g 6Fena3160-3 FORMAPPROVED(September2001) OMBNo.1004-0136
ExpiresJanuary31,2004UNITED STATESDEPARTMENT OF THE INTERIOR 5.
LeaseSerialNo.U-61154BUREAU OF LAND MANAGEMENT
APPLICATION FOR PERMIT TO DRILLOR REENTER 6.
IfIndian,AlloteeorTribeNameN/A
O 7 IfUnitor CAAgreement,NameandNo.la. Typeofwork: DRILL
REENTERDrunkards Wash UTU-67921X
8. LeaseNameandWellNo.Ib. Typeof Well: OilWell GasWell Other
SingleZone MultipleZone USA 24-10052. NameofOperator 9. API
WellNo.
ConocoPhiHips Company
3a. Address P.O. Box 851 3b. PhoneNo.(include area code)
10.FieldandPool,orExploratory435-613-9777 Drunkards Wash
4. Locationof Well(Report locadon clearly andin accordancewith
anyStatemquimmena.*) 11.Sec.,T.R.M. or Blk.andSurveyorAreaAt
surface 332' FSL, 333' FWL 5 tig24 y a , 52 7 CR& SWISW, Sec.
24, T.14S, R.8EAt proposed prod.zone jgQ 1 fjÔÑŸ
14. Distanceinmilesanddirectionfromnearest townorpostoffice*
12.Countyor Parish 13.State11.5 Miles west of Price, Utah Carbon
UT
15. Distancefromproposed* 332' 16. No.of acres inlease
17.SpacingUnitdedicatedto thiswelllocationtonearestpropertyor
leaseline,ft(Alsotonearestdrig.unit line,if any) 3863.87 acres
NA
18. Distancefromproposedlocation* 19. ProposedDepth 20.
BLM/BIABondNo.onfile¯ ¯¯
tonearestwell, drilling,completed,appliedfor,onthis lease,ft.
1250' 3940' TD 8015-16-69
21. Elevations(Showwhether DF,KDB,RT,GL,etc.) 22
Approximatedatework willstart* 23. Estimatedduration¯
6966' GR 04/15/2006
24. AttachmentsThefollowing,completedinaccordancewith
therequirements of OnshoreOilandGasOrderNo.1, shall beattachedin
thisfonn:
1. Wellplatcertifiedbya registeredsurveyor. 4. Bondtocoverthe
operationsunless coveredby an existingbondon file (see2. A
DrillingPlan. Item20 above).3. A SurfaceUse Plan(if the locationis
on NationalForestSystemLands,the 5. Operatorcertification
SUPO shallbe filedwith theappropriateForestServiceOffice). 6.
Suchother sitespecificinformationand/orplansas maybe required
bytheauthorizedofficer.25. Signature . Name (PrintedTybped)
Date
12/27/2005Title
Construction/Apet rity Supervisor
App edby N RABYÆVG. HILL DateENVIRONMENTALMANAGFR
Title Office
Applicationapprovaldoesno t or
certifythattheapplicantholdslegalorequitabletitletothoserightsinthesubjectleasewhich
wouldentitletheapplicant toconductoperationsthereon.Conditionsof
approval,ifany,areattached.Title18U.S.C.Section1001andTide43
U.S.C.Section1212,make it a crimeforany personknowinglyandwillfully
tomake to any departmentor agency ofthe
UnitedStatesanyfalse,fictitiousor fraudulentstatementsor
representationsas to
anymatterwithinitsjurisdiction.*(Instructionsonpage 2)
RECEIVED
DIV,0FOIL,GAS&
-
Ran e 8 East 4°-'•¾°aotionwas determined using a Trimble 5700GPS
survey grade unit.Basis of Bearing:
(WEST - 5278.68') The Basis of Beoring is GPs Measured.
I I | GLO Bearing:The Beorings indicated are per the recorded
plat obtainedfrom the U.S. Land Office.Basis of Elevation:Basis of
Elevation of 6968 being at the Southeast SectionCorner of Section
26, Township 14 South, Range 8 EastSolt Lake Bose and Meridian, os
shown on the Pinnacle PeakQuadrangle 7.5 minute series
map.Description of Location:Proposed Drill Hole located in the SW/4
SW/4 of Section 24.T14S RSE S.LB.&M. being 332.00' North and
333.26' Eastfrom the ŠouthwestŠectionCorner of Section 24, T14S,
RSE,Salt Lake Base & Meridian.
Surveyor's Certi ficate:I, Albert J. Spensko, a Registered
ProfessionalLand Surveyor, holding Certificate 146652State of Utah,
do hereby certify that thetaformation on this drawing is a true
andaccurate survey based on data of record andwas conducted under
my personal directionand supervision as shown hereon.
USA#24-1005 TALON RESOURCES, INC.ELEV. 6966.4' r, e, u¢
INNummWatF.O.Enim
IN 4381725 IE 501528|S89*58'39"E
- 5246.73| Conoco illips Company
Leaend (WEST - 5278.68') WELL USA #24-1005Drill Hole Location
NOTES: section24, T14s, RsE,
s.L.B.&M.
Metal Cap (Found) 1. UTMand Latitude / Longitude Coordinates
Carbon County, Utahare derived usina o GPS Pathfinder and areBrass
Cap (Searched for, but not found)
shown in NAD 27 Datum' N.BUmTK
ICH L A .S.
Calculated Corner LAT / LONGGRAPHIC SC fos
( ) GLo39°35'I3.659"NIl0*58'55.943"W ( m FEff )
, GPS Measured--------- 1 inch - 1000 it thest i •e 4
-
O OUT-060-3160-1
December, 1992
Bureau of Land ManagementMoab District
Application for Permit to DrillOn-Site Inspection Checklist
Company ConocoPhillips Company Well No. USA 24-1005Location:
Sec. 24. T 14 S, R 08 E, Lease No. U-61154On-Site Inspection Date:
10/26/2005
AII operations will be conducted in such a manner that full
compliance is made with applicablelaws, regulations (43 CFR 3100),
Onshore Oil and Gas Orders, the approved plan of operationsand the
conditions of approval. The operator is fully responsible for the
actions of hissubcontractors. A copy of these conditions will be
furnished to the field representative to ensurecompliance.
A. DRILLING PROGRAM
1. Surface Formation and Estimated Formation Tops:Surface
formation: Upper Mancos ShaleEstimated topof Ferron Formation:
3362' TD = 3940'
2. Estimated Depth at Which Oil, Gas, Water or Other Mineral
Bearinq Zones areExpected to be Encountered
Formation Depth
Expected Oil Zones: noneExpected Gas Zones: Ferron Coal
Interval: 3370'-3554'Expected Water Zones: 3370'-3554'Expected
Mineral Zones: none
AII fresh water and prospectively valuable minerals encountered
during drilling willbe recorded by depth and willbe cased and
cemented. When possible, water flowrates will be measured and
samples will be taken and analyzed. All oil and gasshows willbe
tested to determine commercialpotential.
3. Pressure Control Equipment- include schematics of the BOP and
choke manifold,and describe testingprocedures: Quick Test is
contracted to test the manifold,blindrams, and B.O.P to 2000 psi.
Surface casing is tested to 1 psilft.See attachment.
BOP systems will be consistent with API RP 53 and Onshore Oil
and Gas OrderNo. 2. Pressure tests of the surface casing and all
BOP equipment potentiallysubject to pressure will be conducted
before drilling the surface casing shoe.Blowout preventer controls
willbe installed prior to drilling the surface casing shoeand will
remain in use until the well is completed or abandoned. Ram
preventersshall be inspected and operated each trip(no more than
once a day is necessary),and annular preventers shall be inspected
and operated weekly to ensure goodmechanical working order. These
inspections shall be recorded in the drilling logand in the daily
drilling report.
-
04. Casinq Program and Auxiliary Equipment - include casing
size, weight, grade,
thread and coupling, setting depth and condition(new or
acceptably reconditioned):Approximately 30$0)of 5-1/2",N-80 17#lft
productioncasing willbe installed, 400' ofthe above setting depth
will be 8-5/8", 24#lft. J-55 surface casing.
5. Cement-include the cement type, density, yield, additives and
amount used insetting each casing string. Also include the
anticipated cement fill-up. If stagecementing, describe
techniques:See cementing information below.
Proposed Casinq and Cementing ProgramsUSA 244004
Hole Size Casing Size Wt/Ft Grade Joint Depth set14 ¾" 12 ¾"
40.5 H-40 ST&C 0-50'
11" 8 5/8" 24.0 J-55 ST&C 0-400'
7 7/8" 5 ½" 17.0 N-80 LT&C 0-3930'
Cementing Program
The 8 5/8" surface casing willbe set withapproximately 170 sacks
Class G or Type V cement with2% CaCl2 mixed at 15.6 ppg (yield
=1.18 ft /sx). The cement willbe circulated back to surfacewith
100% excess.
The 5 ½" production casing will be set and cemented using a
twostage cementing process. Thisentails setting casing to total TD
and running a DV tool to approximately 300' of the top of
theFerron.
The 1" Stage of cement willthen be pumped to approximately50'
from the DV tool. After cementis pumped, the cement cap willbe
removed and a wiper plug installed. The cement cap willthenbe
screwed back on and a wiper plug willbe displaced to TD. The cement
cap willbe removedand the DV toolbomb will be dropped followed by
the 2ndStage wiper plug. (This is done to openthe DV tooland
establish circulation.) Once circulation is established,
circulationwillcontinue atapproximately 1 bpm for 4 hours while
waiting on cement (WOC). WOC at a minimum of 4 hoursbefore
beginning 2nd Stage cement job. After the 2nd Stage has been
pumped, a top wiper plugwill be dropped and displaced withwater (or
water spacer and mud). Shut in welland WOC.
The 5 ½" production casing will be set with approximately&
sx of Standard Cement, 10% CalSeal 60 (accelerator), 1% Calcium
Chloride (accelerator), ¼ Ibm/sk Flocele (lost
circulationadditive)with a yieldof 1.61 ft'Isx at 14.2 ppg;
calculated withan excess of 35% for the 1" Stage.For the 2nd SÍSge,
OppfOximately M sx of 50/50 POZ Premium cement, 8% Bentonite
(lightweight additive), 10% Cal Seal 60 (accelerator), ¼ lbm/sk
Flocele (lost circulationadditive) with ayieldof 1.98 ft Isx at
12.5 ppg; calculated with an excess of 30% for the 2nd
The above cement volumes are approximate and are calculated
under the assumption that agauge hole willbe achieved. If the
cement does not return to surface, a cement bond log willberun to
determine the top of cement. In the case where the cement is below
the surface casingshoe, the casing willbe perforated and squeeze
cemented to the surface. If the cement is abovethe surface casing
shoe, cement willbe one-inched to the surface.
-
O O
6. Mud Program and Circulating Medium- include mud components
and weights.When air drilling, also include: length and location of
blooie line; description of theauto ignitor; description of the
deduster equipment; and amounts, types andcharacteristics of
stand-by mud: Hole will be drilled with air with the blooie
lineextending to the large pit.
7. Coring, Loqqinq and Testing Program: Gamma, Neutron Density,
and CementBond Log. Initialopening of drill stem test toolswillbe
restricted to daylight hours.
8. Abnormal Conditions, Bottom Hole Pressures and Potential
Hazards- includeanticipated bottom hole pressure and/or pressure
gradient: No abnormal conditionsare anticipated, formation is
slightly over-pressured. Using a 0.433 pressuregradient bottom hole
pressure expected is about 1083 psi max., however due tooffset
production pressures may be much lower.
9. Any Other Aspects of this Proposal that should be
Addressed:
B, THIRTEEN POINT SURFACE USE PLANThe dirt contractor willbe
provided withan approved copy of the surface use plan ofoperations
before initiating construction.
1. Existinq Roads:
a. Proposed route to location (Refer to Drawing L-1).
b. Location of proposed well in relation to townor other
reference point: 119niÏÏeswest of Price. Utah.
c. Contact the Carbon County Road Department for use of county
roads. The useof Carbon County roads will require an encroachment
permit from the CarbonCounty Road Department.
d. Plans for improvement and/or maintenance of existing roads:
Upgrade andmaintain existing state or county roads.
e. Other:
-
O O
2. Planned Access Roads:
a. Location (centerline): Refer to Drawing L-1
b. Length of new access to be constructed: 1300'
c. Length of existing roads to be upgraded &d. Maximum
totaldisturbed width:2T
e. Maximum travelsurfacewidth: 2<
f. Maximum grades: 7°k
g. Turnouts: none
h. Surface materials: In-place residual of Mancos Shale
i. Drainage (crowning, ditching, culverts, etc): Roads will be
crowned with waterditches on both sides. Water willbe diverted
around pad as necessary and 4culverts may be needed and placed
along new roadway.
j. Cattleguards: none
k. Length of new and/or existing roads which lie outside the
lease boundary forwhich a BLM right-of-way is required: NA
I. Other:
Surface disturbance and vehicular travel will be limited to the
approved locationaccess road. Any additional area needed must be
approved by the Area Manager inadvance.
If a right-of-way is necessary, no surface disturbing activities
shall take place on thesubject right-of-wayuntil the associated APD
is approved. The holder willadhere toconditions of approval in the
Surface Use Program of the approved APD, relevant toany
right-of-wayfacilities.
If a right-of-way is secured, boundary adjustments in the lease
or unit shallautomatically amend this right-of-way to include that
portion of the facility no longercontained within the lease or
unit. In the event of an automatic amendment to thisright-of-way
grant, the prior on-leaselunit conditions of approval of this
facility willnotbe affected even thoughtheywould now apply to
facilities outside of the leaselunit asa result of a boundary
adjustment. Rental fees, if appropriate shall be recalculatedbased
on the conditions of this grant and the regulations in effect at
the time of anautomatic amendment.
If the well is productive, the access road willbe rehabilitated
or brought to Resource(Class III) Road Standards within 60 days of
dismantling the rig. If upgraded, theaccess road must be maintained
at these standards until the well is properlyabandoned. If this
time frame cannot be met, the Area Manager willbe notified sothat
temporarydrainage control can be installed along the access
road.
-
O O3. Location of Existing Wells-on a map, show the location of
all water, injection,
disposal, producing and drilling wells withina one mile radius
of the proposed well,and describe the status of each: See Drawing
"L-1".
4. Location of Production Facilities:
a. On-site facilities: See Exhibit "E"
b. Ofl-site facilities: none
c. The pipelines and powerlines will follow the proposed access
route with thepowerline located on the northleast side of the road
and the pipelines on thewest/south. The pipelines will be
approximately 4" for the gas and 4" for thewater. Refer to map
Exhibit "B" page 1 for the location of the proposed pipeline.The
length of the pipeline will be approximately 1300' long. The
pipelines willbebrought to the USA 24-1005 from the existing USA
23-423.
AII permanent (in place for six months or longer) structures
constructed or installed(including oil well pump jacks) will be
painted a flat, non-reflectivecolor to match thestandard
environmental colors, as determined by the Rocky Mountain
Five-StateInteragency Committee. AIIfacilities willbe painted
withinsix months of installation.Facilities that are required to
comply with the Occupational Safety and Health Act(OSHA) may be
excluded. Colors willbe as follows: OliveBlack
If a gas meter run is constructed, it will be located on lease
within 500 feet of thewellhead. The gas flowline willbe buried from
the wellhead to the meter and willbeburied downstream of the meter
until it leaves the pad. Meter runs willbe housedand/or fenced. The
gas meter shall be calibrated prior to first sales and shall
becalibrated quarterly thereafter. AIIgas production and
measurement shall complywiththe provisions of 43 CFR § 3162. 7-3,
Onshore Oil and Gas Order No. 5, andAmerican Gas Association (AGA)
Report No. 3.
If a tank battery is constructed on this lease, it will be
surrounded by a dike ofsufficient capacity to contain 1 ½ times the
storage capacity of the largest tank. AIIloading lines and valves
willbe placed inside the berm surrounding the tank battery.AII oil
production and measurement shall conform to the provisions of 43
CFR §3162.7-3 and Onshore Oil and Gas Order No. 4
Production facilities on location may include a lined or unlined
produced water pit asspecified in NTL-2B. Ifwater is produced from
the well, an NTL-2B application mustbe submitted.
5. Location and Type of Water Supply:
AIIwater needed for drilling purposes willbe obtained from
(describe location and/orshow on a map): PRWID
If necessary, a temporarywater use permit for thisoperation
willbe obtained from theUtah State Engineer in Price, Utah at (435)
637-1303.
Water obtained on private land, or land administered byanother
agency, willrequireapproval from the owner or agency for use of the
land.
-
O O
6. Source of Construction Material:
Pad construction material willbe obtained from (if the source is
Federally owned,show location on a map): Private OwnerThe use of
materials under BLMjurisdictionwillconform to 43 CFR 3610.2-3.
7. Methods of Handlinq Waste Disposal:
Describe the methods and locations proposed for safe containment
and disposal ofwaste material, e.g. cuttings, produced water,
garbage, sewage, chemicals, etc.
The reserve pitwill be lined with (native material, bentonite,
synthetic material):Pit willbe lined with native material unless
otherwise designated by BLMofficers prior toconstruction.
The reserve pit willbe located at the: south side of the
location, and the pit walls willbe sloped at no greater than 2 to
1.
The reserve pit shall be located in cut material, with at least
50% of the pit volumebeing below originalground level. Three sides
of the reserve pit willbe fenced beforedrilling starts. The fourth
side willbe fenced as soon as drilling is completed, andshall
remain until the pit is dry. As soon as the reserve pit has dried,
all areas notneeded for production will be rehabilitated.
Trash must be contained in a trash cage and hauled away to an
approved disposalsite as necessary but no later than at the
completion of drilling operations.8. Ancillary Facilities: Garbage
containers and portable toilets.
9. Well Site Layout - depict the pit, rig, cut and
fill,topsoil,etc. on a plat witha scale ofat least 1" = 50'.
AII well, whether drilling, producing, suspended, or abandoned,
will be identified inaccordance with43 CFR 3162.6.
Access to the well pad will be from: west of location.
The blooie line will be located in the: south, at least 100 feet
from thewellhead.To minimize the amount of fugitive dust and spray
escaping from the blooie pit, thefollowing blooie line deflection
method willbe employed: Water injection.
10. Plans for Restoration of the Surface:
The top 6 inches of topsoilmaterial willbe removed from the
location and stockpiledseparately on: adjacent land.
Topsoil along the access road willbe reserved in place adjacent
to the road.
Immediately upon completion of drilling, all equipment that is
not necessary forproduction shall be removed.
The reserve pit and that portion of the location not needed for
production will bereclaimed.
-
O O
Before any dirt work to restore the location takes place, the
reserve pit must becompletely dry.
Reclaimed roads willhave the berms and cuts reduced and willbe
closed to vehicleuse.
Alldisturbed areas willbe recontoured to replicate the natural
slope.
The stockpiled topsoilwillbe evenly distributed over the
disturbed area.
Prior to reseeding, all disturbed areas, including the access
roads, willbe scarifiedand left witha rough surface.
Seed will be broadcast or drilled between Sept and Nov., or at a
timespecified by theBLM. If broadcast, a harrow or some other
implement will be dragged over theseeded area to cover the
seed.
The following seed mixturewillbe used:
BLM recommended mixture: Piriyon Juniper
The abandonment marker willbe one of the following, as specified
by BLM:1) At least four feet above ground level,2) At restored
ground level, or3) Below ground level.
In any case the marker shall be inscribed with the following:
operator name, leasenumber, well name and surveyed description
(township,range, section and eitherquarter-quarter or
footages).
Additional requirements:
11. Surface and Mineral Ownership: BLMsurface/BLMsubsurface
12. Other Information:
a. Archeological Concerns: none
The operator is responsible for informing all persons in the
area who areassociated with thisproject that theywill be subject to
prosecution forknowingly disturbing historic or archaeological
sites, or for collecting artifacts.If historic or archaeological
materials are uncovered during construction, theoperator is to
immediately stop work that might further disturb such materials,and
contact the authorized officer (AO). Within five (5) working days,
the AOwillinform the operator as to:
• Whether the materials appear eligible for the National
Register ofHistoric Places;
• The mitigation measures the operator will likely have to
undertakebefore the site can be used (assuming in situ preservation
is notnecessary); and
• A time frame for the AO to complete an expedited review under
36CFR 800.11 to confirm, throughthe State HistoricPreservation
Officer, thatthe findings of theAO are correct and that
mitigationis appropriate.
-
O O
If the operator wishes, at any time,to relocate activities to
avoid the expense ofmitigation and/or the delays associated with
this process, the AO will assumeresponsibility for whatever
recordation and stabilization of the exposed materialsmay be
required. Otherwise, the operator will be responsible for
mitigationcosts.The AO will provide technical and procedural
guidelines for the conduct ofmitigation. Upon verification from the
AO that the required mitigationhas beencompleted, the operator
willthen be allowed to resume construction.
b. Threatened and Endangered Species Concerns: No
c. Wildlife Seasonal Restrictions (yes/no): See EIS
d. Off Location Geophysical Testing: N/A
e. Drainage crossings that require additionalState or Federal
approval: N/A
f. Other: N/A
13. Lessee's or Operator's Representative and Certification
Representative:
Name: Jean Semborski
Title: Construction/Asset Integrity Supervisor
Address: 6825 S. 5300 W. P.O. Box 851Price, Utah 84501
Phone No: (435) 613-9777 Fax (435) 613-9782
Certification:
I hereby certify that I, or persons under my direct supervision,
have inspected theproposed drill site and access route; that I am
familiar with the conditions whichcurrentlyexists; that the
statements made in thisAPD package are, to the best of myknowledge,
true and correct; and that the work associated with the
operationsproposed herein will be performed by ConocoPhillips and
its contractors andsubcontractors in conformity with this APD
package and the terms and conditionsunder which it is approved. I
also certify responsibility for the operations conductedon that
portion of the leased lands associated with this application, with
bondcoverage being provided under BLMNation Wide Oil and Gas
8015-16-69. Thisstatement is subject to the provisions of 18 U.S.C.
1001 for the filing of a falsestatement.
Signature
Construction/Asset Integrity Supervisor 12/27/05Title Date
-
O O
C. REQUIRED APPROVALS,REPORTS AND NOTIFICATIONS
Required verbal notificationsare summarized in Table 1,
attached.
Buildinq Location- Contact the Resource Area, Natural Resource
Protection Specialist atleast 24 hours prior to commencing
construction of location.Soud- The spud date will be reported to
the Resource Area Office 24 hours prior tospudding. Written
notification in the form of a Sundry Notice (Form 3160-5) will
besubmitted the District Office within24 hours after spudding,
regardless of whether spudwas made with a dry hole digger or big
rig.
Daily DrillinqReports- Daily drilling reports shall detail the
progress and status of the welland shall be submitted to the
District Officeon a weekly basis.
Monthly Reports of Operations- In accordance with Onshore Oiland
Gas Order No. 1, thiswell shall be reported on Minerals Management
Service (MMS) Form 3160, "MonthlyReport of Operations," starting
the month in which operations commence and continuingeach month
until the well is physicallyplugged and abandoned. This report
willbe. fileddirectly with MMS.
Sundry Notices- There will be no deviation from the proposed
drilling and/or workoverprogram without prior approval from the
Assistant District Manager. "Sundry Notices andReports on Wells:
(Form 3160-5) willbe filed for approval for all changes of plans
andother operations in accordance with 43 CFR 3162.3-2. Safe
drilling and operatingpractices must be observed.
Drillinq Suspensions- Operations authorized by this permit shall
not be suspended formore than 30 days without prior approval of the
Authorized Officer. AIIconditions of thisapproval shall be
applicable during any operations conducted witha replacement
rig.
Undesirable Events- Spills, blowouts, fires, leaks, accidents,
or any other unusualoccurrences shall be immediately reported to
the Resource Area in accordance withrequirements of NTL-3A.
Cultural Resources- If cultural resources are discovered during
construction, work thatmight disturb the resources is to stop, and
the Area Manager is to be notified.
First Production- Should the well be successfully completed for
production, the AssistantDistrict Manager, Minerals Division willbe
notified when the well is placed in producingstatus. Such
notification may be made by phone, but must be followed by a sundry
noticeor letter not later than five (5) business days following the
date on which the well is placedinto production.
A first production conference willbe scheduled as soon as the
productivity of the well isapparent. This conference should be
coordinated throughthe Resource Area Office.The Resource Area
Office shall be notifiedprior to the first sale.
Well Completion Report- Whether the well is completed as a dry
hole or as a producer,"Well Completion and Re-completion Report and
Log" (Form 3160-4) willbe submitted tothe District Office not later
than thirty(30) days after completion of the well or
aftercompletion of operations being performed, in accordance with
43 CFR 3162.4-1. Twocopies of all logs, core descriptions, core
analysis, well test data, geologic summaries,sample description,
and all other surveys or data obtained and compiled during
thedrilling, work-over, and/or completion operations, will be
filedwith Form 3160-4. Samples
-
O O(cuttings and/or samples) will be submitted when requested by
the Assistant DistrictManager.
Venting/Flarinq of Gas-NTL-4A allows venting/flaring of gas
during the initial wellevaluation period not to exceed 30 days or
50 MMcf. Venting/flaring beyond the initial testperiod
thresholdmust be approved by the District Office.Off-Lease
Measurement, Storage, Comminglinq- Prior approval must be obtained
fromthe Assistant District Manager for off-lease measurement,
off-lease storage and/orcommingling(either down-hole or at the
surface).
Pluqqinq and Abandonment- If the well is completed as a dry
hole, plugging instructionsmust be obtained from the BLM, Moab
District Office prior to initiating pluggingoperations. Table 1 of
this document provides the after-hours phone numbers ofpersonnel
who are authorized to give plugging instructions.A "Subsequent
Report of Abandonment" (Form 3160-5) will be filed with the
AssistantDistrict Manager, Minerals Divisions within thirty(30)
days followingcompletion of the wellfor abandonment. This report
will indicate where plugs were placed and the currentstatus of
surface restoration. Upon completion of approved plugging, a
regulation markerwill be erected in accordance with 43 CFR 3162.6.
Final abandonment will not beapproved until the surface reclamation
work required by the approved APD or approvedabandonment notice has
been completed to the satisfaction of the Area Manager or
hisrepresentative, or the appropriate surface managing agency.
TABLE 1NOTIFICATIONS
Notify Don Stephens of the Price Resource Area, at (435)636-3608
for the following:2 days prior to commencement of dirt work,
construction or reclamation;1 day prior to spudding;
50 feet prior to reaching surface and intermediate casing
depths;3 hours prior to testingBOP;
12 hours prior to reaching kickoff point depth (if
applicable).If the person at the above number cannot be reached,
notifythe Moab District Office at(435) 259-6111. If unsuccessful,
notifyone of the people listed below.Well abandonment operations
require 24 hour advance notice and prior approval. In thecase of
newly drilled dry holes, verbal approval can be obtained by calling
the MoabDistrict Office, Branch of Fluid Minerals at (435)
259-6111. If approval is needed afterwork hours, you may contact
the following:
Eric Jones, Petroleum Engineer Office: (435) 259-6111Home: (435)
259-2214
-
ELEVATIONOFUNGRADEDGROUNDATLOCATIONSTAKE=
6966.4'ELEVATIONOFGRADEDGROUNDATLOCATIONSTAKE= 6965.9'
ILL 0.3'
' CUT 0 f.
SA #24-1005 ILL 1.6'V.6966.4' q
'
0.5
ILL 2.2'0 69 «- ---
"' TALONRESOURCES, INC.CUT 0.9'
"' ' o usa.amw.ema..smmass
ihas( )M 10 Isa(G)WB11"~ UT 0.8' amus...tr...t
" 0 ConocoPhillips Company
Section 24. T14S, RSE, S.L.B.&M., WELL USA #24-1005
"' CUT 0.8' N. BUTKOVICH L.W.J.A7osA-2
P=50',asa
a..r 2 « 4
-
100' 75'FILL FILL X-SECTION
SCÆE
LocATION STAKE VIEWC-C
PRECONSTRUCTIONGRADE
\00' 75' 50'
CUT _--------¯-
SLOPE = | \/2 : II II
. (ExcEPT PIT)VIEWB-8 CUT PIT SLOPE = I ; I
\00' 75'
FILL ~' CUT \ TALON RESOURCES, INC.
FINALMNert AEstmi
,-
nms(as)msneas(as)menVIEWA-A GRADE mt.a....tr..t
APPROXIMATEYARDAGES conoco%nnpscompanyCUT TYPICAL CROSS
SECTION(6")ToPSOIL STRIPPING = 8\0 CU. YDs. Section 24, T14S, R8E,
S.L.B.&M.WELL USA 24-1005REMAININGLOCATION= 2,270 CU, Yos.
..
N. BUTKOVICH L.W.J.(INCLUDINGTOPSOIL STRIPPING) ORMMMA
UNETOTALCUT (INCLUDINGPIT) = 3,020 CU. YDs. c-i "|TOTAL FILL = 440
CU. YDs. ..., , ,
-
LEGEND ConocoPhillips Company6825 South 5300 WestP·°· 8°= 661
ConocOPhillipsProposed Well Location: Price, Utah 84501Other
Proposed Well Locations: g Phone: (435) 613-9m COmpanyProposed
Powerline: ,,,,,, Fax: (435) 613-9782
Proposed Pipeline: ......Proposed Roads:Lease Boundary: ....
WELL USA #24-1005Existing Wells: Section 24, T14S, RBE,
S.L.B.&M.Scale: 1 = 2000' November 18, 2005 Drawing L-1 4
of
-
49400omE. 49600 E. 498ooom . 500000mE. 502000mE, 504ooomE. 6
6ooomE. NAD27 Zone 125 511000 E.
ConocoPhilli s Com anv
Talon Resourtes, Inc.5 N 100 W , PO BOX m0Huntmgton, Utah
84528
Ir-- / - r -494ooomE. 496eoomE. 498ooomE. 500ooomE. 502000 E.
504ooomE. 506ooomE. NAD27 Zone 12S 511ooomE.
OD 0.5 1.0 LS 2ß 2.5 3D 3.5 milesTN r i2½° 0 1 2 3 4 5 lun
Map cseatedwith TOPole ©2003 NationelGeogmphic (www
-
APPROXIMATELAYOUTOF RIG & EQUIPMENT
LIGHTPLANT
LIGHT
40'PLANT
PIPE TRAlLER
HOLEO ,
, 840
FUELTANK DOGHOUSE SURFACECUTTINGS20'
PIT
MAN
BOOSTER COMPRESSOR RIG
AUX45' COMP.
FRAC
-
CONOCOPHILLIPSCOMPANYWELLSITELAYOUT(235' x 175')
OANCHOR(TYP. 4 PL.)
145' 90'75'
WELLHEAD PUMPING
UNIT100' --- ' MOTOR
O O
-
' SRTARTER
SEPARATOR--"^ -'
TRANSFORMER
3-PHASE
-
TYPICALROADCROSS-SECTION
CONOCOPHILLIPSCOMPANY
4" THICKLAYERSAND L
4 4
UU •••
GAS& WATER i' 27' ' 3-PHASE
PIPELINES POWERLINES
-
O
DIVERTERHEADCONOCOPHILLIPSCOMPANY
ROTATINGHEAD
fl fl
LJ L.)
DOUBLE
HYDRAULIC3000#
80P
l 1_-__fiL.SCREW-ON
FLANGEll LJ
8-5/8" 24#SURFACECASING
EXHIBIT
-
ce (O
CONOCOPHILLIPSCOMPANY
(1) 2" 5M Fl.ANGEDCHOKE(2) 2" 5M GATEVALVE(FLANGED)(3) 2" 5M
STUDDEDCROSS(4) 2" 5M GATEVALVE(Fl.ANGED)(5) 2" 5M FLANGEDCHOKE(6)
2" 5M GATEVALVE(FLANGED)(7) 2" LINE(8) 2" 5M GATEVALVE(FLANGED)(9)
3000# GAUGE
NOTE:NUMBER8 GATEVALVESITSON TOP OF
MANIFOLDBETWEENSTUDDEDCROSSAND3000# GAUCE.
O
2" LINE
2" LINE 2" LINE
O O
2" LINE
TO BOPANDA NEW2" BALLVALVE
FULLOPEN 5000 PSI
MANIFOLDEXHIBIT
-
e SÙRETY RIDER
To be attached tö and form a part of
Bond No. 8015-16-69
Type ofBond: NATION-WIDE OIL AND GAS BOND
datedeffective 10/19/1963
(MONTH-DAY-YEAR)
executed by CONOCO INC. AND CONOCO GAS HOLDINGS L.L.C.,
,as Principal,(PRINCIPAL) •
and by FEDERAL INSURANCE COMPANY ,as Surety,
in favor of UNITED STATES OF AMERICA(OBLIGEE)
Ínconsideration of the mutual agreements herein contained the
Principal and the Surety hereby consent to changing
PRINCIPAL NAME IS HEREBY AMENDED FROM CONOCO INC. AND CONOCO GAS
HOLDINGS L.L.C. TOCONOCOPHILLIPS COMPANY.
Nothing herein contained shall vary, alter or extend any
provision or condition of this bond except as herein expressly
stated.
This rideris effective 01/01/2003
(MONTH-DAY-YEAR)
.Signed and Sealed 12/18/2002(MONTH-DAY-YEAR)
CONOCOPHILLIPS CO
By: //IN L)
PRINCIPAL)
FEDERAL INSURANCE COMPANY
By:(ATTORNEY-IN-FACT) TINA MARIE FOSTER
-0443/GEEF
-
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
APD RECEIVED: 01/05/2006 API NO. ASSIGNED: 43-007-31088
WELL NAME: USA 24-1005
OPERATOR: CONOCOPHILLIPS COMPANY ( N2335 )
CONTACT: JEAN SEMBORSKI PHONE NUMBER: 435-613-9777
PROPOSED LOCATION:
SWSW 24 140S 080E INSPECT LOCATN BY: / /SURFACE: 0332 FSL 0333
FWL Tech Review Initials DateBOTTOM: 0332 FSL 0333 FWL
CARBON Engineering
DRUNKARDS WASH ( 48 )
LAT: 39.58709 LONG: -110.9822 Surface
LEASE TYPE: 1 - Federal
LEASE NUMBER: U-61154 PROPOSED FORMATION: FRSD
SURFACE OWNER: 1 - Federal COALBED METHANE WELL? YES
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
v" Plat R649-2-3.
s?"Bond: Fed[1] Ind[] Sta[] Fee[]Unit DRUNKARDS WASH
(No. 8015-16-69 )Potash (Y/N) R649-3-2. General
lá Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From
Qtr/Qtr & 920'Between Wells
pr' Water Permit R649-3-3. Exception(No.PRWID )
A Drilling UnitA RDCC Review (Y/N)Board Cause No: (1 L(Date:
)Eff Date: p ()MA Fee Surf Agreement (Y/N) Siting: Lär y ,wd
Aln Intent to Commingle (Y/N) R649-3-11. Directional Drill
COMMENTS:
-
O O s04ttl7172
IT14S RSE " DRUNKARDS T14S R9E o,
' ' WASH FIELDUSiti-ISI
(gg gg.4gg US \ I I 17 i US \ 18 i L5
I NN U 1 i
H a I in yU%\illI7
EX EU4t il 177 13RUNK ARDS
WASH UNIT
I :
CAUSE 243-2 I 7-13-1999
24 59 I I I NN IŒ
RIMIDW U iU
-
JON M. HUNTSMAN, JR.Governor
GARY R. HERBERTas• Lieutenant Governor
State of Utah March 2, 2006Department of
Natural ResourcesMICHAEL R. STYLER
ExecutiveDirectorConocoPhillips Company
Division of PO Box 851Oil, Gas & Mining Price, UT 84501
JOHN R. BAZADivision Director
Re: USA 24-1005 Well, 332' FSL, 333' FWL, SW SW, Sec. 24, T. 14
South,R. 8 East, Carbon County, Utah
Gentlemen:
Pursuant to theprovisions and requirements of Utah Code Ann.§
40-6-1 etseq., Utah Administrative Code R649-3-1 et seq., and the
attached Conditions ofApproval, approval to drill the referenced
well is granted.
This approval shall expire one year from the above date unless
substantial andcontinuous operation is underway, or a request for
extension is made prior to theexpiration date. The API
identification number assigned to this well is 43-007-31088.
Sincerely,
Gil HuntAssociate Director
pabEnclosures
cc: Carbon County AssessorBureau of Land Management, Moab
District Office
1594 West North Temple, Suite 1210, PO Box 145801, Salt
LakeCity, UT 84114-5801telephone (801)538-5340•facsimile
(801)359-3940•TTY (801) 538-7458
-
OOperator: ConocoPhillips CompanyWell Name & Number USA
24-1005API Number: 43-007-31088Lease: U-61154
Location: SW SW Sec.1 T. 14 South R. 8 East
Conditions of Approval
1. GeneralCompliance with the requirements of Utah Admin. R.
649-1 et seq., the Oil and GasConservation General Rules, and the
applicable terms and provisions of the approvedApplication for
permit to drill.
2. Notification RequirementsNotify the Division within 24 hours
of spudding the well.• Contact Carol Daniels at (801) 538-5284.
Notify the Division prior to commencing operations to plug and
abandon the well.• Contact Dan Jarvis at (801) 538-5338
3. Reporting RequirementsAll required reports, forms and
submittals will be promptly filed with the Division,including but
not limited to the Entity Action Form (Form 6), Report of
WaterEncountered During Drilling (Form 7), Weekly Progress Reports
for drilling andcompletion operations, and Sundry Notices and
Reports on Wells requesting approval ofchange of plans or other
operational actions.
4. State approval of this well does not supersede the required
federal approval, which must beobtained prior to
-
STATE OF UTAH FORM 9DEPARTMENT OF NATURALRESOURCES
DIVISIONOF OIL, GAS AND MINING 5.
LEASEDESIGNATIONANDSERIALNUMBER:U-61154
SUNDRY NOTICES AND REPORTS ON WELLS6.
I/FINDIAN,ALLOTTEEORTRIBENAME:
7. UNITor CA AGREEMENT NAME:Do notuse thisform for proposals to
drill new wells, significantly deepen existingwellsbelow current
bottom-hole depth, reenter plugged wells, or to Drunkards Wash
UTU-67921X
drill horizontal laterals. Use APPLICATION FOR PERMIT TO
DRILLform for such proposals.
1. TYPEOF WELL 8. WELL NAMEand NUMBER:OILWELL GAS WELL OTHER USA
24-1005
2. NAMEOF OPERATOR: 9. API NUMBER:
ConocoPhillips Company 43007310883. ADDRESS OF OPERATOR: PHONE
NUMBER: 10. FIELD AND POOL, OR WILDCAT:
P.O. Box 51810 Midland STATE TX ZIP 79710-1810 (432) 688-6943
Drunkards Wash4. LOCATIONOF WELL
FOOTAGESATSURFACE: 332' FSL & 333' FWL COUNTY: Carbon
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SWSW 24 14S 8E
STATE:UTAH
u CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT,
OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT
(Submit in Duplicate) ALTER CASING FRACTURE TREAT SIDETRACK TO
REPAIR WELL
Approximate date worit willstart: CASING REPAIR NEW CONSTRUCTION
TEMPORARILYABANDON
3/2/2007 CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBING
REPAIR
O CHANGE TUBING PLUG ANDABANDON VENT OR FLARESUBSEQUENT REPORT
CHANGE WELL NAME PLUG BACK WATER DISPOSAL
(Submit Original Form Only)
O CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER
SHUT-OFFDate of work completion:COMMINGLEPRODUCING FORMATIONS
RECLAMATIONOF WELL SITE OTHER: Permit RenewalCONVERT WELL TYPE
RECOMPLETE - DIFFERENT FORMATION
12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all
pertinent details including dates, depths, volumes, etc.
ConocoPhillips Company respectfully requests that the approval
of the Application for Permit to Drill for the referenced well
beextended. The current approval willexpire on March 2, 2007.
Approved by theUtah Divisionof
Oil, Gas and Mining
D e: -1
By.
NAME(PLEASE PR NT) D nna Willi ms TITLE Sr. Regulatory
Analyst
SIGNATURE DATE
(Titis space for State use only)
RECEIVEDFEBi 52007 RECEIVED
(5/2000) (See Instructions on Reverse Side)
OlV.OF01L,GAS&MININGFEB0 / 2007DIVOFOILGAS&
-
Application for Permit to DrillRequest for Permit Extension
Validation(thisform should accompany the Sundry Notice
requesting permit extension)
AP1: 143-007-31088|Well Name: USA 24-1eosLocation: SWSW Section
24, T14S, RSECompany Permit issued to: ConocoPhillips CompanyDate
Original Permit Issued: 3/2/2006
The undersigned as ownerwith legal rights to drillon the
property as permittedabove, hereby verifies thatthe information as
submitted in the previouslyapproved application to drill, remains
valid and does not require revision.
Following is a checklistof some items related to the
application, which should beverified.
If located on private land, has the ownership changed, if so,
has the surfaceagreement been updated? YesONom
Have any wells been drilled in the vicinityof the proposed
wellwhich would affectthe spacing or siting requirements for
thislocation? YesO Nom
Has there been any unitor other agreements put in place that
could affect thepermitting or operationof thisproposed well7 YesO
NoO
Have there been any changes to the access route including
ownership, or right-of-way, which could affectthe proposed
location? YesO NoIZI
Has the approved source of water for drillingchanged? YesO
NoO
Have there been any physical changes to the surface location or
access routewhich willrequire a change in plans from what was
discussed at the onsiteevaluatio . esONoO
Is bon ng still n place, which covers thisproposed well?
YesŒNoO
2/12/2007
Signaturk Date
Title: Sr. Regulatory Analyst
Representing: conocoPhillips Company
RECEIVEDFEB1.52001
DIVOFol!··GAS&
-
STATE OF UTAH FORM 9DEPARTMENT OF NATURALRESOURCES
DIVISION OF OIL, GAS AND MINING 5.
LEASEDESIGNATIONANDSERlALNUMBER:U-61154
SUNDRY NOTICES AND REPORTS ON WELLS6.
IFINDIAN,ALLOTTEEORTRIBENAME:
7. UNITor CA AGREEMENT NAME:Do not use thisform for proposals to
drillnewwells, significantly deepen existing wells below current
bottom-hole depth, reenter plugged wells, or to Drunkards Wash
UTU-67921X
drill horizontal laterals. Use APPLICATION FOR PERMIT TO
DRILLform for such proposals.
1. TYPE OF WELL 8. WELL NAME and NUMBER:OIL WELL GAS WELL OTHER
USA 24-1005
2.NAMEOFOPERATOR: 9.APINUMBER:
ConocoPhillips Company 43007310883. ADDRESS OF OPERATOR: PHONE
NUMBER: 10. FlELD AND POOL, OR WILDCAT:
P. O. Box 51810 cin Midland STATE TX zie 79710-1810
(432)688-6943 Drunkards Wash
4 LOCATION OF WELL
FOOTAGESATSURFACE: COUNTY: Carbon
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SWSW 145 85
STATE:UTAH
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR
OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIQNNOTICE OF INTENT
(Submit in Duplicate) ALTER CASING FRACTURE TREAT SlDETRACK TO
REPA1RWELL
Approximate date workwillstart: CASING REPAIR NEW CONSTRUCTION
TEMPORARILYABANDON.
2/21/2008 CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBING
REPAIRCHANGE TUBING PLUG AND ABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER
DISPOSAL(Submit Original Form Only)
CHANGE WELL STATUS PRODUCTION (STARTIRESUME) WATER SHUT-OFF
Date of work completion:COMMINGLEPRODUCING FORMATIONS
RECLAMATIONOF WELL S1TE OTHER: Permit RenewalCONVERT WELLTYPE
RECOMPLETE - DIFFERENT FORMATION
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all
pertinent details including dates, depths, volumes, etc.
ConocoPhillips Company respectfully requests that the approval
of the Application for Permit to Drill for the referenced well
beextended. The current approval willexpire on February 21,
2008.
Approvedby theUtah Divisionof
Oil,Gas and Mining
Date: ( 2-3
By: coPYSENTTooPERATOA
NAME(PLEASE PRIN ) Do na Wi Iiams TITLE Sr. Regulatory
Specialist
1/17/2008SIGNATURE / -- DATE
(This space for State use only)
RECElVED
(5/2000) (See Instructions on Reverse Side) JAN2 3
2008DIV.0F0lL,GAS&
-
Application for Permit to DrillRequest for Permit Extension
Validation(thisform should accompany the Sundry Notice
requesting permit extension)
API: 43-007-31088Well Name: USA 24-1005Location: SWSW Sec 24,
T14S, R8E, Carbon Co.Company Permit Issued to: ConocoPhillips
CompanyDate Original Permit Issued: 3/2/2006
The undersigned as owner with legal rights to drill on the
property as permittedabove, hereby verifies that the information as
submitted in the previouslyapproved application to drill, remains
valid and does not require revision.
Followinq is a checklist of some items related to the
application, which should beverified.
If located on private land, has the ownership changed, if so,
has the surfaceagreement been updated? YesONom
Have any wells been drilled in the vicinityof the proposed well
which would affectthe spacing or siting requirements for this
location? YesO No2
Has there been any unit or other agreements put in place that
could affect thepermitting or operation of thisproposed well? YesO
Nom
Have there been any changes to the access route including
ownership, or right-of-way, which could affect the proposed
location? YesO No 21
Has the approved source of water for drillingchanged? YesO
No2
Have there been any physical changes to the surface location or
access routewhich will require a change in plans from what was
discussed at the onsiteevaluation? YesO NoO
Is bond gs illin place, which covers thisproposed well?
YesŒNoO
1/17/2008
Signat e Date
Title: Sr. Regulatory Specialist
Representing: ConocoPhillips Company
RECEiVEDJAN2 3 2008
DIVOFOIL,GAS&
-
STATE OF UTAH FORM 9
O DEPARTMENTOF NATURALRESOURCESDIVISIONOF OIL, GAS AND MINING 5.
LEASEDESIGNATIONANDSERlALNUMBER:U 61154
6. IF INDIAN,ALLOTTEEOR TRIBE NAME:SUNDRY NOTICES AND REPORTS ON
WELLS N/A
7. UNIT or CA AGREEMENT NAME:Do not use thisform for proposals
to drill new wells, significantly deepen existing wells below
current bottom-hole depth, reenterplugged wells, or to Drunkards
Wash UTU67921X
drill horizontal laterals. Use APPLICATIONFOR PERMlT TO
DRILLform for such proposals.
1. TYPE OF WELLOIL WELL GAS WELL OTHER
8 WELL A4M-Ea0nd0NUMBER:
2. NAMEOF OPERATOR: 9. API NUMBER:
ConocoPhillips Company 43007310883. ADDRESS OF OPERATOR: PHONE
NUMBER: 10. FIELD AND POOL, OR WILDCAT:
P.O. Box 51810 CITY Midland STATE TX ziP79710 (432)688-6943
Drunkards Wash
4. LOCATIONOF WELL
FOOTAGESATSURFACE: 332 FSL & 333 FWL COUNTY: Carbon
QTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN SWSW 24 14S 8E
STATE:UTAH
. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT,
OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
AC1DIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT
(Submit in Duplicate) ALTER CASING FRACTURE TREAT SIDETRACKTO
REPAIR WELL
Approximatedateworkwillstart: CASINGREPAIR NEWCONSTRUCTION
TEMPORARILYABANDON
2/13/2009 CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBING
REPAIR
CHANGE TUBING PLUG ANDABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER
DISPOSAL(Submit Original Form Only)
O CHANGE WELLSTATUS PRODUCTION (START/RESUME) WATER SHUT-OFFDate
ofworkcompletion:COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELL
SITE OTHER: Permit RenewalCONVERT WELLTYPE RECOMPLETE - DIFFERENT
FORMATION
12- DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all
pertinent details including dates, depths, volumes, etc.
ConocoPhillips Company respectfully requests that the approval
of the Application for Permit to Drill for the referenced well
beextended. The current approval willexpire on .
Approvedby theUtahDMeionof
Oil,Gas and Mining
COPYSENTTOOPERATOR
NAME (PLEASE PRIN Do na Willi S TITLE Sr. Regulatory
Specialist
SIGNATURE DATE2/13/2009
(This space for State use
-
Application for Permit to DrillRequest for Permit Extension
Validation(thisform should accompany the Sundry Notice
requesting permit extension)
API: 4300731088Well Name: USA 24-1005Location: SWSW of
24-14S-8ECompany Permit Issued to: ConocoPhillips CompanyDate
Original Permit issued: adota
The undersigned as owner with legal rights to drill on the
property as permittedabove, hereby verifies that the information as
submitted in the previouslyapproved application to drill, remains
valid and does not require revision.
Following is a checklist of some items related to the
application, which should beverified.
If located on private land, has the ownership changed, if so,
has the surfaceagreement been updated? Yes O No O
Have any wells been drilled in the vicinityof the proposed well
which would affectthe spacing or siting requirements for this
location? YesO NoO
Has there been any unit or other agreements put in place that
could affect thepermitting or operation of thisproposed weli? YesO
Nom
Have there been any changes to the access route including
ownership, or right-of-way, which could affect the proposed
location? YesO No I2l
Has the approved source of water for drillingchanged? YesO
NolZI
Have there been any physical changes to the surface location or
access routewhich will require a change in plans from what was
discussed at the onsiteevaluation? YesO NoO
Is bondin still n place, which covers thisproposed well?
YesŒNoO
Signature Date
Title: Sr. Regulatory Specialist
Representing: ConocoPhillips Company
RECEIVEDFEBI 7 2009
DIVOFOIL,GAS&
-
STATEOFUTAH FORM9DEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS AND MINING 5.
LEASEDESIGNATIONANDSERIALNUMBER:U 61154
SUNDRY NOTICES AND REPORTS ON WELLS 6.
F/lNDIAN,ALLOTTEEORTRIBENAME:
7. UNITor CA AGREEMENT NAME:Do not use thisform for proposals to
drill new wells, significantly deepen existing wells below current
bottom-hole depth, reenter plugged wells, or to Drunkards Wash
UTU67921Xdrill horizontal laterals. Use APPLICATION FOR PERMIT TO
DRILLform for such proposals.
1. TYPE OF WELL 8. WELL NAMEand NUMBER:OIL WELL GAS WELL OTHER
USA 24-1005
2. NAMEOF OPERATOR: 9. API NUMBER:
ConocoPhillips Company 43007310883. ADDRESS OF OPERATOR: PHONE
NUMBER: 10. FIELDAND POOL, OR WILDCAT:P.O. Box 51810 Midland STATE
TX 79710 (432) 688-6943 Drunkards Wash
4. LOCATIONOF WELL
FOOTAGESATSURFACE: 332 FSL & 333 FWL COUNTY: Carbon
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SWSW 24 14S 8E
STATE:UTAH
it CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT,
OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF
INTENT(Submit in Duplicate) ALTER CASING FRACTURE TREAT SIDETRACK
TO REPAIR WELL
Approximate date work will start: CASING REPAIR NEW CONSTRUCTION
TEMPORARILYABANDON
3/17/2010 CHANGE TO PRE\nOUS PLANS OPERATOR CHANGE TUBING
REPAIRCHANGE TUBlNG PLUG AND ABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER
DISPOSAL(Submit Original Form Only)
CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHUT-OFFDate
of work completion:
COMM1NGLEPRODUCING FORMATIONS RECLAMATIONOF WELL S1TE OTHER:
Permit RenewalCONVERT WELLTYPE RECOMPLETE -D1FFERENTFORMATION
12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all
pertinent details including dates, depths, volumes, etc.
ConocoPhillips Company respectfully request that the approval of
the APD for the referenced well be extended for an
additionalyear.
Approvedby theUtah Divisionof
Oil, Gas and Mining
Date: DCOPYSENTTOOPERATORBŸ¾
Initials:
NAME(PLEASEPRI T) D nna Will ams T1TLE Sr. Regulatory
Specialist
SIGNATURE Â A Â DATE 3/17/2010
(This space for State use only)
RECEIVED
(5/2000) (See Instructions on Reverse Side)
DN.0FOIL,GAS&
-
Application for Permit to DrillRequest for Permit Extension
Validation(thisform should accompany the Sundry Notice
requesting permit extension)
API. l. 8300231088___¡
Well Name: USA 24-1005Location: SWSW of 24-14S-8ECompany Permit
Issued to: ConocoPhillips CompanyDate Original Permit Issued:
3/2/2006
The undersigned as owner with legal rights to drill on the
property as permittedabove, hereby verifies that the information as
submitted in the previouslyapproved application to drill, remains
valid and does not require revision.
Followinq is a checklist of some items related to the
application, which should beverified.
If located on private land, has the ownership changed, if so,
has the surfaceagreement been updated? YesONolZI
Have any wells been drilled in the vicinityof the proposed well
which would affectthe spacing or siting requirements for this
location? YesO NolZ]
Has there been any unit or other agreements put in place
thatcould affect thepermitting or operation of thisproposed well?
YesO NolZI
Have there been any changes to the access route including
ownership, or right-of-way, which could affect the proposed
location? YesO No O
Has the approved source of water for drillingchanged? YesO
NolZI
Have there been any physical changes to the surface location or
access routewhich will require a change in plans from what was
discussed at the onsiteevaluation? YesO NolZI
Is bon tillin place, which covers this proposed well?
YeslZINoO
3/17/2010
Signa e Date
Title: Sr. Regulatory Specialist
Representing: ConocoPhillips Company
RECEIVED
DIV.0FOIL,GAS&
-
API Well No: 43007310880000
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
5.LEASE DESIGNATION AND SERIAL NUMBER: U-61154
SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for
proposals to drill new wells, significantly deepen existing wells
below currentbottom-hole depth, reenter plugged wells, or to drill
horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for
such proposals.
6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
7.UNIT or CA AGREEMENT NAME: DRUNKARDS WASH
1. TYPE OF WELL Gas Well
8. WELL NAME and NUMBER: USA 24-1005
2. NAME OF OPERATOR: CONOCOPHILLIPS COMPANY
9. API NUMBER: 43007310880000
3. ADDRESS OF OPERATOR: PHONE NUMBER: P.O. Box 51810 , Midland,
TX, 79710 1810 432 688-6943 Ext
9. FIELD and POOL or WILDCAT: DRUNKARDS WASH
4. LOCATION OF WELL FOOTAGES AT SURFACE: 0332 FSL 0333 FWL
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: SWSW Section:
24 Township: 14.0S Range: 08.0E Meridian: S
COUNTY: CARBON
STATE: UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR
OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENTApproximate date work will start:
2/17/2011
SUBSEQUENT REPORTDate of Work Completion:
SPUD REPORTDate of Spud:
DRILLING REPORTReport Date:
ACIDIZE ALTER CASING CASING REPAIR
CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL
TYPE
DEEPEN FRACTURE TREAT NEW CONSTRUCTION
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE
DIFFERENT FORMATION
REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY
ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all
pertinent details including dates, depths, volumes, etc.
ConocoPhillips Company respectfully request to renew the
drilling permit foran additional year. The current permit expires
on 3/2/2011.
NAME (PLEASE PRINT) PHONE NUMBER Donna Williams 432 688-6943
TITLE Sr. Regulatory Specialist
SIGNATURE N/A
DATE 2/17/2011
02/23/2011
iPI Well No: 43007310880000
FORM 9
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING E6AS1E54DESIGNATION AND SERIAL
NUMBER:
SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR
TRIBE NAME:
Do not use this form for proposals to drill new wells,
significantly deepen e×isting wells below currentbottom-hole depth,
reenter plugged wells, or to drill horizontal laterals. Use
APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME:DRILL form
for such proposals. DRUNKARDS WASH
1. TYPE OF WELL 8. WELL NAME and NUMBER:Gas Well USA 24-1005
2. NAME OF OPERATOR: 9. API NUMBER:CONOCOPHILLIPS COMPANY
43007310880000
3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or
WILDCAT:P.O. Box 51810 , Midland, TX, 79710 1810 432 688-6943 Ext
DRUNKARDS WASH
4.LOCATIONOFWELL COUNTY:FOOTAGES AT SURFACE: CARBON
0332 FSL 0333 FWLQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN:
STATE:
Qtr/Qtr: SWSW Section: 24 Township: 14.05 Range: 08.0E Meridian:
S UTAH
11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT,
OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE ALTER CASING CASING REPAIR
NOTICE OF INTENTApproximate date work will start: CHANGE TO
PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
2/17/2011CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS
CONVERT WELL TYPE
SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of
Work Completion:
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE
DIFFERENT FORMATION
O SPUD REPORTDate of Spud: REPERFORATE CURRENT FORMATION
SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD
EXTENSIONReport Date:
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR CC MPLETED OPERATIONS. Clearly show all
pertinent details including dates, depths, volumes, etc.
ConocoPhillips Company respectfully request to renew the
drilling permit foran additional year. The current permit expires
on 3/2/2011. Approved by the
Utah Division ofOil, Gas and Mining
Date: 02/23/2011
By:
NAME (PLEASE PRINT) PHONE NUMBER TITLEDonna Williams 432
688-6943 Sr. Regulatory Specialist
SIGNATURE DATEN/A
-
The Utah Division of Oil, Gas, and Mining
- State of Utah- Department of Natural Resources
Electronic Permitting System - Sundry Notices
Request for Permit Extension Validation Well Number
43007310880000
API: 43007310880000Well Name: USA 24-1005
Location: 0332 FSL 0333 FWL QTR SWSW SEC 24 TWNP 140S RNG 080E
MER SCompany Permit Issued to: CONOCOPHILLIPS COMPANY
Date Original Permit Issued: 3/2/2006
The undersigned as owner with legal rights to drill on the
property as permitted above, hereby verifies thatthe information as
submitted in the previously approved application to drill, remains
valid and does notrequire revision. Following is a checklist of
some items related to the application, which should be
verified.
If located on private land, has the ownership changed, if so,
has the surface agreement beenupdated? Yes No
Have any wells been drilled in the vicinity of the proposed well
which would affect the spacing orsiting requirements for this
location? Yes No
Has there been any unit or other agreements put in place that
could affect the permitting or operationof this proposed well? Yes
No
Have there been any changes to the access route including
ownership, or rightof- way, which couldaffect the proposed
location? Yes No
Has the approved source of water for drilling changed? Yes
No
Have there been any physical changes to the surface location or
access route which will require achange in plans from what was
discussed at the onsite evaluation? Yes No
Is bonding still in place, which covers this proposed well? Yes
No
Signature: Donna Williams Date: 2/23/2011
Title: Sr. Regulatory Specialist Representing: CONOCOPHILLIPS
COMPANY
UTAH
DNR The Utah Division of Oil, Gas, and Mining- State of Utah-
Department of Natural ResourcesElectronic Permitting System -
Sundry Notices
TI, BAS Pr N1NTMG
Request for Permit Extension Validation Well Number
43007310880000
API: 43007310880000Well Name: USA 24-1005
Location: 0332 FSL 0333 FWL QTR SWSW SEC 24 TWNP 140S RNG 080E
MER SCompany Permit Issued to: CONOCOPHILLIPS COMPANY
Date Original Permit Issued: 3/2/2006
The undersigned as owner with legal rights to drill on the
property as permitted above, hereby verifies thatthe information as
submitted in the previously approved application to drill, remains
valid and does notrequire revision. Following is a checklist of
some items related to the application, which should be
verified.
•If located on private_land, has the ownership changed, if so,
has the surface agreement beenupdated? O Yes No
• Have any wells been drilled in the vicinity of the roposed
well which would affect the spacing orsiting requirements for this
location? O Yes No
• Has there been any unit or other agreements put in place that
could affect the permitting or operationof this proposed well? O
Yes @ No
• Have there been any changes to the access route including
ownership, or rightof- way, which couldaffect the proposed
location? O Yes @ No
• Has the approved source of water for drilling changed? O Yes @
No
• Have there been any physical changes to the surface location
or access route which will require achange in plans from what was
discussed at the onsite evaluation? O Yes @ No
• Is bonding still in place, which covers this proposed well? @
Yes O No
Signature: Donna Williams Date: 2/23/2011Title: Sr. Regulatory
Specialist Representing: CONOCOPHILLIPS
-
API Well No: 43007310880000
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
5.LEASE DESIGNATION AND SERIAL NUMBER: U-61154
SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for
proposals to drill new wells, significantly deepen existing wells
below currentbottom-hole depth, reenter plugged wells, or to drill
horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for
such proposals.
6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
7.UNIT or CA AGREEMENT NAME: DRUNKARDS WASH
1. TYPE OF WELL Gas Well
8. WELL NAME and NUMBER: USA 24-1005
2. NAME OF OPERATOR: CONOCOPHILLIPS COMPANY
9. API NUMBER: 43007310880000
3. ADDRESS OF OPERATOR: PHONE NUMBER: P.O. Box 51810 , Midland,
TX, 79710 1810 432 688-6943 Ext
9. FIELD and POOL or WILDCAT: DRUNKARDS WASH
4. LOCATION OF WELL FOOTAGES AT SURFACE: 0332 FSL 0333 FWL
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: SWSW Section:
24 Township: 14.0S Range: 08.0E Meridian: S
COUNTY: CARBON
STATE: UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR
OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENTApproximate date work will start:
2/17/2011
SUBSEQUENT REPORTDate of Work Completion:
SPUD REPORTDate of Spud:
DRILLING REPORTReport Date:
ACIDIZE ALTER CASING CASING REPAIR
CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL
TYPE
DEEPEN FRACTURE TREAT NEW CONSTRUCTION
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE
DIFFERENT FORMATION
REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY
ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all
pertinent details including dates, depths, volumes, etc.
ConocoPhillips Company respectfully request to renew the
drilling permit foran additional year. The current permit expires
on 3/2/2011.
NAME (PLEASE PRINT) PHONE NUMBER Donna Williams 432 688-6943
TITLE Sr. Regulatory Specialist
SIGNATURE N/A
DATE 2/17/2011
02/23/2011
iPI Well No: 43007310880000
FORM 9
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING E6AS1E54DESIGNATION AND SERIAL
NUMBER:
SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR
TRIBE NAME:
Do not use this form for proposals to drill new wells,
significantly deepen e×isting wells below currentbottom-hole depth,
reenter plugged wells, or to drill horizontal laterals. Use
APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME:DRILL form
for such proposals. DRUNKARDS WASH
1. TYPE OF WELL 8. WELL NAME and NUMBER:Gas Well USA 24-1005
2. NAME OF OPERATOR: 9. API NUMBER:CONOCOPHILLIPS COMPANY
43007310880000
3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or
WILDCAT:P.O. Box 51810 , Midland, TX, 79710 1810 432 688-6943 Ext
DRUNKARDS WASH
4.LOCATIONOFWELL COUNTY:FOOTAGES AT SURFACE: CARBON
0332 FSL 0333 FWLQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN:
STATE:
Qtr/Qtr: SWSW Section: 24 Township: 14.05 Range: 08.0E Meridian:
S UTAH
11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT,
OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE ALTER CASING CASING REPAIR
NOTICE OF INTENTApproximate date work will start: CHANGE TO
PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
2/17/2011CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS
CONVERT WELL TYPE
SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of
Work Completion:
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE
DIFFERENT FORMATION
O SPUD REPORTDate of Spud: REPERFORATE CURRENT FORMATION
SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD
EXTENSIONReport Date:
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR CC MPLETED OPERATIONS. Clearly show all
pertinent details including dates, depths, volumes, etc.
ConocoPhillips Company respectfully request to renew the
drilling permit foran additional year. The current permit expires
on 3/2/2011. Approved by the
Utah Division ofOil, Gas and Mining
Date: 02/23/2011
By:
NAME (PLEASE PRINT) PHONE NUMBER TITLEDonna Williams 432
688-6943 Sr. Regulatory Specialist
SIGNATURE DATEN/A
-
The Utah Division of Oil, Gas, and Mining
- State of Utah- Department of Natural Resources
Electronic Permitting System - Sundry Notices
Request for Permit Extension Validation Well Number
43007310880000
API: 43007310880000Well Name: USA 24-1005
Location: 0332 FSL 0333 FWL QTR SWSW SEC 24 TWNP 140S RNG 080E
MER SCompany Permit Issued to: CONOCOPHILLIPS COMPANY
Date Original Permit Issued: 3/2/2006
The undersigned as owner with legal rights to drill on the
property as permitted above, hereby verifies thatthe information as
submitted in the previously approved application to drill, remains
valid and does notrequire revision. Following is a checklist of
some items related to the application, which should be
verified.
If located on private land, has the ownership changed, if so,
has the surface agreement beenupdated? Yes No
Have any wells been drilled in the vicinity of the proposed well
which would affect the spacing orsiting requirements for this
location? Yes No
Has there been any unit or other agreements put in place that
could affect the permitting or operationof this proposed well? Yes
No
Have there been any changes to the access route including
ownership, or rightof- way, which couldaffect the proposed
location? Yes No
Has the approved source of water for drilling changed? Yes
No
Have there been any physical changes to the surface location or
access route which will require achange in plans from what was
discussed at the onsite evaluation? Yes No
Is bonding still in place, which covers this proposed well? Yes
No
Signature: Donna Williams Date: 2/17/2011
Title: Sr. Regulatory Specialist Representing: CONOCOPHILLIPS
COMPANY
Feb. 17, 2011
UTAH
DNR The Utah Division of Oil, Gas, and Mining- State of Utah-
Department of Natural ResourcesElectronic Permitting System -
Sundry Notices
TI, BAS Pr N1NTMG
Request for Permit Extension Validation Well Number
43007310880000
API: 43007310880000Well Name: USA 24-1005
Location: 0332 FSL 0333 FWL QTR SWSW SEC 24 TWNP 140S RNG 080E
MER SCompany Permit Issued to: CONOCOPHILLIPS COMPANY
Date Original Permit Issued: 3/2/2006
The undersigned as owner with legal rights to drill on the
property as permitted above, hereby verifies thatthe information as
submitted in the previously approved application to drill, remains
valid and does notrequire revision. Following is a checklist of
some items related to the application, which should be
verified.
•If located on private_land, has the ownership changed, if so,
has the surface agreement beenupdated? O Yes No
• Have any wells been drilled in the vicinity of the roposed
well which would affect the spacing orsiting requirements for this
location? O Yes No
• Has there been any unit or other agreements put in place that
could affect the permitting or operationof this proposed well? O
Yes @ No
• Have there been any changes to the access route including
ownership, or rightof- way, which couldaffect the proposed
location? O Yes @ No
• Has the approved source of water for drilling changed? O Yes @
No
• Have there been any physical changes to the surface location
or access route which will require achange in plans from what was
discussed at the onsite evaluation? O Yes @ No
• Is bonding still in place, which covers this proposed well? @
Yes O No
Signature: Donna Williams Date: 2/17/2011Title: Sr. Regulatory
Specialist Representing: CONOCOPHILLIPS
-
O OState of Utah
.DEPARTMENT OF NATURAL RESOURCES
- MICHAEL R. STYLER
GAR BERTExecutiveDirector
Governor Division of Oil, Gas and MiningGREG BELL JOHN R.
BAZA
Lieutenant Governor Division Director
June 14, 2012
ConocoPhillips CompanyP.O. Box 51810Midland, TX 79710-1810
Re: APD Rescinded - USA 24-1005, Sec. 24, T.14S, R.8E,Carbon
County, Utah API No. 43-007-31088
Ladies and Gentlemen:
The Application for Permit to Drill (APD) for the subject well
wasapproved by the Division of Oil, Gas and Mining (Division) on
March 2, 2006.On February 21, 2007, January 23, 2008, February 23,
2009, March 22, 2010 andFebruary 23, 2011 the Division granted a
one-year APD extension. No drillingactivity at this location has
been reported to the division. Therefore, approval todrill the well
is hereby rescinded, effective June 14, 2012.
A new APD must be filed with this office for approval prior to
thecommencement of any future work on the subject location.
If any previously unreported operations have been performed on
this welllocation, it is imperative that you notify the Division
immediately.
Sincerely,
ana asonEn JronmentalScientist
cc: Well FileBureau of Land Management, Price
UTAH
DNR
1594 West North Temple, Suite 1210, PO Box 145801, Salt Lake
City, UT84114-5801
telephone(801) 538-5340 • facsimile(801) 359-3940 • TTY (801)
538-7458• www.ogm.utah.gov°1', GAS &
APD-DRILLAPD-WORKSHEETAPD-APPROVALAPD-RESCIND