combines eight field-proven Pressure Control technologies to improve safety and to reduce well cost by maximizing efficiency for the most demanding drilling applications using the latest generation walking drilling rigs and top drive CRTs. Distinct from the rest of the RSH product line, the 11” upper bowl of the RSH-2-N is nested inside the lower packoff. A wide range of casing hanger choices are available to fit most requirements. When drilling operations are complete, the RSH-2-N housing converts to an API 13-5/8” 5M flange profile to allow installation of standard tubing heads. Features Time saving No waiting on surface casing cement required; surface casing is run, suspended, and cemented with RSH-2 housing installed No field welding Quick-connect RSH-USC drilling adapter makes up in about 20 minutes to minimize BOP nipple-up and nipple-down time Wear bushing is quickly run and retrieved without operating wellhead lockscrews in the cellar When mandrel hanger for production casing is used, patented “RT” rotating casing hangar is standard Lock rings are engaged from the rig floor without operating wellhead lockscrews in the cellar Improved well control Both intermediate and production mandrel hangers and packoffs are locked in and seals are tested before BOP is removed Back pressure valve prep is standard in mandrel production hanger systems Back pressure valve prep is available with slip casing hangers for production casing BPV use during frac and completion operations Improved safety No lockscrews—minimal body penetrations Reduced time for personnel working in the cellar Hot work is eliminated 11” upper bowl is nested inside the lower packoff, which is interchangeable with the rest of the RSH product line, thereby reducing your inventory requirements and costs Choice of casing hangers Patented “RT” rotating mandrel casing hanger allows production casing hanger and pup joint to be made up to casing string with a CRT; Casing may be rotated to the right while landing the hanger and during cementing, if desired. BPV prep available for slip hangers with optional packoffs Standard W2 and W1-M slip hangers may be run for production casing when BPV prep is not required Choice of tubing heads and completions T tubing head with 7-1/16” top (TD for dual completions) MTH2 or MTH-2FB tubing head with 4-1/16” top or 5-1/8” top Availability Available extended-height tubing head raises valves above ground level if TA cap was installed RSH-2 Housing Type H BPV Prep Conductor Surface Casing Intermediate Casing Production Casing 20” x 1/4” WT 13-3/8” 9-5/8” 4-1/2”, 5-1/2”, 7” 20” x 3/8” WT 13-3/8” 9-5/8” 4-1/2”, 5-1/2” Other sizes available upon request. 13-5/8” 5M RSH-2-N 20” x 13-3/8” x 9-5/8” x 5-1/2” with RT mandrel hanger and 7-1/16” 10M T tubing head 295-6656 Conductor Surface Casing Production Casing Intermediate Casing 13-5/8” 5M RSH-2-N 20” x 13-3/8” x 9-5/8” x 5-1/2” with W1-M or W2 slips and 7-1/16” 10M T tubing head 295-6657 Conductor Surface Casing Production Casing Intermediate Casing 5-1/2” “RT” Mandrel Hanger W1-M Slip Hanger Available extended-height tubing head raises valves above ground level if TA cap was installed RSH-2 Housing W2 Slip Hanger
2

Time-Saving Wellheads - GE Oil & Gas · PDF fileGE Oil & Gas Time-Saving Wellheads RSH-2-N 13-5/8” 5M Riser Speedhead™ System The RSH-2-N Riser Speedhead is an...

Mar 19, 2018

Download

Documents

dangdat
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Time-Saving Wellheads - GE Oil & Gas · PDF fileGE Oil & Gas Time-Saving Wellheads RSH-2-N 13-5/8” 5M Riser Speedhead™ System The RSH-2-N Riser Speedhead is an all-purpose speedhead

GE Oil & Gas

Time-Saving WellheadsRSH-2-N 13-5/8” 5M Riser Speedhead™ System

The RSH-2-N Riser Speedhead is an all-purpose speedhead system that combines eight field-proven Pressure Control technologies to improve safety and to reduce well cost by maximizing efficiency for the most demanding drilling applications using the latest generation walking drilling rigs and top drive CRTs. Distinct from the rest of the RSH product line, the 11” upper bowl of the RSH-2-N is nested inside the lower packoff. A wide range of casing hanger choices are available to fit most requirements. When drilling operations are complete, the RSH-2-N housing converts to an API 13-5/8” 5M flange profile to allow installation of standard tubing heads.

Features • Time saving

– No waiting on surface casing cement required; surface casing is run, suspended, and cemented with RSH-2 housing installed

– No field welding – Quick-connect RSH-USC drilling adapter makes up in about

20 minutes to minimize BOP nipple-up and nipple-down time – Wear bushing is quickly run and retrieved without operating

wellhead lockscrews in the cellar – When mandrel hanger for production casing is used, patented

“RT” rotating casing hangar is standard – Lock rings are engaged from the rig floor without operating

wellhead lockscrews in the cellar

• Improved well control – Both intermediate and production mandrel hangers and packoffs

are locked in and seals are tested before BOP is removed – Back pressure valve prep is standard in mandrel production

hanger systems – Back pressure valve prep is available with slip casing hangers for

production casing BPV use during frac and completion operations

• Improved safety – No lockscrews—minimal body penetrations – Reduced time for personnel working in the cellar – Hot work is eliminated

• 11” upper bowl is nested inside the lower packoff, which is interchangeable with the rest of the RSH product line, thereby reducing your inventory requirements and costs

• Choice of casing hangers – Patented “RT” rotating mandrel casing hanger allows production

casing hanger and pup joint to be made up to casing string with a CRT; Casing may be rotated to the right while landing the hanger and during cementing, if desired.

– BPV prep available for slip hangers with optional packoffs – Standard W2 and W1-M slip hangers may be run for production

casing when BPV prep is not required • Choice of tubing heads and completions – T tubing head with 7-1/16” top (TD for dual completions) – MTH2 or MTH-2FB tubing head with 4-1/16” top or 5-1/8” top

Availability

Available extended-height tubing head raises valves

above ground level if TA cap was installed

RSH-2 Housing

Type H BPV Prep

Conductor Surface CasingIntermediate

Casing Production Casing20” x 1/4” WT 13-3/8” 9-5/8” 4-1/2”, 5-1/2”, 7”20” x 3/8” WT 13-3/8” 9-5/8” 4-1/2”, 5-1/2”

Other sizes available upon request.

13-5/8” 5M RSH-2-N 20” x 13-3/8” x 9-5/8” x 5-1/2”

with RT mandrel hanger and 7-1/16” 10M T tubing head

295-6656

ConductorSurface Casing

Production Casing

Intermediate Casing

13-5/8” 5M RSH-2-N 20” x 13-3/8” x 9-5/8” x 5-1/2”

with W1-M or W2 slips and 7-1/16” 10M T tubing head

295-6657

ConductorSurface Casing

Production CasingIntermediate Casing

5-1/2” “RT” Mandrel Hanger

W1-M Slip Hanger

Available extended-height tubing head raises valves

above ground level if TA cap was installed

RSH-2 Housing

W2 Slip Hanger

Page 2: Time-Saving Wellheads - GE Oil & Gas · PDF fileGE Oil & Gas Time-Saving Wellheads RSH-2-N 13-5/8” 5M Riser Speedhead™ System The RSH-2-N Riser Speedhead is an all-purpose speedhead

GE © 2016. All rights reserved.08/16, PC #16-0073

geoilandgas.com

RSH-2-N 13-5/8” 5M Riser Speedhead™ System

RSH-2-N 13-5/8” 5M x 13-3/8” casing head landed through the drilling riser; options for “riserless” cementing are available

ConductorSurface Casing

295-6652

24” RiserRunning Tool

Landing Joint

RSH-2 Housing

Save up to 4 to 5 hours wait-on-cement time. Save up to 5 to 6 hours versus cutting conductor and surface casing, and welding wellhead to surface casing.

Quick-connect 5M RSH-USC drilling adapter makes up in about 20 minutes

RSH-2-N with 7-1/16” 10M T tubing head

TA caps on multi-well pads

BOP

RSH-2 Housing

ConductorSurface Casing

295-6653

RSH-USC Drilling Adapter

13-5/8” 5M RSH-2-N 20” x 13-3/8” x 9-5/8” x 5-1/2” with TA cap

Type H BPV Prep

295-6654

ConductorSurface Casing

5-1/2”Production Casing

Intermediate Casing

13-5/8” 5M

RSH-2 Housing

W1 Slip Hanger

13-5/8” 5M RSH-2-N 20” x 13-3/8” x 9-5/8” x 5-1/2” with BPV prep over W2 or W1 slip hangers and 7-1/16” 10M T tubing head

RSH-2 Housing

295-6655

ConductorSurface Casing

5-1/2” Production CasingIntermediate Casing

Available extended-height tubing head raises valves

above ground level if TA cap was installed

RSH-UPR-W2 Slip Hanger

BPV Prep

BPV Prep

Patented “RT” rotating casing hanger allows the production casing to be rotated to the right while landing the hanger and during cementing

295-6631

“RT” Running Tool with

Torque Pins

RSH-UPR-RT Mandrel

Hanger with BPV Prep